This document is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for the North Boardwalk Reconstruction project at the Guana Tolomato Matanzas National Estuarine Research Reserve. The primary contractor is Colliers Engineering & Design (formerly Bergmann Associates), with Michael Leonard, P.E. as the consultant representative and Ralph Perkins as the FDEP Contract Manager.
The task assignment involves additional design and permitting for parking lot steps and ditch crossing, with a task assignment reduction of $10,942.00. The total fixed price cost for the project is $27,188.00, broken down across multiple subtasks including draft scope of work, environmental permit applications, lead and asbestos review, permit authorizations, final scope of work, contractor submittals, and construction site visits. The project is scheduled to be executed from August 2, 2024, with a completion date of May 11, 2026. Payment will be made upon approval of deliverables for each subtask by the FDEP in the specified amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-WQ177-T1.pdf | ||
| CN-370000-WQ177-T2.pdf | ||
| CN-370000-WQ177.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN300 TA15 1 RM2403
North Boardwalk Reconstruction
Colliers Engineering & Design (Formerly Bergmann Associates)
Michael Leonard, P.E. (904) 760-4503 michael.leonard@collierseng.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Additional design and permitting for corresponding parking lot steps and ditch crossing per the attached dated January 16, 2025. Also, a task assignment reduction by $10,942.00 per the attached dated June 24, 2024.
$ 0.00 $ 26,430.00 $ 26,430.00 $ 0.00 $ 26,430.00 $ 26,430.00 $ 0.00 $ 16,246.00 $ 16,246.00 $ 0.00 $ 42,676.00 $ 42,676.00
08/02/2024
05/11/2026
05/11/2026
05/11/2026
Lisa Yarborough 02/24/2025
Richard Marcil
Ralph Perkins
Michael Leonard, P.E.
Michael W. Foster Jr., P.E.
RM2403 37538060000 083643/24 423001 U3220 241000 QK $ 16,246.00