CN-370000-WM998-T17CO1.pdf
PDF 4 MB Posted
- Contract number
- DE850
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order for Task Assignment 17 under DEP Contract No. WM998, issued by the Florida Department of Environmental Protection (DEP) and executed by Wildwood Consulting, Inc. The task focuses on providing facilitation support for Total Maximum Daily Loads (TMDLs) and Basin Management Action Plans (BMAPs) in Northwest Florida, specifically covering the Upper Wakulla River, Wakulla Spring, Jackson Blue Springs, Lake Talquin, Lake Munson, Escambia Bay, and Bayou Chico Basins.
The task assignment involves meeting facilitation, basin-specific planning, stakeholder engagement, and technical support for water quality improvement efforts. Wildwood Consulting will provide services including meeting organization, BMAP development, follow-up tracking, meeting summaries, project briefings, pollutant source contribution assessments, and load reduction strategy evaluations. The maximum budget for the task is $249,046.46, with a period of performance from the current date through October 31, 2016. The contract includes detailed deliverables with specific timeframes and performance measures, with no additional funding changes, merely a time extension of 12 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-WM998-T16CO1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .