CN-370000-DC956-TA1.pdf
PDF 927 KB Posted
- Contract number
- DC956
- Issued by
- Florida
About this file
This document is a Consultant's Task Assignment Notification and Scope of Services for the Long Key Shoreline Recovery and Stabilization project, involving the Florida Department of Environmental Protection (FDEP), Applied Technology Management, Inc. (ATM), and the Bureau of Beaches and Coastal Systems (BBCS). The contract is specifically for professional coastal engineering and related services, focusing on design and permitting tasks for the Long Key State Park shoreline, which has been designated as critically eroded.
The contract (FDEP Contract No. DC956, Task Assignment No. 01, Project No. 07MO2) has a fixed price of $142,034.00 and is structured around two primary tasks: Design and Permitting (Task 2.1) and Campground Shore Protection Permitting (Task 2.2). The scope includes comprehensive environmental surveys, beach profile mapping, sand sampling, benthic habitat mapping, submerged aquatic vegetation assessment, and mitigation planning. The project will involve detailed data collection, agency coordination, and preparation of a Joint Coastal Permit (JCP) application. The work is expected to be completed within three months after submission of the JCP application, with specific deliverables including design reports, habitat maps, and a mitigation assessment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-DC956.pdf | ||
| CN-370000-CM238.pdf | ||
| CN-370000-DC956-TA1 CO1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .