Clarifications to SOW from Site Visit
· Item 11 of SOW, “Manhole Covers, Replace”.
It was discussed that in the event material could be sourced to “REPAIR” the existing manhole covers, the Offeror should write that work into item #9, “Void, clean repair and preserve”. This item should also include repairs to the installed ladders in the voids. This action would render Item #11 unnecessary. Sources for such material should be listed in the Item.
In the event material CANNOT be sourced for the existing manhole covers in Item #11, then Item #11 will be written independent of Item #9.
· A new Item #16 will be added to the revised SOW stating the removal of temporary attachments.
· Item #9 of SOW, “Void, Clean, Repair and preserve”.
Due to the age of the barge, it is possible that Lead Paint exists in the voids. If needed, the Offeror would perform this work under Item #9, to include the removal of up to 100 square feet of lead paint in way of other repairs/work.