CN-370000-GC738-A9.pdf
PDF 379 KB Posted
- Contract number
- GC738
- Issued by
- Florida
About this file
DEP Agency Term Contract No. GC738 Amendment No. 9
This is Amendment No. 9 to Agency Term Contract No. GC738, a language amendment with rate increase executed between the Florida Department of Environmental Protection (FDEP) and Ardaman & Associates, Inc. (FEID No. 592984496). The original contract, executed on March 18, 2014, provides petroleum contamination site response action services in the Central Region of Florida. The amendment was executed on June 1, 2023, with an effective rate change date of 6/1/2023.
The amendment modifies the rate schedule for petroleum restoration program services without adding, deleting, or otherwise modifying any line items contained in the original contract. Rate increases apply exclusively to new work assignments offered on or after the Rate Change Date, while all pre-rate change work assignments continue to apply the prior rate schedule. The amended rate schedule (Attachment D, Version 3.2) encompasses over 200 pay items covering site assessment, drilling and boring, well installation and maintenance, laboratory analysis, remediation services, and disposal operations. Rate increases range from approximately 0.43% to 7.50%, with most increases clustered between 4% and 5%. The amendment also adds a requirement for photo documentation of drum interiors to ensure compliance with the industry standard of 75% capacity. Additionally, the amendment clarifies that no new purchase orders or task assignments will be issued after the renewal term expires, though existing assignments may continue for up to twelve months for completion purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC738-AR1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC738-A13.pdf | ||
| CN-370000-GC738-A3.pdf | ||
| CN-370000-GC738-A7.pdf | ||
| CN-370000-CN304-Task 2.pdf | ||
| CN-370000-GC738-A10.pdf | ||
| CN-370000-GC738-A11E2.pdf | ||
| CN-370000-GC738-A12E3.pdf | ||
| CN-370000-GC738-A5.pdf | ||
| CN-370000-GC738-A6.pdf | ||
| CN-370000-GC738-A8.pdf | ||
| CN-370000-GC738-AR1.pdf | ||
| CN-370000-GC738-CMC.pdf | ||
| CN-370000-GC738-A2.pdf | ||
| CN-370000-GC738-A4.pdf | ||
| CN-370000-GC738-CMC1.pdf | ||
| CN-370000-GC738.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
4.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.1) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC738 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and ARDAMAN &
ASSOCIATES, INC. (hereinafter "Contractor") executed on March 18, 2014, to provide petroleum contamination site response action services in the Central Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC738
LANGUAGE AMENDMENT WITH
RATE INCREASE
AMENDMENT NO. 9
Amendment No. 9
DEP Agency Term Contract No. GC738
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Attachment D, Rate Schedule (V3.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.2) shall apply.
Amendment No. 9
DEP Agency Term Contract No. GC738
5.
6.
C.
7.
8.
The following provision is hereby added to paragraph 4, Term of Contract:
This amendment shall include an update to ATTACHMENT A (V2.0), SCOPE OF SERVICES, V.
Technical Specification, B. Schedule of Pay Items, Section 12. DEBRIS, WASTE AND
PRODUCT REMOVAL AND DISPOSAL, as follows:
No new Purchase Orders or Task Assignments shall be issued or executed after renewal term. However, the Restated Contract shall continue in effect up to twelve months after expiration of the renewal term for completion of any Purchase Order or Task Assignment issued/executed during the renewal term. Purchase Orders or Task Assignments, completion of which that extends beyond the renewal term shall continue to be subject to change, as appropriate.
Photo documentation of the inside of the drums is required to ensure drums meet the industry wide standard of being 75% full.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change
Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate(1)
560.00$ $ 575.00
30.00$ $ 31.00
32.00$ $ 33.00
35.00$ $ 36.00
125.00$ $ 130.00
135.20$ $ 140.00
3,000.00$ $ 3,150.00
25.00$ $ 26.00
29.50$ $ 31.00
35.00$ $ 36.00
30.00$ $ 31.00
35.00$ $ 36.00
40.00$ $ 42.00
37.44$ $ 39.00
42.00$ $ 44.00
47.00$ $ 49.00
32.00$ $ 33.00
35.00$ $ 36.00
42.00$ $ 43.00
Est %
Rate
Change(2)
+2.68%
+5.00%
5-9.
5-10.
5-11.
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
Split Spoon Sampling – 2 foot (during boring) >
100 feet
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and
Equipment
Description
Table 1. Listed Schedule of Pay Items with Rate Changes
DPT Rig and Support Vehicles Mobilization - ≤
100 miles each way
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, >
100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, <
50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, >
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, <
50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
Split Spoon Sampling – 2 foot (during boring)
50 to 100 feet
Split Spoon Sampling – 2 foot (during boring) <
50 feet
Pay Item No.
3-7.a.
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-6.
5-7.
5-17.
5-12.
5-13.
5-14.
5-15.
5-16.
5-8.
+3.33%
+3.13%
+2.86%
+4.00%
+3.55%
+5.00%
+4.00%
+5.08%
+2.86%
+3.33%
+2.86%
+4.17%
+4.76%
+4.26%
+3.13%
+2.86%
+2.38%
40.00$ $ 43.00
46.00$ $ 48.00
57.00$ $ 59.00
60.00$ $ 62.00
65.50$ $ 67.00
78.00$ $ 81.00
24.96$ $ 26.20
28.10$ $ 29.50
125.00$ $ 130.00
33.20$ $ 34.75
125.00$ $ 130.00
37.44$ $ 39.00
32.24$ $ 33.75
35.36$ $ 37.00
46.80$ $ 48.00
57.20$ $ 60.00
6.24$ $ 6.50
8.32$ $ 8.50
9.36$ $ 9.75
11.44$ $ 12.00
450.00$ $ 472.50
520.00$ $ 546.00
832.00$ $ 870.00
125.00$ $ 130.00
200.00$ $ 210.00
250.00$ $ 255.00
18.00$ $ 18.90
6-5.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
6-7.
6-8.
Well Redevelopment
Installation of Well Vault - 4 x 4 x 2 foot
Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
7-1.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-12.
6-13.
6-14.
6-15.
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, 1 to 2 inch diameter
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Surface Casing - 12 inch diameter
Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-18.
5-19.
5-20.
5-21.
5-22.
5-23.
6-1.
6-2.a.
+4.00%
+4.17%
+4.68%
+4.64%
+2.56%
+4.90%
+4.17%
+2.16%
+4.17%
+4.90%
+5.00%
+5.00%
+4.57%
+4.00%
+7.50%
+4.35%
+3.51%
+3.33%
+2.29%
+3.85%
+4.97%
+4.98%
+4.00%
+4.67%
+5.00%
+2.00%
+5.00%
22.00$ $ 23.10
27.04$ $ 28.25
29.12$ $ 30.50
374.40$ $ 393.00
540.80$ $ 567.00
150.00$ $ 157.50
190.00$ $ 199.00
230.00$ $ 240.00
85.00$ $ 88.50
28.00$ $ 29.25
493.00$ $ 510.00
46.00$ $ 48.00
63.25$ $ 66.25
79.00$ $ 82.25
90.00$ $ 94.00
81.00$ $ 84.75
68.00$ $ 71.00
250.00$ $ 260.00
79.00$ $ 82.50
12.50$ $ 13.00
12.50$ $ 13.00
12.50$ $ 13.00
12.50$ $ 13.00
+4.00%
+4.00%
+4.00%
+4.00%
9-1.
9-2.
9-3.
9-4.
9-5.
9-6.
8-10.
8-11.
9-8.
9-8.a.
9-10.
9-11.
9-12.
9-13.
9-14.
Monitoring Well Sampling with Water Level, >
100 foot depth
Monitoring Well Sampling with Water Level, ≤
100 foot depth
Removal of Well Pad and Manhole
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Vault - 2 x 2 x 2 foot
7-2.
7-3.
7-4.
7-5.
7-6.
7-7.
8-1.
8-2.
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum
Hydrocarbons (FL-PRO)
Electronic Data Deliverables (EDD)
Vapor/Ambient Air Sample Collection -
SUMMATM Canister (or equivalent)
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Soil, Priority Pollutant Volatile Organics (EPA
8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA
8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or
EPA 8260)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
+5.00%
+4.47%
+3.45%
+4.35%
+4.74%
+4.11%
+4.44%
+4.63%
+4.41%
+4.00%
+4.43%
+4.74%
+4.97%
+4.84%
+5.00%
+4.74%
+4.35%
+4.12%
+4.46%
70.00$ $ 73.00
258.00$ $ 260.00
269.00$ $ 282.00
448.00$ $ 460.00
48.00$ $ 50.00
56.00$ $ 58.50
73.00$ $ 76.50
84.00$ $ 88.00
42.50$ $ 44.50
58.50$ $ 58.75
78.50$ $ 82.25
78.50$ $ 82.25
67.25$ $ 70.50
11.25$ $ 11.75
11.25$ $ 11.75
11.25$ $ 11.75
11.25$ $ 11.75
23.50$ $ 24.00
+4.29%
+0.78%
+4.83%
+2.68%
+4.17%
+4.46%
+4.79%
+4.76%
+4.71%
+0.43%
Water, Priority Pollutant Volatile Organics [for
NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Volatile Organic Halocarbons, except
EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Total Recoverable Petroleum
Hydrocarbons (FL-PRO)
Water, Priority Pollutant Volatile Organics (EPA
8260)
Water, Used Oil/Unknown Product Group-Table
D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-
Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA
200.8, EPA 6010 or EPA 6020)
9-32.
9-24.
9-25.
9-26.
9-27.
9-28.
9-29.
9-30.
9-31.
9-31.a.
9-41.
9-41.a.
9-39.
9-40.
9-23.
9-33.
9-36.
9-38.
+4.83%
+4.44%
+4.44%
+4.44%
+4.44%
+2.13%
+4.78%
+4.78%
20.00$ $ 21.00
11.00$ $ 11.50
11.00$ $ 11.50
11.00$ $ 11.50
11.00$ $ 11.50
11.00$ $ 11.50
11.00$ $ 11.50
252.00$ $ 264.50
60.00$ $ 63.00
75.00$ $ 76.25
96.00$ $ 100.00
184.00$ $ 193.20
224.00$ $ 235.00
224.00$ $ 235.00
4.25$ $ 4.40
52.00$ $ 54.00
42.00$ $ 44.00
55.00$ $ 57.00
215.00$ $ 225.75
30.00$ $ 31.50
40.00$ $ 42.00
32.00$ $ 33.50
12-3.
12-4.
12-5.
12-6.
12-7.
9-67.
9-78.
9-80.
9-68.
9-69.
9-70.
9-71.
Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Sodium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA
200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA
6010 or EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Air, Polycyclic Aromatic Hydrocarbons (EPA
Method TO-13)
Air, Volatile Organic Aromatics (EPA Method
TO-15)
Air, Volatile Organic Compounds (EPA Method
TO-17)
Air, Total Petroleum Hydrocarbons (EPA
Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, BTEX/MTBE + Naphthalene (EPA
8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted
Soil (includes drum)
Transport and Disposal of Mixed Debris
Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean
Overburden
Removal and Loading of Asphalt and/or
Concrete - up to 4 inch thickness
9-48.
9-42.
9-43.
9-44.
9-45.
9-46.
9-47.
12-8.
12-1.
12-9.
+5.00%
+4.55%
+4.55%
+4.55%
+4.55%
+4.55%
+4.55%
+5.00%
+1.67%
+4.17%
+5.00%
+4.91%
+4.91%
+4.96%
+3.53%
+3.85%
+4.76%
+3.64%
+5.00%
+5.00%
+5.00%
+4.69%
31.00$ $ 32.50
33.00$ $ 34.00
33.33$ $ 35.00
212.00$ $ 222.00
1.35$ $ 1.40
232.00$ $ 242.00
1.20$ $ 1.25
450.00$ $ 470.00
140.00$ $ 145.00
88.75$ $ 93.00
95.00$ $ 99.75
105.00$ $ 110.00
15.00$ $ 15.75
15.00$ $ 15.75
3,800.00$ $ 3,975.00
630.00$ $ 660.00
4,000.00$ $ 4,200.00
630.00$ $ 660.00
4,500.00$ $ 4,725.00
630.00$ $ 660.00
4,800.00$ $ 5,000.00
630.00$ $ 660.00
5,200.00$ $ 5,450.00
+4.61%
+4.76%
+5.00%
+4.76%
+5.00%
+4.76%
+4.17%
+4.76%
+4.81%
+5.00%
+4.76%
+5.00%
+5.00%
16-5.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
15-1.a.
15-1.b.
15-1.c.
16-3.
16-4.
Additional Rental of 20 Cubic Yard Roll-Off
Container
Delivery, Pick Up and Rental of 20 Cubic Yard
Roll-Off Container
Transport and Disposal of Petroleum Product
(bulk)
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact
Water (bulk)
Transport and Disposal of Petroleum Contact
Water (includes drum)
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) > 450 tons
Vapor Extraction/Aquifer Pumping Test -
Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test -
Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
Installation of Plumbing (and Electrical) Lines
Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10
Lines Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing
(and Electrical) Lines in Trench
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test -
Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
12-17.
12-18.
15-2.a.
15-1.d.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
+4.84%
+4.79%
+3.03%
+5.01%
+4.72%
+3.70%
+4.31%
+4.17%
+4.44%
+3.57%
700.00$ $ 725.00
5,580.00$ $ 5,850.00
950.00$ $ 995.00
3,750.00$ $ 3,900.00
7,500.00$ $ 7,850.00
3,300.00$ $ 3,450.00
8,200.00$ $ 8,600.00
5,000.00$ $ 5,250.00
4,500.00$ $ 4,725.00
2,750.00$ $ 2,875.00
3,200.00$ $ 3,350.00
3,750.00$ $ 3,925.00
4,250.00$ $ 4,450.00
450.00$ $ 470.00
6,500.00$ $ 6,800.00
4,200.00$ $ 4,400.00
7,000.00$ $ 7,300.00
4,750.00$ $ 4,975.00
8,500.00$ $ 8,925.00
6,250.00$ $ 6,550.00
4,720.00$ $ 4,950.00
3,300.00$ $ 3,450.00
6,000.00$ $ 6,300.00
4,500.00$ $ 4,700.00
7,500.00$ $ 7,875.00
5,500.00$ $ 5,750.00
650.00$ $ 680.00
750.00$ $ 785.00
1,060.50$ $ 1,110.00
+4.74%
+5.00%
+3.57%
+4.84%
+4.74%
+4.00%
+4.67%
+4.55%
+4.88%
+5.00%
+5.00%
+4.55%
+4.69%
+4.67%
16-24.
16-25.
18-21.
18-22.
16-27.
17-1.
17-2.
17-3.
17-4.
17-5.
18-20.
18-17.
18-18.
18-19.
16-12.
16-13.
16-14.
16-21.
16-22.
16-23.
Multi-Phase Pilot Test - Additional Time
Supplemental System O&M Package - Add
Thermox or Catox Treatment
System O&M Package - Extra Large
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
SVE System Package - Medium
AS/MPE System Package - Medium
MPE System Package - Medium
MPE System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test -
Additional Time
Air Sparging/Multiphase Extraction Pilot Test -
8 hours
MPE System - Large - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Large -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small -
Short Term ≤ 6 mos.
18-35.
18-36.
18-37.
18-23.
18-24.
18-25.
18-26.
18-27.
18-28.
+4.71%
+4.44%
+4.80%
+4.87%
+4.55%
+5.00%
+4.44%
+5.00%
+4.55%
+4.62%
+4.76%
+4.29%
+4.62%
+4.67%
+4.67%
313.10$ $ 328.00
363.60$ $ 380.00
404.00$ $ 424.00
4,700.00$ $ 4,925.00
4,000.00$ $ 4,200.00
5,600.00$ $ 5,875.00
5,300.00$ $ 5,550.00
7,300.00$ $ 7,650.00
6,600.00$ $ 6,900.00
7,400.00$ $ 7,700.00
5,800.00$ $ 6,050.00
8,600.00$ $ 9,000.00
6,800.00$ $ 7,000.00
11,000.00$ $ 11,500.00
9,400.00$ $ 9,850.00
4,000.00$ $ 4,200.00
2,500.00$ $ 2,600.00
1,500.00$ $ 1,575.00
1,000.00$ $ 1,050.00
1,500.00$ $ 1,575.00
2,750.00$ $ 2,850.00
+2.94%
+4.55%
19-8.
19-9.
19-10.
18-57.
18-58.
19-3.
19-4.
19-19.
18-56.
18-47.
18.48.
18-49.
18-50.
18-51.
18-52.
18-53.
18-54.
18-55.
Remedial Action Startup Report
Notes:
Carbon Off Gas Treatment - Add On - Large -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small-
Long Term > 6 mos.
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring
Report, Annual
Soil Vapor Extraction (SVE) System - Large -
Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Medium -
Long Term > 6 Months
Supplemental Site Assessment Report
General Site Assessment Report
Air Sparge/Multiphase Extraction (AS/MPE)
System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Large - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Medium - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Small - Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Large -
Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Medium -
Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Small -
Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Small -
Short Term ≤ 6 Months
18-38.
18-39.
18-40.
+4.76%
+4.51%
+4.95%
+4.79%
+5.00%
+4.00%
+5.00%
+5.00%
+5.00%
+4.79%
+5.00%
+4.91%
+4.72%
+4.79%
+4.55%
+4.05%
+4.31%
+4.65%
+3.64%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Printed Printed Name: Name:
Title: Title:
Date: Date:
Letter/Number D (V3.2)
Type Description Attachment Rate Schedule (27 pages)
Signature of Authorized Representative Signature of Authorized Representative
ARDAMAN & ASSOCIATES, INC. FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FEID No.: 592984496
List of attachments/exhibits included as part of this Amendment:
Signature of Processor Printed Name of Processor Data Entry Date
The Table 1 rate changes have been entered in the Department’s processing system with an effective Rate Change Date of:
Corresponding Rate Schedule, Attachment D
Version No. V3.2
Department Data Processing Information:
IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.
5-16-23
Contract Manager
Carl R Stephens
Carl R Stephens Digitally signed by Carl R Stephens Date: 2023.05.16 09:20:39 -04'00'
6/1/2023
Justin Wolfe Digitally signed by Justin Wolfe Date: 2023.05.30 14:54:55 -04'00'
Jamie Lopez Digitally signed by Jamie Lopez Date: 2023.05.31 11:09:33 -04'00'
File details come from the government source that posted it. Updated .