CN-370000-HW561-TDC20L.pdf
PDF 2 MB Posted
- Contract number
- PL264
- Issued by
- Florida
About this file
Summary of Task Assignment Notification Form HW561 DC020L
This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract HW561 to Golder Associates Inc. for environmental remediation services at Concord Custom Cleaners No. 34 in Tallahassee, Leon County, Florida (ERIC_4877). The Task Assignment (DC020L) was executed in April 2019 with signatures from FDEP's Contract Manager Miranda McClure (acting) and other authorized representatives. The contract representative for Golder Associates Inc. is Matt Crews.
The task authorizes Golder Associates to conduct removal and relocation of a multi-phase extraction (MPE) remedial system from the site to an FDEP storage yard in Lakeland, Florida. The scope includes two subtasks: Subtask 1 comprises project management with 6 labor hours, and Subtask 2 encompasses MPE system relocation activities including removal of approximately 3,600 pounds of spent carbon from vapor-phase canisters, disposal of 30-40 gallons of oil, removal of system anchors, site restoration, and submission of field notes and chain-of-custody documentation. The total task assignment value is $11,827.71 with 75 total labor hours allocated. The fixed-price contract structure includes $6,343.28 in total labor costs (with 172.50% overhead applied), $4,459.92 in subcontractor and vendor services, and $116.39 in other direct costs. The final deliverable of system relocation documentation and field notes is due May 31, 2019, with task execution completion targeted for August 30, 2019. No retainage applies to this task assignment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC755-CO01.pdf | ||
| CN-370000-PL264-A1.pdf | ||
| CN-370000-PL264-A3.pdf | ||
| CN-370000-PL264-A4.pdf | ||
| CN-370000-PL264-CO01.pdf | ||
| CN-370000-PL264-T1.pdf | ||
| CN-370000-PL264-T7.pdf | ||
| CN-370000-PL264-A5.pdf | ||
| CN-370000-PL264-A6.pdf | ||
| CN-370000-PL264-T2.pdf | ||
| CN-370000-PL264-T4CO1.pdf | ||
| CN-370000-PL264-T1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-PL264-T4.pdf | ||
| CN-370000-PL264-T4CO2.pdf | ||
| CN-370000-PL264-T5.pdf | ||
| CN-370000-PL264-T6.pdf | ||
| CN-370000-PL264-A2.pdf | ||
| CN-370000-PL264-T3.pdf | ||
| CN-370000-PL264-T8.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW561 Contract Negotiation File
Concord Custom Cleaners No. 34 Tallahassee, Leon County
ERIC_4877
From: Miranda McClure, Project Manager (acting) Date: April 30, 2019 Subject: Negotiation Summary
HW561 DC020L
This Task Assignment authorizes Golder Associates to conduct removal of a Multi-Phase Extraction (MPE) remedial system from the site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: MPE System Relocation Subtask includes costs and labor related to removal and relocation of the MPE system to the FDEP storage yard in Lakeland Florida. Following completion of tasks Golder will submit field notes, a photograph log, and a signed copy of necessary chain-of-custody forms to the Department.
The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $11,827.71 with 75 labor hours.
Golder Associates may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Change Order Notification Form.
FDEP COST ESTIMATE
Contractor: Golder Associates Inc.
Date: 4/8/2019
Task #: DC020L SubTask 1 Project Management SubTask 6
Site: SubTask 2 MPE System Relocation SubTask 7
Activity/Phase: O&M SubTask 3 SubTask 8
Project Manager: Miranda McClure SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$46.73 Project Manager (MCC) 6 5.5
$0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0
$56.57 Senior Consultant - LV6 (JB) 1 1 0 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0
$46.73 Senior Project Sci/Eng - LV4 (MCC) 5 5 0 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - LV3 0 0 0 0 0 0 0 0 0 0
$37.85 Project Sci/Eng - LV3 (BL) 0 0 0 0 0 0 0 0 0 0
$26.32 Staff Sci/Eng - LV1 (HH) 30 30 0 0 0 0 0 0 0 0
$0.00 Senior Draftsperson - LD3 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0
$0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0
$29.98 Senior Technician - LT3 (DM) 33 33 0 0 0 0 0 0 0 0
$0.00 Senior Technician - LT3 0 0 0 0 0 0 0 0 0 0
$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0
$24.10 Staff Admin - LA2 (AS) 0 0 0 0 0 0 0 0 0 0
$0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 75 6 69 0 0 0 0 0 0 0 0
Direct Labor $2,327.81 $258.65 $2,069.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,015.47 $446.17 $3,569.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $6,343.28 $704.82 $5,638.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $116.39 $12.93 $103.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Concord No. 34 Cleaners
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates Inc.
Date: 4/8/2019
Task #: DC020L SubTask 1 Project Management SubTask 6
Site: SubTask 2 MPE System Relocation SubTask 7
Activity/Phase: O&M SubTask 3 SubTask 8
Project Manager: Miranda McClure SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Concord No. 34 Cleaners
Travel
Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $568.00 $568.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $859.00 $859.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW (FECC) $1,382.00 $1,382.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sunbelt $1,083.49 $1,083.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Capital Wrecker $727.50 $727.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
U-Haul $68.88 $68.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,261.87 $3,261.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $326.19 $326.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $3,588.06 $3,588.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $97.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $189.15 $189.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $286.65 $286.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $11,193.38 $717.75 $10,475.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $634.33 $70.48 $563.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $11,827.71 $788.23 $11,039.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord No. 34 Cleaners SUBTASK 2: MPE System Relocation
DATE: 4/8/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Consultant (J. Brown) Senior review of e-mail deliverable. 1
Senior Project Sci/Eng (M. Crews) 5
Senior Tech (D. McDaniels) 33
Staff Sci/Eng (H. Huang) 30
TOTAL LABOR 69
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $32.50 Per Day 3 $97.50 Construction/O&M/Supplies $63.05 Per Day 3 $189.15
$286.65
VEHICLE TYPE RATE UNIT USAGE TOTALS
Truck $97.00 Per Day 3 $291.00
TOTAL VEHICLE $291.00
PER DIEM STAFF RATE UNIT USAGE TOTALS
Per Diem D. McDaniels $36.00 Per Day 3 $108.00 Per Diem H. Huang $36.00 Per Day 3 $108.00
Hotel D. McDaniels $88.00 Per Day 2 $176.00 Hotel H. Huang $88.00 Per Day 2 $176.00
TOTAL PER DIEM $568.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME RATE COSTING UNIT USAGE TOTALS
Sunbelt $300.00 per day 2 $600.00 Sunbelt $200.00 EA 2 $400.00 Sunbelt $31.00 LS 1 $31.00 Sunbelt $4.80 LS 1 $4.80 Sunbelt $47.69 EA 1 $47.69
U-Haul $29.95 Per Day 2 $59.90 U-Haul $4.49 Per Day 2 $8.98
Capital Wrecker $727.50 LS 1 $727.50
FECC $1,382.00 LS 1 $1,382.00
TOTAL $3,261.87
Correspondence with Earth Systems to arrange system delivery (1 hour). Prepare FDEP documentation and e-mail deliverable (4 hours).
MPE system relocation activities, including travel from Jacksonville to Tallahassee, Tallahassee to Lakeland, and Lakeland to Jacksonville (10 hours per day x 3 days = 30 hours). Field event preparation and order equipment (3 hours).
MPE system relocation activities, including travel from Jacksonville to Tallahassee, Tallahassee to Lakeland, and Lakeland to Jacksonville (10 hours per day x 3 days = 30 hours).
TOTAL EQUIPMENT
PURPOSE
Forklift
Transport Trailer
Open Trailer (Canister Disposal)
Spent Carbon T&D
Delivery/Pickup
Environmental Surcharge Tax (7.5%)
Transportation Surcharge
Tax (7.5%)
FINAL --7/24/96
Golder Associates Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida USA 32256 T: +1 904 363-3430 | F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
VIA EMAIL
April 8, 2019 FDEPDC020 P13-82530
Ms. Miranda McClure
Florida Department of Environmental Protection
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR MPE SYSTEM RELOCATION
CONCORD CUSTOM CLEANERS NO. 34
3475 THOMASVILLE ROAD
TALLHASSEE, LEON COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4877
PROPOSED TASK ASSIGNMENT: DC020L
Dear Ms. McClure:
Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal to complete multi-phase extraction (MPE) system relocation activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.
SUBTASK 2 – MPE SYSTEM RELOCATION ACTIVITIES
Golder will mobilize to the site to relocate the trailer-mounted MPE system to the FDEP storage yard
(8345 Highway 33, Lakeland, Florida [Fountain RV]). The MPE system (FDEP Property #117310) is no longer in operation and is currently staged next to the soil vapor extraction system, as shown on the attached Figure 6. There is no fencing surrounding the system, and power to the system has already been disconnected. Removal and relocation of the trailer-mounted MPE system will consist of the following general tasks:
Ms. Miranda McClure FDEPDC020 P13-82530
Florida Department of Environmental Protection April 8, 2019
Oversight of the transportation and disposal of a total of approximately 3,600 pounds of spent carbon from the two vapor-phase carbon canisters. Golder collected a composite sample of spent carbon from the two vapor-phase carbon vessels in December 2018 for waste characterization purposes. The sample was analyzed for pH, flashpoint, and VOCs using the Toxicity Characteristic Leaching Procedure. The analytical results from the spent carbon sample indicated the carbon can be disposed as non-hazardous waste.
Loading and transporting the two carbon canisters to Leon Iron and Metal at 1351 Aenon Church Road in
Tallahassee, Florida for scrapping. Golder will obtain a donation receipt from the facility and remove any FDEP property numbers from the canisters prior to scrap.
Transporting and disposing of 30 to 40 gallons of oil located within two plastic containers inside the MPE system. The oil will be disposed at Leon County’s Solid Waste Management facility at 7550 Apalachee
Parkway in Tallahassee, Florida.
Removing the MPE system anchors from each corner of the trailer.
Preparing the MPE system for transportation to FDEP storage yard.
Site restoration in the area of the MPE system.
Preparation of FDEP documentation for system transfer.
Oversight of wrecking service to tow the MPE system to FDEP storage yard.
Dispose of debris and other materials generated during system decommissioning.
The MPE trailer tires currently located inside the trailer will be placed back onto the trailer. If the tires are observed to have deteriorated, new tires will be purchased and a work change directive will be submitted to the FDEP for approval.
Upon completion of the tasks described above, Golder will submit field notes, a photograph log, and a signed copy of the equipment chain-of-custody form to the FDEP via an e-mail deliverable.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the MPE system relocation is $11,827.71. Golder will tentatively schedule the event for April 2019. Golder anticipates the MPE system relocation activities will take up to three days to complete. The
LOE/CEF cost sheets are included in Attachment A. Subcontractor and vendor quotes are included in
Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Ms. Miranda McClure FDEPDC020 P13-82530
Florida Department of Environmental Protection April 8, 2019
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $788.23 July 26, 2019
Subtask 2 – MPE System Relocation Activities
$11,039.48
May 31, 2019
(E-mail with FDEP Documentation for System Relocation and Field Notes)
Total/Completion Date $11,827.71 August 30, 2019
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Golder Associates Inc.
Matthew C. Crews, PE Jesse C. Brown, PE
Senior Engineer Senior Consultant and Associate
MCC/JCB/as
Attachments: Figure 6 – Horizontal VEW Locations and Design Area of Influence
Attachment A – LOECEF Cost Sheets Attachment B – Subcontractor and Vendor Quotes
G:\Projects\DEP-Drycleaning\Projects\Tallahassee\Concord 34\Props & Task Assignments\DC020L - MPE System Relocation\DC020L - Concord 34 MPE System Relocation Proposal.docx
CVS
BUILDING
1.) SITE MAP DEVELOPED FROM SITE PLAN BY HARDING ESE, DATED
DECEMBER 2002.
MONITORING WELL LOCATION
VAPOR EXTRACTION WELL LOCATION
INJECTION WELL LOCATION
1.) DETAILS OF CVS EXPANSION SHOWN IN SHADED FONT
2.) VEW - VAPOR EXTRACTION WELL
3.) BGS - BELOW GROUND SURFACE
HORIZONTAL VAPOR EXTRACTION WELLS VEH025, VEH026,
VEH027, AND VEH028 INSTALLED AT 4' BGS; 20' SCREEN
HORIZONTAL VAPOR EXTRACTION WELL VEH029 INSTALLED
AT 3' BGS; 44' TOTAL SCREEN ACROSS 2 SECTIONS
DESIGN AREA OF INFLUENCE FOR HORIZONTAL VEWS
i n
FDEP-DC020
Control No.
FDEP-DC020-H006
FIGURE
2018-09-17
BCL
MCC
MCC
JCB
CONCORD CLEANERS No. 34
TALLAHASSEE, LEON COUNTY, FLORIDA
FL DEPT OF ENVIRONMENTAL PROTECTION
HORIZONTAL VEW LOCATIONS AND DESIGN AREA OF
INFLUENCE
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
I F
T
H
S
M
E A
S U
R E
M E
N
D
O E
S
N
O
M
A T
C
W
A
T
O
W N
T
E
Z
E
H
A
B
E
N
M
O D
I F
I E
D
F
R O
M
A
N S
I
B
P a t h j a c k s o n v i l l e d r a f t i n g F i l e F
D E
P F
D E
P D
C D
C
N o
C o n c o r d
G e p
R p t A c t i v e
D r a w i n g s
F i l e
N a m e
F
D E
P D
C H d w g
SCALE
0 10 20
FEET
LEGEND
NOTE(S)REFERENCE(S)
AutoCAD SHX Text
DRIVE THRU
AutoCAD SHX Text
DRIVE THRU
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
GRASS
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text
VE003
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MW001
AutoCAD SHX Text
MW003
AutoCAD SHX Text
VE007
AutoCAD SHX Text
VE005
AutoCAD SHX Text
RW002
AutoCAD SHX Text
DESTROYED
AutoCAD SHX Text
VEW018S
AutoCAD SHX Text
VEW016S
AutoCAD SHX Text
VEW023S
AutoCAD SHX Text
VEW022S
AutoCAD SHX Text
VEW020S
AutoCAD SHX Text
VEW017S
AutoCAD SHX Text
VEW001S
AutoCAD SHX Text
VEW002S
AutoCAD SHX Text
VEW005S
AutoCAD SHX Text
VEW004S
AutoCAD SHX Text
VEW006S
AutoCAD SHX Text
VEW022D
AutoCAD SHX Text
VEW020D
AutoCAD SHX Text
VEW023D
AutoCAD SHX Text
VEW002D
AutoCAD SHX Text
VEW004D
AutoCAD SHX Text
VEW001D
AutoCAD SHX Text
VEW005D
AutoCAD SHX Text
VEW006D
AutoCAD SHX Text
IW003
AutoCAD SHX Text
IW001
AutoCAD SHX Text
IW002
AutoCAD SHX Text
IW004
AutoCAD SHX Text
IW005
AutoCAD SHX Text
IW006
AutoCAD SHX Text
VEH025
AutoCAD SHX Text
VEH026
AutoCAD SHX Text
VEH027
AutoCAD SHX Text
VEH028
AutoCAD SHX Text
VEW019S
AutoCAD SHX Text
VEW019D
AutoCAD SHX Text
MW-5
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
VEH029
AutoCAD SHX Text
VEW021S
AutoCAD SHX Text
VEW021D
AutoCAD SHX Text
MW013
AutoCAD SHX Text
FORMER CONCORD CLEANERS #34
AutoCAD SHX Text
SVE TRAILER
AutoCAD SHX Text
EXISTING MPE TRAILER
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
MW001
AutoCAD SHX Text
VE003
AutoCAD SHX Text
VEH025
AutoCAD SHX Text
VEH029
Email Date:
To:
Company:
Message:
From:
Location:
Phone:
Fax #:
Time:
** WWW.SUNBELTRENTALS.COM ** RNTOUTE (Rev 10/01/18)
2/07/19
14:28
DMCDANIELS@GOLDER.COM
704 377 4200
704 377 5107
TALLAHASSEE PC073
JOHN ARD PCM073
DAVID
GOLDER ASSOCIATES INC
Contract #.. 86752811
SUNBELT RENTALS, INC.
BEH PROPOSED Rental Contract REVISIONS to v20 20160108 FRONT Items 1-9 only.docx]
PC#:
IF THE EQUIPMENT DOES NOT WORK
PROPERLY, NOTIFY THE OFFICE AT ONCE
MULTIPLE SHIFTS OR
OVERTIME RATES MAY APPLY
CUSTOMER IS RESPONSIBLE FOR
REFUELING, DAMAGES AND REPAIRS
*Rate your rental experience www.sunbeltrentals.com/survey
** www.sunbeltrentals.com ** RNTOUTE (Rev 10/01/18)
QUOTE
COPY
Continued on the next page...
2800 W. TENNESSEE STREET
TALLAHASSEE, FL 32304
850-241-0660
Salesman: 007300 TALLAHASSEE HOUSE ( Typed By: JARD1
Job Site:
CONCORD 34
3475 THOMASVILLE ROAD
TALLAHASSEE, FL 32309 3425
C#: 770-496-1893 J#: 770-496-1893
For operations in Florida: Prima facie evidence of intent to defraud: Failure to return rental property or equipment upon expiration of rental period and failure to pay all amounts due (including costs for damage to the property or Equipment) are evidence of abandonment or refusal to redeliver the property, punishable in accordance with Section 812.155, Florida Statutes.
Customer: 14615
GOLDER ASSOCIATES INC
3730 CHAMBLEE TUCKER RD
CHAMBLEE, GA 30341
Contract #.. 86752811 Contract dt. 2/07/19 Date out.... 2/07/19 5:00 PM Est return.. 2/08/19 5:00 PM Job Loc..... 3475 THOMASVILLE ROAD, TALLAHASS Job No...... 1 - CONCORD 34
P.O. #...... QUOTE
Ordered By.. DAVID, MCDANIELS
NET DUE UPON RECEIPT
QTY EQUIPMENT # Min Day Week 4 Week Amount
1.00 5500LB 19' SHOOTING BOOM FORKLIFT 300.00 300.00 955.00 1840.00 300.00
0560230
*** EQP MSG ***
** ALWAYS REFER TO THE EQUIPMENT LOAD CHART AS TO ACTUAL LIFTING
CAPACITIES IN ALL THE EQUIPMENT'S LOAD RANGES **
WARNING - FORKLIFTS ARE NOT TO BE USED FOR LIFTING PERSONNEL
SALES ITEMS:
Qty Item number Unit Price
1 DLPKSRCHG EA 31.000 31.00
TRANSPORTATION SURCHARGE
1 ENVIRONMENTAL EA 4.800 4.80
ENVIRONMENTAL
RENTAL PROTECTION PLAN 45.00
DELIVERY CHARGE 100.00
PICKUP CHARGE 100.00
Sub-total: 580.80 Tax: 25.19
BEH PROPOSED Rental Contract REVISIONS to v20 20160108 FRONT Items 1-9 only.docx]
PC#:
IF THE EQUIPMENT DOES NOT WORK
PROPERLY, NOTIFY THE OFFICE AT ONCE
MULTIPLE SHIFTS OR
OVERTIME RATES MAY APPLY
CUSTOMER IS RESPONSIBLE FOR
REFUELING, DAMAGES AND REPAIRS
*Rate your rental experience www.sunbeltrentals.com/survey
** www.sunbeltrentals.com ** RNTOUTE (Rev 10/01/18)
QUOTE
COPY
2800 W. TENNESSEE STREET
TALLAHASSEE, FL 32304
850-241-0660
Salesman: 007300 TALLAHASSEE HOUSE ( Typed By: JARD1
Job Site:
CONCORD 34
3475 THOMASVILLE ROAD
TALLAHASSEE, FL 32309 3425
C#: 770-496-1893 J#: 770-496-1893
For operations in Florida: Prima facie evidence of intent to defraud: Failure to return rental property or equipment upon expiration of rental period and failure to pay all amounts due (including costs for damage to the property or Equipment) are evidence of abandonment or refusal to redeliver the property, punishable in accordance with Section 812.155, Florida Statutes.
Customer: 14615
GOLDER ASSOCIATES INC
3730 CHAMBLEE TUCKER RD
CHAMBLEE, GA 30341
Contract #.. 86752811 Contract dt. 2/07/19 Date out.... 2/07/19 5:00 PM Est return.. 2/08/19 5:00 PM Job Loc..... 3475 THOMASVILLE ROAD, TALLAHASS Job No...... 1 - CONCORD 34
P.O. #...... QUOTE
Ordered By.. DAVID, MCDANIELS
NET DUE UPON RECEIPT
QTY EQUIPMENT # Min Day Week 4 Week Amount
Total: 605.99
All amounts are in USD
RNTOUTE (Rev 03/30/18)
Crews, Matt
From: Crews, Matt Sent: Tuesday, March 5, 2019 9:38 AM To: Crews, Matt Subject: Your U-Haul Quote
From: no‐reply@uhaul.com <no‐reply@uhaul.com> Sent: Thursday, February 7, 2019 1:55 PM To: McDaniels, David <David_McDaniels@golder.com> Subject: Your U‐Haul Quote
EXTERNAL EMAIL
To help protect you r privacy, Micro so ft Office prevented au tomatic download of this pictu re from the Internet.
U-Haul
Dear david mcdaniels, We thank you for choosing U-Haul to make your move easier.
The rate(s) for the rental equipment that you were quoted for pick up on Thursday, February 07, 2019 for 24 hours.
6' X 12' Open Trailer $29.95
Quoted rates are subject to change.
To confirm your reservation and guarantee your rate with a credit card, visit us anytime on uhaul.com or call 8502221389.
Thanks again. We are looking forward to serving you.
Sincerely, U-HAUL MOVING & STORAGE AT LAKE ELLA
1580 N MONROE ST
TALLAHASSEE, FL 32303
8502221389
Started packing? Fill out our free U-Haul packing planner to get started. In addition to having the widest selection of boxes and moving supplies, we also have FREE boxes via our Take-A-Box / Leave-A-Box and Box Exchange programs.
mcrews Text Box Capital Wrecker Services Quote
FECC, Inc.
3652 Old Winter Garden Road • Orlando, FL • 32805 407-296-9995 • Facsimile 407-296-9125
CLIENT:
Attn: Matt Crews
Company: Golder Associates
Street: 3475 Thomasville Road
City, St, Zip: Tallahassee, FL, 32309Phone:
904-327-8420
Email: Matt_Crews@golder.com
WORK TO BE PERFORMED AT:
Site: Carbon Cleaners No. 34
Company: Carbon Cleaners
Street: 3475 Thomasville Road
City, St, Zip: Tallahassee, FL, 32309
Site Contact: Matt Crews
Phone: 904-327-8420
BID NAME: Carbon Cleaners No.
DATE: 4/4/2019
BID NO: 040 42019- 001
Dear Mr. Crews
FECC. Inc. appreciates the opportunity to present this bid to you. Below is the scope of work and pricing for the services requested.
SCOPE OF WORK:
FECC crews will provide a Vacuum Truck and a technician to the site to vacuum the spent carbon from the carbon canisters and transport it to a permitted facility for disposal.
PROJECT PRICING:
• Labor $538.00
• Equipment $945.00
• Truck wash out Fee $250.00
• Profile fee $75.00
• Disposal $182.00
TOTAL $1,382.00
Special Note: This proposal includes fuel costs based on the average published cost of fuel as of the BID DATE. In accordance with the ENERGY SURCHARGE terms on page 2, additional fuel surcharges may apply when the work is performed.
mailto:Matt_Crews@golder.com
• PO Box 305 Eighty Four, PA 15330 • (724) 222.3334 / Fax:(724) 222.4090 •
• PO Box 618102 Orlando, FL 32861 • (407) 313.9113 / Fax:(407) 313.9114 •
• PO Box 1062 Chapin, SC 29036 • (803) 447.0888 •
3.06.19
Golder Associates, Inc.
9428 Baymeadows Road, Suite 400
Jacksonville, FL 32256
Subject: Concord 34, 3475 Thomasville Road, Tallahassee, FL (Facility ID: ERIC_4877)
Proposal #18937
Carbon Service and Equipment Company is pleased to offer pricing for our spent carbon vacuum extraction service for your site located in Tallahassee, FL, as follows:
(1.) All labor and equipment to remove non-hazardous spent vapor phase carbon from two(2) Air 1,800 adsorbers via vacuum extraction.
(2.) Removal of the spent carbon from site.
(3.) Reactivation of the spent carbon.
(4.) All freight.
(5.) Leon County’s 7.5% sales tax.
The price, complete as described above, will be $3,137.93. Terms are Net 30 Days. Pricing is valid for 30 days.
Pricing is valid if the spent carbon is free-flowing and free of miscellaneous debris and accepted for reactivation.
CSEC has spent carbon acceptance for this site – no additional forms are needed at this time.
The following is required to remove the spent carbon from site for reactivation:
(1.) Completed Reactivation Facility Papers.
(2.) A Toxicity Characteristic Leachate Procedure (TCLP) from a NECLAC lab and no more than 3 months old.
(3.) One (1) - 1 quart sample of the spent carbon sent to our facility.
There is an approximately three (3) – four (4) week lead time on the acceptance of spent carbon for reactivation. This acceptance process begins once CSEC receives the completed forms, spent carbon sample and the TCLP results. Spent carbon acceptance, and subsequent reactivation, is dependent upon the results of the TCLP, the condition of the spent carbon sample and the reactivation facility’s ability to reactivate the site-specific carbon.
I trust that the information provided is adequate for your present decision-making purposes. However, if you have any questions please do not hesitate to contact me.
Thank you for your continued interest in our services.
Very truly, Jennifer Belmore
JACKSONVILLE | 251 LEVY ROAD | ATLANTIC BEACH, FL 32233 | TEL. 904-241-2200
CORPORATE OFFICE | 75-D YORK AVENUE | RANDOLPH, MA 02368| TEL. 888-233-5338
CLIENT:
Company: Golder Associates, Inc.
Street: 9428 Baymeadows Rd. Suite 400
City, St, Zip: Jacksonville , FL 32256 Phone: (904)327-8420 Email: Matt_Crews@golder.com
WORK TO BE PERFORMED AT:
Site: Thomasville Rd Carbon Removal
Company: Concord 34 Site
Street: 3475 Thomasville Road
City, St, Zip: Tallahassee , FL
Site Contact: Matt Crews
Phone: (904)327-8420
BID NAME: Thomasville Rd Carbon Removal DATE: March 5, 2019 BID NO: 19FLRa0055
Dear Matt, Moran Environmental Recovery (MER) appreciates this opportunity to be of service. MER is a specialized provider of integrated environmental and industrial services. Below is the scope of work and pricing for the services requested.
SCOPE OF WORK:
MER to provide labor, equipment, materials and disposal for the following:
1. Remove 3,600 lbs of non haz carbon from two carbon vessels attached to a remediation trailer. Bring to WRI for disposal. Golder to handle disposal of the empty vessels.
2. Pump out 30-40 gallons of oil associated with the liquid ring pump that operated in the MPE System onsite.
Bring to WRI for disposal.
PROJECT PRICING:
• Labor, Material & Equipment $4,164.00 Lump Sum
Clarifications:
- Assumes work to be performed Mon through Friday. No weekends or holidays.
- Price based on disposal quantities given.
Special Note: This proposal includes fuel costs based on the average published cost of fuel as of the BID DATE. In accordance with the ENERGY SURCHARGE terms on page 2, additional fuel surcharges may apply when the work is performed.
File details come from the government source that posted it. Updated .