CN-370000-DC754-TA3.pdf
PDF 110 KB Posted
- Contract number
- DC754
- Issued by
- Florida
About this file
This is a Consultant's Task Assignment Notification under FDEP Contract No. DC754 for Project No. 10181, Fred Gannon Rocky Bayou State Park Bridge Design. The contract involves the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, as the client, and Registe, Sliger, Engineering, Inc. (RSE) as the consulting firm. The document is dated June 3, 2009, with task assignment execution on June 24, 2009. The project manager for FDEP is Michael Renard, and the consultant's representative is Jacques Registe.
The scope of services includes two primary tasks: Task No. 1 consists of design and construction plans for two bridge structures to accommodate a 12-ton fire truck load, requiring three sets of 11" X 17" drawings for review, three sets of final drawings, and two sets signed and sealed by a Registered Professional Engineer. Task No. 2 covers design survey and soil investigation services. The fixed price cost for the task assignment is $45,385.00 with no cost reimbursement authorized. The project completion deadline is 90 days after execution of the task assignment but shall not exceed contract expiration. The total task amount of $45,385.00 is funded through Object Code 131500 under Fund 131001, Module U3200, with billing upon completion of work. The consultant is responsible for all labor and out-of-pocket expenses within the lump sum fee.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .