CN-370000-GC716-T43A.pdf
PDF 480 KB Posted
- Contract number
- GC716
- Issued by
- Florida
About this file
Task Assignment Summary
This is a Petroleum Preapproval Program Task Assignment document issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The task assignment (GC716-043A) involves Professional Service Industries, Inc. (PSSI), the contractor, and is managed by the FDEP with Scott Lashbrook serving as the FDEP/LP Site Manager and Grant Willis as the FDEP Contract Manager. The work is being performed at Bradfords Towing, located at 501 S Pinellas Avenue in Tarpon Springs, Florida, in Pinellas County.
The task assignment is for supplemental site assessment work under the Remedial Action cleanup phase, with a fixed price total cost of $5,837.27. The scope includes mobilization of two personnel, groundwater sampling from 14 monitoring wells (DW-1 through MW-15), laboratory analysis of samples per the Sampling Parameter Table, collection of chain-of-custody documentation, and submission of a Remedial Action Interim Report as the final deliverable. Work activities are organized into field activities (Section C), subcontractor laboratory costs (Section G), and office activities/reports (Section H), with deliverables due May 21, 2013, and the final report due June 21, 2013. The contract period extends through December 18, 2013, with the FDEP share at 75 percent and the applicant/owner share at 25 percent. Total encumbrance is $5,837.27 with no cost-plus component.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .