CN-370000-DC780-TA3CO1.pdf
PDF 2 MB Posted
- Contract number
- DC858
- Issued by
- Florida
About this file
This document is a project tracking executive summary and related correspondence for an additional authorization request by Jones Edmunds & Associates for the Florida Department of Environmental Protection (DEP), specifically for improvements to the Take-Out Tube Exit at Ichetucknee Springs State Park. The project involves the Bureau of Design and Construction, with Chuck Moneyham serving as the Construction Projects Administrator for the Division of Real Estate Development and Management in Tallahassee, Florida.
The additional authorization is for a "new" scope of work involving stairs design, with a total requested amount of $5,138.51. The project (DEP Project 13039010) includes adding stairs to the 100% Construction Documents, described as a "pool transfer step" with a 17" max tread, positioned to be as close as possible in the existing footprint. The authorization was requested by Jones Edmunds on December 3, 2014, and approved by the agency, with the stairs design intended to make minor changes to the existing river conditions. The funds are under the control of DEP, and the project involves modifying the concrete ramp and stair area at the state park site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-DC780.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .