CN-370000-GM159-TA1CO1.pdf

PDF 57 KB Posted

Attached to
Master Agreement FL|GM159|2e31053e8c1dd8c66cfcfc80f4052020
Contract number
GM159
Issued by
Florida

About this file

This document is a Task Assignment Change Order Form for DEP Contract No. GM159, issued by the Florida Department of Environmental Protection (DEP) and involving Eisman & Russo, Inc. as the contractor. The change order is dated March 24, 2014, and specifically pertains to a task assignment for the Layton to Channel 5 Bridge MM68.4 - 70.8 construction project, with Michael Greene listed as the contractor representative and Jim Post as the DEP Contract Manager.

The change order authorizes two additional months of construction services, increasing the contract by $200,477.05, which brings the total CEI (Construction Engineering and Inspection) cost to $200,477.05. The project involves construction for 2.4 miles of trail, with a 180-day construction schedule and a total budgeted amount of $201,231.00. The additional time and cost cover continued construction management, engineering, administrative support, and compliance services, with specific allocations for different project roles such as Contract Manager, Senior Project Engineer, Project Administrator, and Resident Compliance Specialist. The not-to-exceed cost per month is set at $27,067.74, and the change includes provisions for project construction and subsequent project closeout phases.

View the file

Other files

File Type Posted
CN-370000-GM159-Task 1.pdf PDF
CN-370000-GM159-CO1.pdf PDF
CN-370000-GM159.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .