CN-370000-GC811-A14.pdf
PDF 538 KB Posted
- Contract number
- GC811
- Issued by
- Florida
About this file
This is Amendment No. 14 to Agency Term Contract No. GC811, a rate increase amendment executed by the Florida Department of Environmental Protection (Department) and Geosyntec Consultants, Inc. (Contractor). The original contract was executed on February 17, 2014, to provide petroleum contamination site response action services in the North Region of Florida. The amendment was signed on May 14, 2024, by Eric Sager, Sr. Principal for Geosyntec Consultants, Inc., and Jessica Kramer, Deputy Secretary for the Florida Department of Environmental Protection.
Amendment No. 14 increases rates across 231 pay items in the contractor's rate schedule, effective for new work assignments offered on or after June 10, 2024 (the Rate Change Date). Rate increases range from approximately 2.85% to 5.00%, with most items receiving the maximum 5% increase authorized under contract provision 11.B.ii. Pay items include field services such as sampling and drilling, laboratory analysis for soil and water testing, remediation system design and installation, equipment mobilization, waste disposal, and professional services including engineering and geological oversight. The new rates are documented in Attachment D (Rate Schedule V3.5), replacing the prior rate schedule (V3.4). All work assignments offered prior to the Rate Change Date continue to apply the previous rate schedule. The amendment does not add, delete, or modify any line items in the contract, only adjusts the rates as specified in Table 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC811-A12.pdf | ||
| CN-370000-GC811-A3.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC811-A17.pdf | ||
| CN-370000-GC811-A4.pdf | ||
| CN-370000-GC811-A6.pdf | ||
| CN-370000-GC811-AR1.pdf | ||
| CN-370000-GC811-CMC2.pdf | ||
| CN-370000-GC811.pdf | ||
| CN-370000-GC811-A10.pdf | ||
| CN-370000-GC811-A15E2.pdf | ||
| CN-370000-GC811-A2.pdf | ||
| CN-370000-GC811-A5.pdf | ||
| CN-370000-GC811-CMC1.pdf | ||
| CN-370000-GC811-CMC3.pdf | ||
| CN-370000-GC807-CO1.pdf | ||
| CN-370000-GC811-A11.pdf | ||
| CN-370000-GC811-A13E1.pdf | ||
| CN-370000-GC811-A16E3.pdf | ||
| CN-370000-GC811-A3.pdf | ||
| CN-370000-GC811-A7.pdf | ||
| CN-370000-GC811-A8.pdf | ||
| CN-370000-GC811-A9.pdf | ||
| CN-370000-GC811-CMC.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC811 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and GEOSYNTEC
CONSULTANTS, INC. (hereinafter "Contractor") executed on February 17, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC811
RATE INCREASE
AMENDMENT NO. 14
Amendment No. 14
DEP Agency Term Contract No. GC811
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 14
DEP Agency Term Contract No. GC811
4.
5.
6.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
716.00$ $751.80
386.57$ $405.89
748.55$ $785.97
1,183.06$ $1,242.21
698.34$ $733.25
39.51$ $41.48
47.42$ $49.79
63.24$ $66.40
159.92$ $167.91
46.67$ $49.00
58.50$ $61.42
43.69$ $45.87
99.55$ $104.52
21.64$ $22.72
564.59$ $592.81
57.86$ $60.75
75.56$ $79.33
102.88$ $108.02
Est %
Rate
Change (2)
+5.00%
+5.00%
+5.00%
+5.00%
8-14.
9-1.
9-2.
9-3.
9-4.
8-6.
8-10.
2-2.
3-4.
3-18.
Sonic Core Sampling - 5 or 10 foot (during boring)
Split Spoon Sampling – 2 foot (during boring) > 100 feet
Description
Table 1. Listed Schedule of Pay Items with Rate Changes
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
File Review
Notice of Discovery of Contamination Package
(Initial or TPOC)
Receptor Survey and Exposure Pathway Identification
(excludes report)
Split Spoon Sampling – 2 foot (during boring) 50 to
100 feet
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Mini Excavator/Loader (Bobcat
TM
) Mobilization - >
100 miles each way
Well Installation - 2 inch diameter (vertical)
Vapor/Ambient Air Sample Collection - SUMMATM
Canister (or equivalent)
Soil/Sediment Sample Collection
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of
Ch. 62-780, F.A.C., except for non-Priority Pollutant
Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram
Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
Well Installation - 4 inch diameter (vertical)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA
8260)
6-3.a.
Pay
Item No.
1-1.
1-3.
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
6-2.a.
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+5.00%
+4.99%
+4.99%
+5.00%
+4.99%
+4.99%
109.30$ $114.76
118.31$ $124.22
82.31$ $86.42
311.85$ $327.44
76.97$ $80.81
107.77$ $113.15
14.69$ $15.42
14.69$ $15.42
14.69$ $15.42
14.69$ $15.42
58.11$ $61.01
72.29$ $75.90
352.24$ $369.85
55.35$ $58.11
72.01$ $75.61
100.42$ $105.44
112.01$ $117.61
51.44$ $54.01
66.11$ $69.41
110.22$ $115.73
+4.99%
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.97%
+4.97%
+4.97%
+4.97%
+4.99%
9-5.
9-6.
9-18.
9-15.
9-8.
9-8.a.
9-9.
9-10.
9-11.
9-12.
9-13.
9-14.
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Water, Priority Pollutant Volatile Organics [for
NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including
1-methylnaphthalene + 2-methylnaphthalene (EPA
610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA
624, EPA 6021 or EPA 8260)
Water, Volatile Organic Halocarbons, except EDB
(EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA
8021 or EPA 8260)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM
D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Soil, Toxicity Characteristic Leaching Procedure-
Extraction Only (EPA 1311)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
9-32.
9-25.
9-27.
9-28.
9-29.
9-30.
9-31.
9-31.a.
+5.00%
+5.00%
+4.99%
+5.00%
+4.99%
+4.99%
+5.00%
117.01$ $122.86
82.31$ $86.42
76.97$ $80.81
13.47$ $14.14
13.47$ $14.14
13.47$ $14.14
14.14$ $14.84
23.14$ $24.29
13.47$ $14.14
13.47$ $14.14
37.42$ $39.29
13.47$ $14.14
13.47$ $14.14
13.47$ $14.14
13.47$ $14.14
16.20$ $17.01
21.60$ $22.68
17.15$ $18.00
17.15$ $18.00
18.00$ $18.90
9-49.
9-50.
9-51.
9-52.
9-53.
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Volatile Organics (EPA
8260)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3
C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM
2320 B)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA
6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA
6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-48.
9-41.
9-42.
9-43.
9-44.
9-44.a.
9-45.
9-46.
9-47.
9-39.
9-40.
9-33.
9-36.
9-37.
9-38.
+4.99%
+4.99%
+4.97%
+4.97%
+4.97%
+4.95%
+4.97%
+5.00%
+4.97%
+4.97%
+5.00%
+4.97%
+4.97%
+4.97%
+4.97%
+5.00%
+5.00%
+4.96%
+4.96%
18.00$ $18.90
27.00$ $28.35
20.26$ $21.27
15.42$ $16.19
15.42$ $16.19
17.15$ $18.00
53.87$ $56.56
80.51$ $84.53
62.37$ $65.48
111.87$ $117.46
0.52$ $0.54 +3.85%
9-57.
9-58.
9-59.
9-60.
9-61.
9-76.
9-55.
9-56.
9-78.
9-79.
9-68.
Water, Residue-nonfilterable [Total Suspended
Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310
C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM
4500-NO2 B or SM 4500-NO3 F)
Additional Laboratory % Surcharge authorized in the
ATC contract for 3 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.
The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Heterotrophic Plate Count (SM 9215 B)
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+4.99%
+4.96%
+4.99%
1.05$ $1.10
52.35$ $54.96
159.10$ $167.05
140.05$ $147.05
180.55$ $189.57
359.52$ $377.49
173.72$ $182.40
288.80$ $303.24
148.83$ $156.27
44.57$ $46.79
44.57$ $46.79
84.49$ $88.71
62.07$ $65.17
3.72$ $3.90
66.53$ $69.85
246.46$ $258.78
51.75$ $54.33
44.35$ $46.56
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
+4.98%
+4.99%
+4.76%
12-5.
12-6.
10-7.
10-9.
10-10.
9-77.
Additional Laboratory % Surcharge authorized in the
ATC contract for 1 Day Turnaround. The quoted price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task.
The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units.
#57 Stone
Pea Gravel
Clean Backfill Material, Compaction and Testing
(includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing
(includes transport) ≤ 300 cubic yards
Flowable Fill Concrete and Installation
LDA Excavation and Loading With Driven Casing >
300 cubic yards
LDA Excavation and Loading With Surface Casing >
300 cubic yards
LDA Excavation and Loading With Driven Casing <
300 cubic yards
LDA Excavation and Loading With Surface Casing ≤
300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport and Disposal of Petroleum Impacted Soil
(includes drum)
Transport and Disposal of Mixed Debris
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
10-11.a.
10-17.
10-11.b.
10-12.a.
10-12.b.
10-13.
10-14.
10-15.
10-16.
12-8.
12-2.
12-9.
+4.99%
+4.84%
+4.99%
+5.00%
+4.99%
+4.98%
44.35$ $46.56
46.94$ $49.28
46.94$ $48.28
258.77$ $271.70
232.78$ $244.41
316.24$ $332.05
10.41$ $10.93
2.94$ $3.08
11.38$ $11.94
2.58$ $2.70
5,852.81$ $6,145.45
5,375.30$ $5,644.06
3,801.60$ $3,991.68
4,276.80$ $4,490.64
6,062.36$ $6,365.47
5,901.98$ $6,197.07
5,658.15$ $5,941.05
5,388.72$ $5,658.15
6,789.84$ $7,129.33
2,597.72$ $2,727.60
2,227.91$ $2,339.30
2,970.55$ $3,119.07
5,941.11$ $6,238.16
8,315.48$ $8,731.25
+5.00%
18-43.
18-53.
16-25.
18-6.
18-20.
18-11.
18-13.
18-15.
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off
Container
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact Water
(includes drum)
Disposal of Petroleum Impacted Soil at a Thermal
Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) > 450 tons
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Groundwater Treatment System - Stand Alone Small -
Long Term > 6 mos.
AS/MPE System Package - Medium
Groundwater Treatment - Add On - Large - Long
Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Short
Term ≤ 6 mos.
MPE System - Large - Long Term > 6 mos.
MPE System - Medium - Long Term > 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Short Term ≤ 6 Months
Thermox/Catox Off Gas Treatment - Add On - Large -
Short Term ≤ 6 mos.
12-18.
13-1.
13-2.
13-3.
13-4.
12-10.
12-11.
12-12.
12-13.
12-15.
18-31.
18-33.
18-34.
18-23.
18-26.
18-28.
+4.98%
+4.99%
+2.85%
+5.00%
+5.00%
+5.00%
+5.00%
+4.76%
+4.92%
+4.65%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
7,707.99$ $8,093.38
9,681.82$ $10,165.91
9,075.84$ $9,529.63
11,237.83$ $11,799.72
2,297.48$ $2,412.35
847.02$ $889.37
1,841.40$ $1,933.47
1,158.05$ $1,215.95
1,808.73$ $1,899.16
14,742.00$ $15,479.10
19,278.00$ $20,241.90
1,871.10$ $1,961.65
3,515.40$ $3,691.17
6,191.64$ $6,501.22
10,120.95$ $10,626.99
4,346.01$ $4,563.31
962.55$ $1,010.67
3,214.89$ $3,375.63
400.62$ $420.65
2,154.60$ $2,262.33
3,742.20$ $3,929.31
1,475.48$ $1,549.25
396.90$ $416.74
142.83$ $149.97
114.26$ $119.97
178.68$ $187.61
170.18$ $178.68
170.18$ $178.68
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
19-20.
19-21.
19-22.
19-23.
21-1.
19-17.
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
19-15.
19-16.
19-26.
20-3.
20-6.
18-58.
19-1.
19-7.
19-18.
19-19.
18-56.
18-54.
18-55.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key)
Professional Engineer (Key)
Construction Drawings and Specs Report
P.G. Field Oversight of Drilling and Boring and Soil-
Boring Logging (Use hourly rate on site specific basis)
Level 1 Remedial Action Plan
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System -
Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Long Term > 6 Months
Level 4 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP
Modification Plan
Level 2 Remedial Action Plan
Scientist/Technical Specialist (Key)
Engineer (Key)
Well Abandonment/Site Restoration Report
Remedial Action General Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non-
Annual
Letter/NPDES Report
21-2.
21-3.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
+4.99%
+5.00%
+4.84%
170.18$ $178.68
825.00$ $866.25
357.53$ $375.40
1,430.25$ $1,501.76
495.05$ $519.80
715.06$ $750.81
536.04$ $562.84
1,430.25$ $1,501.76
893.48$ $938.15
278.99$ $292.92
550.10$ $577.60
316.12$ $331.92
+5.00%
+5.00%
+5.00%
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Project Oversight for Remediation System
Operation and Maintenance
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Weekly Basis
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Daily Basis
P.E. Project Oversight for Remediation Technology
Pilot Testing
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a
Soil Source Removal Report That Includes a
Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering
Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a
Conditional NFA
P.E. Design and Certification of Plans and Project
Oversight of Installation for Engineering Controls
(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
21-11.
21-12.
21-13.
21-15.
21-16.
21-7.a.
21-7.b.
21-8.
21-9.
21-10.
21-4.
21-5.
+5.00%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
268.04$ $281.44
178.68$ $187.61
178.68$ $187.61
268.02$ $281.42
178.68$ $187.61
268.02$ $281.42
1,787.67$ $1,877.05
2,337.72$ $2,454.60
268.04$ $281.44
426.12$ $447.42
715.06$ $750.81
1,168.40$ $1,226.82
178.68$ $187.61
371.08$ $389.63
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
P.E. Review, Evaluation and Certification of a Level
1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot
Test Report
P.E. Review, Evaluation and Certification of a Pilot
Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Non-
Annual Natural Attenuation or Post RA Monitoring
Report That Includes a Recommendation for NFA or a Recommendation to Modify the Approved
Monitoring Plan
P.E. Review, Evaluation and Certification of a Level
2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and Certification of a
Receptor and Exposure Pathway Report
P.E. Review, Evaluation and Certification of As-Built
Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level
4 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
3 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
1 Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level
2 Remedial Action Plan
21-29.
21-17.
21-18.
21-19.
21-20.
21-30.
21-21.
21-22.
21-23.
21-24.
21-25.
21-26.
21-27.
21-28.
268.02$ $281.42
453.61$ $476.29
178.68$ $187.61
178.68$ $187.61
753.46$ $791.13
376.71$ $395.54
+5.00%21-31.
21-32.
21-33.
21-34.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of Annual
PARM Report
P.E. Review, Evaluation, and Certification of
Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a
Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non-
Annual Operation and Maintenance Report That
Includes Significant Proposed Changes to the
Approved RAP
+5.00%
+5.00%
+5.00%
+5.00%