CN-370000-DC837-T10 CO1.pdf

PDF 121 KB Posted

Attached to
Master Agreement FL|DC837|21768e6d86ec40e07729cdcf858332ca
Contract number
DC837
Issued by
Florida

About this file

This document is a Change Order for a Task Assignment under Contract DC837, issued by the Department of Environmental Protection (FDEP) for the Guana Tolomato Matanzas NERR project. The contract involves Kimley-Horn and Associates, Inc. as the primary consultant, with Martin Brenny as the contact person. The change order is specifically for Task Assignment No. 10, located in Guam, and involves modifications to walkways and engineering services.

The change order authorizes two primary modifications: first, a structural engineering task to substitute proposed structural calculations and design for a concrete structure supporting shell material, with a price increase of $3,600.00; and second, a geotechnical engineering task to coordinate with Universal Engineering Sciences to evaluate prevailing subgrade soil conditions for a proposed walkway, with a price increase of $4,700.00. The total net change to the original task amount is $8,300.00, increasing the total task amount from $25,600.00 to $33,900.00. The tasks include deliverables such as design calculations, geotechnical reports, and standard penetration tests, with specified submission timelines of 30 days from the signed change order. Payment will be made upon completion of each task and submittal of satisfactory deliverables.

View the file

Other files

File Type Posted
CN-370000-RM137.pdf PDF
CN-370000-DC837-A2.pdf PDF
CN-370000-DC837-A3.pdf PDF
CN-370000-DC837-A1.pdf PDF
CN-370000-DC837-T10.pdf PDF
CN-370000-DC837.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .