This document is a Task Assignment Notification Form for a Phase I Environmental Site Assessment (ESA) issued by the Florida Department of Environmental Protection (DEP), Division of State Lands, in conjunction with Partner Engineering and Science, Inc. The task assignment is for a property located in Monroe County, specifically in the Coupon Bight/Key Deer area, owned by Michael R. Hussey and Rose Elizabeth Hussey. The contract number is PL518, with this specific task assignment numbered PL518.002.

The task requires Partner Engineering to conduct a comprehensive environmental assessment of the 0.9-acre parcel, including a Phase I ESA, Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP) survey, and mold survey. The total task assignment value is $7,090.00, broken down into $1,900.00 for fee schedule and $5,190.00 for cost reimbursement. The contractor must comply with Division of State Lands standards, the most current American Society of Testing and Materials (ASTM) 1527 standard, and provide color photographs, GPS coordinates, and a detailed report. The draft products are due by September 20, 2024, with the assessment aimed at identifying potential environmental conditions or risks associated with the property.

View the file

Other files

File Type Posted
CN-370000-PL518-T3.pdf PDF
CN-370000-CN220-T13CO2.pdf PDF
CN-370000-PL518-T1.pdf PDF
CN-370000-PL518.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ASSIGNMENT NOTIFICATION FORM

DEP CONTRACT NO. PL518

Task Assignment Number: PL518.002 BLA File Number: 328847 Date: August 6, 2024

Project Name: Coupon Bight/Key Deer County: Monroe Owner’s Name/Parcel #: Michael R. Hussey and Rose Elizabeth Hussey Acres: 0.9 Parcel ID: 00110530-000000

Contractor: PARTNER ENGINEERING AND SCIENCE, INC. FEID No: F20-8264379 Contractor Contract Manager: Steve Snyder Phone Number: 561-660-8675 DEP Designated Task Manager: James Parker Phone Number: 850-245-3045 DEP Contract Manager: James Parker Phone Number: 850-245-3045 Subcontractors: (List, if any) ___________________________ MBE:______ Yes No ___________________________________________________ MBE:______ Yes No

Task Description:

1) Provide a Phase I Environmental Site Assessment (ESA) for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate and scope of work attached as Exhibit “C”. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 1527 standard for conducting Phase I ESAs. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.

2) Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP) survey, and mold survey in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL and attached hereto as Exhibit “C”.

Deviations:

None

Property Owner / Representative contact information:

The User Questionnaire is completed and attached. For property questions and access, contact the sellers representative Shane Wilson at 239-851-3861 or shane@shanewaterfrontwilson.com

Attachments: Exhibit “A”, Exhibit “B”, Exhibit “C”, and User Questionnaire

Draft Products Due Date: September 20, 2024

Task Assignment Type: Amount Not to Exceed:

Fee Schedule $ 1,900.00 Cost Reimbursement $ 5,190.00 Additional AUL/Lien Searches $ NA Total Task Assignment Value $ 7,090.00

PARTNER ENGINEERING AND SCIENCE, INC FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

Contract Manager Date DEP Contract Manager or designee Date

APPROVED:

Contractual Authority Date

Funding Authority Date

FOR DEPARTMENT USE ONLY:

Funding Information:

Org. Code E. O. Fund Object Code Budget Entity Module Special Category Project # Year Amount

37102400000 QH 423001 131545 37100400 N/A 084108 00649 23 $7,090.00

cc: Contracts Office (MS93) Bureau of Finance & Accounting (MS75) 2 copies

29-Digit FLAIR Code: 37 20 2 423001 37100400 00 084108 23

Performance Measure: DEP Contract Manager will review deliverable to ensure specifications were met.

Financial Consequences: DEP will not pay for unsatisfactory deliverables. The contractor shall be given the right to remedy at no cost to DEP.

Coupon Bight/Key Deer Hussey Monroe County

Exhibit “A”

NOTE: This legal description is for appraisal purposes. There may be revisions based on a boundary survey and title insurance commitment of the property.

01/17/2024

BSM APPROVED By:

. Date: _____

State of Florida Department of Environmental Protection

Phase I Environmental Site Assessment Services Exhibit G

REQUIREMENTS FOR PERFORMING THE PHASE I ENVIRONMENTAL SITE ASSESSMENT

(PHASE I ESA)

The Environmental Site Assessment (ESA) of the Subject Property to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Real Estate Services (BRES). For purposes of performing the ESA, the term “hazardous materials” shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term “environmental law” shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 1527; Standard Practice for Environmental Site Assessments:

Phase I Environmental Site Assessment Process

The required components and scope of the ESA beyond the above are as follows:

1. Requests for deviation from the requirements as set forth must be approved in writing by the DSL prior to the issuance of a Task Assignment (TA).

2. Certify the ESA to the Board of Trustees and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the TA was signed by the Contractor (also insert a copy of the signed TA in the report following the certification page); (b) the date the Contractor began the work on the ESA; (c) the ESA meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM E 1527 standard (https://www.astm.org), and therefore the federal Environmental Protection Agency’s All Appropriate Inquiry Rule https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries; (d) the accuracy, correctness and completeness of the ESA is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the ESA.

3. Determine if prior ESA’s have been done or any other environmental work and, if so, what it disclosed. Include all found information in the report as an Appendix for the independent review.

4. Contractor agrees to notify the Department DSL immediately if any substantial problems are discovered at any point during the Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens and Activity and Use Limitations (AUL) of enforcement actions against the Property. The DSL contracts with the Contractor to fulfill these obligations on behalf of the user(s)/DSL. Identify adjoining property landowners.

6. Interview the applicable adjoining neighbors if it is determined by the Contractor that an adjoining landowner is involved in an industrial use (an activity requiring the application of labor and capital for the production or distribution of a product or article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or landfills; or waste treatment, storage, disposal, processing or recycling facilities. Interviewing residential neighbors is not necessary unless the Contractor has cause for concern.

7. Review and provide a summary of current and historical aerial photographs of the Property and surrounding area for an evaluation of prior and current use. Copies of the photography shall be placed in an appendix within the environmental site assessment for independent review.

8. Provide color photographs of the current site conditions in the ESA. All structures, wells, access roads and trail paths leading or impacting the Subject Property, areas and items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed. Photographs should provide good representation of the site’s entire condition. If access is available inside of each structure(s), photographs should provide a good representation of the interior of the structure(s).

a. Include a table that lists the corresponding Longitude and Latitude of each photograph, and an

Arc Geographic Information System (GIS) shapefile in the ESA report for all indicated areas.

b. List manufacturer and model number of the GPS unit or mobile application (including version) used to collect data.

9. Orient all photograph points on a site map.

10. Provide an estimate of the depth to groundwater and direction of groundwater flow.

11. List all data failures, as defined in the current ASTM E 1527 standard, and explain why they exist.

12. The Environmental Assessment Report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

13. As requested, provide hard copies of the reports on double-sided pages.

14. Include a Table of Contents in the ESA report.

15. Provide corresponding page numbers to the Contractor’s Itemized Checklist (see Exhibit H), attached to the TA, and include a completed copy of the checklist in the ESA.

16. Clearly label appendices in the report.

17. One (1) certified digital copy of the ESA shall be delivered to the DSL on compact disc, USB storage device, or other approved electronic methods as set out below:

The Department Contract Manager Office of Environmental Services Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 140 Tallahassee, Florida 32399

Contractor’s Itemized Checklist Exhibit H

PHASE I ESA (ASTM E 1527 AND ASTM E 2247); UPDATED PHASE I ESA (ASTM E 1527 AND ASTM E 2247)

Directions: Please fill in each blank with the appropriate response. An appendix may be indicated instead of page number(s), if appropriate.

1) YES/NO Have any requests for deviation to the DSL Scope of Services been approved?

2) Page # Certification to the Board of Trustees, with subsections a, b, c, d, and e.

3) Page # Determination of whether other or previous ESAs or environmental work has been performed at the Subject Property. If other ESAs or environmental work exists, state the Appendix in which copies of the previous ESAs or environmental work can be found in the report: Appendix

4) Page # Determination of existing environmental liens and AULs on the Subject Property.

5) Page # Adjoining property landowner identification.

6) YES/NO Were any adjoining landowners interviewed? If so, what page number can this information be found on in the report? Page #

7) Page # Summary of current and historical aerial photographs.

8) Page # Geographic Information System (GPS) points and GPS manufacturer and model.

9) Page # Photograph points oriented on a site map to scale or current aerial photograph.

10) Page # Groundwater information.

11) Page # Data failure information.

12) Page # Discussion and evaluation of findings, conclusions and recommendations.

Phase I Environmental Site Assessment Services for Forestland or Rural Property

EXHIBIT I

REQUIREMENTS FOR PERFORMING PHASE I ENVIRONMENTAL SITE ASSESSMENT FOR

FORESTLAND OR RURAL PROPERTY

The Environmental Site Assessment of the Subject Property to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Real Estate Services (BRES). For purposes of performing the ESA, the term “hazardous materials” shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term “environmental law” shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 2247; Standard Practice for Environmental Site Assessments:

Phase I Environmental Site Assessment Process

2. Certify the ESA to the Board of Trustees and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the TA was signed by the Contractor (also insert a copy of the signed TA in the report following the certification page); (b) the date the Contractor began the work on the ESA; (c) the environmental site assessment meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM E 2247 standard (https://www.astm.org),, and therefore the federal Environmental Protection Agency’s All Appropriate Inquiry Rule https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries; (d) the accuracy, correctness and completeness of the environmental site assessment is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the environmental site assessment.

4. Contractor agrees to notify DSL immediately if any substantial problems are discovered at any point during the Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens contracts with the Contractor to fulfill these obligations on behalf of the user(s)/DSL.

6. Identify adjoining property landowners.

7. Interview the applicable adjoining neighbors if it is determined by the Contractor that an and capital for the production or distribution of a product or article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or

8. Review and provide a summary of current and historical aerial photographs of the Property and placed in an appendix within the environmental site assessment for independent review.

9. Provide color photographs of the current site conditions in the ESA. All structures, wells, access roads and trail paths leading or impacting the Subject Property, areas and items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed. Photographs should provide a good representation of the sites entire condition. If access is available inside of each structure(s), photographs should provide a good representation of the interior of the structure(s).

a. Include a table that lists the corresponding Longitude and Latitude of each photograph, and an

Arc Geographic Information System (GIS) shapefile in the ESA report for all indicated areas.

b. List manufacturer and model number of the GPS unitor mobile application (including version)

10. Orient all photograph points on a site map.

11. Provide an estimate of the depth to groundwater and direction of groundwater flow.

12. List all data failures, as defined in the current ASTM E 2247 standard, and explain why they exist.

13. The Environmental Assessment Report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

14. As requested, provide any required hard copies of the reports on double-sided pages.

15. Include a Table of Contents in the ESA report.

16. Provide corresponding page numbers to the Contractor’s Itemized Checklist (see Exhibit I), attached to the TA, and include a completed copy of the checklist in the ESA.

17. Clearly label appendices in the report.

18. One (1) certified digital copy of the ESA shall be delivered to the DSL on compact disc, USB storage device, or other approved electronic method as set out below:

The Department Contract Manager Office of Environmental Services Department of Environmental Protection

Updated Phase I Environmental Site Assessment Services Exhibit J

REQUIREMENTS FOR PERFORMING UPDATED PHASE I (ASTM E 1527 or E 2247)

ENVIRONMENTAL SITE ASSESSMENT (ESA)

The Updated Environmental Site Assessment (ESA) of the Subject Property to be acquired by the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (Board of Trustees) must meet the requirements of the Florida Department of Environmental Protection, Division of State Lands (DSL), Bureau of Real Estate Services (BRES). For purposes of performing the ESA, the term “hazardous materials” shall mean any hazardous or toxic substance, material or waste of any kind or any other substance which is designated pursuant to and/or regulated by any environmental law. The term “environmental law” shall mean any and all applicable federal, state, tribal or local laws, statutes, ordinances, rules, regulations or other governmental restrictions regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E 1527 or current ASTM E 2247 standard, whichever is applicable to the update. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements. Please see the Contractor’s Itemized Checklist which will be attached to the Task Assignment (see Exhibit II). Specifically, the Contractor must adhere to the current scope and limitations of ASTM Designation: E 1527; Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, or ASTM Designation: E 2247, Standard Practice for Environmental Site Assessment Process for Forestland or Rural Property, whichever is applicable to the update.

2. Certify the Updated ESA to the Board of Trustees and any other parties requested by DSL. If the updated ESA report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the TA was signed by the Contractor (also insert a copy of the signed TA in the report following the certification page); (b) the date the Contractor began the work on the Updated ESA; (c) the Updated ESA meets the requirements of the Department of Environmental Protection, Division of State Lands, the current ASTM standard(https://www.astm.org), , and therefore the federal Environmental Protection Agency’s All Appropriate Inquiry Rule https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries;

(d) the accuracy, correctness and completeness of the updated environmental site assessment is provided with the knowledge of the ASTM; and (e) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the Updated ESA.

4. Contractor agrees to notify DSL immediately if any substantial problems are discovered at any point during the Updated Phase I ESA that impact the Subject Property.

5. Determine the potential existence of federal, state, tribal, and local environmental cleanup liens contracts with the Contractor to fulfill these obligations on behalf of the user(s)/DSL.

6. Identify adjoining property landowners.

7. Interview the applicable adjoining neighbors if it is determined by the Contractor that an and capital for the production or distribution of a product or article, including, without limitation, manufacturing, processing, extraction, refining, warehousing, transportation, and utilities of hazardous substances or petroleum products), or if the adjoining site shows current or historical issues in the regulatory database search. Applicable sites would include gas stations; motor repair facilities; commercial printing facilities; dry cleaners; photo developing laboratories; junkyards or

8. Review and provide a summary of current and historical aerial photographs of the Property and placed in an appendix within the updated environmental site assessment for independent review.

9. Provide color photographs of the current site conditions in the updated ESA. All structures, wells, access roads and trail paths leading or impacting the Subject Property, areas and items of concern (including trash sites, borrow pits, stressed vegetation and stained soil), business environmental risks, historical recognized environmental conditions, and recognized environmental conditions on the Property or impacting the Property shall be photographed. Photographs should provide a good representation of the sites entire condition. If access is available inside of each structure(s), photographs should provide a good representation of the interior of the structure(s).

a. Include a table that lists the corresponding Longitude and Latitude of each photograph, and an

Arc Geographic Information System (GIS) shapefile in the ESA report for all indicated areas.

b. List manufacturer and model number of the GPS unit or mobile application (including version)

10. Orient all photograph points on a site map.

11. Provide an estimate of the depth to groundwater and direction of groundwater flow.

12. List all data failures, as defined in the current ASTM standard, and explain why they exist.

13. The Updated Environmental Assessment Report shall contain a discussion and evaluation of the relevance of all the components listed above and other findings of the updated ESA, along with definite conclusions and specific recommendations for further work the Contractor deems necessary as pertinent to the Subject Property.

14. As requested, provide any required hard copies of the reports on double-sided pages.

15. Include a Table of Contents in the updated ESA report.

16. Provide corresponding page numbers to the Contractor’s Itemized Checklist (see Exhibit H), attached to the TA, and include a completed copy of the checklist in the updated ESA.

17. Clearly label appendices in the report.

18. One (1) certified digital copy of the updated ESA shall be delivered to the DSL on compact disc, USB storage device, or other electronic methods as set out below:

Department of Environmental Protection

Phase II Environmental Site Assessment Services Exhibit K

REQUIREMENTS FOR PERFORMING PHASE II ENVIRONMENTAL SITE ASSESSMENT

(PHASE II ESA)

1. Certify the Phase II Environmental Site Assessment (ESA) to the Board of Trustees and any other parties requested by DSL. If the report is not certified to the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida and other requested parties, the product will not be accepted. The certification shall state the following: (a) the date the Task Assignment (TA) was signed by the Contractor and the due date (also insert a copy of the signed TA in the report following the certification page); (b) the Phase II Environmental Site Assessment (ESA) meets the requirements of the Department of Environmental Protection, Division of State Lands; (c) the accuracy, correctness and completeness of the Phase II ESA is provided with the knowledge of the Comprehensive Environmental Response Compensation And Liability Act as set forth in 42 U.S.C.

Section 9601 et seq., as amended (“CERCLA”); and (d) the Board of Trustees of the Internal Improvement Trust Fund of the State of Florida is entitled to rely on the information set forth in the Phase II ESA.

2. Requests for deviation from the requirements as set forth must be approved in writing by the DSL prior to the issuance of a TA.

3. Contractor agrees to notify DSL immediately a) if any substantial problems unfold or are discovered at any point during the Phase II ESA that impact the Subject Property, or b) if any new Recognized Environmental Conditions (RECs) that were not listed as an REC in the corresponding Phase I ESA are discovered during the course of the Phase II ESA.

4. Contractor agrees to communicate to DSL, by email and/or telephone, all of the data results once received from the laboratory prior to submittal of the written report.

5. Provide color photographs of the Phase II ESA work and any onsite conditions that may have changed since the Phase I ESA that may be of concern. Photographs should provide a good representation of the site’s RECs that are associated with the Phase II ESA.

Orient all photographs on a site map.

6. Provide correlating Geographic Information System (GPS) points for all existing wells, sample points, monitor wells, and newly discovered recognized environmental conditions, items of concern or business environmental risks.

Orient GPS points on a site map.

7. All Phase II ESAs shall be approved and certified by a Professional Engineer or Professional Geologist licensed by the State of Florida.

8. Submit a report which shall include a description of the RECs identified in the Phase I ESA (any other

RECs identified during the course of the Phase II ESA), the correlating work performed;

observations; all back up documentation including, but not limited to, the results of the laboratory analysis, waste manifests, receipts and chain of custody documentation; monitoring well construction data; findings; conclusions, and specific recommendations based on the conditions encountered during the assessment.

9. As requested, provide any required hard copies of the reports on double-sided pages.

10. Clearly label appendices in the report.

11. One (1) certified digital copy of the Phase II ESA shall be delivered to the DSL on compact disc, USB storage device, or other approved electronic method as set out below:

Department of Environmental Protection

(800) 419-4923 www.PARTNEResi.com

August 2, 2024

James Parker Florida Department of Environmental Protection 3800 Commonwealth Boulevard, MS 140 Tallahassee, Florida 32399-3000 James.Parker@FloridaDEP.gov

RE: Pre-Renovation Asbestos, Lead-Based Paint Inspection, and Suspect Microbial Growth Proposal FDEP DSL Project (Big Pine Key) 31625 Warner Street Big Pine Key, Florida 33043

Proposal Number: 24-460292

Dear James Parker:

In response to your request to perform a Pre-Renovation asbestos survey, lead paint inspection, and suspect microbial growth assessment, we are pleased to present this proposal. The purpose of this survey is to investigate the condition of accessible suspect asbestos in the building that will be impacted by scheduled renovation plans. Partner has not been provided with renovation plans.

This proposal was prepared in accordance with our contract for Environmental Site Assessment Services (ESA), Florida Department of Environmental Protection (FDEP) Contract No. PL518.

PRE-RENOVATION ASBESTOS SURVEY

Conduct a survey of the major interior components of the building. The exterior and roof are not included in this scope of work.

Visually identify suspect Asbestos-containing Materials (ACM).

Inspect the condition of suspect ACM.

Give an approximate quantification of potential ACM.

Collect suspect asbestos bulk samples according to the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) protocol from accessible locations.

Analyze ACM samples by Polarized Light Microscopy (PLM) at a state-certified laboratory also certified by the American Industrial Hygiene Association (AIHA) and National Voluntary Laboratory Accreditation Program (NVLAP).

ng

Prepare a report summarizing methods, lab results, and approximate quantities of confirmed ACM. Partner can obtain abatement

Asbestos Business Organization #ZA522.

abatement and a rough cost estimate, if necessary.

Please note that asbestos sampling requires the removal of material, which may alter the visual appearance of, or around, the sampled area. It shall be noted that flooring materials included in future renovations may be require additional testing prior to renovation. By authorizing this contract, you acknowledge the use of intrusive testing in this survey and release any and all liability from Partner for damages to property or materials as a result of this survey.

PRE-RENOVATION LEAD-BASED PAINT INSPECTION

Visually identify potential Lead-Based Paint (LBP) surfaces.

Proposal No.: 24-460292

Test suspect lead-based paint utilizing x-ray fluorescence analysis combined with paint chip analysis, for comparison against OSHA standards.

Prepare a report summarizing our methods and lead-based paint results. Our report will be reviewed by an EPA Lead Risk Assessor.

SUSPECT MICROBIAL GROWTH/WATER INTRUSION INSPECTION

Partner will investigate any reported water intrusion and the potential source(s). Partner will also note any observations indicative of microbial growth (i.e., odors, visual evidence of water damage or repairs).

Any onsite personnel with knowledge of the building history relevant to leaks/flooding/repairs will be interviewed for pertinent information.

Partner will obtain moisture measurements of building materials to ascertain the potential of water damage within the materials utilizing an electronic direct reading device (i.e. moisture meter).

Partner will visually inspect the designated building to identify, document, and quantify any visible suspect microbiological growth and evidence (i.e., efflorescence, staining, condensation, etc.) of water infiltration/ suspect microbial growth, as well as obvious causes for allergens.

Photographic documentation will be utilized for areas where visible microbial growth contamination is observed and provided in the letter report which will be reviewed by a State of Florida Licensed Mold Assessor (MRSA).

FEE QUOTE AND SCHEDULE

The cost for providing these services is listed below:

Site Inspection, Sampling and Report Time:

Pre-Renovation Asbestos Survey Lead-based Paint Inspection Suspect Microbial Growth/Moisture Survey

$3,800.00

Lab Analysis

Asbestos (up to 50 samples @ $17/ sample) * Lead Paint Chip (up to 15 samples @ $16/ sample) * XRF ($300 per day)

$850.00 $240.00 $300.00

Total $5,190.00

*Analyses are 72-hour turnaround time

Total fee is based on the provided property information. Field conditions that significantly differ from the referenced information may warrant additional costs. Should additional samples be required at the discretion of the inspector, the client will be contacted for approval prior to analysis. Partner will not analyze any samples in excess of this budgeted amount without prior authorization from the client.

Project activities will commence upon receipt of completed and signed authorization form. Electronic versions of the report will be delivered within 20 business days from receipt of lab results, provided that site access is granted without delay. This proposal shall be valid for ten (10) business days.

SCOPE OF ASSESSMENT

This assessment will be performed utilizing methods and procedures consistent with good commercial or customary practices designed to conform to acceptable industry standards. The independent conclusions will represent our professional judgment based upon the available information and data. Specific description of the applicable scope(s) of work is included as an attachment to this proposal and incorporated by reference.

CLIENT RESPONSIBILITIES

The Client and/or User of the reports or documents generated during this assessment is responsible for understanding the proposed Scope of Work, contract reliance conditions and the applicable industry standards to which the work is performed. In addition, the Client agrees to provide prompt, safe access to the subject property and coordinate access with the identified site contact, disclose any and all

Proposal No.: 24-460292 known relevant information and documentation necessary to support our completion of the work. Revision of reports to incorporate information that is provided subsequent to report delivery may require additional costs.

To the extent the provided description of the subject property is incomplete or inaccurate, please provide any additional information on the Authorization to Proceed page.

PROPOSAL TERMS

We appreciate the opportunity to assist with this project. Please review this entire document, especially the information above to confirm that the assets to be assessed are correctly described and identified. In addition to the proposed assessment, we can assist with services such as pre-demolition hazardous building material surveys, indoor air quality analysis, mechanical, electrical and plumbing design, structural evaluation and retrofit design, zoning, land use and accessibility studies, civil engineering and land surveying. If I can be of any contact me via telephone at 561-660-8675 or e-mail at ssnyder@partneresi.com.

Sincerely, Steve Snyder Operations Manager

Reviewed by Corey Myers, FLAC AX125

X3. USER QUESTIONNAIRE

(1) Environmental cleanup liens that are filed or recorded against the site (40 CFR 312.25).

Are you aware of any environmental cleanup liens against the property that are filed or recorded under federal, tribal, state or local law? No, DSL looks to the ESA consultant to provide us with this information.

(2) Activity and land use limitations that are in place on the site or that have been filed or recorded in a registry

(40 CFR 312.26).

Are you aware of any AULs, such as engineering controls, land use restrictions or institutional controls that are in place at the site and/or have been filed or recorded in a registry under federal, tribal, state or local law? No, DSL looks to the ESA consultant to provide us with this information.

(3) Specialized knowledge or experience of the person seeking to qualify for the LLP (40 CFR 312.28).

As the user of this ESA do you have any specialized knowledge or experience related to the property or nearby properties? For example, are you involved in the same line of business as the current or former occupants of the property or an adjoining property so that you would have specialized knowledge of the chemicals and processes used by this type of business? No.

(4) Relationship of the purchase price to the fair market value of the property if it were not contaminated (40

CFR 312.29).

Does the purchase price being paid for this property reasonably reflect the fair market value of the property? If you conclude that there is a difference, have you considered whether the lower purchase price is because contamination is known or believed to be present at the property? Yes, DSL looks to the DSL approved value established by review and approval of the appraisal of said property by its Bureau of Appraisal. Total compensation to be provided for this property reasonably reflects the fair market value of the property.

(5) Commonly known or reasonably ascertainable information about the property (40 CFR 312.30).

Are you aware of commonly known or reasonably ascertainable information about the property that would help the environmental professional to identify conditions indicative of releases or threatened releases? For example, as user,

(a) Do you know the past uses of the property? No, DSL looks to the ESA consultant to determine past uses of the property.

(b) Do you know of specific chemicals that are present or once were present at the property? No, the ESA consultant will find out through their research of the property, interviews, etc.

(c) Do you know of spills or other chemical releases that have taken place at the property? No, the

ESA consultant will find out through their research of the property, interviews, etc.

(d) Do you know of any environmental cleanups that have taken place at the property? No, the ESA consultant will determine this through their research and regulatory record review of the property.

(6) The degree of obviousness of the presence of likely presence of contamination at the property, and the ability to detect the contamination by appropriate investigation (40 CFR 312.31).

As the user of this ESA, based on your knowledge and experience related to the property are there any obvious indicators that point to the presence or likely presence of contamination at the property? No.

James Parker ______ ESA Contract Manager __ Name (Authorized User Representative) Title

_________________________________ August 6, 2024 _____ _____ Signature Date

RE:

Project: Coupon Bight/Key Deer Property Owner: Hussey Task Assignment No.: PL518.002

File details come from the government source that posted it. Updated .