Table 1 Repair Loading Dock Concrete Stairs-repairs might not match existing concrete EPIC, Fort Bliss Texas
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | DAY | 2.5 |
| 2 | Concrete Mason/Helper | DAY | 3 |
| 3 | Dispose off site | LS | 1 |
| 4 | Structural repair concrete | LS | 1 |
| 5 | Fortifier, concrete cleaner | LS | 1 |
| 6 | Tools- chisel, drill, brush, | | 0 |
| 9 | Hammer | LS | 1 |
| 10 | | | |
| 23 | | | |
| 24 | | | |
| 25 | | | |
| 27 | Burdened Labor | @ | % | | |
| 28 | | | | Subtotal | |
| 29 | Overhead | @ | % | | |
| 30 | | | | subtotal | |
| 31 | G&A | @ | % | | |
| 32 | | | | subtotal | |
| 33 | Profit | @ | % | | |
| 34 | | | | TOTAL | = |
| 35 | Bond | @ | % | | |
| | | | Grand TOTAL | |
| 26 | | | | | |
| Exterior Rear Ramp_Patch and Repair Concrete (65' x 8') repairs might not match existing concrete EPIC, Fort Bliss Texas | | | | |
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | DAY | 2.5 |
| 2 | Concrete Mason/Helper | DAY | 3 |
| 3 | Structural repair concrete | LS | 1 |
| 4 | Fortifier, concrete cleaner | LS | 0 |
| 5 | Tools, chisel, scrapers, brush | LS | 0 |
| 16 | | | |
| 17 | | | |
| 18 | | | |
| 20 | Burdened Labor | @ | % | | |
| 21 | | | | Subtotal | |
| 22 | Overhead | @ | % | | |
| 23 | | | | subtotal | |
| 24 | G&A | @ | % | | |
| 25 | | | | subtotal | |
| 26 | Profit | @ | % | | |
| 27 | | | | TOTAL | = |
| 28 | | | | | |
| | | | Grand TOTAL | |
| 19 | | | | | |
| Exterior Rear Double Door Concrete By Loading Dock_Patch and Repair Concrete & Paint EPIC, Fort Bliss Texas | | | | |
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | DAY | 3 |
| 2 | Concrete Mason/Helper | DAY | 2 |
| 3 | Painter/Helper | DAY | 2 |
| 4 | Structural repair concrete | LS | 1 |
| 5 | Fortifier, concrete cleaner | LS | 0 |
| 6 | Tools, chisel, scrapers, brush | LS | 0 |
| 7 | Epoxy Primer B | GAL | 1 |
| 8 | Epoxy Paint Part A | GAL | 2.5 |
| 9 | Epoxy Paint Part B | GAL | 2.5 |
| 10 | Sharkgrip Additive | LS | 1 |
| 16 | | | |
| 17 | | | |
| 18 | | | |
| 20 | Burdened Labor | @ | % | | |
| 21 | | | | Subtotal | |
| 22 | Overhead | @ | % | | |
| 23 | | | | subtotal | |
| 24 | G&A | @ | % | | |
| 25 | | | | subtotal | |
| 26 | Profit | @ | % | | |
| 27 | | | | TOTAL | = |
| 28 | | | | | |
| | | | Grand TOTAL | |
| 19 | | | | | |
| Exterior Front Entrance Ramp_Patch and Repair Concrete and Paint EPIC, Fort Bliss Texas | | | | |
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | DAY | 4 |
| 2 | Concrete Mason/Helper | DAY | 2.5 |
| 3 | Painter/Helper | DAY | 2.5 |
| 4 | Structural repair concrete | LS | 1 |
| 5 | Fortifier, concrete cleaner | LS | 0 |
| 6 | Tools, chisel, scrapers, brush | LS | 0 |
| 7 | Epoxy Primer A | GAL | 1 |
| 8 | Epoxy Paint Part A | GAL | 2.5 |
| 9 | Epoxy Paint Part B | GAL | 2.5 |
| 10 | Sharkgrip Additive | LS | 1 |
| 16 | | | |
| 17 | | | |
| 18 | | | |
| 20 | Burdened Labor | @ | % | | |
| 21 | | | | Subtotal | |
| 22 | Overhead | @ | % | | |
| 23 | | | | subtotal | |
| 24 | G&A | @ | % | | |
| 25 | | | | subtotal | |
| 26 | Profit | @ | % | | |
| 27 | | | | TOTAL | = |
| 28 | | | | | |
| | | | Grand TOTAL | |
| 19 | | | | | |
| Radio Room_New Partition wall with new door | | | | |
EPIC, Fort Bliss Texas
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | DAY | 12 |
| 2 | Carpenter/Helper-wall section | DAY | 8 |
| 3 | Painter/Helper-tapebed texture | DAY | 7 |
| 4 | Electrician/Helper | DAY | 1.5 |
| 5 | Mobilization | LS | 1 |
| 6 | Door-3'0"x7'0"Solid Core Wood | LS | 0 |
| 7 | HM Frame-3'0"x7'0" x 5-3/4" | LS | 1 |
| 8 | Lockset-Grade 1- Hinges BB | LS | 1 |
| 9 | Metal Track/Studs | LS | 1 |
| 10 | Insulation R-13 | LS | 1 |
| 11 | Sheetrock 5/8" | LS | 1 |
| 12 | Materials-screws/hilti shots | LS | 1 |
| 13 | Tap/Bedding/Texture material | LS | 1 |
| 14 | Paint primer | LS | 1 |
| 15 | Paint finish | LS | 1 |
| 16 | Cove Base | LS | 1 |
| 17 | Accostical Tile | LS | 1 |
| 28 | | | |
| 29 | | | |
| 30 | | | |
| 32 | Burdened Labor | @ | % | | |
| 31 | | | | | |
| 33 | | | | Subtotal | |
| 34 | Overhead | @ | % | | |
| 23 | | | | subtotal | |
| 36 | G&A | @ | % | | |
| 25 | | | | subtotal | |
| 38 | Profit | @ | % | | |
| 39 | | | | TOTAL | = |
| 40 | Bond | @ | % | | |
| | | | Grand TOTAL | |
| Install steel handrails (Base plate and handrails on sidewalk) and paint | | | | |
EPIC, Fort Bliss Texas
| Ite | | | | | | | | | | |
| m no. | Description | | UoM | QTY | Cost per Unit | | | COST | | | Total |
| Estimated Cost | | Sub-Contractor Cost | | Total Cost | | | | | | | |
| | | | | | Matl | Labor | Equipment | Material | Labor | Equipment |
| 1 | PM /QControl /Safety Officer | WK. | 1 |
| 2 | Welder / helper | WK. | 1.5 |
| 3 | Mobilization | LS | 1 |
| 4 | Welding materials gas,wire etc | LS | 1 |
| 5 | Metal Pipe - steel 2" | LS | 1 |
| 6 | Paint to match | LS | 1 |
| 7 | Site Installation - base plates | | |
| on Existing Concrete sidewalk | LS | 0 |
| 8 | | LS | 0 |
| 18 | | | |
| 19 | | | |
| 20 | | | |
| 22 | Burdened Labor | @ | % | | |
| 23 | Subtotal $ | | | | |
| 24 | Overhead | @ | % | | |
| 25 | subtotal $ | | | | |
| 26 | G&A | @ | % | | |
| 27 | subtotal $ | | | | |
| 28 | Profit | @ | % | | |
| 29 | | | | TOTAL | = |
| 30 | | | | | |
| | | | Grand TOTAL | |
| 21 | | | | | |