This document is a Task Assignment (TA) issued by the Florida Department of Environmental Protection (FDEP) to Environmental Consulting and Technology, Inc. (ECT) under Contract Number HW682. The task assignment is specifically for the Victorian Cleaners site located at 4920 Newkirk Drive #10 in Tampa, Florida, and involves conducting an initial site assessment for environmental investigation purposes.
The task assignment authorizes ECT to perform comprehensive site assessment activities, including health and safety plan preparation, utility clearance, soil and groundwater sampling, well installation, soil vapor assessment, and related technical services. The total value of the task assignment is $71,711.66, broken down into various subtasks with specific deliverables and completion dates ranging from December 2022 to May 2023. The work will involve direct push technology borings, groundwater sampling at multiple depths, installation of monitoring wells, and preparation of a comprehensive site assessment report. Invoicing will be done incrementally upon completion and approval of each project subtask, with the final deliverable being a detailed Site Assessment Report due by May 30, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-PL080-A3.pdf | ||
| CN-370000-PL080-CO002.pdf | ||
| CN-370000-PL080-CO003.pdf | ||
| CN-370000-PL080-CO004.pdf | ||
| CN-370000-PL080-A1.pdf | ||
| CN-370000-PL080-A2.pdf | ||
| CN-370000-PL080-A4.pdf | ||
| CN-370000-PL080-A5.pdf | ||
| CN-370000-PL080-A2.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-PL080-CO001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC004B Completion June 23, 2023
This Task Assignment authorizes ECT to to conduct site assessment activities at the Victorian Cleaners site located in Tampa, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on October 13, 2022.
Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4775
4920 NEWKIRK DR #10, Tampa, Hillsborough County
VICTORIAN CLEANERS
Contractor Contractor
✔ $ 71,711.66
$ 71,711.66
Select One
Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth
Contract Manager Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2022.11.02 14:57:17-04'00' Foxit PhantomPDF Version: 10.1.6
Mark Culbreth
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.11.02 14:48:07 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
GPR Survey and Field notes (Subtask 2) 12/30/2022
DPT Soil and Groundwater Sampling Field Notes (Subtask 3) 03/01/2023
Well Installation and Groundwater Sampling Field Notes (Subtask 4) 04/01/2023
MAGS Field Notes (Subtask 5) 04/30/2023
IDW Manifests and PLS (Subtask 6 and 7) 05/10/2023
Site Assessment Report and PM (Subtask 8 and 1) 05/30/2023
Approval of GPR Survey and Field notes (Subtask 2) $ 3,242.13
Approval of DPT Soil and Groundwater Sampling Field Notes (Subtask 3) $ 30,957.79
Approval of Well Installation and Groundwater Sampling Field Notes (Subtask 4) $ 19,642.07
Approval of MAGS Field Notes (Subtask 5) $ 4,840.91
Approval of IDW Manifests and PLS (Subtask 6 and 7) $ 6,625.85
Approval of Site Assessment Report and PM (Subtask 8 and 1) $ 6,402.91
$ 71,711.66
HW682
DC004B
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
Memorandum
TO: HW682 Contract File Victorian Cleaners
ERIC_4775
FROM: Kelly Crain, Project Manager SUBJECT: Negotiation Summary Task Assignment DC-004B DATE: October 28, 2022
This Task Assignment authorizes ECT to conduct initial site assessment activities in accordance with the Scope of Work dated October 13, 2022. The Department reviewed and provided comments on ECT’s Site Assessment Workplan for the Victorian Cleaner site. The Department’s comments on the Workplan have been addressed in the Scope of Work for this Task Assignment. ECT will implement the Site Assessment Workplan that has been approved by the Department, which includes: HASP preparation and utility clearance, soil and DPT groundwater sampling and interior well installation, monitor well installation and sampling, soil vapor assessment, IDW management, professional land survey, and complete a Site Assessment Report.
The original Task Assignment totaled $76,680.21, but after negotiations and corrections, the final costs associated with this Task Assignment are $71,711.66. ECT may invoice according to the attached schedule.
S ub
Ta sk
W el l I ns ta lla tio n
G ro un dw at er
S am pl in g S ub Ta sk
S ub
Ta sk
M
A G
S S ub Ta sk
T To ta ls
La bo r
R at e C at eg or y
P ro je ct
M an ag er
.0
0.
0.
S)
2.
0.
P) nt is t (
KM
.5
.5
9.
0.
0.
(J
P)
0.
8.
.0
9.
5.
0.
4.
To ta l H ou rs
.0
.5
6.
$8 ,3
.7
$9
.3
$7
.7
$2
,7
.0
$1 ,6
.1
$8
.7
$5
5.
$1
.4
5.
$1 0, 9.
$1
,2
.3
$8
.6
$3 ,4
.3
$2
,1
.8
$1 ,0
.1
$6
8.
$2
.3
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
.4 0%
$3 ,9
.8
$4
.2
$3
.9
$1
,3
.2
$8
.1
$3
.4
$2 6.
$8
2.
To ta l L ab or
$2 2, 4.
$2
,6
.9
$1 ,9
.3
$7
,5
.6
$4 ,6
.1
$2
,2
.2
$1
.9
$4
.0
Tr av el $1
,1
.0
$8 0.
$6
.0
$1
.0
$1
.0
$0
.0
$1
.0
$1 ,1
.0
$8
0.
$6
.0
$1
.0
$1
.0
$0 .0
$1
.0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t)
$4 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$4 ,2
.0
$9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$9
.0
$0
.0
$9
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$2
3, 5.
$0 .0
$1
3, 5.
$1 0, 0.
$0
.0
$0 .0
$0
.0
$2 9, 0.
$9
.0
$1
3, 5.
$1 0, 0.
$0
.0
$9
.0
$4 ,2
.0
$2
,9
.0
$9 0.
$1
,3
.5
$1 ,0
.0
$0
.0
$9 9.
$4
.5
To ta l S ub co nt ra ct or
C os t $3
2, 6.
$9
.0
$1 5, 9.
$1
1, 6.
$0 .0
$1
,0
.0
$4 ,6
.5
La bo ra to ry
$7
,8
.0
$0 .0
$5
,4
.0
$7
.0
$1 ,6
.0
$0
.0
$0 .0
$5
.0
$0
.0
$2
.0
$2
.0
$1
.0
$0 .0
$0
.0
To ta l L ab or at or y
$8 ,3
.0
$0
.0
$5 ,6
.0
$9
.0
$1
,7
.0
$0 .0
$0
.0
Fi el d E xp en se s
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$6
.0
$4 0.
$2
.0
$2
.0
$4
0.
$0 .0
$4
0.
$2 ,0
.0
$0
.0
$7
.0
$1 ,3
.0
$0
.0
$0 .0
$0
.0 er S am pl in g
K it)
$5
.0
$0 .0
$2
.0
$2
.0
$0
.0
$0 .0
$0
.0 at er
S am pl in g K
it) $0
.0
$0 .0
$4
.0
$0
.0
$0 .0
$0
.0
$4 0.
$0
.0
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0 on
K it)
$5
.0
$0 .0
$0
.0
$0 .0
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$7 8.
$0
.0
$3 9.
$3
9.
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $44
,2
.0
$4
$1
$2
$5
$0
$4
S ub to ta l C om pl et io n Fe e
To ta l E st im at ed C os t
$7 1, 1.
$2
,8
.7
$3 ,2
.1
$3
0, 7.
$1 9, 2.
$4
,8
.9
$1 ,2
.9
$5
,3
.8
$3 ,5
.1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Victorian Cleaners SUBTASK:2 (HASP & Utility Clearance)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Total 2
D. Phillips Senior Scientist Mobilize from Orlando to the site in Tampa 1.5 Utility clearance 4 ROW Access, if needed 4 Demobilize from Tampa to Orlando 1.5
Total 11
TOTAL LABOR 13
VEHICLE TYPE RATE UNIT USEAGE
Rental Car $80.00 day 1 $80.00
TOTAL VEHICLE $80.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIITS
GeoView Private Utility Location 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
$40.00TOTAL EQUIPMENT
$900.00
FINAL --7/24/96
SUBTASK:3 (DPT Soil & Groundwater Sampling)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Mobilize from Orlando to the site in Tampa 1.5 Soil Borings and DPT Sampling (0.5 day) 5 Demobilize from Tampa to Orlando 1.5
Total 9 K. Morrison Senior Associate Scientist Mobilize from office to the site 3.75
Soil Borings and DPT Groundwater Sampling 50 Demobilize from site to office 3.75
Total 57.5 J. Penia Technician Mobilize from office to the site 0.75
Open Well and collect DTW at 6 wells 1 Groundwater sampling 6 wells 6 Demobilize from site to office 0.75
Total 8.5 B. Jarvis Administrative Create tables and data entry 4
Total 4
TOTAL LABOR 79
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00 Rental Truck $120.00 week 1 $120.00 Rental Car $80.00 day 1 $80.00
TOTAL VEHICLE $680.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
Preferred Drilling Solutions DPT Soil & Groundwater Sampling $13,645.00 1 $13,645.00
TOTAL $13,645.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units USEPA Method 8260 for VOHs Soil SBs $73.00 16 $1,168.00 USEPA Method 8260 for VOHs Soil Sediment $73.00 2 $146.00 SPLP Extractions $45.00 8 $360.00 USEPA Method 8260 for VOHs Groundwater DPT $73.00 33 $2,409.00 USEPA Method 8260 for VOHs Sediment Water $73.00 2 $146.00 USEPA Method 8260 VOHs Grab samples from 6 MW's $73.00 6 $438.00 USEPA Method 8260 for VOHs Groundwater CBs $73.00 3 $219.00 USEPA Method 8260 for SPLP $73.00 8 $584.00 Shipping Samples $70.00 3 $210.00
TOTAL LAB $5,680.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 6 $240.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Soil Assessment Kit $700.00 Week 1 $700.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 0 $0.00 Ice $6.50 each 6 $39.00
$0.00
$1,309.00TOTAL EQUIPMENT
SUBTASK:4 (Well Installation & Groundwater Sampling)
DATE: 9/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Principal Scientist MC Develop conclusions and recommendations and prepare final PFAS deliverable 1 Total 1
Senior Scientist DP Prepare draft PFAS delverable 2 Total 2
K. Morrison Senior Associate Scientist Mobilize from office to the site 2.25 Soil Borings, DPT Sampling, & Well Install 30 Demobilize from site to office. A 0.75 hour each day. 2.25
Total 34.5 J. Von Borstel GIS Analyst Prepare the PFAS Figure 1
Total 1 J. Penia Technician Mobilize from office to the site 0.75
Open Well and collect DTW at 16 wells 1.5 Groundwater Sampling (8 new wells) 8 Demobilize from site to office 0.75
Total 11 B. Jarvis Administrative Update tables and create the PFAS table. 2
Total 2
