This document is a Task Assignment Change Order issued by the Department of Environmental Protection (FDEP) for the Kemp Channel Bridge project. The contract involves Calvin, Giordano & Associates, Inc. as the primary contractor, with the project located in Monroe County, Florida. The change order is associated with Contract No. CN126 and Project No. FS050, and involves multiple FDEP personnel including Alan Yassin, Diane Langston, James H Post, and Mae Roth.

The change order extends the Construction Phase CEI (Construction Engineering Inspection) services by two months, increasing the contract duration from eleven to thirteen months. The total value of additional work is $10,070.76, with services not originally included in the initial task assignment but required by FDOT specification and for local agency (LAP) reimbursement. The change increases the original task amount from $221,406.95 to $277,252.07, with a net change of $55,845.12. The additional funds will compensate Calvin, Giordano & Associates for extended CEI services, including structural inspection of the steel bridge at the manufacturing site, as requested by Amec Foster Wheeler, Inc.

View the file

Other files

File Type Posted
CN-370000-CN126-T2CO1.pdf PDF
CN-370000-CN126.pdf PDF
CN-370000-CN126-T1.pdf PDF
CN-370000-CN126-T2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .