CN-370000-CN298-T1CO5.pdf
PDF 2 MB Posted
- Contract number
- CN298
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for a contract with Sweet Sparkman Architects, Inc. for the Lovers Key State Park New Visitor Center project. The contract number is CN298, with a specific task assignment (TA01) and change order (CO5) for project number 61120C located at Lovers Key State Park. The change order involves Sweet Sparkman Architects and involves collaboration with multiple engineering firms including Stirling & Wilbur Engineering and ME3 Engineers, LLC.
The change order specifically covers Task 10, Subtask 10A for drawing revisions related to construction changes, including updates to structural and electrical drawings. The modifications stem from value engineering cost alternatives and additional requirements from Florida Power & Light (FPL) and FOLKS (presumably a local organization). The total cost for this change order is $2,457.16, broken down into a fixed fee of $2,357.16 and $100 in reimbursable costs for overnight delivery. The revision process involves updating drawings to reflect changes in structural materials (replacing PSL wood beams with pressure-treated lumber) and electrical system modifications. The task has a 21-day duration and requires delivering PDF revisions to the contractor and owner, along with signed and sealed drawings for building permit submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN298-CMC3.pdf | ||
| CN-370000-CN298-T1CO2.pdf | ||
| CN-370000-CN298-T1CO4.pdf | ||
| CN-370000-PL342-TA3.pdf | ||
| CN-370000-CN298-CMC1.pdf | ||
| CN-370000-CN298-CMC2.pdf | ||
| CN-370000-CN298-T1CO3.pdf | ||
| CN-370000-CN298.pdf | ||
| CN-370000-CN298-T1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN298 TA01 CO 5 61120C
Lovers Key State Park New Visitor Center
Sweet Sparkman Architects, Inc.
John Bryant 941-952-0084 jbryant@sweetsparkman.com
Philip Stone, or successor 850-245-2570 Philip.Stone@FloridaDEP.gov
This change order provides updated structural drawings for Value Engineering (attached proposal dated 2/21/20) and also reassigns some of the reimbursable costs per emails dated 6/18/2020 and 7/29/2020.
$ 34,112.05 $ 284,266.43 $ 318,378.48 $ 38,362.05 $ 395,751.42 $ 434,113.47 $ 2,357.16 $ 100.00 $ 2,457.16 $ 40,719.21 $ 395,851.42 $ 436,570.63
12/9/2016
12/14/2017
2/12/2021
2/12/2021
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.08.20 12:14:49 -04'00'
Laura Ross Laura S. Ross Digitally signed by Laura S. Ross Date: 2020.08.20 12:17:02 -04'00'
Philip Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.09.15 07:43:51 -04'00'
John Bryant John W. Bryant Digitally signed by John W. Bryant DN: C=US, E=jbryant@sweetsparkman.com, O=Sweet Sparkman Architects, CN=John W. Bryant Date: 2020.10.08 22:13:09-04'00'
Emile D. Hamilton Emile Hamilton Digitally signed by Emile Hamilton Date: 2021.01.27 07:48:39 -06'00'
61120C 37504000193 088130-19 675002 U3200 131500 XR $ 2,457.16
$ 2,457.16
2168 Main Street, Sarasota, FL 34237 USA T 941.952.0084 F 941.952.0201 www.sweetsparkman.com
AA26000857
02.21.20
Laura Ross, RA Senior Architect Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: Contract # CN298, Task Assignment 01, Change Order #5 Lovers Key State Park New Visitor Center
Dear Laura, For your review, Sweet Sparkman Architects has provided a proposal summary and man-hour documentation for the tasks identified herein for the Lovers Key State Park New Visitor Center.
This proposal includes Task 10 (Subtask 10A) for revision of structural and electrical drawings drawings.
Please review the attached Proposal Summary and deliverables.
Sincerely, John W. Bryant, AIA, LEED AP Principal and Project Manager Sweet Sparkman Architects
New Visitor Center
Lovers Key State Park
Contract # CN298, Task Assignment # 01, CO # 5
TASK 10 – DRAWING REVISIONS
Subtask 10A: Drawing Revisions for Construction Changes
Description: Revisions to the approved and permitted construction drawings are required as a result of changes outside the control of the design team. The approved GMP contract for construction includes a value engineering cost alternate that was selected by OWNER to replace selected PSL wood structural beams and columns with standard pressure treated lumber beams and columns. This change needs to be documented in the structural drawings for construction and building permit purposes. The electrical drawings need to be revised to reflect changes due to FPL primary service requirements that were provided after completion of construction documents, as well as additional electrical outlets and AV coordination requests from FOLKS. CONSULTANT shall review design and revise structural and electrical drawings as required for these changes. Revised drawings will be issued to Owner and Contractor, and signed and sealed drawings will be provided for submission to the building department.
Deliverable: PDF of revised structural drawings to Contractor and Owner. Hard copy signed and sealed drawings for Contractor’s submission to the building department.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 10A: Drawing Revisions for Construction Changes
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Sweet Sparkman Arch. Project Manager 73.51 6 $441.06
Sweet Sparkman Arch. SUBTOTAL FEE $441.06
Stirling & Wilbur Eng. Principal 176.62 2 $353.24
Stirling & Wilbur Eng. Senior Engineer 121.43 2 $242.86
Stirling & Wilbur Eng. SUBTOTAL FEE $596.10
ME3 Engineers, LLC Registered Engineer 110.00 12 $1,320.00
Stirling & Wilbur Eng. SUBTOTAL FEE $1,320.00
TOTAL FIXED FEE $2,357.16
Reimbursable Cost:
Overnight Delivery (Shipping) $100.00
Total for Subtask 10: $2,457.16
CO#5 Summary of Fees:
Task / Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Task 10: Drawing Revisions
Subtask 10A: Drawing Revisions for Construction Changes $2,357.16 $100.00
Total Fixed Price Cost: $2,357.16
Total Reimbursable Cost: $100.00
Overall Total Cost: $2,457.16
Task Schedule for CO # 5
Activity Task Duration (Calendar Days)
Milestone Days (from CO#5
Authorization to Proceed)
Task 10: Design Development
Subtask 10A: Drawing Revisions for Construction Changes
21 21
Ross, Laura S.
From: John Bryant <jbryant@sweetsparkman.com> Sent: Thursday, June 18, 2020 1:41 PM To: Carrier, Andy J; Ross, Laura S.
Subject: Lovers Key - reimbursable mileage
Follow Up Flag: Follow up Flag Status: Flagged
Laura or Andy, Our structural engineer, Steve Wilbur, has had to make more visits to the construction site than originally anticipated. I don't believe this is a result of any mistakes, just due to the complexity of the elevated deck rebar and formwork.
He's asked if he can submit a reimbursement for mileage. I know we don't have a specific mileage reimbursement task for construction site visits. However, we do have other reimbursement tasks that have remaining funds.
Would it be possible to submit for his mileage reimbursement using remaining funds from one of the other categories?
Thanks for your consideration.
Regards, John
John W. Bryant AIA, LEED AP Principal
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.
2168 Main Street, Sarasota, FL 34237
941.952.0084 (office)
941.914.3455 (cell) jbryant@sweetsparkman.com www.sweetsparkman.com
AIA Florida 2018 Firm of the Year
Ross_LS Highlight
Ross, Laura S.
From: John Bryant <jbryant@sweetsparkman.com> Sent: Wednesday, July 29, 2020 10:14 PM To: Ross, Laura S.
Cc: Carrier, Andy J Subject: Re: Lovers Key - reimbursable mileage
Hi Laura, just following up to see about reallocating some of the reimbursable funds to accommodate mileage for our structural engineer. Currently he has 3 trips so around $280. He may not need to make any more trips.
It looks like we have $1,300 in unused reimbursable in Task 3E. Could we move $500 of that into task 8E?
Thanks, John
On Mon, Jun 29, 2020 at 11:07 AM Ross, Laura S. <Laura.S.Ross@dep.state.fl.us> wrote:
John –
I am pursuing reallocating funds for the extra mileage similar to what we did with CO#3.
Also, the referenced invoice is being processed currently. I was a little delayed as I was thinking it was dependent upon CO#5. I apologize for that misunderstanding and subsequent delay.
Thank you!
Laura S. Ross, RA
Florida Department of Environmental Protection
Senior Architect
Bureau of Design and Construction
3800 Commonwealth Boulevard 260B, MS 520 Tallahassee, FL 32399 Laura.S.Ross@FloridaDEP.gov O: 850.245.2737
FL Dept of Environmental Protection Invoice number 16451.12 Invoice date 07/10/2020
4B DD Cost Estimate 5,430.00 100.00 5,430.00 5,430.00 0.00
4A Reimbursable 375.00 100.00 375.00 375.00 0.00
4A DD 60% Plans 67,039.06 100.00 67,039.06 67,039.06 0.00
Subtotal 72,844.06 100.00 72,844.06 72,844.06 0.00
Task 4 : Design Development - 60% Plans
3E Reimbursable 1,300.00 0.00 0.00 0.00 0.00
3E Design/Permit for new fire line 19,011.32 100.00 19,011.32 19,011.32 0.00
3D SD Cost Estimate 4,740.00 100.00 4,740.00 4,740.00 0.00
3C Reimbursable 230.00 100.00 230.00 230.00 0.00
3C 30% Plans 30,632.30 100.00 30,632.30 30,632.30 0.00
3B Reimbursable 200.00 100.00 200.00 200.00 0.00
3B Geotechnical Report 6,129.89 100.00 6,129.89 6,129.89 0.00
3A Site Survey 6,078.15 100.00 6,078.15 6,078.15 0.00
Subtotal 68,321.66 98.10 67,021.66 67,021.66 0.00
Task 3 : Schematic Design - 30% Plans
2B Reimbursable 122.00 96.91 118.23 118.23 0.00
2A - Concept Design 5,664.92 100.00 5,664.92 5,664.92 0.00
Subtotal 5,786.92 99.93 5,783.15 5,783.15 0.00
Task 2 : Concept Design
1D Site & Permitting Analysis 2,784.40 100.00 2,784.40 2,784.40 0.00
1C Building Program 5,256.06 100.00 5,256.06 5,256.06 0.00
1B Reimbursable 194.02 48.17 93.45 93.45 0.00
1B Exhibit Design Meeting 3,331.90 100.00 3,331.90 3,331.90 0.00
1A Reimbursable 291.03 100.00 291.03 291.03 0.00
1A Kick-off 5,548.12 100.00 5,548.12 5,548.12 0.00
Subtotal 17,405.53 99.42 17,304.96 17,304.96 0.00
Task 1 : Preliminary
Description
Contract Amount % Complete Previous Total Billed Amount Due
2168 Main Street
Sarasota, FL 34237
941.952.0084
Professional services through June 30, 2020
Project Number: 61120C Contract Number: CN298 Project Manager: Laura Ross
FL Dept of Environmental Protection Invoice number 16451.12
Date 07/10/2020
Project 16451 LOVERS KEY NEW VISITORS
CENTER
-$500.00 800
Ross_LS Cross-Out
Date 07/10/2020
Invoice number 16451.12FL Dept of Environmental Protection
16451 LOVERS KEY NEW VISITORS CENTERProject
FL Dept of Environmental Protection Invoice number 16451.12 Invoice date 07/10/2020
10A - Reimbursable Costs 100.00 67.95 0.00 67.95 67.95
10A - Drawing Revisions 2,357.16 100.00 0.00 2,357.16 2,357.16
Task 10 - Drawing Revisions (CO #5)
9F - Reimbursable Costs 50.00 100.00 50.00 50.00 0.00
9F - Lee County LDO Amendment 6,721.82 100.00 6,721.82 6,721.82 0.00
9E - Reimbursable Costs 250.00 0.00 0.00 0.00 0.00
9E - SFWMD ERP Modification 4,799.78 0.00 0.00 0.00 0.00
9D - Reimbursable Costs 650.00 0.00 0.00 0.00 0.00
9D - FDOH Permit Modification 3,177.44 0.00 0.00 0.00 0.00
9C - Reimbursable Costs 2,250.00 15.56 350.00 350.00 0.00
9C - Bonita Springs LDO Modification 7,098.68 100.00 7,098.68 7,098.68 0.00
9B - Surveying Services 3,831.96 100.00 3,831.96 3,831.96 0.00
9A - Environmental Review 3,222.38 100.00 3,222.38 3,222.38 0.00
Subtotal 32,052.06 66.38 21,274.84 21,274.84 0.00
Task 9 - Waterline Relocation (CO # 4)
8E - Construction Site Visits 8,505.84 58.33 2,126.46 4,961.74 2,835.28
8D - 100% Construction Admin Completion 10,768.19 0.00 0.00 0.00 0.00
8C - 75% Construction Admin Completion 11,794.82 100.00 0.00 11,794.82 11,794.82
8B - 50% Construction Admin Completion 12,760.73 100.00 12,760.73 12,760.73 0.00
8A - 25% Construction Admin Completion 14,151.65 100.00 14,151.65 14,151.65 0.00
Subtotal 57,981.23 75.32 29,038.84 43,668.94 14,630.10
Task 8 - Construction Administration
4F - Potable Water Booster Pump 4,754.42 100.00 4,754.42 4,754.42 0.00
4E - Fire Alarm System 5,281.44 100.00 5,281.44 5,281.44 0.00
4D Reimbursable Costs 1,050.00 55.38 581.47 581.47 0.00
4D - Civil & Site Permitting Mods for Storage Tank 8,009.38 100.00 8,009.38 8,009.38 0.00
4C - Fire Water Storage Tank Design 6,606.46 100.00 6,606.46 6,606.46 0.00
Subtotal 25,701.70 98.18 25,233.17 25,233.17 0.00
Change Order # 2
7A Reimbursable 625.00 100.00 586.12 625.00 38.88
7A Bidding & Building Permitting 12,296.17 100.00 12,296.17 12,296.17 0.00
Subtotal 12,921.17 100.00 12,882.29 12,921.17 38.88
Task 7 : Bidding & Building Permitting
6A Reimbursable 1,650.00 43.55 718.54 718.54 0.00
6A Construction Documents 100% 90,145.84 100.00 90,145.84 90,145.84 0.00
Subtotal 91,795.84 98.99 90,864.38 90,864.38 0.00
Task 6 : Contruction Documents- 100%
5D Reimbursable 7,000.00 0.00 0.00 0.00 0.00
5D Gopher Tortoise Relocation Permit 6,946.04 100.00 6,946.04 6,946.04 0.00
5C Reimbursable 7,450.00 82.72 6,162.41 6,162.41 0.00
5C Bonita Springs Dev. Order 2,546.00 100.00 2,546.00 2,546.00 0.00
5B Reimbursable 8,375.00 89.17 7,468.07 7,468.07 0.00
5B State Fire Marshal Plan Review 294.04 100.00 294.04 294.04 0.00
5A Reimbursable 6,300.00 31.75 2,000.00 2,000.00 0.00
5A SFWMD Site Permitting 10,392.22 100.00 10,392.22 10,392.22 0.00
Subtotal 49,303.30 72.63 35,808.78 35,808.78 0.00
Task 5 - Site Permitting
Description
Contract Amount % Complete Previous Total Billed Amount Due
+$500.00 9005.84
Ross_LS Cross-Out
File details come from the government source that posted it. Updated .