TOTAL LABOR 51.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck KM $480.00 week 1 $480.00 Rental Truck JP $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
Preferred Drilling Solutions DPT & Well install 1 $10,160.00
TOTAL $10,160.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units IDW USEPA Method 8260 for VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals Soil $52.00 1 $52.00 USEPA 8260 for VOHs Groundwater MWs $73.00 8 $584.00 IDW USEPA 8260 for VOHs Groundwater $73.00 1 $73.00 Shipping Samples $70.00 3 $210.00
TOTAL LAB $992.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 6 $240.00 Monitoring well Install Kit $1,300.00 week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Ice $6.50 each 6 $39.00
$2,284.00
$10,160.00
TOTAL EQUIPMENT
SUBTASK:5 (MAGS)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer P.E. oversite of MGAS events 3 Check MAGS data 2
Total 5 K. Morrison Sr. Associate Scientis Mobilize from office to the site 0.75
MAGS Testing 8 Demobilize from office to site 0.75
Total 9.5 J. Penia Technician Mobilize from office to the site 0.75
Open Well and collect DTW at 12 wells 0 MAGS Testing 8 Demobilize from office to site 0.75
Total 9.5 B. Jarvis Administrative Update tables 1
Total 1
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
USEPA Method TO-15 for VOHs $200.00 8 $1,600.00 Sampling Shipping Overnight $110.00 1 $110.00
TOTAL LAB $1,710.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00 MAGS Investigation Kit $500.00 Day 1 $500.00
$540.00TOTAL EQUIPMENT
SUBTASK:6 (IDW Management)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Characterization and waste profile for transportation and disposal of soil & water IDW 1 Schedule IDW transport and disposal
Total 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
Erwin Remediation IDW T&D $110.00 9 $990.00
TOTAL $990.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00TOTAL EQUIPMENT
SUBTASK:7 (Professional Land Survey)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Total 1
J. Penia Technician Mobilize from Tampa to the site 0.75 PLS Oversight 4 Demobilize from the site 0.75
Total 5.5
TOTAL LABOR 6.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
SurvTech Professional Land Survey $4,265.00 1 $4,265.00
TOTAL $4,265.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
$40.00TOTAL EQUIPMENT
SUBTASK:8 (SAR Preparation)
DATE: 9/22/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Assessment Report 2 Total 2
G. Sattler Senior Engineer Develop conclusions and recommendations and prepare for the MAGS section 2 Total 2
D. Phillips Senior Scientist Check of soil & groundwater lab data and prepare draft SAR 10 Total 10
K. Morrison Sr. Associate ScientistPrepare the draft SAR 20 Total 20
J. Von Borstel GIS Analyst Revise and Update Figures 8 Total 8
B. Jarvis Administrative Update tables 4 Document Preparation & Publishing 4
Total 8
TOTAL LABOR 50
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00TOTAL EQUIPMENT
A Geophysical Services Company
5709 1st Avenue S Tel.: (727) 209-2334 St. Petersburg, FL 33707 Fax: (727) 328-2477
September 21, 2022
Mr. Daniel S. Phillips, P.G.
Environmental Consulting & Technology, Inc.
3751 Maguire Blvd., Suite 234 Orlando, FL 32803
Subject: Proposal to Perform a Utility Designation Study
Former Victorian Cleaners Site Tampa, Florida GeoView Proposal Number: 10168p
Mr. Daniel S. Phillips, P.G.
The purpose of this letter is to transmit a proposal to complete a geophysical investigation at the subject site. This proposal is in response to your request for proposal made during your recent conversations with our office. GeoView, Inc.
appreciates the opportunity to provide our services on this project. We look forward to hearing from you soon.
Sincerely, GEOVIEW, INC.
Stephen Scruggs, P.G.
Senior Geophysicist Florida Professional Geologist Number 2470 Enclosure
Proposal This document shall serve as a proposal for work to be performed by
GeoView, Inc. (GeoView) for Environmental Consulting & Technology, Inc..
Description of Site The project site is referred to as the Former Victorian Cleaners Site and is located at 4920 Newark Drive #10 in Tampa, Florida. The purpose of the geophysical survey will be to determine the location of underground utilities within a 5 to 10 feet radius of approximately 20 proposed borings (see Figure 1 on page 6).
Scope of Work The geophysical survey will be conducted using ground penetrating radar
(GPR) and conventional electromagnetic (EM) pipe and cable locators. The GPR survey will be conducted using either a Mala and/or a GSSI GPR system. The appropriate GPR antenna configuration and time range and processing parameters will be determined in the field by the project manager.
The EM survey will be performed using a Subsite 95R and/or a Radiodetection RD (8000, 8100 or 8200) system. As appropriate, the EM survey will be conducted using both passive and active modes. The passive mode is used to find cables and conduits carrying live power (50-60 Hz) and communication (29-33Hz) signals. For the active mode survey, a current is transmitted directly or broadcast into using electromagnetic induction a metal pipe or conduit and the path of the pipe/conduit is identified by following the signal with a portable receiver.
The active mode is used to trace out cast iron pipes, metal water and sewer lines, utilities that have trace wires, and inactive power and communication lines.
Presentation of Results The location and estimated depths of underground utilities or any other identified structures shall be indicated on the ground surface using spray paint or other methods as specified by Environmental Consulting & Technology, Inc.. No report shall be prepared.
Compensation Cost to complete the survey will be $900 per half day or $1,300 per full day.
This price is inclusive of all charges associated with the project. Unless otherwise agreed upon, GeoView shall be compensated for all services within 30 days of invoice date. GeoView shall be paid in full regardless of whether the results of the geophysical survey are what Environmental Consulting & Technology, Inc.
anticipated. If it is determined during the survey that the geophysical survey will not achieve the objectives of the project, Environmental Consulting & Technology, Inc. will immediately be notified. If a decision is made to discontinue the survey, only charges for time and materials costs to that point will be submitted.
Requirements of Client Environmental Consulting & Technology, Inc. will provide a scaled map and digital file, if available, of the project site showing the boundaries of the project site, areas of specific concern and pertinent landmarks. Environmental Consulting & Technology, Inc. will also supply all available information regarding the presence and history of underground utilities at the project site (see limitations for further discussion). Unless otherwise requested, Environmental Consulting & Technology, Inc. will be responsible for the coordination of site access, traffic control, clearing of onsite obstructions or any other logistical consideration necessary to conduct the survey.
General Description of Each of The Geophysical Methods Ground Penetrating Radar (GPR)
The GPR survey will be conducted using a Mala or GSSI GPR system. The survey will be conducted with either a 500, 400 or 250 mega-Hertz antenna. The appropriate antenna will be determined in the field by the project manager. GPR will be able to provide both the position and estimated depth of both metallic and non-metallic underground utilities.
The ability of GPR to resolve a particular utility will be controlled by the following factors: 1) Depth of penetration of the GPR signal, 2) Depth of burial and diameter of the underground utility and 3) Electrical contract between the underground utility and the surrounding soils and 4) The complexity of the utility layout at the site. Due to one or a combination of these factors the GPR may not be able to identify all the utilities at the site. The diameter or composition of utilities cannot be accurately determined using GPR, though can be estimated. Estimates of burial depth are typically accurate to within +/- 20 percent, more accurate depths are possible if invert elevations for some on-site utilities are known.
Conventional Electromagnetic Pipe and Cable Locators
A Radiodetection System is used to locate underground utilities using conventional means. The system consists of a dual-function receiver and transmitter. The receiver can be operated in two modes: active and passive. In the passive mode the receiver detects the presence of underground utilities that are energized by a 60-Hertz or other known frequency. These utilities can either be those actually carrying electrical power or those utilities that are both metallic and sufficiently close to the electrical lines to have an electrical field induced within them.
In the active mode, the transmitter deliberately induces an electrical current into the utility. The frequency of this field can be varied from 512 Hertz to 200 kilohertz. The electrical field is induced using a transmitter which is either directly attached to the utility, placed on or above the utility or attached to an induction coil which is placed around the utility. Depths of underground utilities can be determined when the EM equipment is being used in the active mode. Depths are typically accurate to within 10-15 percent of the total utility depth.
Limitations GeoView shall only be liable for the successful locating of underground utilities or any other under ground structures whose presence is both known and indicated on site maps to be provided prior to the performance of the geophysical survey. Every attempt will be made to locate both known and unknown utilities within the survey area. However, GeoView will only be liable for utilities whose presence is known prior to the survey.
The objective of the geophysical survey is to determine the presence and configuration of underground utilities. However, the geophysical response of these features may be highly complex depending upon on the physical characteristics of the underground utilities, the electrical properties of the surrounding soils, the depth of burial of the utilities, and the proximity of the utilities to each other.
GeoView shall conduct the geophysical survey using the most “up-to-date” geophysical equipment in a manner consistent with the level of care and skill ordinarily exercised by members of the geophysical profession practicing in the same locality under similar conditions. GeoView’s utility locating personnel are all certified GPR and conventional pipe and cable locator operators with extensive in-house training.
When Environmental Consulting & Technology, Inc. is working around indicated utilities, a minimum of 2 feet clearance from either side of the marked utility will be maintained. Unless otherwise indicated, a minimum vertical clearance of +/- 20 percent of the indicated depth shall also be maintained.
Environmental Consulting & Technology, Inc. maintains the responsibility for manually exposing any indicated underground utility for absolute confirmation.
Other Terms and Conditions Additional Insured: If requested, Environmental Consulting & Technology, Inc.
will be named as an additional insured with respect to the services to be performed under this agreement.
Confidentiality: GeoView shall not directly or indirectly disclose to any third person information regarding the results of the geophysical investigation prior to obtaining written permission from Environmental Consulting & Technology, Inc..
Agreement: This agreement represents the entire agreement between the parties and may only be modified in writing signed by both parties.
Governing Law: This agreement shall be deemed to have been made in the place of performance of the Geophysical Services and shall be governed by, and construed in accordance with the laws of the state in which the geophysical services were provided. Any controversy or claim arising out of this agreement, or breach thereof, shall be settled by binding arbitration administered by the American Arbitration Association under its Construction Industry Arbitration rules. Judgment on the award rendered by the arbitrator(s) may be entered in any court having jurisdiction thereof.
Indemnity: GeoView agrees to indemnify, protect and hold harmless Environmental Consulting & Technology, Inc. from and against all liabilities, claims or demands of every kind of injury, including death, or damages to any person or property related in any way to GeoView’s performance of this agreement, except to the extent such liabilities, claims or demands are caused by the negligence or willful misconduct of Environmental Consulting & Technology, Inc..
Figure 1
GEOVIEW, INC.
PROPOSAL ACCEPTANCE SHEET
Project Name: Former Victorian Cleaners Site Project Location Tampa, Florida GeoView Proposal #: 10168p Proposal Date: September 21, 2022 Description of Services Provide Utility Designating Services Project Cost: – see compensation page 2 Payment Terms: Payable within 30 days of receipt of invoice
CHARGE INVOICE TO THE ACCOUNT OF:
Client: Environmental Consulting & Technology, Inc.
Address: 3751 Maguire Blvd., Suite 234
Orlando, FL 32803 Attention: Daniel S. Phillips, P.G.
Phone (Office): (407) 903-0005 Phone (Cell): (407) 509-7684 Email: dphillips@ectinc.com
FOR APPROVAL OF CHARGES:
Firm:
Address:
Phone No.: Fax No:
Attention:
Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:
In witness thereof, the parties hereto have made and executed this Agreement
Client: GeoView, Inc.
Signature
By: By: Steve Scruggs, P.G.
Title: Title: Senior Geophysicist
Date Signed: Date Signed: September 21, 2022
GPRS is the nation’s premier company specializing in the detection of underground utilities and underground storage tanks, video pipe inspection, leak detection and the imaging of concrete structures. Our services enable your projects to stay safe, on time and on budget.
GPRSINC.COM
SIM-CERTIFIED FIELD STAFF
Our SIM-Certified Project Managers are equipped with the latest technology, industry leading training and a methodology that has produced over 99.8% accuracy on over 300,000 projects. Visit SIMSPEC.ORG today for details.
NATIONWIDE FOOTPRINT
GPRS is the largest company of our kind. With highly trained Project Managers across America we can provide rapid response to your job site — wherever it may be located.
CONSULTATIVE APPROACH
GPRS Project Managers are trained to help you remove barriers that could impact your project being safe, on time and on budget. They provide industry-leading deliverables such as CAD, 3D drawings, NASSCO reports, and a .KMZ and .PDF map is included with every utility locating project which accelerates planning, organizes operations and increases communication.
PROPOSAL
VISUALIZING
THE BUILT WORLD
A B O V E AND B E L O W G R O U N D
TM
Environmental Consulting &
Technology, Inc.
GPRSQUOTE-28590 v.3 Page 2 of 6
September 19, 2022 Client: Environmental Consulting & Technology, Inc.
Attn: Daniel S. Phillips 407-509-7684 | dphillips@ectinc.com Project: Former Victorian Cleaners 4920 Newkirk Drive #10 Tampa, FL
Submitted By:
Laura Perez
419-767-2437 laura.perez@gprsinc.com
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website (www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.
Scope of Work Soil Boring: We understand the scope of work on this project is to search for underground utilities in a 10’ radius around 15 soil bores. We will attempt to trace any utilities for which structures are visible from the work area. Utilities will be marked on the surface using paint, pin flags, or other appropriate means. The client will be responsible for providing drawings or notifying GPRS of any utilities entering the work area for which there are no apparent surface features or structures visible from the work area. To avoid additional charges, the areas should be laid out, marked, and cleared of obstructions before our arrival. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.
Equipment Underground Scanning GPR Antenna. This GPR Antenna uses frequencies ranging from 250 MHz to 450 MHz and is mounted in a stroller frame that rolls over the surface. Data is displayed on a screen and marked in the field in real-time. The surface needs to be reasonably smooth and unobstructed to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the efficacy of GPR. The total effective scan depth can be as much as 8’ or more with this antenna but can vary widely depending on the soil conditions and composition. Some soil types, such as clay, may limit maximum depths to 3’ or less. As depth increases, targets must be larger to be detected, and non-metallic targets can be challenging to locate. The depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Electromagnetic Pipe Locator. This receiver can passively detect the signals from live AC power or radio signals traveling along some conductive utilities. Operators can connect a transmitter directly to accessible metallic pipes, risers, or tracer wires to generate a current at a specific frequency. The receiver can then detect the resulting signal along the pipe or tracer wire. Various factors may impact this device's effectiveness, including (but not limited to) access to the utility, conductivity, grounding, and interference from other utilities. The depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit:
Link
Traceable Rodder. The rodder consists of a copper wire encased in fiberglass. This device is pushed through a pipe with direct access, such as a sewer line at a cleanout or a storm drain catch basin. Operators then induce a current on the wire and trace the signal from the surface. The maximum traceable depth is 10’ depending on the soil conditions, and the maximum distance is 200’. Inserting the rodder into deeper pipes within manholes may not be feasible depending on site conditions. GPRS will not access electrical conduits. The signal is not detectable through metallic pipes. For more information, please visit: Link
GPS. This handheld unit offers accuracy down to 4 inches; however, the accuracy achieved will depend on the satellite environment at the time of collection and is not considered survey-grade. Features can be collected as points, lines, or areas and then exported as a KML/KMZ or overlaid on a CAD drawing. For more information, please visit: Link
GPRSQUOTE-28590 v.3 Page 3 of 6
Optional Equipment Video Pipe Camera (1”-4” pipes). This push camera is designed for video pipe inspection and pipe locating. It has a 1" diameter, self-leveling camera head that provides high-quality images in pipes with a diameter between 1" -4". Behind the camera is a 512 Hz sonde that can be located from above ground to provide the approximate depth of the pipe up to 10' deep. The locatable signal from the sonde will not pass through solid metal barriers or metal pipes other than cast iron. Access through a structure such as a cleanout, drain, etc., or an open pipe within arm's reach is required for inspection service and locating. An operator can push the camera through the pipe to a maximum of 100' and past 90-degree bends in most 2" lines. If the project requires entry into confined spaces to gain access to the subject piping, GPRS will need the client to coordinate all confined space entry and obtain any required permits. Video and photos of the interior of pipes can be provided, along with inspection reports. The client must request inspection reports before fieldwork begins. For more information, please visit: Link
GPRSQUOTE-28590 v.3 Page 4 of 6
Supporting Documentation
GPRSQUOTE-28590 v.3 Page 5 of 6
Project Costs
SERVICE DESCRIPTION PRICE
SCANNING/FIELD MARKINGS Described on Page 2 $975.00 MOBILIZATION Included GPS MAP For exterior locations only. Findings will be collected with GPS and displayed with an aerial image background. Results are not survey-grade accuracy See example: Link
Included
TOTAL $975.00
OPTIONAL SERVICES (INITIAL IF DESIRED)
FORMAL REPORT Detailed report of findings with photos, example data, and a site sketch (if applicable) in addition to the basic summary report that is included with every job. See example: Link
Initial ____ $400
CAD DRAWING Findings will be drafted in CAD with an aerial image background. A linework version will also be provided if the client provides an existing drawing. Results are not survey-grade accuracy. See example: Link
Initial ____ $600
VIDEO PIPE PUSH CAMERA Trace lines from accessible cleanouts and storm drains. Initial ____ $Call For Pricing
General Terms & Conditions This proposal is subject to the General Terms and Conditions for Services of Ground Penetrating Radar Systems, LLC posted at Link (the “Terms and Conditions”) and is hereby incorporated by reference into and made a part of this proposal. Customer acknowledges it has read and agrees to be bound by such Terms and Conditions. In the event of any conflict between the terms of this proposal and the Terms and Conditions, the Terms and Conditions will prevail. Customer also acknowledges that Ground Penetrating Radar Systems, LLC may, from time to time and at its discretion, modify the Terms and Conditions and Customer agrees to be bound by such Terms and Conditions as modified.
Customer agrees to meet and perform all requirements described in this document and has fully read and understands all items listed within this document including the Proposal-Specific Assumptions on the following page.
1.
It is the customer’s responsibility to prepare the site for scanning, including clearly identifying areas to be scanned, securing access to all areas required for scanning, and keeping these areas clear and free of obstructions. Delays caused by customer’s failure to do so may result in an increased price.
2.
GPRS does not conduct an investigation, analysis, or interpretation of soil composition, soil/concrete conditions, or geophysical, geological, engineering, or land surveying information. Customer acknowledges it understands that we are merely reporting retrieved data and that we do NOT provide geophysical, geological, engineering, or land surveying services. Customer should contact a professional in those fields if such services are needed.
3.
If any work to be performed is within a road or street, unless specifically included by GPRS within this proposal, it is the customer’s responsibility to provide adequate traffic control to allow GPRS’ personnel to safely and efficiently work in the road/street.
4.
If this proposal is not accepted within 90 days of September 19, 2022, then the pricing may be subject to review.5.
If for some reason the technician arrives on site and the work is cancelled there will be a charge of $500 per requested technician.6.
Accepted and Agreed
Print Name:_____________________ Signature:_____________________ Date:________________
Company Phone/Email:___________________________ PO #:___________ Job #:______________
GPRSQUOTE-28590 v.3 Page 6 of 6
Project-Specific Assumptions This price assumes that we will be given access to perform the work during normal, weekday business hours. Work performed outside of 7am-5pm Monday-Friday will be billed at overtime rates.
As-builts and any other applicable drawings shall be made available to GPRS prior to the project.• A thorough utility search can only be completed if GPRS is given access to all utility structures, interior and exterior. This service is never a replacement for the use of the state One Call system (811).
All of our technicians have OSHA-10 safety training or greater. Site-specific safety training is not included in this quote. Please notify us if this project requires additional safety training.
These rates assume that there are no certified payroll requirements. GPRS has not been notified of any PLA, DIR, or Certified Payroll requirements. If GPRS receives notice that any of these conditions exist, there will be additional costs.
ESTIMATE
Blood Hound 6500 Technology Center Dr.
Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website:
Phone #: 888-858-9830 888-858-9829 Fax #:
6500 Technology Center Dr.
Blood Hound will use electromagnetic (EM) and ground-penetrating-radar (GPR) equipment to locate private underground utilities at site indicated by client. All findings will be marked according to APWA standard. Customer is responsible for calling 811 for locates of any public utilities. If the scope of work should change or is different than that listed on estimate, please call our office for a revised estimate.
Unless expressly noted, Vacuum Excavation estimates do not include any of the following services: Permitting, Traffic Control, Restoration, Special Restoration, Special Backfill or Waste Disposal. If you need any of those services please call our office for a revised estimate.
Blood Hound is not responsible for the condition of the pipes or structures before or after jetting/clearing service is performed. Unsatisfactory conditions could be present within the structure and any services may bring those deficiencies to light.
In the event of inclement weather, if the client still requests for crew to arrive on site, then the client will be responsible for minimum charges even if no work is performed.
6500 Technology Center Dr.
By signing this Estimate the client acknowledges that they accept the scope of work listed on the estimate, as well as the service rates provided and are providing Blood Hound with a Notice To Proceed (NTP) for the listed Project. If the scope of work should change while the work is in progress, any changes will be documented on the technician’s field notes and signed off on by the client. Signing this estimate also acknowledges that the client agrees to the terms and conditions as they relate to payment for services rendered.
Signature: ______________________________________________________________________________________
Printed Name: ___________________________________________________________________________________
Date Signed: ____________________________________________________________________________________
Payment is due at the time of service, unless you already have an account with us. If you do have an account with us, payment terms are Net 30 days, unless otherwise stated in a pre-approved contract. To learn more, please call the office at 888-858-9830.
PRICE MAY VARY BASED ON ACTUAL TIME ON SITE. The above pricing is based only on the information supplied by the customer.
If a site walk through has not been conducted, this may affect the price.
If this is a prevailing wage job, please contact our office for a revised quote as this pricing does not reflect prevailing wage rates. If at some later date a project is determined to be a prevailing wage job, then any extra expense incurred by Blood Hound will be billed to the client.
The project estimate outlined in this specific proposal is valid for 90 days from the date of the proposal. Blood Hound reserves the right to review and adjust this estimate if client does not approve of the proposal within 90 days.
Please send all POs / Contracts to .BHUGContracts@bhug.com
We look forward to working with you.
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 9/21/22 FAC ID#: ERIC_4775
Unit Unit Rate Number of Units Extended Price whole day $1,875.00 4 7,500.00$ half day $1,450.00 1 1,450.00$ per foot $35.00 15 525.00$ each $110.00 -$ each $45.00 1 45.00$ each $30.00 1 30.00$ per well $150.00 6 900.00$ roundtrip $825.00 1 825.00$ per crew / per night $450.00 -$ each $70.00 6 420.00$ each $100.00 1 100.00$ lump sum $350.00 1 350.00$ per day $150.00 5 750.00$ per day $250.00 3 750.00$
TOTAL QUOTE PRICE $13,645.00
Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 9/21/22
Days to Complete Scope of Work: 4.5
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Concrete Core Drill with 6" core bit
Decon Pad & Steam Cleaner
Poly Tank w/ Approved Water (from Lakeland, FL)
Refurbished - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Site Name and Location: Victorian Cleaners
Consultant Name: Environmental Consulting & Technology, Inc.
PROPOSED SCOPE OF WORK:
(1) DPT soil boring to 50' (or refusal), backfill and grout, restore grade
(11) DPT borings to 50' (or refusal), 3 grab groundwater samples per boring, convert (2) to SVE wells, backfill and grout, restore grade
Event 14920 Newkirk Drive #10, Tampa, Hillsborough County, FL
Well Completion (includes MH w/ cover, concrete, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
2" Well Install (includes all materials)
Direct Push Half-Day Rate 1 - on-site half day
(2) Interior hand auger borings to 8', convert to wells, backfill and grout, restore grade
(1) Interior 1" x 6' MW with 5' .010 screen, complete with 2" bolt down manhole
Drum cuttings, development water, and decon fluids
Decon all down hole tooling with Alconox/Liquinox with PFAS free water
(1) Interior 2" x 3' SVEW with 2' .010 screen, pad and 5" manhole
(4) 2" x 3' SVEW's with 2' .010 screen, pad and 5" manhole utions, Inc. (727) 561-7477 s Park, FL 33782
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 9/21/22 FAC ID#: ERIC_4775
Unit Unit Rate Number of Units Extended Price whole day $1,775.00 2 3,550.00$ half day $1,450.00 1 1,450.00$ per foot $30.00 48 1,440.00$ each $110.00 4 440.00$ each $45.00 -$ each $25.00 24 600.00$ per well $125.00 5 625.00$ roundtrip $775.00 1 775.00$ per crew / per night $450.00 -$ each $70.00 9 630.00$ each $100.00 1 100.00$ lump sum $300.00 1 300.00$ per day $150.00 -$ per day $250.00 1 250.00$
TOTAL QUOTE PRICE $10,160.00
Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 9/21/22
4920 Newkirk Drive #10, Tampa, Hillsborough County, FL
Well Completion (includes MH w/ cover, concrete, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
2" Well Install (includes all materials)
Direct Push Half-Day Rate 1 - on-site half day
Drum cuttings, development water, and decon fluids
Decon pad,decon all down hole tooling with Alconox/Liquinox with PFAS free water
(1) 1" x 50' MW with 5' prepacked screen via DPT with 3.25" rods, soil sampling as needed, drum cuttings, pad and 8" manhole
Site Name and Location: Victorian Cleaners
Consultant Name: Environmental Consulting & Technology, Inc.
PROPOSED SCOPE OF WORK:
(4) 2" x 12' MW's with 10' .010 screen, soil sampling as needed, drum cuttings, pad and 8" manhole
(3) 1" x 30' MW's with 5' prepacked screen via DPT with 3.25" rods, soil sampling as needed, drum cuttings, pad and 8" manhole
Event 2
Days to Complete Scope of Work: 3
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Concrete Core Drill with 8" core bit
Decon Pad & Steam Cleaner
Poly Tank w/ Approved Water (from Lakeland, FL)
Refurbished - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Park, FL 33782
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 9/19/2022
FAC ID#:
PROPOSED SCOPE OF WORK: (1st Mobilization)
Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (4) Drums
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,600.00 4 $6,400.00 half day $0.00 each $195.00 5 $975.00 each $0.00 each $100.00 1 $100.00 each $40.00 1 $40.00 per well $210.00 6 $1,260.00 daily roundtrip $1,200.00 1 $1,200.00 per crew / per night $475.00 4 $1,900.00 each $80.00 4 $320.00 each $60.00 0 $0.00 each $65.00 33 $2,145.00 each $95.00 2 $190.00
$0.00
TOTAL QUOTE PRICE $14,530.00
Notes:
Project No.: ___________________________
Date: 9/19/2022
(8) Hand Auger Borings to 2' - (2) borings are Inside Bldg.
DIRECT PUSH TECHNOLOGY
Contractor Name: ECT - Dan Phillips - 407 509-7684
Site Name: Victorian Cleaners - 4920 Newkirk Drive #10 - Tampa, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client
(1) DPT Soil Borings to 50' - Grout Abandon
(11) DPT Water Sample borings with samples at 10', 30' & 50' (Total of 33 samples) - Abandon Borehole
(5) SVE or VMP 2" x 3' w/ 2' .010" Screen & 5"/6" BD Completion - (1) Inside Bldg. - Concrete Core - Installed by hand
(1) MW 1"x6' w/ 5' Pre-Pack Screen & 4" Brass Completion - Inside Bldg. - Concrete Core - Installed by hand
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: CCharles Bucher
Concrete Core
Days to Complete Scope of Work: 4 Days
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
MISCELLANEOUS
Mobilization Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) ID ___1"___ 5' Length
Well Completion (includes 30 Min Dev. B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____
Auger Attachment, 4" Surface Casing
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
SVE/VMP Wells - 2" x 3' w/ 2' .010" Screen
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 9/19/2022
FAC ID#:
PROPOSED SCOPE OF WORK: (2nd Mobilization)
Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (5) Drums
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,600.00 2 $3,200.00 half day $0.00 each $0.00 each $100.00 4 $400.00 each $135.00 8 $1,080.00 each $40.00 24 $960.00 each $45.00 4 $180.00 per well $210.00 8 $1,680.00 daily roundtrip $1,200.00 1 $1,200.00 per crew / per night $475.00 2 $950.00 each $80.00 5 $400.00 each $60.00 2 $120.00 each $65.00 0 $0.00 each $95.00 0 $0.00
$0.00
TOTAL QUOTE PRICE $10,170.00
Notes:
Project No.: ___________________________
Date: 9/19/2022
MISCELLANEOUS
Mobilization Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) 2" x 5'
Well Completion (includes 30 Min Dev. B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 2" x 5'
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: CCharles Bucher
Concrete Core
Days to Complete Scope of Work: 2 Days
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Contractor Name: ECT - Dan Phillips - 407 509-7684
Site Name: Victorian Cleaners - 4920 Newkirk Drive #10 - Tampa, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL) - Will bring some water from Shop but an approved water source will be provided by client
(4) MW 2" x 12' w/ 10' .010" Pre-Pack Screen - 8" BD Completion - Installed w/ DPT Rods
(3) MW 1" x 30' w/ 5' .010" Pre-Pack Screen - 8" BD Completion - Installed with DPT Rods
(1) MW 1" x 50' w/ 5' .010" Pre-Pack Screen - 8" BD Completion - Installed with DPT Rods
Pre-Packed PVC Well Screen (includes all materials) 1" x 5'
Well Riser (includes all materials) 1" x 5'
No Soil Sampling
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
Auger Attachment, 2" Well Installation
DIRECT PUSH TECHNOLOGY
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
September 20, 2022
Daniel Phillips, PG ECT, Inc 3751 Maguire Blvd Suite 234 Orlando, FL 32803
Email: dphillips@ectinc.com
Re: Victorian Cleaners 4920 Newkirk Dr Tampa, FL
Dear Mr. Philips, GFA/Universal Engineering Sciences Inc. (GFA/UES) appreciates the opportunity to become a part of your project team. Our professional staff is dedicated to making this project a success, both on schedule and within budget. We are proud of our commitment to maintaining the highest levels of customer service and client satisfaction, and respectfully submit the following for your consideration.
It is our understanding the…