CN-370000-GC750-A5.pdf

PDF 489 KB Posted

Attached to
Master Agreement FL|GC750|fbf37e53414e0f91a5bb5f564211efb9
Contract number
GC750
Issued by
Florida

About this file

This is Amendment No. 5 to Agency Term Contract No. GC750, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and Fourtune 4, Inc d/b/a Environmental Assessments & Consulting. The original contract was executed on February 25, 2014, to provide petroleum contamination site response action services in Florida's Central Region. This amendment modifies the contractor's rate schedule effective for new work assignments offered on or after the Rate Change Date of May 22, 2018, while all pre-Rate Change Date work assignments continue to apply the prior rate schedule.

The amendment increases rates on 104 pay items across the contract's scope of work, with individual rate increases ranging from approximately 3.70% to 5.00%, all within the maximum 5% increase threshold permitted under contract provision 11.B.ii. The revised rates cover comprehensive environmental remediation services including drilling and boring operations, well installation and abandonment, sample collection and laboratory analysis, soil source removal and disposal, remediation system construction and operation, pilot testing, and professional engineering and geology services. Specific examples of rate changes include pay item 1-1 (File Review) increasing from $448.50 to $470.00, pay item 6-12 (Installation of Well Vault) increasing from $1,080.00 to $1,134.00, and pay item 19-11 (Level 1 Remedial Action Plan) increasing from $9,975.00 to $10,400.00. The updated rate schedule is designated as Attachment D (V2.2) and applies only to work assignments offered on or after the effective date, with all other contract terms and conditions remaining unchanged.

View the file

Other files

File Type Posted
CN-370000-GC750-A10.pdf PDF
CN-370000-GC750-A13.pdf PDF
CN-370000-GC750-A2.pdf PDF
CN-370000-GC750-A4.pdf PDF
CN-370000-GC750-CMC1.pdf PDF
CN-370000-GC750-A11.pdf PDF
CN-370000-GC750-A18.pdf PDF
CN-370000-GC750-A7.pdf PDF
CN-370000-GC750-AR1.pdf PDF
CN-370000-GC750-CMC3.pdf PDF
CN-370000-GC750.pdf PDF
CN-370000-GC750-A12.pdf PDF
CN-370000-GC750-A14E1.pdf PDF
CN-370000-GC750-A16E2.pdf PDF
CN-370000-GC750-A17.pdf PDF
CN-370000-GC750-CO1.pdf PDF
PC-370000-GC750.pdf PDF
CN-370000-GC750-A15.pdf PDF
CN-370000-GC750-A3.pdf PDF
CN-370000-GC750-A6.pdf PDF
CN-370000-GC750-A8.pdf PDF
CN-370000-GC750-A9.pdf PDF
CN-370000-GC750-CMC.pdf PDF
CN-370000-GC750-CMC2.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (�New Work� assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department�s data processing of the rate changes (hereinafter �Rate Change Date�); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC750 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING (hereinafter "Contractor") executed on February 25, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC750

RATE INCREASE

AMENDMENT NO. 5

Amendment No. 5 DEP Agency Term Contract No. GC750

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor�s applicable prior Rate Schedule.

Contractor�s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 5 DEP Agency Term Contract No. GC750

4.

5.

6.

Attachment D, Rate Schedule (V2.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V2.2) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department�s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.

Pre-existing Rate

Agreed New Rate(1)

$448.50 $470.00

$212.45 $223.00

$250.46 $262.00 $155.95 $163.50

$179.50 $188.00

$825.00 $866.00

$1,155.00 $1,212.00

$8,250.00 $8,660.00

$9,350.00 $9,817.00

$1,080.00 $1,134.00 $96.75 $101.00

$206.50 $216.00

$235.40 $247.00

$550.00 $577.00 $110.00 $115.00

$28.80 $30.00

$367.20 $385.00

$325.00 $341.00

$165.00 $173.00

$4,095.00 $4,299.00

$7,245.00 $7,605.00

Est % Rate

Change(2)

+4.79%

+4.97%

+4.61% +4.84%

+4.74%

+4.97%

14-4.

14-5.

9-1.

8-11.

2-1.

2-2.

Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot

Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)

Well Redevelopment Installation of Well Vault - 4 x 4 x 2 foot

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

6-12.

6-13.

6-14.

6-15.

7-6.

7-7.

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review Notice of Discovery of Contamination Package (Initial or TPOC) Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Electronic Data Deliverables (EDD) Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)

Additional Dewatering System Well Points (2) (includes installation) Additional Rental of 20 Cubic Yard Roll-Off Container

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

Pay Item No.

1-1.

1-3.

1-5.

3-14.a.

3-8.a.

3-10.a.

10-23.

12-18.

+4.94%

+4.97%

+4.99%

+5.00% +4.39%

+4.60%

+4.93%

+4.85%

+4.91% +4.55% +4.17%

+4.92%

+4.98%

+4.97%

+4.85%

$69.25 $72.50

$74.50 $78.00 $85.00 $89.00

$18.90 $19.80

$13.15 $13.75

$4,350.00 $4,560.00

$510.00 $535.00

$3,260.00 $3,423.00

$4,900.00 $5,100.00 $5,100.00 $5,350.00 $4,900.00 $5,145.00 $3,850.00 $4,040.00 $5,500.00 $5,775.00 $2,120.00 $2,226.00 $2,625.00 $2,750.00 $2,990.00 $3,120.00

$5,500.00 $5,775.00

$8,500.00 $8,920.00

$5,500.00 $5,775.00

$9,500.00 $9,975.00

$2,200.00 $2,300.00

$2,550.00 $2,670.00

$2,205.00 $2,315.00

$3,727.00 $3,900.00

$2,887.00 $3,020.00

+4.83%

+4.90%

+4.70% +4.71%

+4.76%

+4.56%

16-24.

16-25.

18-5.

18-7.

18-8.

18-9.

16-28.

17-2.

17-3.

17-4.

18-11.

18-13.

18-14.

18-15.

18-16.

16-17.

16-13.

16-14.

16-20.

16-22.

15-1.a.

15-1.b.

15-1.c. Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Groundwater Treatment System - Stand Alone Large

- Short Term 6 mos.

Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Medium - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Small

- Short Term 6 mos.

System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium SVE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Air Sparge System - Medium - Short Term 6 mos.

Air Sparge System - Small - Short Term 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Large - Short Term 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

15-2.a.

15-1.d.

+4.69%

+4.08%

+5.00%

+4.90% +5.00% +4.94% +5.00% +5.00% +4.76% +4.35%

+5.00%

+4.94%

+5.00%

+5.00%

+4.55%

+4.71%

+4.99%

+4.64%

+4.61%

$3,517.00 $3,690.00

$2,782.00 $2,920.00

$3,727.00 $3,910.00

$3,517.00 $3,690.00

$4,672.00 $4,900.00

$3,937.00 $4,130.00

$3,950.00 $4,140.00

$4,500.00 $4,720.00

$5,500.00 $5,770.00

$1,500.00 $1,575.00

$2,260.00 $2,370.00

$1,800.00 $1,890.00

$1,150.00 $1,200.00

$1,600.00 $1,680.00

$1,350.00 $1,417.00

$2,640.00 $2,770.00

$2,530.00 $2,650.00

$3,080.00 $3,230.00

$2,970.00 $3,118.00

$5,720.00 $6,000.00

$5,500.00 $5,770.00

$6,600.00 $6,930.00

+4.92%

+4.88%

18-47.

18.48.

18-49.

18-50.

18-51.

18-53.

18-55.

18-21.

18-22.

18-20.

18-17.

18-18.

18-19.

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short Term 6 mos.

Groundwater Treatment - Add On - Medium - Short Term 6 mos.

Groundwater Treatment - Add On - Small - Short Term 6 mos.

MPE System - Large - Short Term 6 mos.

MPE System - Medium - Short Term 6 mos.

MPE System - Small - Short Term 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Large - Short Term 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Medium - Short Term 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Small - Short Term 6 mos.

Soil Vapor Extraction (SVE) System - Large - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Medium - Short Term 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Small - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Medium - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Small - Short Term 6 Months

18-29.

18-30.

18-31.

18-32.

18-33.

18-34.

18-23.

18-25.

18-27.

+4.90%

+4.81%

+4.89%

+4.91%

+5.00%

+4.87%

+5.00%

+4.35%

+5.00%

+4.96%

+4.92%

+4.96%

+4.91%

+4.92%

+4.74%

+4.87%

+4.98%

+4.90%

+4.91%

+5.00%

$6,050.00 $6,350.00

$7,370.00 $7,730.00

$6,930.00 $7,270.00

$2,310.00 $2,420.00 $1,600.00 $1,680.00

$850.00 $890.00 $9,975.00 $10,400.00

$11,550.00 $12,120.00

$2,150.00 $2,250.00

$3,675.00 $3,850.00

$6,300.00 $6,600.00

$3,000.00 $3,150.00 $2,205.00 $2,300.00

$535.00 $561.00

$535.00 $561.00

$805.00 $845.00

$1,060.00 $1,113.00

$1,560.00 $1,638.00

$270.00 $280.00

$670.00 $700.00

$270.00 $283.00

+4.96%

+4.88%

19-17.

19-11.

19-12.

19-14.

19-15.

19-16.

18-57.

18-58.

19-3.

19-4.

19-5.

19-19.

18-56.

Remedial Action Startup Report Construction Drawings and Specs Report

P.E. Project Oversight for Remediation System Operation and Maintenance

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Weekly Basis

P.E. Project Oversight for Short Term or Episodic Remediation System Operation - Daily Basis

P.E. Project Oversight for Remediation System Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System Integration and Startup - Large System

P.E. Project Oversight for Remediation System Integration and Startup - Medium System

P.E. Project Oversight for Remediation System Integration and Startup - Small System

P.E. Project Oversight for Remediation Technology Pilot Testing

Level 1 Remedial Action Plan Receptor and Exposure Pathway Report Supplemental Site Assessment Report General Site Assessment Report

Air Sparge/Multiphase Extraction (AS/MPE) System

- Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Large - Short Term 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System

- Medium - Long Term > 6 Months

Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

Level 2 Remedial Action Plan

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-7.a.

21-7.b.

21-8.

21-5.

+4.91%

+4.76% +5.00% +4.71% +4.26%

+4.65%

+4.76%

+4.76%

+5.00% +4.31%

+4.86%

+4.86%

+4.97%

+5.00%

+5.00%

+3.70%

+4.48%

+4.81%

+4.94%

$535.00 $561.00

$1,060.00 $1,113.00

$535.00 $561.00

$262.50 $275.00

$395.00 $414.00 +4.81%

+4.86%

21-31.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA

Notes:

P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP

P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA

P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA

P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

21-11.

21-12.

21-13.

21-9.

+4.86%

+4.76%

+5.00%

Printed Printed Name: Name:

Title: Title:

Date: Date:

Signature of Authorized Representative Signature of Authorized Representative

Type Letter/Number Description Attachment D (V2.2) Rate Schedule (27 pages)

FOURTUNE 4, INC D/B/A

ENVIRONMENTAL ASSESSMENTS &

CONSULTING

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

FEID No.: 271153638

List of attachments/exhibits included as part of this Amendment:

Signature of Processor Printed Name of Processor Data Entry Date

The Table 1 rate changes have been entered in the Department�s processing system with an effective Rate Change Date of:

Corresponding Rate Schedule, Attachment D Version No. V2.2

Department Data Processing Information:

IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.

PAY

ITEM UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

1.

1-1. Per Review $ 427.39 $ 448.50 $ 470.00 1-2. Per Site $ 291.81 $ 291.81 $ 291.81

1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 212.45 $ 212.45 $ 223.00 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 250.46 $ 250.46 $ 262.00

1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.

2-1. Per Visit $ 148.56 $ 155.95 $ 163.50 2-2. Per Survey $ 170.95 $ 179.50 $ 188.00 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 850.00 $ 850.00 $ 850.00 3.

3-1. Per Round Trip $ 425.00 $ 425.00 $ 425.00 3-2. Per Round Trip $ 550.00 $ 550.00 $ 550.00 3-3. Per Round Trip $ 500.00 $ 500.00 $ 500.00 3-4. Per Round Trip $ 750.00 $ 750.00 $ 750.00 3-5. Per Round Trip $ 200.00 $ 200.00 $ 200.00 3-6. Per Round Trip $ 300.00 $ 300.00 $ 300.00

DESCRIPTION

OFFICE ACTIVITIES

File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order) Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 550.00 $ 550.00 3-8. Per Round Trip $ 650.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 825.00 $ 866.00 3-9. Per Round Trip $ 550.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 808.50 $ 808.50

3-10. Per Round Trip $ 800.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,155.00 $ 1,212.00

3-11. Per Round Trip $ 600.00 $ 600.00 $ 600.00 3-12. Per Round Trip $ 950.00 $ 950.00 $ 950.00 3-13. Per Round Trip $ 7,500.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 8,250.00 $ 8,660.00 3-14. Per Round Trip $ 10,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 9,350.00 $ 9,817.00 3-15. Per Round Trip $ 550.00 $ 550.00 $ 550.00 3-16. Per Round Trip $ 950.00 $ 950.00 $ 950.00 3-17. Per Round Trip $ 450.00 $ 450.00 $ 450.00 3-18. Per Round Trip $ 700.00 $ 700.00 $ 700.00 3-19. Per Round Trip Not Applicable $ 385.00 $ 385.00 3-20. Per Round Trip Not Applicable $ 495.00 $ 495.00

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way

Drum Compactor mobilization - > 100 miles each way

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

4.

4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 32.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 26.50 $ 26.50 5-1.a.2. Per Spoon Not Applicable $ 35.22 $ 35.22 5-1.a.3. Per Spoon Not Applicable $ 41.80 $ 41.80 5-1.b. Per Core $ 120.00 $ 120.00 $ 120.00 5-1.c. Per Core $ 35.00 Not Applicable Not Applicable 5-2. Per Boring $ 200.00 $ 200.00 $ 200.00 5-3. Per Foot $ 16.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,500.00 $ 2,500.00 5-4. Per Foot $ 23.00 Not Applicable Not Applicable 5-5. Per Foot $ 34.00 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 2,830.00 $ 2,830.00

5-6. Per Foot $ 25.00 $ 25.00 $ 25.00

Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

5-7. Per Foot $ 28.00 $ 29.40 $ 29.40 5-8. Per Foot $ 30.00 $ 30.00 $ 30.00 5-9. Per Foot $ 30.00 $ 31.50 $ 31.50

5-10. Per Foot $ 31.00 $ 32.50 $ 32.50 5-11. Per Foot $ 38.00 $ 38.00 $ 38.00 5-12. Per Foot $ 34.00 $ 35.70 $ 35.70 5-13. Per Foot $ 37.00 $ 38.85 $ 38.85 5-14. Per Foot $ 45.00 $ 47.25 $ 47.25 5-15. Per Foot $ 33.00 $ 33.00 $ 33.00 5-16. Per Foot $ 36.00 $ 36.00 $ 36.00 5-17. Per Foot $ 43.00 $ 43.00 $ 43.00 5-18. Per Foot $ 37.50 $ 39.30 $ 39.30 5-19. Per Foot $ 43.00 $ 45.10 $ 45.10 5-20. Per Foot $ 49.00 $ 49.00 $ 49.00 5-21. Per Foot $ 59.50 $ 62.25 $ 62.25 5-22. Per Foot $ 68.00 $ 71.25 $ 71.25 5-23. Per Foot $ 85.00 $ 85.00 $ 85.00

6.

6-1. Per Foot $ 26.50 $ 26.50 $ 26.50 6-2. Per Foot $ 33.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 27.25 $ 27.25 6-2.b. Per Foot Not Applicable $ 79.75 $ 79.75

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

6-3. Per Foot $ 42.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 38.25 $ 38.25 6-3.b. Per Foot Not Applicable $ 104.25 $ 104.25 6-4. Per Foot $ 48.00 $ 48.00 $ 48.00 6-5. Per Foot $ 37.50 $ 37.50 $ 37.50 6-6. Per Foot $ 48.50 $ 48.50 $ 48.50 6-7. Per Foot $ 58.00 $ 58.00 $ 58.00 6-8. Per Foot $ 64.00 $ 64.00 $ 64.00

6-9.a. Per Foot $ 6.50 $ 6.50 $ 6.50 6-9.b. Per Foot $ 9.00 $ 9.00 $ 9.00 6-9.c. Per Foot $ 15.00 $ 15.00 $ 15.00 6-9.d. Per Foot $ 18.00 $ 18.00 $ 18.00 6-10. Per Well $ 288.00 $ 288.00 $ 288.00 6-11. Per Vault $ 640.00 $ 640.00 $ 640.00 6-12. Per Vault $ 1,080.00 $ 1,080.00 $ 1,134.00 6-13. Per Well Not Applicable $ 96.75 $ 101.00

6-14. Per Well Not Applicable $ 206.50 $ 216.00

6-15. Per Well Not Applicable $ 235.40 $ 247.00

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)

Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

7.

7-1. Per Foot $ 14.50 $ 15.20 $ 15.20 7-2. Per Foot $ 21.00 $ 21.00 $ 21.00 7-3. Per Foot $ 21.00 $ 21.00 $ 21.00 7-4. Per Foot $ 25.00 $ 25.00 $ 25.00 7-5. Per Vault $ 350.00 $ 350.00 $ 350.00 7-6. Per Vault $ 550.00 $ 550.00 $ 577.00 7-7 Per Well Not Applicable $ 110.00 $ 115.00 8.

8-1. Per Well $ 150.00 $ 157.50 $ 157.50 8-2. Per Well $ 210.00 $ 210.00 $ 210.00 8-3. Per Well $ 100.00 $ 100.00 $ 100.00 8-4. Per Sample $ 95.00 $ 95.00 $ 95.00 8-5. Per Sample $ 83.00 $ 83.00 $ 83.00 8-6. Per Sample $ 50.00 $ 50.00 $ 50.00 8-7. Per Well $ 20.00 $ 20.00 $ 20.00 8-8. Per Well $ 110.00 $ 110.00 $ 110.00

8-9. Per Sample $ 50.00 $ 50.00 $ 50.00

8-10. Per Sample $ 80.00 $ 80.00 $ 80.00 8-11. Per Sampling Event Not Applicable $ 28.80 $ 30.00 8-12. Per Well Not Applicable $ 60.00 $ 60.00

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole

Survey Latitude/Longitude of Existing Monitor Wells

Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

8-13. Per Well Not Applicable $ 80.00 $ 80.00

8-14 Per Sample Not Applicable $ 15.00 $ 15.00

9.

9.A.

9-1. Per Sample $ 367.20 $ 367.20 $ 385.00

9-2. Per Sample $ 45.36 $ 45.36 $ 45.36 9-3. Per Sample $ 64.80 $ 64.80 $ 64.80 9-4. Per Sample $ 70.20 $ 70.20 $ 70.20 9-5. Per Sample $ 86.40 $ 86.40 $ 86.40 9-6. Per Sample $ 91.80 $ 91.80 $ 91.80

9-7. Per Sample $ 270.00 $ 270.00 $ 270.00

9-8. Per Sample $ 66.95 $ 66.95 $ 66.95 9-8.a. Per Sample Not Applicable $ 210.00 $ 210.00 9-9. Per Sample $ 61.56 $ 61.56 $ 61.56

9-10. Per Sample $ 86.40 $ 86.40 $ 86.40

9-11. Per Sample $ 10.80 $ 10.80 $ 10.80

Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

9-12. Per Sample $ 10.80 $ 10.80 $ 10.80 9-13. Per Sample $ 10.80 $ 10.80 $ 10.80 9-14. Per Sample $ 10.80 $ 10.80 $ 10.80 9-15. Per Sample $ 27.00 $ 27.00 $ 27.00 9-16. Per Sample $ 27.00 $ 27.00 $ 27.00 9-17. Per Sample $ 43.20 $ 43.20 $ 43.20

9-18. Per Sample $ 70.20 $ 70.20 $ 70.20

9-19. Per Sample $ 14.04 $ 14.04 $ 14.04 9-20. Per Sample $ 70.20 $ 70.20 $ 70.20

9-21. Per Sample $ 320.00 $ 320.00 $ 320.00

9-22. Per Sample $ 600.00 $ 600.00 $ 600.00

9-23. Per Sample $ 65.00 $ 65.00 $ 65.00

9-24. Per Sample $ 210.00 $ 210.00 $ 210.00 9.B.

