CN-370000-CN291-CO1.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|CN291|d928a1b2e1ea6e9944da5f342811856e
Contract number
CN291
Issued by
Florida

About this file

This document is a Construction Change Order issued by the Florida Department of Environmental Protection (FDEP) for a project at Mike Roess Gold Head Branch State Park. The primary parties involved are the FDEP, Old World Craftsmen, Inc. (the contractor), and key personnel including Jeff Ganskop (contractor representative), Binion Waters (FDEP Contract Manager), and other FDEP administrative staff.

The change order pertains to the CCC Bathhouse Reroof project, specifically authorizing additional structural work beyond the original contract. The modifications include adding 422 square feet of structural deck replacement and 64 linear feet of fascia replacement, with associated costs totaling $7,610.00. This increases the original contract sum from $37,300.00 to $44,910.00. The project timeline has been extended, with the new substantial completion date set for 06/02/16 and final completion date set for 06/17/16. The change order was proposed by Old World Craftsmen and approved by various FDEP representatives, with pricing based on previously established alternate bid document rates of $15.00 per square foot for deck replacement and $20.00 per linear foot for fascia replacement.

View the file

Other files

File Type Posted
CN-370000-CN291.pdf PDF
CN-370000-CN291-NTP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .