CN-370000-WM946-T12CO2.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|PL291|0c5ad9f59e085097ce6a077b6b9ac187
Contract number
PL291
Issued by
Florida

About this file

This document is a task assignment change order for the Florida Department of Environmental Protection (FDEP) under Contract WM946, issued to AECOM through URS Corporation Southern. The project is a Statewide Onsite Wastewater Study focusing on biosolids land application sites across central Florida. The change order involves six biosolids sites in Putnam, Polk, Gilchrist, and Marion counties, with four sites in Phase 1 and two additional sites added in Phase 2.

The task assignment involves comprehensive groundwater monitoring and site investigation services, including site reconnaissance, utility location, health and safety plan (HASP) development, monitoring well installation, top-of-casing surveys, and groundwater sampling. AECOM will subcontract with Huss Drilling to install 16 monitoring wells (4 wells at each of 4 Phase 1 sites, and 4 wells at each of 2 Phase 2 sites). The total project budget is $165,620.10, with costs distributed across various sub-tasks such as site setup, well installation, surveys, and reporting. The project is scheduled to run approximately 24 weeks, with different sub-tasks having specific start and end dates between Week 1 and Week 24.

View the file

Other files

File Type Posted
CN-370000-PL291-A1.pdf PDF
CN-370000-PL291-A2.pdf PDF
CN-370000-PL291-T1.pdf PDF
CN-370000-PL291-T2.pdf PDF
CN-370000-PL291.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .