CN-370000-WM946-T12.pdf

PDF 770 KB Posted

Attached to
Master Agreement FL|MOE29|944d3652829c43ba8a2ee1e2ed28a102
Contract number
MOE29
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for a statewide onsite wastewater study (Phase II Sites) issued by the Florida Department of Environmental Protection (FDEP) to URS Corporation. The contract (WM946) involves AECOM, a wholly-owned subsidiary of URS Corporation Southern, who will serve as the primary contractor. The project will involve monitoring well installation and groundwater sampling at four biosolids spreading sites across different Florida counties: Turner (Putnam County), Byrd Septic Service (Polk County), Affordable and Mann Septic (Polk County), and Jones Land Spreading (Gilchrist County).

The task assignment is a fixed-price contract valued at $110,068.00, with execution through October 31, 2015. The scope of work includes four primary sub-tasks: (1) project setup, health and safety plan revision, and site reconnaissance; (2) monitoring well installation with subcontractor Huss Drilling; (3) top-of-casing surveys and groundwater sampling; and (4) comprehensive reporting. The project involves installing 16 monitoring wells across the four sites, conducting groundwater sampling, and analyzing samples for various parameters including nutrients, isotopes, and chemical constituents. AECOM will provide detailed documentation, including site maps, utility location information, well construction reports, and groundwater sample logs.

View the file

Other files

File Type Posted
CN-370000-WM946-T11CO2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .