This document is Amendment No. 5 to Agency Term Contract No. GC858, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING. The original contract, executed on February 25, 2014, provides petroleum contamination site response action services in the South Region of Florida. The amendment was executed on May 10, 2018, and became effective on May 22, 2018, following the Department's data processing of the rate changes.

The amendment modifies rates for 127 pay items contained in the contract's Rate Schedule (Attachment D, Version 2.2) without adding, deleting, or otherwise modifying any line items. All rate increases are effective only for new work assignments offered on or after the Rate Change Date of May 22, 2018; pre-existing and previously offered work assignments continue to apply the prior rate schedule. The requested rate increases range from approximately 2.27% to 5.00%, with most increases falling between 4% and 5%, and all increases remain within the maximum 5% threshold allowed under contract provision 11.B.ii. The rate changes apply to diverse environmental services including site assessments, drilling and boring, well installation, sampling and laboratory analysis, soil source removal, petroleum storage tank removal, remediation system packages, engineering oversight, and professional services. The contractor submitted detailed justification supporting the increases, which the Department reviewed and approved.

View the file

Other files

File Type Posted
CN-370000-GC858-A14E1.pdf PDF
CN-370000-GC858-A3.pdf PDF
CN-370000-GC858-A7.pdf PDF
CN-370000-GC858-A8.pdf PDF
CN-370000-GC858-CMC2.pdf PDF
CN-370000-GC858-A12.pdf PDF
CN-370000-GC858-A13.pdf PDF
CN-370000-GC858-A15.pdf PDF
CN-370000-GC858-A16E2.pdf PDF
CN-370000-GC858-A9.pdf PDF
CN-370000-GC858-AR1.pdf PDF
CN-370000-GC858-CMC3.pdf PDF
CN-370000-GC858-CO1.pdf PDF
CN-370000-GC858-A10.pdf PDF
CN-370000-GC858-CMC1.pdf PDF
CN-370000-GC858.pdf PDF
PC-370000-GC858.pdf PDF
CN-370000-GC858-A11.pdf PDF
CN-370000-GC858-A17.pdf PDF
CN-370000-GC858-A18.pdf PDF
CN-370000-GC858-A2.pdf PDF
CN-370000-GC858-A4.pdf PDF
CN-370000-GC858-A6.pdf PDF
CN-370000-GC858-CMC.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor�s applicable prior Rate Schedule.

Contractor�s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (�New Work� assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department�s data processing of the rate changes (hereinafter �Rate Change Date�); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC858 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING (hereinafter "Contractor") executed on February 25, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC858

RATE INCREASE

AMENDMENT NO. 5

Amendment No. 5 DEP Agency Term Contract No. GC858

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

NOW THEREFORE, the parties agree as follows:

Amendment No. 5 DEP Agency Term Contract No. GC858

4.

5.

6.

Attachment D, Rate Schedule (V2.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V2.2) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department�s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing Rate

Agreed New Rate(1)

$448.75 $471.00

$212.45 $223.00

$262.75 $275.00 $148.56 $155.75

$179.40 $188.00

$577.50 $605.00

$750.00 $787.00

$550.00 $577.00

$866.00 $908.00

$808.00 $848.00

$1,155.00 $1,212.00

$79.75 $83.70

$104.45 $109.50

$640.00 $670.00 $1,080.00 $1,130.00

$96.86 $101.00

$206.50 $216.00

$235.45 $245.00

$350.00 $367.00 $550.00 $577.00 $115.50 $121.00

+4.60%

+4.06%

+4.86% +4.91% +4.76%

+4.69% +4.63% +4.27%

+4.95%

+4.83%

+4.95%

+4.94%

6-2.b.

Pay Item No.

1-1.

1-3.

1-5.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

6-3.b.

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

File Review Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

6-11.

6-12.

6-13.

6-14.

6-15.

7-6.

7-7.

Well Redevelopment Installation of Well Vault - 4 x 4 x 2 foot Installation of Well Vault - 2 x 2 x 2 foot

7-5.

Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Vault - 2 x 2 x 2 foot

Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

2-1.

2-2.

3-2.

3-4.

Est % Rate

Change(2)

+4.96%

+4.97%

+4.66% +4.84%

+4.79%

+4.76%

+4.93%

+4.91%

+4.85%

$157.50 $165.00

$50.00 $52.00 $28.85 $30.20

$367.20 $385.00

$27.00 $28.25

$27.00 $28.25

$70.00 $73.00

$210.00 $220.00

$54.00 $56.50

$226.80 $238.00

$226.80 $238.00

$14.70 $15.40

$18.50 $19.40

$30.00 $31.50

$16.00 $16.75

$16.00 $16.75

$4,095.00 $4,299.00

$7,245.00 $7,605.00

$58.05 $60.90

+4.98%

+4.97%

+4.94%

+4.63%

+4.94%

+4.85%

+4.76%

+4.00% +4.68%

10-15.

10-15.a.

10-15.b.

9-23.

9-24.

Trenching and Installation of 21 - 30 Lines

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing 300 cubic yards

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Sheet Piling Installation for > 20 feet deep Excavation

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)

Sheet Piling Installation for 20 feet deep Excavation

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)

Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Electronic Data Deliverables (EDD) Soil/Sediment Sample Collection

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

8-1.

Monitoring Well Sampling with Water Level, 100 foot depth

9-1.

9-16.

8-6.

8-11.

9-15.

9-67.

9-66.

10-2.a.

9-72.

10-1.a.

14-4.

14-5.

15-1.c.

+4.29%

+4.76%

+4.63%

+4.63%

+5.00%

+4.69%

+4.69%

+4.76%

+4.86%

+4.91%

$18.00 $18.90

$2,675.00 $2,800.00

$350.00 $367.00

$4,350.00 $4,560.00

$510.00 $535.00

$3,500.00 $3,675.00

$8,500.00 $8,750.00

$5,500.00 $5,750.00 $4,900.00 $5,140.00 $3,850.00 $4,025.00 $5,775.00 $6,050.00 $1,942.00 $2,030.00 $2,121.00 $2,225.00 $2,500.00 $2,620.00 $2,850.00 $2,990.00

$5,500.00 $5,700.00

$8,500.00 $8,750.00

$5,775.00 $6,000.00

$9,975.00 $10,400.00

$2,200.00 $2,300.00

$2,550.00 $2,650.00

$3,550.00 $3,700.00

$2,750.00 $2,880.00

$3,517.00 $3,690.00

+3.64%

+2.94%

+3.90%

+4.26%

+4.55%

+3.92%

+4.23%

+4.73%

+4.92%

+5.00%

+2.94%

+4.55% +4.90% +4.55% +4.76% +4.53% +4.90% +4.80% +4.91%

15-4.d.

15-1.d.

Air Sparge System - Medium - Short Term 6 mos.

Air Sparge System - Small - Short Term 6 mos.

AS/SVE System - Small - Short Term 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Large

- Short Term 6 mos.

Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Medium - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Small

- Short Term 6 mos.

Air Sparging/Vapor Extraction Pilot Test - Additional Time

System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small SVE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium

Groundwater Treatment System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

16-18.

16-17.

16-10.

16-13.

16-14.

16-22.

16-24.

16-25.

18-5.

18-7.

18-8.

18-9.

16-28.

17-1.

17-2.

17-3.

17-4.

18-11.

18-13.

18-15.

18-16.

18-17.

+4.86%

+4.83%

+4.90%

+5.00%

+4.67%

$2,782.00 $2,900.00

$3,727.00 $3,900.00

$3,517.00 $3,650.00

$4,672.00 $4,900.00

$3,937.00 $4,130.00

$3,950.00 $4,100.00

$4,500.00 $4,700.00

$5,500.00 $5,775.00

$1,500.00 $1,575.00

$2,260.00 $2,370.00

$1,800.00 $1,890.00

$1,150.00 $1,205.00

$1,600.00 $1,680.00

$1,350.00 $1,415.00

$2,772.00 $2,900.00

$2,656.00 $2,780.00

$3,234.00 $3,390.00

$3,118.00 $3,270.00

$5,720.00 $6,000.00

$5,500.00 $5,750.00

$5,280.00 $5,400.00

$6,600.00 $6,900.00

+4.62%

+4.67%

+4.82%

+4.87%

+4.90%

+4.55%

+2.27%

+4.55%

+4.90%

+3.80%

+4.44%

+5.00%

+5.00%

+4.87%

+5.00%

+4.78%

+5.00%

+4.81%

+4.24%

+4.64%

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-23.

18-25.

18-27.

Soil Vapor Extraction (SVE) System - Large - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Medium - Short Term 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Small - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Small - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Medium - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short Term 6 Months

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short Term 6 mos.

Groundwater Treatment - Add On - Medium - Short Term 6 mos.

Groundwater Treatment - Add On - Small - Short Term 6 mos.

MPE System - Large - Short Term 6 mos.

MPE System - Medium - Short Term 6 mos.

MPE System - Small - Short Term 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

18-21.

18-22.

18-20.

18-18.

18-19.

18-47.

18.48.

18-49.

18-50.

18-51.

18-53.

18-54.

18-55.

+3.78%

+4.88%

$6,050.00 $6,350.00

$7,370.00 $7,730.00

$6,930.00 $7,270.00

$2,310.00 $2,425.00 $850.00 $892.00

$9,500.00 $9,975.00 $11,550.00 $12,120.00

$1,260.00 $1,320.00

$2,152.00 $2,250.00

$3,675.00 $3,850.00

$6,300.00 $6,610.00

$3,000.00 $3,150.00 $2,205.00 $2,300.00

$535.00 $560.00

$561.50 $589.00

$845.00 $885.00

$1,060.00 $1,110.00

$1,560.00 $1,630.00

$270.00 $280.00

$670.00 $700.00

$283.00 $297.00

+4.92%

+5.00% +4.31%

+4.67%

+4.90%

+4.73%

+4.72%

+4.49%

+3.70%

+4.48%

+4.95%

+4.94%

+4.76%

+4.55%

+4.76%

+4.91%

+4.98% +4.94% +5.00%

21-5.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Remedial Action Plan Level 1 Remedial Action Plan Receptor and Exposure Pathway Report General Site Assessment Report

Air Sparge/Multiphase Extraction (AS/MPE) System

- Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Large - Short Term 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Medium - Long Term > 6 Months

Construction Drawings and Specs Report

P.E. Project Oversight for Remediation System Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology Pilot Testing

Remedial Action Startup Report

18-57.

18-58.

19-3.

19-5.

19-19.

18-56.

19-17.

19-11.

19-12.

19-13.

19-14.

19-15.

19-16.

+4.96%

+4.88%

$535.00 $560.00

$1,060.00 $1,110.00

$535.00 $560.00

$250.00 $262.00

$270.00 $281.00

$270.00 $280.00

$535.00 $560.00

$414.50 $435.00

$283.50 $297.00

+4.67%

+4.80%

+4.76%

+4.72%

21-30.

21-25.

21-29.

21-11.

21-12.

21-13.

21-9.

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

P.E. Review, Evaluation and Certification of As- Built Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

Notes:

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

21-31.

21-32.

+4.07%

+3.70%

+4.67%

+4.95%

+4.67%

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

Printed Printed Name: Name:

Title: Title:

Date: Date:

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

The Table 1 rate changes have been entered in the Department�s processing system with an effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D Version No. V2.2

Department Data Processing Information:

Signature of Authorized Representative Signature of Authorized Representative

Type Letter/Number Description Attachment D (V2.2) Rate Schedule (27 pages)

FOURTUNE 4, INC D/B/A

ENVIRONMENTAL ASSESSMENTS &

CONSULTING

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

FEID No.: 271153638

List of attachments/exhibits included as part of this Amendment:

Signature of Processor Printed Name of Processor Data Entry Date

PAY

ITEM UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

1.

1-1. Per Review $ 427.39 $ 448.75 $ 471.00 1-2. Per Site $ 291.81 $ 291.81 $ 291.81

1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 212.45 $ 212.45 $ 223.00 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 250.46 $ 262.75 $ 275.00

1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.

2-1. Per Visit $ 148.56 $ 148.56 $ 155.75 2-2. Per Survey $ 170.95 $ 179.40 $ 188.00 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 850.00 $ 850.00 $ 850.00 3.

3-1. Per Round Trip $ 425.00 $ 425.00 $ 425.00 3-2. Per Round Trip $ 550.00 $ 577.50 $ 605.00 3-3. Per Round Trip $ 660.00 $ 660.00 $ 660.00 3-4. Per Round Trip $ 750.00 $ 750.00 $ 787.00 3-5. Per Round Trip $ 250.00 $ 250.00 $ 250.00 3-6. Per Round Trip $ 300.00 $ 300.00 $ 300.00

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

DESCRIPTION

OFFICE ACTIVITIES

File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 550.00 $ 577.00 3-8. Per Round Trip $ 750.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 866.00 $ 908.00 3-9. Per Round Trip $ 550.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 808.00 $ 848.00

3-10. Per Round Trip $ 825.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,155.00 $ 1,212.00

3-11. Per Round Trip $ 700.00 $ 700.00 $ 700.00 3-12. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00 3-13. Per Round Trip $ 7,500.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 8,250.00 $ 8,250.00 3-14. Per Round Trip $ 10,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 9,350.00 $ 9,350.00 3-15. Per Round Trip $ 550.00 $ 550.00 $ 550.00 3-16. Per Round Trip $ 1,000.00 $ 1,000.00 $ 1,000.00 3-17. Per Round Trip $ 550.00 $ 550.00 $ 550.00 3-18. Per Round Trip $ 650.00 $ 650.00 $ 650.00 3-19. Per Round Trip Not Applicable $ 385.00 $ 385.00 3-20. Per Round Trip Not Applicable $ 495.00 $ 495.00 Drum Compactor mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

4.

4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 33.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 26.50 $ 26.50 5-1.a.2. Per Spoon Not Applicable $ 35.20 $ 35.20 5-1.a.3. Per Spoon Not Applicable $ 41.80 $ 41.80 5-1.b. Per Core $ 120.00 $ 120.00 $ 120.00 5-1.c. Per Core $ 35.00 Not Applicable Not Applicable 5-2. Per Boring $ 150.00 $ 150.00 $ 150.00 5-3. Per Foot $ 21.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,500.00 $ 2,500.00 5-4. Per Foot $ 23.00 Not Applicable Not Applicable 5-5. Per Foot $ 34.00 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 2,830.00 $ 2,830.00

5-6. Per Foot $ 25.00 $ 25.00 $ 25.00

Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

5-7. Per Foot $ 28.00 $ 28.00 $ 28.00 5-8. Per Foot $ 30.00 $ 30.00 $ 30.00 5-9. Per Foot $ 30.00 $ 31.50 $ 31.50

5-10. Per Foot $ 31.00 $ 32.50 $ 32.50 5-11. Per Foot $ 38.00 $ 38.00 $ 38.00 5-12. Per Foot $ 34.00 $ 35.70 $ 35.70 5-13. Per Foot $ 37.00 $ 38.85 $ 38.85 5-14. Per Foot $ 45.00 $ 45.00 $ 45.00 5-15. Per Foot $ 33.00 $ 33.00 $ 33.00 5-16. Per Foot $ 36.00 $ 36.00 $ 36.00 5-17. Per Foot $ 43.00 $ 43.00 $ 43.00 5-18. Per Foot $ 37.50 $ 39.25 $ 39.25 5-19. Per Foot $ 43.00 $ 45.15 $ 45.15 5-20. Per Foot $ 49.00 $ 49.00 $ 49.00 5-21. Per Foot $ 59.50 $ 59.50 $ 59.50 5-22. Per Foot $ 68.00 $ 68.00 $ 68.00 5-23. Per Foot $ 85.00 $ 85.00 $ 85.00

6.

6-1. Per Foot $ 26.50 $ 26.50 $ 26.50 6-2. Per Foot $ 33.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 27.30 $ 27.30 6-2.b. Per Foot Not Applicable $ 79.75 $ 83.70

Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

6-3. Per Foot $ 42.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 40.15 $ 40.15 6-3.b. Per Foot Not Applicable $ 104.45 $ 109.50 6-4. Per Foot $ 48.00 $ 48.00 $ 48.00 6-5. Per Foot $ 37.50 $ 37.50 $ 37.50 6-6. Per Foot $ 48.50 $ 48.50 $ 48.50 6-7. Per Foot $ 58.00 $ 58.00 $ 58.00 6-8. Per Foot $ 64.00 $ 64.00 $ 64.00

6-9.a. Per Foot $ 7.00 $ 7.00 $ 7.00 6-9.b. Per Foot $ 10.00 $ 10.00 $ 10.00 6-9.c. Per Foot $ 15.00 $ 15.00 $ 15.00 6-9.d. Per Foot $ 18.00 $ 18.00 $ 18.00 6-10. Per Well $ 288.00 $ 288.00 $ 288.00 6-11. Per Vault $ 640.00 $ 640.00 $ 670.00 6-12. Per Vault $ 1,080.00 $ 1,080.00 $ 1,130.00 6-13. Per Well Not Applicable $ 96.86 $ 101.00

6-14. Per Well Not Applicable $ 206.50 $ 216.00

6-15. Per Well Not Applicable $ 235.45 $ 245.00

Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

7.

7-1. Per Foot $ 15.50 $ 15.50 $ 15.50 7-2. Per Foot $ 21.00 $ 21.00 $ 21.00 7-3. Per Foot $ 28.00 $ 28.00 $ 28.00 7-4. Per Foot $ 29.00 $ 29.00 $ 29.00 7-5. Per Vault $ 350.00 $ 350.00 $ 367.00 7-6. Per Vault $ 550.00 $ 550.00 $ 577.00 7-7 Per Well Not Applicable $ 115.50 $ 121.00 8.

8-1. Per Well $ 150.00 $ 157.50 $ 165.00 8-2. Per Well $ 210.00 $ 210.00 $ 210.00 8-3. Per Well $ 150.00 $ 150.00 $ 150.00 8-4. Per Sample $ 150.00 $ 150.00 $ 150.00 8-5. Per Sample $ 90.00 $ 90.00 $ 90.00 8-6. Per Sample $ 50.00 $ 50.00 $ 52.00 8-7. Per Well $ 20.00 $ 20.00 $ 20.00 8-8. Per Well $ 110.00 $ 110.00 $ 110.00

8-9. Per Sample $ 50.00 $ 50.00 $ 50.00

8-10. Per Sample $ 85.00 $ 85.00 $ 85.00 8-11. Per Sampling Event Not Applicable $ 28.85 $ 30.20 8-12. Per Well Not Applicable $ 60.00 $ 60.00 Survey Latitude/Longitude of Existing Monitor Wells

Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

8-13. Per Well Not Applicable $ 70.00 $ 70.00

8-14 Per Sample Not Applicable $ 15.00 $ 15.00

9.

9.A.

9-1. Per Sample $ 367.20 $ 367.20 $ 385.00

9-2. Per Sample $ 45.36 $ 45.36 $ 45.36 9-3. Per Sample $ 64.80 $ 64.80 $ 64.80 9-4. Per Sample $ 70.20 $ 70.20 $ 70.20 9-5. Per Sample $ 86.40 $ 86.40 $ 86.40 9-6. Per Sample $ 91.80 $ 91.80 $ 91.80

9-7. Per Sample $ 270.00 $ 270.00 $ 270.00

9-8. Per Sample $ 66.95 $ 66.95 $ 66.95 9-8.a. Per Sample Not Applicable $ 210.00 $ 210.00 9-9. Per Sample $ 61.56 $ 61.56 $ 61.56

9-10. Per Sample $ 86.40 $ 86.40 $ 86.40

9-11. Per Sample $ 10.80 $ 10.80 $ 10.80

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

9-12. Per Sample $ 10.80 $ 10.80 $ 10.80 9-13. Per Sample $ 10.80 $ 10.80 $ 10.80 9-14. Per Sample $ 10.80 $ 10.80 $ 10.80 9-15. Per Sample $ 27.00 $ 27.00 $ 28.25 9-16. Per Sample $ 27.00 $ 27.00 $ 28.25 9-17. Per Sample $ 43.20 $ 43.20 $ 43.20

9-18. Per Sample $ 70.20 $ 70.20 $ 70.20

9-19. Per Sample $ 14.04 $ 14.04 $ 14.04 9-20. Per Sample $ 70.20 $ 70.20 $ 70.20

9-21. Per Sample $ 320.00 $ 320.00 $ 320.00

9-22. Per Sample $ 388.85 $ 388.85 $ 388.85

9-23. Per Sample $ 70.00 $ 70.00 $ 73.00

9-24. Per Sample $ 210.00 $ 210.00 $ 220.00 9.B.

9-25. Per Sample $ 259.20 $ 259.20 $ 259.20

9-26. Per Sample $ 388.80 $ 388.80 $ 388.80

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)

Soil, Cadmium (EPA 6010 or EPA 6020)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

9-27. Per Sample $ 43.20 $ 43.20 $ 43.20 9-28. Per Sample $ 58.00 $ 58.00 $ 58.00 9-29. Per Sample $ 70.20 $ 70.20 $ 70.20

9-30. Per Sample $ 86.40 $ 86.40 $ 86.40

9-31. Per Sample $ 43.20 $ 43.20 $ 43.20 9-31.a. Per Sample Not Applicable $ 53.50 $ 53.50 9-32. Per Sample $ 86.40 $ 86.40 $ 86.40 9-33. Per Sample $ 91.80 $ 91.80 $ 91.80

9-34. Per Sample $ 226.80 $ 226.80 $ 226.80

9-35. Per Sample $ 270.00 $ 270.00 $ 270.00

9-36. Per Sample $ 64.80 $ 64.80 $ 64.80 9-37. Per Sample $ 64.80 $ 64.80 $ 64.80 9-38. Per Sample $ 10.80 $ 10.80 $ 10.80 9-39. Per Sample $ 10.80 $ 10.80 $ 10.80 9-40. Per Sample $ 10.80 $ 10.80 $ 10.80 9-41. Per Sample $ 10.80 $ 10.80 $ 10.80

9-41.a. Per Sample Not Applicable $ 29.50 $ 29.50

9-42. Per Sample $ 10.80 $ 10.80 $ 10.80

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

9-43. Per Sample $ 10.80 $ 10.80 $ 10.80 9-44. Per Sample $ 10.80 $ 10.80 $ 10.80

9-44.a. Per Sample Not Applicable $ 29.50 $ 29.50

9-45. Per Sample $ 10.80 $ 10.80 $ 10.80 9-46. Per Sample $ 10.80 $ 10.80 $ 10.80 9-47. Per Sample $ 10.80 $ 10.80 $ 10.80 9-48. Per Sample $ 10.80 $ 10.80 $ 10.80 9-49. Per Sample $ 10.80 $ 10.80 $ 10.80

9-50. Per Sample $ 16.20 $ 16.20 $ 16.20

9-51. Per Sample $ 12.96 $ 12.96 $ 12.96

9-52. Per Sample $ 12.96 $ 12.96 $ 12.96 9-53. Per Sample $ 12.96 $ 12.96 $ 12.96

9-54. Per Sample $ 14.58 $ 14.58 $ 14.58

9-55. Per Sample $ 12.96 $ 12.96 $ 12.96 9-56. Per Sample $ 21.60 $ 21.60 $ 21.60

9-57. Per Sample $ 16.00 $ 16.00 $ 16.00

9-58. Per Sample $ 12.11 $ 12.11 $ 12.11

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

9-59. Per Sample $ 12.70 $ 12.70 $ 12.70

9-60. Per Sample $ 12.96 $ 12.96 $ 12.96

9-61. Per Sample $ 40.24 $ 40.24 $ 40.24

9-62. Per Sample $ 942.00 $ 942.00 $ 942.00

9-63. Per Sample $ 972.00 $ 972.00 $ 972.00

9-64. Per Sample $ 355.00 $ 355.00 $ 355.00

9-65. Per Sample $ 525.00 $ 525.00 $ 525.00

9-66. Per Sample $ 54.00 $ 54.00 $ 56.50

9-67. Per Sample $ 226.80 $ 226.80 $ 238.00 9-78. Per Sample Not Applicable $ 47.50 $ 47.50 9-79. Per Sample Not Applicable $ 36.75 $ 36.75 9-80. Per Sample Not Applicable $ 68.25 $ 68.25

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

9.C.

9-68. Per Sample $ 91.80 $ 91.80 $ 91.80 9-69. Per Sample $ 218.70 $ 218.70 $ 218.70 9-70. Per Sample $ 243.00 $ 243.00 $ 243.00 9-71. Per Sample $ 270.00 $ 270.00 $ 270.00 9.D.

9-72. Per Sample $ 226.80 $ 226.80 $ 238.00

9-73. Per Sample $ 605.00 $ 605.00 $ 605.00

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75. Percent Surcharge $ - $ - $ -

9-76. Percent Surcharge $ 0.50 $ 0.50 $ 0.50

9-77. Percent Surcharge $ 1.00 $ 1.00 $ 1.00

10.

10-1. Per Sq. Foot/Day $ 40.00 Not Applicable Not Applicable

10-1.a Per Sq. Foot Not Applicable $ 14.70 $ 15.40

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for ≤ 20 feet deep Excavation

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID) Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

10.1.b Per Sq. Foot/Day Not Applicable $ 3.50 $ 3.50 10.1.c Per Sq. Foot/Week Not Applicable $ 10.00 $ 10.00 10.1.d Per Sq. Foot/Month Not Applicable $ 14.00 $ 14.00 10-2. Per Sq. Foot/Week $ 40.00 Not Applicable Not Applicable

10-2.a Per Sq. Foot Not Applicable $ 18.50 $ 19.40 10.2.b Per Sq. Foot/Day Not Applicable $ 6.00 $ 6.00 10.2.c Per Sq. Foot/Week Not Applicable $ 8.00 $ 8.00 10.2.d Per Sq. Foot/Month Not Applicable $ 19.50 $ 19.50 10-3. Per Sq. Foot/Month $ 48.40 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 57.00 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 57.00 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 61.00 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 35.00 $ 35.00 $ 35.00 10-8. Per Cubic Yard $ 32.00 $ 32.00 $ 32.00 10-9. Per Cubic Yard $ 115.00 $ 115.00 $ 115.00

10-10. Per Cubic Yard $ 105.00 $ 105.00 $ 105.00 10-11.a. Per Cubic Yard $ 140.00 $ 140.00 $ 140.00 10-11.b. Per Cubic Yard $ 290.00 $ 290.00 $ 290.00 10-12.a. Per Cubic Yard $ 145.00 $ 145.00 $ 145.00 10-12.b. Per Cubic Yard $ 240.00 $ 240.00 $ 240.00 10-13. Per Cubic Yard $ 105.00 $ 105.00 $ 105.00 10-14. Per Cubic Yard $ 33.00 $ 33.00 $ 33.00

LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing ≤ 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

10-15. Per Cubic Yard $ 30.00 $ 30.00 $ 31.50 10-15.a. Per Cubic Yard Not Applicable $ 16.00 $ 16.75 10-15.b. Per Cubic Yard Not Applicable $ 16.00 $ 16.75 10-16. Per Ton $ 60.00 $ 60.00 $ 60.00 10-17. Per Ton $ 55.00 $ 55.00 $ 55.00 10-18. Per Day $ 3,300.00 $ 3,300.00 $ 3,300.00 10-19. Per Day $ 325.00 $ 325.00 $ 325.00 10-20. Per Week $ 7,700.00 $ 7,700.00 $ 7,700.00 10-21. Per Week $ 325.00 $ 325.00 $ 325.00 10-22. Per Month $ 17,500.00 $ 17,500.00 $ 17,500.00 10-23. Per Month $ 325.00 $ 325.00 $ 325.00

11.

11-1. Per Tank $ 6,325.00 $ 6,325.00 $ 6,325.00 11-2. Per Tank $ 8,325.00 $ 8,325.00 $ 8,325.00 11-3. Per Tank $ 9,580.00 $ 9,580.00 $ 9,580.00 11-4. Per Tank $ 13,500.00 $ 13,500.00 $ 13,500.00 12.

12-1. Per Square Foot $ 3.93 $ 3.93 $ 3.93 12-2. Per Square Foot $ 3.30 $ 3.30 $ 3.30 12-3. Per Ton $ 50.00 $ 50.00 $ 50.00 12-4. Per Ton $ 40.00 $ 40.00 $ 40.00 12-5. Per Ton $ 45.00 $ 45.00 $ 45.00

Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness Additional Removal/Loading Cost for Concrete - > 4 inch thickness Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel #57 Stone Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation)

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

12-6. Per Drum $ 195.00 $ 195.00 $ 195.00 12-7. Per Ton $ 26.50 $ 26.50 $ 26.50 12-8. Per Ton $ 40.00 $ 40.00 $ 40.00 12-9. Per Ton $ 38.00 $ 38.00 $ 38.00

12-10. Per Ton $ 35.00 $ 35.00 $ 35.00 12-11. Per Ton $ 36.00 $ 36.00 $ 36.00 12-12. Per Ton $ 33.50 $ 33.50 $ 33.50 12-13. Per Drum $ 185.00 $ 185.00 $ 185.00 12-14. Per Gallon $ 1.36 $ 1.36 $ 1.36 12-15. Per Drum $ 210.00 $ 210.00 $ 210.00 12-16. Per Gallon $ 1.36 $ 1.36 $ 1.36 12-17. Per Week Not Applicable $ 825.00 $ 825.00 12-18. Per Week Not Applicable $ 165.00 $ 165.00

13.

13-1. Per Square Foot $ 8.50 $ 8.50 $ 8.50 13-2. Per Square Foot $ 2.30 $ 2.30 $ 2.30 13-3. Per Square Foot $ 7.00 $ 7.35 $ 7.35 13-4. Per Square Foot $ 2.25 $ 2.25 $ 2.25 13-5. Per Square Foot $ 2.70 $ 2.70 $ 2.70 13-6. Per Square Foot $ 1.25 $ 1.25 $ 1.25 13-7. Per Square Foot $ 0.65 $ 0.65 $ 0.65

Concrete Paving - 4 inch thickness (includes sub-base) Concrete Paving - additional 1 inch thickness Crushed Lime Rock Cover - 2 inch thickness Grass - Sod Grass - Seed and Mulch

Transport and Disposal of Petroleum Product (bulk) Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Contact Water (bulk) Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) ≤ 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

South

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC858

DEP Restated Agency Term Contract No. GC858 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

DESCRIPTION

14.

14-1. Per Foot $ 30.00 $ 30.00 $ 30.00 14-2. Per Injection Point $ 440.00 $ 440.00 $ 440.00 14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 14-4. Per Week Not Applicable $ 4,095.00 $ 4,299.00 14-5. Per Month Not Applicable $ 7,245.00 $ 7,605.00 15.

15.A.

15-1. Per Linear Foot $ 87.00 Not Applicable…

This is the start of the file's text. The full file is on GovTribe.