Document Summary
This is a Petroleum Preapproval Program Task Assignment issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The assignment (GC723-032B) involves FRS Environmental Remediation, Inc. DBA The FGS Group as the contractor, with the work being conducted at the Dutton Auto Parts facility located at 413 Main Street N. in Havana, Gadsden County, Florida. The work was assigned to FDEP/LP Site Manager Grant Willis and FDEP Contract Manager Grant Willis, with contractor representative Glenn Macgraw overseeing the project on behalf of FRS Environmental Remediation, Inc.
The task assignment authorizes a supplemental site assessment during the remedial action phase at a fixed price of $2,683.68, including a 10% retainage of $268.37. The work scope includes soil sampling and analysis to characterize contaminated media associated with previously undocumented oil/water separator and hydraulic lift components discovered during PBC RAP implementation activities. Laboratory costs total $1,390.10, and field work costs include mobilization, drilling setup, soil screening, well installation, air sparging installation, and oversight activities totaling $453.05. The authorization period extends through December 5, 2012, with a final deliverable of a letter report due June 8, 2012. All work must be preapproved by the Department in accordance with Section 376.3071(1)(b), F.S., prior to performance or cost incurrence.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .