CN-370000-DC854-A1.pdf
PDF 438 KB Posted
- Contract number
- DC854
- Issued by
- Florida
About this file
This document is Amendment No. 01 to DEP Contract No. DC854 between the State of Florida Department of Environmental Protection and CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A., a consulting firm located in Coral Gables, Florida. The amendment was executed on July 13, 2009, modifying the original contract dated October 21, 2008.
Amendment No. 01 reduces the consultant's overhead rates effective May 7, 2009. The Home Office overhead rate is reduced to $157.15 and the Field Office overhead rate is reduced to $125.15. These revised overhead rates result in new combined multipliers of 2.83 for Home Office positions and 2.48 for Field Office positions, which apply to the wage rates for eight position categories: Principal ($64.81 base wage, $183.41 new billing rate), Engineer PE/Architect RA ($50.13, $141.87), Engineer EI/Architect AI ($34.72, $98.26), Senior Technician ($27.73, $78.48), Technician ($21.58, $61.07), Senior Inspector ($26.68, $66.17), Inspector ($22.71, $56.32), and Data Processor ($21.97, $62.18). All other terms and conditions of the original agreement remain in full force and effect.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .