CN-370000-CN664-T1.pdf
PDF 2 MB Posted
- Contract number
- CN664
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) for Contract CN664, Task Assignment 01, involving Kimley Horn as the consultant for the Bald Point State Park New Campground project. The document outlines a professional services agreement between FDEP and Kimley Horn, with Cameron Snipes as the project contact and Ralph Perkins serving as the FDEP Contract Manager.
The contract covers conceptual phase services for developing a 30-site campground, including a bathhouse, ranger station, and associated infrastructure at Bald Point State Park. The total fixed price for the project is $42,191.03, with work to be completed between the date of execution and December 10, 2025. The project is divided into four subtasks: Site Visit and Data Collection ($4,267.15), Site Concept Planning ($12,950.28), Architectural Schematic Plan of Ranger Station ($13,646.16), and Architectural Schematic Plan of Bathhouse ($11,327.44). Payment will be made upon FDEP approval of deliverables for each subtask, with the work to be performed concurrently after the initial site visit and data collection phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN664.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN683-CMC1.pdf | ||
| CN-370000-CN664-CMC1.pdf | ||
| CN-370000-CN664.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN664 01 FDEP-BDC 61429C
Bald Point State Park New Campground
Kimley Horn
Cameron Snipes, PE 850-553-3511 cameron.snipes@kimley-horn.com
Ralph Perkins 850-245-2560 ralph.perkins@floridadep.gov
Conceptual phase services for the 30-site campground, bathhouse, ranger station, and associated infrastructure per the attached proposal dated 6/5/2023.
Theresa Carron upon execution $ 42,191.03 12/10/2025 $ 0.00
$ 42,191.03
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.06.09 15:10:42 -04'00'
Theresa Carron T.Carron Digitally signed by T.Carron Date: 2023.06.12 09:00:15 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.06.12 10:39:21 -04'00'
Richard Barr, AICP Richard Barr Digitally signed by Richard Barr Date: 2023.06.13 09:06:12 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.06.15 13:41:27 -04'00'
61429C 37501000257 080039/23 000286 U3100 131500 AD $ 42,191.03
$ 0.00 kimley-horn.com 2619 Centennial Boulevard, Suite 200, Tallahassee, FL 32308 850 553 3500
June 5, 2023
Ms. Theresa Carron Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, Florida 32399
RE: Bald Point Campground Development – CN664 – Task Assignment 1
Dear Theresa:
For your review, Kimley-Horn, has provided a proposal summary and man-hour documentation for the project above.
Please contact me at (850) 553-3511 or cameron.snipes@kimley-horn.com should you have any questions or need additional information.
Sincerely, Cameron R. Snipes, P.E.
Project Manager
Ms. Theresa Carron , June 5, 2023, Page 2
Bald Point Campground Development CN664 - Task Assignment Number 1
Subtask 1: Site Visit and Data Collection
Description: Kimley-Horn (KH or Consultant) will visit the site 1 time to observe existing conditions.
Kimley-Horn will meet with FDEP and Bald Point Park staff on-site to discuss the project goals, objectives, and programming. Kimley-Horn will obtain GIS based background information from FDEP for the project.
Deliverable: PDF memorandum with photographs to summarize the site visit/data collection.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 2: Site Concept Planning
Description: KH will provide two planning level Concept Plans for the project. The Concept Plans will be prepared in AutoCAD and will consider geometry for RV circulation. Aesthetics, cost, existing designs, environmental impacts and permitting will be considered in developing the concept plans.
KH will describe the functional basis for the Concept Plans. An order of magnitude budget estimate for constructions costs will be prepared and submitted for each of the Concept Plans.
KH will prepare two planning level Typical Campsite Concept Plans. The Typical Campsite Concept Plan will depict parking, water, sewer, electricity, and limited amenities.
Deliverable: PDF of 22”x34” Concept Plans and Opinion of Probable Construction Cost.
Ms. Theresa Carron , June 5, 2023, Page 3
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Subtask 3: Architectural Schematic Plan of Ranger Station
Description: Based upon the programming discussions documented under Subtask1, KH, through subconsultant, will develop up to two schematic plans for the ranger station. Plans, exterior elevations, and an order of magnitude construction cost project (based upon overall building square footage) will be included.
Deliverables: PDF of floor plan, 4 exterior elevations on 22”x34” sheets, and Opinion of Probable Construction Cost.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Ms. Theresa Carron , June 5, 2023, Page 4
Subtask 4: Architectural Schematic Plan of Bathhouse
Description: Based upon the programming discussions documented under Subtask1, KH, through subconsultant, will develop up to two schematic plans for a camp bathhouse. Plans, exterior elevations, and an order of magnitude construction cost project (based upon overall building square footage) will be included.
Deliverables: PDF of floor plan, 4 exterior elevations on 22”x34” sheets, and Opinion of Probable Construction Cost.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Ms. Theresa Carron , June 5, 2023, Page 5
Project Schedule:
* Subtask 2-4 will be performed concurrently after 1 is complete.
Ms. Theresa Carron , June 5, 2023, Page 6
Summary of Fees:
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
File details come from the government source that posted it. Updated .