9-25. Per Sample $ 259.20 $ 259.20 $ 259.20

9-26. Per Sample $ 388.80 $ 388.80 $ 388.80

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

9-27. Per Sample $ 43.20 $ 43.20 $ 43.20 9-28. Per Sample $ 60.00 $ 60.00 $ 60.00 9-29. Per Sample $ 70.20 $ 70.20 $ 70.20

9-30. Per Sample $ 86.40 $ 86.40 $ 86.40

9-31. Per Sample $ 43.20 $ 43.20 $ 43.20 9-31.a. Per Sample Not Applicable $ 53.50 $ 53.50 9-32. Per Sample $ 86.40 $ 86.40 $ 86.40 9-33. Per Sample $ 91.80 $ 91.80 $ 91.80

9-34. Per Sample $ 226.80 $ 226.80 $ 226.80

9-35. Per Sample $ 270.00 $ 270.00 $ 270.00

9-36. Per Sample $ 64.80 $ 64.80 $ 64.80 9-37. Per Sample $ 64.80 $ 64.80 $ 64.80 9-38. Per Sample $ 10.80 $ 10.80 $ 10.80 9-39. Per Sample $ 10.80 $ 10.80 $ 10.80 9-40. Per Sample $ 10.80 $ 10.80 $ 10.80 9-41. Per Sample $ 10.80 $ 10.80 $ 10.80

9-41.a. Per Sample Not Applicable $ 29.50 $ 29.50

9-42. Per Sample $ 10.80 $ 10.80 $ 10.80

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

9-43. Per Sample $ 10.80 $ 10.80 $ 10.80 9-44. Per Sample $ 10.80 $ 10.80 $ 10.80

9-44.a. Per Sample Not Applicable $ 29.50 $ 29.50

9-45. Per Sample $ 10.80 $ 10.80 $ 10.80 9-46. Per Sample $ 10.80 $ 10.80 $ 10.80 9-47. Per Sample $ 10.80 $ 10.80 $ 10.80 9-48. Per Sample $ 10.80 $ 10.80 $ 10.80 9-49. Per Sample $ 10.80 $ 10.80 $ 10.80

9-50. Per Sample $ 16.20 $ 16.20 $ 16.20

9-51. Per Sample $ 12.96 $ 12.96 $ 12.96

9-52. Per Sample $ 12.96 $ 12.96 $ 12.96 9-53. Per Sample $ 12.96 $ 12.96 $ 12.96

9-54. Per Sample $ 14.58 $ 14.58 $ 14.58

9-55. Per Sample $ 12.96 $ 12.96 $ 12.96 9-56. Per Sample $ 21.60 $ 21.60 $ 21.60

9-57. Per Sample $ 16.35 $ 16.35 $ 16.35

9-58. Per Sample $ 12.12 $ 12.12 $ 12.12

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

9-59. Per Sample $ 12.65 $ 12.65 $ 12.65

9-60. Per Sample $ 12.96 $ 12.96 $ 12.96

9-61. Per Sample $ 40.24 $ 40.24 $ 40.24

9-62. Per Sample $ 942.00 $ 942.00 $ 942.00

9-63. Per Sample $ 972.00 $ 972.00 $ 972.00

9-64. Per Sample $ 355.00 $ 355.00 $ 355.00

9-65. Per Sample $ 525.00 $ 525.00 $ 525.00

9-66. Per Sample $ 54.00 $ 54.00 $ 54.00

9-67. Per Sample $ 226.80 $ 226.80 $ 226.80 9-78. Per Sample Not Applicable $ 47.50 $ 47.50 9-79. Per Sample Not Applicable $ 36.75 $ 36.75 9-80. Per Sample Not Applicable $ 68.25 $ 68.25

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

9.C.

9-68. Per Sample $ 91.80 $ 91.80 $ 91.80 9-69. Per Sample $ 218.70 $ 218.70 $ 218.70 9-70. Per Sample $ 243.00 $ 243.00 $ 243.00 9-71. Per Sample $ 270.00 $ 270.00 $ 270.00 9.D.

9-72. Per Sample $ 226.80 $ 226.80 $ 226.80

9-73. Per Sample $ 605.00 $ 605.00 $ 605.00

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75. Percent Surcharge $ - $ - $ -

9-76. Percent Surcharge $ 0.50 $ 0.50 $ 0.50

9-77. Percent Surcharge $ 1.00 $ 1.00 $ 1.00

10.

10-1. Per Sq. Foot/Day $ 40.00 Not Applicable Not Applicable

10-1.a Per Sq. Foot Not Applicable $ 15.40 $ 15.40

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID) Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for ≤ 20 feet deep Excavation

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

10.1.b Per Sq. Foot/Day Not Applicable $ 3.50 $ 3.50 10.1.c Per Sq. Foot/Week Not Applicable $ 10.00 $ 10.00 10.1.d Per Sq. Foot/Month Not Applicable $ 14.00 $ 14.00 10-2. Per Sq. Foot/Week $ 40.00 Not Applicable Not Applicable

10-2.a Per Sq. Foot Not Applicable $ 19.40 $ 19.40 10.2.b Per Sq. Foot/Day Not Applicable $ 6.00 $ 6.00 10.2.c Per Sq. Foot/Week Not Applicable $ 8.00 $ 8.00 10.2.d Per Sq. Foot/Month Not Applicable $ 19.50 $ 19.50 10-3. Per Sq. Foot/Month $ 48.40 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 57.00 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 57.00 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 61.00 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 35.00 $ 36.75 $ 36.75 10-8. Per Cubic Yard $ 32.00 $ 32.00 $ 32.00 10-9. Per Cubic Yard $ 115.00 $ 115.00 $ 115.00

10-10. Per Cubic Yard $ 105.00 $ 105.00 $ 105.00 10-11.a. Per Cubic Yard $ 145.00 $ 145.00 $ 145.00 10-11.b. Per Cubic Yard $ 300.00 $ 300.00 $ 300.00 10-12.a. Per Cubic Yard $ 143.00 $ 143.00 $ 143.00 10-12.b. Per Cubic Yard $ 245.00 $ 245.00 $ 245.00 10-13. Per Cubic Yard $ 105.00 $ 105.00 $ 105.00 10-14. Per Cubic Yard $ 33.00 $ 34.65 $ 34.65

Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling Rental for ≤ 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation

Conventional Soil Excavation and Loading ≤ 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing ≤ 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for ≤ 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)

LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

10-15. Per Cubic Yard $ 30.00 $ 31.50 $ 31.50 10-15.a. Per Cubic Yard Not Applicable $ 16.00 $ 16.00 10-15.b. Per Cubic Yard Not Applicable $ 16.00 $ 16.00 10-16. Per Ton $ 60.00 $ 60.00 $ 60.00 10-17. Per Ton $ 45.00 $ 45.00 $ 45.00 10-18. Per Day $ 3,300.00 $ 3,300.00 $ 3,300.00 10-19. Per Day $ 325.00 $ 325.00 $ 325.00 10-20. Per Week $ 7,700.00 $ 7,700.00 $ 7,700.00 10-21. Per Week $ 325.00 $ 325.00 $ 325.00 10-22. Per Month $ 17,500.00 $ 17,500.00 $ 17,500.00 10-23. Per Month $ 325.00 $ 325.00 $ 341.00

11.

11-1. Per Tank $ 6,325.00 $ 6,325.00 $ 6,325.00 11-2. Per Tank $ 8,325.00 $ 8,325.00 $ 8,325.00 11-3. Per Tank $ 9,000.00 $ 9,000.00 $ 9,000.00 11-4. Per Tank $ 13,500.00 $ 13,500.00 $ 13,500.00 12.

12-1. Per Square Foot $ 3.93 $ 3.93 $ 3.93 12-2. Per Square Foot $ 2.50 $ 2.50 $ 2.50 12-3. Per Ton $ 50.00 $ 50.00 $ 50.00 12-4. Per Ton $ 40.00 $ 40.00 $ 40.00 12-5. Per Ton $ 45.00 $ 45.00 $ 45.00

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel #57 Stone Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation)

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness Additional Removal/Loading Cost for Concrete - > 4 inch thickness Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

12-6. Per Drum $ 195.00 $ 195.00 $ 195.00 12-7. Per Ton $ 21.00 $ 21.00 $ 21.00 12-8. Per Ton $ 40.00 $ 40.00 $ 40.00 12-9. Per Ton $ 32.00 $ 32.00 $ 32.00

12-10. Per Ton $ 30.00 $ 30.00 $ 30.00 12-11. Per Ton $ 31.50 $ 33.00 $ 33.00 12-12. Per Ton $ 30.45 $ 31.95 $ 31.95 12-13. Per Drum $ 185.00 $ 185.00 $ 185.00 12-14. Per Gallon $ 1.15 $ 1.15 $ 1.15 12-15. Per Drum $ 210.00 $ 210.00 $ 210.00 12-16. Per Gallon $ 1.15 $ 1.15 $ 1.15 12-17. Per Week Not Applicable $ 825.00 $ 825.00 12-18. Per Week Not Applicable $ 165.00 $ 173.00

13.

13-1. Per Square Foot $ 8.50 $ 8.50 $ 8.50 13-2. Per Square Foot $ 2.30 $ 2.30 $ 2.30 13-3. Per Square Foot $ 7.00 $ 7.00 $ 7.00 13-4. Per Square Foot $ 2.15 $ 2.15 $ 2.15 13-5. Per Square Foot $ 4.00 $ 4.00 $ 4.00 13-6. Per Square Foot $ 1.40 $ 1.40 $ 1.40 13-7. Per Square Foot $ 0.65 $ 0.65 $ 0.65

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Contact Water (bulk) Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) ≤ 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

Concrete Paving - 4 inch thickness (includes sub-base) Concrete Paving - additional 1 inch thickness Crushed Lime Rock Cover - 2 inch thickness Grass - Sod Grass - Seed and Mulch

Transport and Disposal of Petroleum Product (bulk) Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

14.

14-1. Per Foot $ 30.00 $ 30.00 $ 30.00 14-2. Per Injection Point $ 440.00 $ 440.00 $ 440.00 14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 14-4. Per Week Not Applicable $ 4,095.00 $ 4,299.00 14-5. Per Month Not Applicable $ 7,245.00 $ 7,605.00 15.

15.A.

15-1. Per Linear Foot $ 74.00 Not Applicable Not Applicable

15-1.a. Per Linear Foot of Trench Not Applicable $ 69.25 $ 72.50

15-1.b. Per Linear Foot of Trench Not Applicable $ 74.50 $ 78.00

15-1.c. Per Linear Foot of Trench Not Applicable $ 85.00 $ 89.00

15-1.d. Per Linear Foot of Trench Not Applicable $ 18.90 $ 19.80

15-2. Per Linear Foot $ 20.00 Not Applicable Not Applicable

15-2.a. Per Foot Not Applicable $ 13.15 $ 13.75

IN-SITU INJECTION

TRENCHING

Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Trenching and Installation of 11 - 20 Lines

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Direct Push Boring with In-Situ Injection In-Situ Injection Into Existing Well/Treatment Point Materials to be Injected Groundwater Injection System (not by direct push) Groundwater Injection System (not by direct push)

REMEDIAL ACTION CONSTRUCTION

Trenching and Installation - Additional 2 plumbing lines Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED

ITEM PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

DESCRIPTION

Region:

Contractor:

Contract #:

Central

FOURTUNE 4, INC D/B/A ENVIRONMENTAL ASSESSMENTS & CONSULTING

GC750

DEP Restated Agency Term Contract No. GC750 Amendment No. 5

Attachment D (V2.2) ‐ Rate Schedule

15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00 15.B.

15-4. Per Integration / Startup $ 12,000.00 Not Applicable Not Applicable

15-4.a Per Startup Not Applicable $ 19,305.00 $ 19,305.00

15-4.b Per Startup Not Applicable $ 21,450.00 $ 21,450.00

15-4.c Per Startup Not Applicable $ 24,750.00 $ 24,750.00

15-4.d Per Startup Not Applicable $ 2,800.00 $ 2,800.00

15-5. Per Additional Tech Component $ 3,250.00 $ 3,250.00 $ 3,250.00

15-6. Per 2 Recovery / Treatment Points $ 950.00 Not Applicable Not Applicable

15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00

System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points

System…

This is the start of the file's text. The full file is on GovTribe.