CN-370000-DC780-TA3CO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|DC786|019ed0ae68d3ee1095cf6e73cb3a158a
Contract number
DC786
Issued by
Florida

About this file

This document is a project tracking and authorization set of documents for improvements to the Take-Out Tube Exit at Ichetucknee Springs State Park in Florida. The project involves the Florida Department of Environmental Protection (DEP), the Division of Real Estate Development and Management, and Jones Edmunds & Associates, Inc., an architectural and engineering firm located in Gainesville, Florida. The project number is DEP-13039010, and the specific authorization is for additional design services related to stairs at the project site.

The total additional authorization amount is $5,138.51, which covers the design of stairs along the Ichetucknee River that were not originally included in the initial project scope. The stairs are described as a "pool transfer step" with a 17" max tread, proposed to be added to the existing footprint with minimal changes to the site conditions. The authorization is for additional architectural and engineering services to incorporate these stairs into the 100% Construction Documents. The funding source is indicated as being under the control of the DEP, and the project is part of the Bureau of Design and Construction's ongoing improvements to the state park facility.

View the file

Other files

File Type Posted
CN-370000-DC786-A1.pdf PDF
CN-370000-DC786-A2.pdf.crdownload CRDOWNLOAD file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .