About this file
This document is a Change Order (Task Assignment No. 04, Change Order No. 01) issued by the Florida Department of Environmental Protection (DEP) to Coastal Systems International, Inc. for continuing professional services under DEP Contract No. DC419. The contract pertains to work at Fort Zachary Taylor State Park in Monroe County, Florida, and is managed by the Bureau of Design and Recreational Services. The primary contact for Coastal Systems is Tim Blankenship, and the work is authorized under Project No. 01MO2.
The change order authorizes additional profiles, mapping, and design revisions for the truck haul beach nourishment project at Fort Zachary Taylor State Park, which was impacted by 2005 hurricanes. The scope of work includes three main components: Additional Beach Profile Surveys (conducted perpendicular to shorelines with twelve profiles and coastal engineer evaluation of exotic vegetation removal and site grading); Base Maps (reducing survey data to horizontal and vertical coordinate systems with one-foot elevation contours); and Beach Fill Design Revisions (redesigning beach fill templates and grading based on updated survey data). The fixed price cost for this change order is $12,700.00, with a grand total project cost of $88,207.00. The original task amount was $75,507.00. Work deliverables include survey files and contour maps due within 15-45 days, contingent upon field work completion and weather conditions. Services are invoiced according to the DEP Parks contract terms, with encumbrance charged to fund 193001.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .