CN-370000-WM960-T1.pdf

PDF 695 KB Posted

Attached to
Master Agreement FL|WM960|cf2c39dc38cb5929316dd23d34a644be
Contract number
WM960
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for a Basin Management Action Plan (BMAP) Facilitation & Strategic Support contract between the Florida Department of Environmental Protection (DEP) and a contractor. The contract is specifically for Task Assignment No. 1, dated September 1, 2009, with Lee Ann Walter as the Contractor Contract Manager and Eric Livingston/Amy Tracy as the DEP Contract Managers.

The contract provides basin-specific and statewide assistance in developing Basin Management Action Plans (BMAPs) across multiple Florida watersheds, including Upper Ocklawaha River, Orange Creek, Wekiwa Spring, St. Lucie Estuary, Upper Peace River, Pensacola Basin, Northwest Florida BMAPs, Indian River Lagoon, and Suwannee Basin. The total task value is $801,226, broken down into a $716,691 fee schedule and $84,535 in cost reimbursement, with the performance period running from the execution date through June 30, 2011. Services include facilitating stakeholder meetings, providing technical support, drafting documents, developing project materials, and assisting the DEP in implementing Total Maximum Daily Load (TMDL) goals through collaborative watershed planning processes.

View the file

Other files

File Type Posted
CN-370000-WM960-T1CO1.pdf PDF
CN-370000-WM960-T1CO3.pdf PDF
CN-370000-WM960-T1CO4.pdf PDF
CN-370000-WM960-T3.pdf PDF
CN-370000-WM960-T1CO2.pdf PDF
CN-370000-WM960-T2.pdf PDF
CN-370000-WM960-T2CO1.pdf PDF
CN-370000-WM960.pdf PDF
CN-370000-WM960-CO001.pdf PDF
CN-370000-WM960-T4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .