This is Amendment No. 14 to Agency Term Contract No. GC768, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and RNA Consulting Group, LLC. The contract, originally executed on February 21, 2014, provides petroleum contamination site response action services in the Central Region of Florida. The amendment was signed on May 8, 2024, by Robert Brown, President of RNA Consulting Group, LLC, and Jessica Kramer, Deputy Secretary of FDEP.

Amendment No. 14 modifies the rate schedule (Attachment D, Version 3.4) for petroleum remediation services, effective June 10, 2024, for all new work assignments offered on or after the Rate Change Date. The rate increases, which do not exceed the maximum 5% allowable under contract provision 11.B.ii, apply to 61 pay items including services such as well sampling, soil and water testing, pilot testing, dewatering systems, trenching and installation, remediation system oversight, and professional engineer reviews and certifications. Most pay items received a 5.00% increase, with three items receiving slightly lower increases of 4.99%, 4.98%, and 3.90%. Pre-existing rate schedules remain in effect for work assignments offered before the Rate Change Date. All other contract terms and conditions remain unchanged, with this amendment superseding any inconsistent provisions in the original contract.

View the file

Other files

File Type Posted
CN-370000-GC768-A15E2.pdf PDF
CN-370000-GC768-CMC1.pdf PDF
CN-370000-GC768-A10.pdf PDF
CN-370000-GC768-A3.pdf PDF
CN-370000-GC768-A4.pdf PDF
CN-370000-GC768-A5.pdf PDF
CN-370000-GC768-A8.pdf PDF
CN-370000-GC768-AR1.pdf.crdownload CRDOWNLOAD file
CN-370000-GC768-CMC3.pdf PDF
CN-370000-GC768-A11.pdf PDF
CN-370000-GC768-A12.pdf PDF
CN-370000-GC768-A6.pdf PDF
CN-370000-GC768-A7.pdf PDF
CN-370000-GC768-A9.pdf PDF
CN-370000-GC768-CMC2.pdf PDF
CN-370000-GC768-CMC4.pdf PDF
CN-370000-GC768-A13E1.pdf PDF
CN-370000-GC768-A2.pdf PDF
CN-370000-GC768-AR1.pdf PDF
CN-370000-GC768-CMC.pdf PDF
CN-370000-GC768.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes

WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.3) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC768 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and RNA CONSULTING GROUP, LLC (hereinafter "Contractor") executed on February 21, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC768

RATE INCREASE

AMENDMENT NO. 14

Amendment No. 14 DEP Agency Term Contract No. GC768

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 14 DEP Agency Term Contract No. GC768

4.

5.

6.

Attachment D, Rate Schedule (V3.4) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.4) shall apply.

Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing Rate

Agreed New Rate(1)

229.00$ $240.45 100.00$ $105.00 141.00$ $148.05

25.00$ $26.25

25.00$ $26.25

61.50$ $64.57

110.00$ $115.50

250.00$ $262.50

9.00$ $9.45

9.00$ $9.45

3,850.00$ $4,000.00

6,800.00$ $7,140.00 82.80$ $86.94

106.45$ $111.77

33.12$ $34.77

4,725.00$ $4,961.25

550.00$ $577.50

550.00$ $577.50

550.00$ $577.50

550.00$ $577.50

760.00$ $798.00

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00% +5.00%

+4.98%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

Est % Rate

Change(2)

16-6.

16-8.

16-12.

16-14.

15-1.b.

15-1.c.

16-2.

10-2.c.

10-1.c.

9-67.

9-70.

9-18.

8-12.

8-3.

8-11.

Domestic Water Well Sampling

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

6-10.

8-13. Survey Latitude/Longitude of New Monitor Wells

Survey Latitude/Longitude of Existing Monitor Wells

Electronic Data Deliverables (EDD)

Above Grade Well Completion

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Air, Polycyclic Aromatic Hydrocarbons (EPA Method

TO-13)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Dewatering System, up to 12 well points (includes installation)

Sheet Piling Rental for > 20 feet deep Excavation

Direct Push Boring with In-Situ Injection

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - Additional Time

Vapor Extraction Pilot Test - Additional Time

Groundwater Recovery System Pilot Test - Additional Time

Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

Pay Item No.

10-22.

14-1.a.

15-4.d.

15-1.d.

+5.00% +5.00% +5.00%

+5.00%

+5.00%

+3.90%

+5.00%

10,530.00$ $11,056.50

1,815.00$ $1,905.75 3,680.00$ $3,864.00 3,850.00$ $4,042.50 7,675.00$ $8,058.75 3,300.00$ $3,465.00 6,615.00$ $6,945.75

575.00$ $603.75

630.00$ $661.50

1,145.00$ $1,202.25

1,720.00$ $1,806.00

2,165.00$ $2,273.25

2,590.00$ $2,719.50

780.00$ $819.00

1,080.00$ $1,134.00

780.00$ $819.00

455.00$ $477.75

570.00$ $598.50

+5.00%

+5.00%

+5.00%

19-6.

16-24.

16-18.

16-19.

16-20.

16-21.

16-22.

16-23.

P.E. Review, Evaluation and Certification of a Pilot Test Report

P.E. Review, Evaluation and Certification of a Pilot Test Plan

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Level 2 Natural Attenuation Monitoring Plan

Carbon Off Gas Treatment - Add On - Small - Short

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

18-35.

21-11.

21-12.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-9.

21-21.

21-22.

+5.00% +5.00%

+5.00%

+5.00% +5.00% +5.00% +5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

1,260.00$ $1,323.00

1,720.00$ $1,806.00

1,260.00$ $1,323.00

1,260.00$ $1,323.00

800.00$ $840.00

800.00$ $840.00

800.00$ $840.00

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%21-31.

21-32.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan

Notes:

P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action

P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan

21-30.

21-23.

21-24.

21-27.

21-28.