This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection (FDEP) for The Ash Group, Inc., a consulting engineering firm. The task assignment is related to electrical upgrades at Wekiwa Springs State Park, with the primary contract being FDEP Contract No. CN227 and the specific task assignment being Task 02, involving Project No. 61008C for electrical improvements to RV campsites.
The project scope includes upgrading electrical services from 30 amp to 50 amp for 60 campsites, involving design and construction administration services. The total task amount is $35,982.09, broken down into five primary tasks: preliminary investigation and background file preparation ($2,577.60), conceptual design ($10,423.88), design development ($6,960.48), final construction drawings ($5,871.22), and construction phase services ($10,148.91). The project is scheduled to be completed by June 1, 2017, with tasks ranging from six weeks to matching the construction schedule. The consultant will provide comprehensive services including field assessments, CADD drawings, engineering design, site visits, and technical documentation for the electrical infrastructure improvements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractBudgetExport.csv | CSV file | |
| CN-370000-CN227-CMC2.pdf | ||
| CN-370000-CN227-T1CO1.pdf | ||
| CN-370000-CN227-T3.pdf | ||
| CN-370000-CN227-T3CO3.pdf | ||
| CN-370000-CN227-CMC1.pdf | ||
| CN-370000-CN227-CMC3.pdf | ||
| CN-370000-CN227-T3CO1.pdf | ||
| CN-370000-CN227-T3CO2.pdf | ||
| CN-370000-CN227.pdf | ||
| CN-370000-WQ019-T10CO3.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 29, 2015
Mr. Robert D. George President George and Associates, Inc.
1967 Commonwealth Lane, Ste. 200 Tallahassee, Florida 32303
RE: Engineering Services Proposal Wekiwa Springs State Park
Campground Electrical Improvements
Mr. George:
The Ash Group, Inc. (Ash) is pleased to present this proposal to George and Associates, Inc. for the Florida Department of Environmental Protection’s (FDEP) proposed electrical improvements at the Wekiwa Springs State Park.
OVERVIEW
The intent of the project is to upgrade the existing 30 AMP electrical services to 50 AMP at 60 campsites within the Wekiwa Springs State Park located at 1800 Wekiwa Circle in Apopka, Florida.
The project will include upgrading the two existing 240 volt, single phase electrical distribution systems in the restroom buildings, replacing the panel boards and circuit breakers, replacing the RV site pedestals, installing bollards at each pedestal, and designing the electrical conduit to each camp site.
The below Scope of Services is offered to design the electrical improvements and provide construction administration services for the proposed improvements:
SCOPE OF SERVICES
Task 1.0: Preliminary Investigation and Background File Preparation
1.1 Preliminary Investigation
A field assessment will be performed of the electrical system components, RV site pedestal locations, and roadway/campsite geometry for determination of the optimum conduit corridor.
1.2 Background File Preparation
The site plan provided by the FDEP will be reformatted and updated to the current CADD standards and utilized as the background file for the conceptual drawings.
Deliverable: The site plan will be provided electronically in PDF format.
Performance Measure: The deliverable will be reviewed by the
Department to confirm completeness and accuracy.
Fixed Price: $2,390.70
Reimbursables (mileage): $186.90
Total for Task 1.0: $2,577.60
Task 2.0: Conceptual Design (60% Construction Documents)
2.1 Conceptual drawings shall be prepared to present to proposed electrical service improvements and shall include the following components:
Cover Sheet
General Notes
Overall Site Plan
Conduit Plan
Schedules
Diagrams
Details
2.2 The electrical and civil engineering services associated with development of the conceptual design shall include the design of power for the project including load calculations, riser diagram, fault current calculation, pedestal orientation/location, and electrical conduit alignment.
Deliverable: The site plan will be provided electronically in PDF format.
Performance Measure: The deliverable will be reviewed by the Department to confirm completeness and accuracy.
Fixed Price: $10,423.88
Reimbursables (mileage): $0.00
Total for Task 2.0: $10,423.88
Task 3.0 Design Development (90% Construction Documents)
3.1 The conceptual design shall be further developed to the 90% Stage. The drawings will be suitable for permitting of the work and will provide the level of detail required to perform the work. All plan components and plan sheets presented in Task 2.1 shall be included within this Task.
3.2 Conceptual design comments received from the FDEP will be incorporated into the 90% Plans
Deliverable: The 90% plan will be provided electronically in PDF
Fixed Price: $6,960.48
Total for Task 3.0: $6,960.48
Task 4.0 Final Construction Drawings (100% Construction Documents)
4.1 Final construction drawings and plan specifications shall be provided.
The final construction drawings shall be signed and sealed by a professional engineer licensed in the State of Florida.
4.2 All FDEP comments received from previous submissions shall be incorporated into the final construction drawings.
Deliverable: Five 24” x 36” signed and sealed plan sets will be provided and all associated electronic design files will be provided in both DWG and PDF format.
Fixed Price: $5,871.22
Total for Task 4.0: $5,871.22
Task 5.0 Construction Phase Services
5.1 Shop drawings will be reviewed and engineering comments provided.
5.2 Responses to Requests for Information (RFIs) will be provided.
5.3 Three site visits during construction and one final site visit will be performed to evaluate the improvements and a summary letter will be prepared stating the observed conditions. The letter shall also address any items requiring corrective measures.
Deliverable: A summary letter of the site observations shall be provided in electric and hardcopy
Performance Measure: The deliverable will be reviewed by the
Department to confirm completeness and accuracy.
Fixed Price: $9,962.01
Reimbursables (mileage): $186.90
Total for Task 6.0: $10,148.91
GENERAL UNDERSTANDINGS AND EXCLUDED SERVICES
The professional services that Ash will provide under this Proposal/Agreement include, and are limited to, those described in the Scope of Services. All other services, including those listed below, are specifically excluded.
Topographic/Boundary Survey
Structural Engineering
Gopher Tortoise Survey
Payment of Permit Fees
Electrical Coordination Study or Arc Flash Analysis
Technology (low-voltage) System Design
Preparation of Record Drawings
SUE Investigation
PROJECT FEES
Ash proposes to perform the Scope of Services above for the fees presented on the attached Appendix A.
SCHEDULE
Task 1.0 Six weeks from Notice to Proceed Task 2.0 Four weeks from receipt of approved Task 1.0 Task 3.0 Four weeks from receipt of approved Task 2.0 Task 4.0 Two weeks upon receipt of approved Task 3.0 Task 5.0 Schedule will match the construction schedule
We look forward to working with you on this project. Please do not hesitate to call us with any questions or comments concerning this proposal.
Respectfully yours, THE ASH GROUP, INC.
Christopher K. Martin, P.E.
Group Manager
Financial Management Plan
Appendix A
Classification Sr. Project
Engineer
Project
Engineer
Project
Scientist
CADD
Designer
Sr. Const.
Inspector
Mileage
Expense Administration
Rates $115.89 $111.75 $72.12 $85.20 $96.75 $0.445 $72.12
1.0 Prelim. Investigation and Background File Preparation 2 8 14 0 420 1 $2,577.60
2.0 Conceptual Design (60% Plans) 2 16 18 1 $3,625.50
3.0 Design Development - (90% Plans) 2 10 8 1 $2,103.00
4.0 Final Construction Drawings (100% Plans) 2 9 11 1 $2,246.85
5.0 Construction Phase Services 5 22 18 420 1 $5,038.47
SUBTOTAL $15,591.42
Classification Director of
Elec. Eng.
Director of
Mec. Eng.
Engineer II Designer Office Admin. BIM Manager
President and
CEO
Rates $113.46 $113.46 $113.18 $90.13 $80.61 $100.75 $223.52
2.0 Conceptual Design (60% Plans) 8 24 24 2 4 2 $6,798.38
3.0 Design Development - (90% Plans) 8 18 10 2 4 2 $4,857.48
4.0 Final Construction Drawings (100% Plans) 6 10 10 2 3 2 $3,624.37
5.0 Construction Phase Services 5 24 16 2 1 $5,110.44
SUBTOTAL $20,390.67
TOTAL $35,982.09
TASK
Volt Air - Direct Labor
Total Wage and
Labor Rates
Wekiwa Springs State Park - Electrical Service Improvements
TASK
The Ash Group, Inc. - Direct Labor
Total Wage and
Labor Rates
| CN227 TA2 |
| Engineering Services Proposal - Wekiwa Springs Campground Electrical Improvements v.2 |
File details come from the government source that posted it. Updated .