This is a Scope of Work document for the City of Corona, California, detailing the Citywide Sidewalk Improvements Phase II project. The project encompasses the removal and replacement of approximately 347,000 square feet of existing Portland Cement Concrete (PCC) sidewalk at various locations throughout the entire city, along with restoration of landscape and irrigation systems disturbed during construction activities. Work includes traffic control, clearing and grubbing, construction surveying, Best Management Practice (BMP) implementation, and public notifications. Add alternate bid items may include tree removals and root pruning in accordance with the City's Urban Forest Management Plan.
The document specifies technical requirements and construction standards for all sidewalk improvements, including specifications for materials, installation methods, and quality assurance procedures. Additional requirements encompass environmental compliance, erosion control measures, and restoration protocols for landscaping elements. The project requires contractors to coordinate with city departments and manage public access throughout the construction phases to minimize disruption to residents and businesses.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA\DD\02000.50111\10151761.2 (UPDATED: 01-19)
CITY OF CORONA
Riverside County, California
FORMAL
PUBLIC WORKS DEPARTMENT
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
CITYWIDE SIDEWALK IMPROVEMENTS PHASE II
PROJECT NO. ST-2027-04
NIB 27-003CA
FUNDED BY
CAPITAL IMPROVEMENT PROGRAM
July, 2026
PREPARED BY
CAPITAL IMPROVEMENT PROGRAM
400 S. VICENTIA AVE, STE. 210
CORONA, CA 92882-2187
(951) 736-2266
Docusign Envelope ID: 6EAAECAA-9B7A-80F9-83A1-AEB40E03187C
CONTRACT DOCUMENTS AND SPECIAL PROVISIONS
FOR THE
CIYWIDE SIDEWALK IMPROVEMENTS PHASE II
FORMAL
Project No. ST-2027-04
APPROVALS
For City of Corona
Javier Luna, P.E.
Acting Public Works Director/City Engineer
Date
7/14/2026
PROJECT NO. ST-2027-04
BID AND CONTRACT DOCUMENTS
CA\DD\02000.50111\10151761.2 1 (UPDATED: 01-19)
Table of Contents
NOTICE INVITING BIDS
INSTRUCTIONS TO BIDDERS
BID FORM
BID SCHEDULE
BIDDER SELF-PERFORMANCE VERIFICATION FORM
ADDENDA ACKNOWLEDGEMENT
CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION
BID BOND
DESIGNATION OF SUBCONTRACTORS
INFORMATION REQUIRED OF BIDDERS
NON-COLLUSION DECLARATION
CONTRACTOR/ SUBCONTRACTOR REGISTRATION FORM
CONTRACT
PERFORMANCE BOND
PAYMENT BOND (LABOR AND MATERIALS)
CERTIFICATES OF INSURANCE AND ENDORSEMENT
CONTRACTOR’S AFFIDAVIT OF RELEASE OF LIENS AND SUBCONTRACTOR’S
FINAL WAIVER OF LIEN
CONTRACT RETENTION POLICY (OPTIONAL)
SUBSTITUTION REQUEST FORM
GENERAL PROVISIONS ....................................................................................................... G-1 LANDSCAPE AND IRRIGATION SYSTEMS SPECIFICATIONS .............................................L-1 APPENDIX A – STANDARD PLANS ...................................................................................... A-1 APPENDIX B - LOCATION MAPS .......................................................................................... A-2
NOTICE INVITING BIDS
The City of Corona, Public Works Department, (City) will receive sealed bids for the Citywide Sidewalk Improvements Phase II, Project No. ST-2027-04, 27-003CA, through the City’s PlanetBids electronic bidding system, no later than August 13, 2026, 2:00 p.m. Bids submitted after this date and time will not be accepted by the electronic bidding system. At said time, it will be bidder’s responsibility to log into the PlanetBids system for the City of Corona to view the apparent low bidder for the project. Bids shall be valid for 90 calendar days after the close of bid.
Bids must be submitted on the City’s Bid Forms
Prospective Bidders must visit the City’s Bids and Requests for Proposals Vendor Portal at https://www.planetbids.com/portal/portal.cfm?CompanyID=39497 and register as a new vendor in PlanetBids in order to download Contract Documents, including Instructions to Bidders, plans and specifications, and to receive addenda and notifications when issued. Bidders will also submit electronic bids through this website. The City will also make the Contract Documents available for review at one or more plan rooms.
All electronic Bids must be accompanied by a bid security in an amount not less than 10% of the submitted Total Bid Price pursuant to Section 12 Bid Guarantee (Bond) of the Instructions to Bidders.
It shall be Bidder’s responsibility to allow sufficient time to complete and submit its bid including all required documentation referred to in the Contract Documents prior to the stated deadline.
Electronic bid submission cannot be completed unless bidder properly uploads all required documents. Each bid shall be accompanied by the security referred to in the Contract Documents, the Non-Collusion Declaration, the list of proposed subcontractors, and all additional documentation required by the Instructions to Bidders.
Bidders are solely responsible for the “on time” submission of their electronic Bid. The City will only consider Bids from “contractors” that have transmitted successfully and have been issued a confirmation number with a time stamp from PlanetBids indicating that the Bid was submitted successfully. Transmission of Bids by any other means will not be accepted. Bidders shall be solely responsible for informing themselves with respect to the proper utilization of the online bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the Bidder to successfully submit an electronic Bid shall be the Bidder’s sole risk and no relief will be given for late and/or improperly submitted Bids. Bidders experiencing technical difficulties with the bid submission process may contact PlanetBids Support at 818-992-1771. If you continue to have difficulty, call City of Corona Purchasing Department at 951-736-2274. Neither the City, nor PlanetBids, make any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission date and/or time.
The successful bidder will be required to furnish the City with a Performance Bond equal to 100% of the successful bid, and a Payment (Labor and Materials) Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California.
Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by City to ensure performance under the Contract.
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497
CA\DD\02000.50111\10151761.2 2 (UPDATED: 01-19)
The Work is subject to the payment of not less than prevailing wages pursuant to Chapter 1 (beginning at Section 1720 et seq.) of Part 7 of Division 2 of the California Labor Code, as well as Title 8, Section 16000 et seq. of the California Code of Regulations (“Prevailing Wage Laws”).
The Director of the Department of Industrial Relations (“DIR”) has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, copies of which are on file and will be made available to any interested party upon request at Owners office or online at http://www.dir.ca.gov/dlsr. A copy of these rates shall be posted by the successful bidder at the Project site.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. The DIR registration number for each contractor and subcontractor must be identified on the bid proposal - failure to identify this number could result in the bid being rejected as non-responsive. The City will report all necessary contracts to the DIR as required by the Prevailing Wage Laws.
The successful bidder and their subcontractor(s) shall comply with all applicable Prevailing Wage Laws, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor, the payment of overtime, and the debarment of contractors and subcontractors. The successful bidder and all subcontractor(s) under him shall also be responsible for any and all violations and fines imposed on them pursuant to the Prevailing Wage Laws.
Before the Contract is awarded, the successful bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor’s license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: valid Class ‘A’ General Engineering Contractor.
The successful bidder must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are broader, the successful bidder shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. The successful bidder will be required to indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by the successful bidder, its subcontractors, or others for whom the successful bidder is responsible under its indemnity obligations.
CARB implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024 and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at:
https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the duration of the Project. Bidders must provide, with their Bid, Docusign Envelope ID: 6EAAECAA-9B7A-80F9-83A1-AEB40E03187C http://www.dir.ca.gov/dlsr https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf.
CA\DD\02000.50111\10151761.2 3 (UPDATED: 01-19)
copies of Bidder’s and all listed subcontractors’ most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.
Award of Contract: The City shall award the Contract for the Project to the lowest responsive, responsible bidder as determined on the basis of the summation of the Total Base Bid Schedule and the Total Alternate Bid Item combined. However, the City may choose to award the Contract on the basis of the base bid alone or the base bid and any selected alternate bid item or combination of selected alternate bid items. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.
For further information, contact Carol Appelt, Lead Purchasing Specialist at (951) 279-3620 or via email at Carolyn.Appelt@CoronaCA.gov.
______________________________________ Date: __________________
Javier Luna, PE Acting Public Works Director/City Engineer
Docusign Envelope ID: 6EAAECAA-9B7A-80F9-83A1-AEB40E03187C
7/14/2026 mailto:Carolyn.Appelt@CoronaCA.gov
CA\DD\02000.50111\10151761.2 4 (UPDATED: 01-19)
INSTRUCTIONS TO BIDDERS
1. AVAILABILITY OF CONTRACT DOCUMENTS
Bids must be submitted to the City through the City’s PlanetBids electronic bidding system on the Bid Forms which are a part of the Bid Package for the Project. Prospective bidders may obtain a complete set of Contract Documents through the City’s PlanetBids electronic bidding system.
The City may also make the Contract Documents available for review at one or more plan rooms, as indicated in the Notice Inviting Bids. Please note that prospective bidders who choose to review the Contract Documents at a plan room must still register with the City’s PlanetBids electronic bidding system to obtain the required Contract Documents if they decide to submit a bid for the Project.
2. EXAMINATION OF CONTRACT DOCUMENTS
The City has made copies of the Contract Documents available, as indicated above. Bidders shall be solely responsible for examining the Project Site and the Contract Documents, including any Addenda issued during the bidding period, and for informing itself with respect to local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors’ licensing requirements, availability of required insurance, and other factors that could affect the Work. Bidders are responsible for consulting the standards referenced in the Contract. Failure of Bidder to so examine and inform itself shall be at its sole risk, and no relief for error or omission will be given except as required under State law.
3. INTERPRETATION OF CONTRACT DOCUMENTS
Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of the City by submission of a written request for an interpretation or correction to the City. Such submission, if any, must be sent through the City’s PlanetBids electronic bidding system:
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497 utilizing the Questions & Answers tab. Questions must be submitted no later than 5:00 p.m., July 30, 2026.
Any interpretation of the Contract Documents will be made only by written addenda duly issued through the City’s PlanetBids electronic bidding system. The City will not be responsible for any explanations or interpretations provided in any other manner. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any bidder, and no bidder should rely on any such oral interpretation.
Bids shall include complete compensation for all items that are noted in the Contract Documents as the responsibility of the Contractor.
4. INSPECTION OF SITE
Each prospective bidder is responsible for fully acquainting itself with the conditions of the Project Site (which may include more than one site), as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions which may impact the cost or effort required to complete the Project.
https://www.planetbids.com/portal/portal.cfm?CompanyID=39497
CA\DD\02000.50111\10151761.2 5 (UPDATED: 01-19)
5. ADDENDA
The City reserves the right to revise the Contract Documents prior to the bid opening date.
Revisions, if any, shall be made by written Addenda. All addenda issued by the City shall be included in the bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of bids, the City will extend the deadline for submission of bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the bid submission date. Copies of Addenda will be posted to the City’s PlanetBids electronic bidding platform. Each prospective bidder that has registered to receive a set of the Contract Documents will be notified by email when Addenda have been posted for the Project to PlanetBids. Please note: bidders are responsible for ensuring that they have received any and all Addenda. To this end, each bidder should contact the City’s Finance Department – Purchasing Division to verify that he has received all Addenda issued, if any, prior to the bid opening. Bidders shall acknowledge receipt of all Addenda by indicating in the appropriate place in the Bid that they have received all Addenda.
6. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the lowest bid will be determined on the basis of the summation of the Total Base Bid Schedule and the Total Add Alternate Bid Items combined. However, the City may choose to award the contract on the basis of the base bid alone or the base bid and any selected alternate bid item or combination of selected alternate bid items. The time required for completion of the alternate bid item(s) has been factored into the Contract duration and no additional Contract time will be awarded for the alternate bid item(s).
The City may elect to include one or more of the alternate bid item(s), or to otherwise remove certain work from the Project scope of work, accordingly each Bidder must ensure that each bid item contains a proportionate share of profit, overhead and other costs or expenses which will be incurred by the Bidder.
7. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents and are provided herein. The use of substitute bid forms other than clear and correct photocopies of those provided by the City will not be permitted. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable) and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. USE OF BLACK OR BLUE INK, INDELIBLE PENCIL OR A TYPEWRITER IS REQUIRED. Deviations in the bid form may result in the bid being deemed non-responsive.
8. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms, nor make substitutions thereon. Oral, telephonic and electronic modifications will not be considered, unless the Notice Inviting Bids authorizes the submission of electronic bids and modifications thereto and such modifications are made in accordance with the Notice Inviting Bids.
CA\DD\02000.50111\10151761.2 6 (UPDATED: 01-19)
9. DESIGNATION OF SUBCONTRACTORS
Pursuant to State law, the Bidders must designate the name, location, DIR registration and contractor’s license number of each subcontractor who will perform work or render services for the Bidder in an amount that exceeds one half of one percent (1/2%) of the Bidder’s Total Bid Price, as well as the portion of work each such subcontractor will perform on the form provided herein by the City. No additional time will be provided to bidders to submit any of the requested information in the Designation of Subcontractor form.
10. LICENSING REQUIREMENTS
Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code (as well as Public Contract Code Section 20103.5 when federal funds are involved), the successful bidder must possess proper licenses for performance of this Contract before the Contract is awarded. Subcontractors must possess the appropriate licenses for each specialty subcontracted before the Contract is awarded. The City shall have the right to request, and Bidders shall provide within five (5) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract. Please also note that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.
11. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.
If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid;
and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.
12. BID GUARANTEE (BOND)
Each bid shall be accompanied by: (a) cash; (b) a certified check made payable to the City; (c) a cashier’s check made payable to the City; or (d) a bid bond payable to the City executed by the bidder as principal and surety as obligor in an amount not less than 10% of the maximum amount of the bid. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section
995.120. The cash, check, or bid bond shall be given as a guarantee that the bidder shall execute the Contract if it be awarded to the bidder, shall provide the payment and performance bonds and insurance certificates and endorsements as required herein within ten (10) calendar days after notification of the award of the Contract to the bidder. Failure to provide the required documents may result in forfeiture of the bidder’s bid deposit or bond to the City and the City may award the Contract to the next lowest responsive, responsible bidder, or may call for new bids.
CA\DD\02000.50111\10151761.2 7 (UPDATED: 01-19)
Each bidder shall be required to submit a copy of their bid security when submitting their electronic bid. Bidders may submit a scanned copy of their bid bond as the City does not require original, embossed corporate seals on any bonds. However, the City reserves the right at any time to demand an original bond with an embossed corporate seal, and Contractor shall supply such bond within seven (7) calendar days of any such request. Other original bid security (in the form of cash, cashier’s check or certified check) shall be delivered to the City’s Finance Department – Purchasing Division office, 400 South Vicentia Ave., Suite 320, Corona, CA 92882 by the bid closing date and time specified in the Notice Inviting Bids.
An electronic bid not accompanied by (a) cash; (b) certified check made payable to the City; (c) or cashier’s check made payable to the City; or (d) an acceptable bid bond payable to the City may be rejected.
13. SUBMISSION OF SEALED BIDS
All bids must be submitted at the time and place and in the manner set forth in the Notice Inviting Bids. Bids must be made on the bid forms set forth herein. If the Notice Inviting Bids requires the use of the electronic bidding system, pursuant to Public Contract Code Sections 1600 and 1601, Bids must be made on the bid forms provided therein.
City reserves the right to not accept electronically transmitted bids where not specifically authorized in the Notice Inviting Bids, and may reject any bid not strictly complying with City’s designated methods for delivery.
14. DELIVERY AND OPENING OF BIDS
Bids will be received by the City in the manner set forth in the Notice Inviting Bids up to the date and time shown therein. It is the Bidder’s sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than the dates(s) and time(s) indicated.
Bid results will be posted to the City’s PlanetBids electronic bidding system no earlier than the close of bid. The City may in its sole discretion, elect to postpone the opening of the submitted Bids. City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid. The Bid shall state the unit prices, the total amount of each bid item and the Total Bid Price for which the Bidder proposes to complete the work as specified by the Contract Documents, including but not limited to labor, materials and goods. If the unit price and the total amount stated by a Bidder for any item do not agree, the unit price alone shall be considered as representing Bidder’s intention, and the total price for that item shall be corrected by the City to conform thereto.
City will correct the extended unit price and math errors to determine the total amount of bid.
15. WITHDRAWAL OF BID
Electronic bids may be withdrawn prior to the hour and date set forth in the Notice Inviting Bids.
16. RELIEF FROM THE BID DUE TO A MISTAKE
Pursuant to Sections 5100 through 5107 of the Public Contract Code, a Bidder may be relieved of its bid by the City.
Pursuant to Section 5103 of the Public Contract Code, the Bidder shall establish to the satisfaction of the City that:
A. A mistake was made.
B. The Bidder gave the City written notice of the mistake within 5 days after the date of the
CA\DD\02000.50111\10151761.2 8 (UPDATED: 01-19)
Bid opening specifying in detail how the mistake occurred.
C. The mistake made the Bid materially different than the Bidder intended it to be.
D. The mistake was made in filling out the Bid and not due to error in judgment or to carelessness in inspecting the Work site, or in reading the Plans and Specifications.
Pursuant to Section 5105 of the Public Contract Code, a Bidder who claims a mistake shall be prohibited from participating in further bidding on the Contract on which the mistake was claimed.
17. BASIS OF AWARD; BALANCED BIDS
The City shall award the Contract to the lowest responsive, responsible Bidder submitting a responsive Bid. The City may reject any Bid which, in its opinion when compared to other bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any bid which unevenly weighs or allocates costs, including but not limited to overhead and profit to one or more particular bid items.
18. DISQUALIFICATION OF BIDDERS; INTEREST IN MORE THAN ONE BID
No bidder shall be allowed to make, submit or be interested in more than one bid. However, a person, firm, corporation or other entity that has submitted a sub-proposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other bidders submitting a bid to the City. No person, firm, corporation, or other entity may submit a sub-proposal to a bidder, except for quoting prices of materials to a bidder, when also submitting a prime bid on the same Project.
19. INSURANCE REQUIREMENTS
The successful bidder shall procure the insurance in the form and in the amount specified under Section 5-4 Insurance in Section G – General Provisions.
20. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the City Council may award the Contract. The apparent successful Bidder should begin to prepare the following documents: (1) the Performance Bond; (2) the Payment (Labor and Materials) Bond; and (3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the award, the Bidder will have 10 consecutive calendar days from the date of this notification to execute the Contract and supply the City with all of the required documents and certifications. Regardless of whether or not the Bidder supplies the required documents and certifications in a timely manner, the Contract time may begin to run 10 calendar days from the date of the notification. Once the City receives all of the properly drafted and executed documents and certifications from the Bidder, the City shall issue a Notice to Proceed to that Bidder.
No Bid shall be considered as binding upon the City until the Contract is fully executed.
21. FILING OF BID PROTESTS
Bidders may file a “protest” of a Bid with the Deputy Director of Finance. In order for a Bidder’s protest to be considered valid, the protest must:
A. Be filed in writing within 5 calendar days after the bid opening date;
B. Clearly identify the specific irregularity or accusation;
C. Clearly identify the specific City staff determination or recommendation being protested;
CA\DD\02000.50111\10151761.2 9 (UPDATED: 01-19)
D. Specify, in detail, the grounds of the protest and the facts supporting the protest; and
E. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, it will be rejected as invalid.
If the protest is valid, the City’s Deputy Director of Finance, or other designated City staff member, shall review the basis of the protest and all relevant information. The Deputy Director of Finance will provide a written decision to the protestor. The protestor may then appeal the decision of the Deputy Director of Finance to the Finance Director.
22. WORKERS COMPENSATION
Each bidder shall submit the Contractor’s Certificate Regarding Workers’ Compensation form.
23. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments based upon the percentage of the work completed. The City will retain five percent of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.
City expenses for administration of the Escrow Agreement shall be billed quarterly to the Contractor pursuant to the City’s current Fee Recovery Schedule effective October 17, 2024:
Set up fees (one time only) $350.00 Monthly maintenance fee $95.00
24. PREVAILING WAGES
Refer to the Notice Inviting Bids and Article 8 of the Contract for Prevailing Wage requirements.
25. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Section 1777.1 or Section 1777.7 of the Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
26. PERFORMANCE BOND AND PAYMENT (LABOR AND MATERIALS) BOND
REQUIREMENTS
Within the time specified in the Contract Documents, the Bidder to whom a Contract is awarded shall deliver to the City the Performance Bond and Payment (Labor and Materials) Bond in the form supplied by the City and included in the Contract Documents. Failure to do so may, in the sole discretion of City, result in the forfeiture of the Bid Guarantee. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment (Labor and Materials) Bond shall be for 100% of the Total Bid Price. The City does not require original, embossed corporate seals on any bonds. However, CA\DD\02000.50111\10151761.2 10 (UPDATED: 01-19) the City reserves the right at any time to demand an original bond with an embossed corporate seal, and Contractor shall supply such bond within seven (7) calendar days of any such request.
27. REQUEST FOR SUBSTITUTIONS
The successful bidder shall comply with the substitution request provisions set forth in the Special Conditions, including any deadlines for substitution requests which may occur prior to the bid opening date.
28. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents.
29. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so.
30. SAFETY REQUIREMENTS/VIOLATIONS
Safety at the Project site during performance of the Work is of paramount concern to the City.
Accordingly, bidders must not have committed any serious violations within the last two (2) years or any willful violations within the last five (5) years of federal or state OSHA regulations. Bidders must identify the number of OSHA violations on the INFORMATION REQUIRED OF BIDDERS page. Any serious or willful violation falling within the timeframes noted above may render a bid as non-responsive. We strongly encourage full disclosure, since failure to identify all violations on the INFORMATION REQUIRED OF BIDDERS page may result in rejection of the bid as non-responsive or the bidder as non-responsible following a hearing. A citation properly appealed through OSHA is not considered to be a violation until the matter is closed and considered final by OSHA. The City still expects this information to be disclosed by the bidder, with an explanation and documentation showing that the matter is properly under appeal with OSHA and not considered closed or final. Failure to be forthcoming with this information may result in rejection of the bid as non-responsive.
31. IRAN CONTRACTING ACT
Pursuant to the Iran Contracting Act of 2010 (Public Contract Code 2200-2208), Vendors/Bidders are ineligible to bid on or submit a proposal for any contract with a public entity for goods or services of one million dollars ($1,000,000) or more if the Vendor/Bidder engages in investment activities in Iran. For bids $1,000,000 or more, Bidders must certify that it is not on the list of ineligible vendors prohibited from doing business with the State of California and shall complete the Iran Contracting Act Certification form and submit with their bid. Failure to do so may deem Contractor’s Bid non-responsive.
CA\DD\02000.50111\10151761.2 11 (UPDATED: 01-19)
32. FLEET COMPLIANCE CERTIFICATION
The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, valid Certificates of Reported Compliance (“CRC”) for the Bidder’s fleet and for the fleet(s) of its listed subcontractors (including any applicable leased equipment or vehicles). Bidder must additionally complete and submit the Fleet Compliance Certification, included in the Bid Documents. Failure to provide a CRC for the Bidder, and for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the bid non-responsive.
END OF INSTRUCTIONS TO BIDDERS
CA\DD\02000.50111\10151761.2 12 (UPDATED: 01-19)
BID FORM
NAME OF BIDDER:
The undersigned, hereby declares that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:
Citywide Sidewalk Improvements Phase II Project No. ST-2027-04, NIB 27-003CA
The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.
The Contract duration shall commence on the date stated in the City’s Notice to Proceed and shall be completed by the Contractor in the time specified in the Contract Documents. In no case shall the Contractor commence construction prior to the date stated in the City’s Notice to Proceed.
Bidder certifies that it is either:
CURRENTLY LICENSED: Bidder is currently licensed in accordance with the law providing for the registration of Contractor as follows:
License No.
Expiration Date
Class of License
TO BE LICENSED: Bidder shall have the following license in accordance with the law providing for the registration of Contractors before the Contract is awarded:
Class of License
If the bidder is a joint venture, each member of the joint venture must include the above information.
Attached is the required bid security in the amount of not less than 10% of the Total Bid Price.
Attached is the fully executed Non-Collusion Declaration form.
Attached is the completed Designation of Subcontractors form.
Attached is the completed Bidder Information Form.
Attached is the completed Contractor’s Certificate Regarding Workers’ Compensation form.
Attached is the completed Fleet Compliance Certification.
Attached is the fully executed Iran Contracting Act Certification Form (for bids of $1,000,000 or more).
CA\DD\02000.50111\10151761.2 13 (UPDATED: 01-19)
Bidder acknowledges and understands that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.
I hereby certify under penalty of perjury under the laws of the State of California, that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
Signature:
Name:
Title:
Date:
CA\DD\02000.50111\10151761.2 14 (UPDATED: 01-19)
BID SCHEDULE
Contractor shall complete the Electronic Bid Schedule found in the Line Items tab within the PlanetBids electronic bidding system and enter its bid prices there to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project. A copy of the Bid Schedule below is provided for reference purposes only and need not be completed.
Citywide Sidewalk Improvements Phase II, Project No. ST-2027-04, NIB 27-003CA
BASE BID SCHEDULE
NO. ITEM DESCRIPTION
UNIT OF
MEASURE
EST.
QTY.
UNIT
PRICE
ITEM COST
1 Mobilization (2%) LS 1
2 Traffic Control LS 1
3 Implementation of BMPs LS 1
4 Informational Project Sign EA 10
5 Public Notification LS 1
6 Water Consumption LS 1
7 Potholing LS 1
8 Clearing and Grubbing LS 1
9 Construction Surveying LS 1
Remove Existing PCC Sidewalk
(up to 6-inch thick)
SF 347,704
CA\DD\02000.50111\10151761.2 15 (UPDATED: 01-19)
NO. ITEM DESCRIPTION
UNIT OF
MEASURE
EST.
QTY.
UNIT
PRICE
ITEM COST
PCC Sidewalk per City Standard
SF 347,704
Remove and Replace Landscape and Irrigation In-Kind
LS 1
ADD ALTERNATE BID ITEMS
NO. ITEM DESCRIPTION
UNIT OF
MEASURE
EST.
QTY.
UNIT
PRICE
ITEM COST
Remove Tree (24” Diameter or less)
EA 54
Remove Tree (25” Diameter or greater)
EA 162
Perform Root Pruning in accordance with the Urban Forest Management Plan
LS 1
CA\DD\02000.50111\10151761.2 16 (UPDATED: 01-19)
BASIS OF AWARD
The City shall award the Contract for the Project to the lowest responsive, responsible bidder as determined on the basis of the summation of the Total Base Bid Schedule and the Add Alternate Bid Items combined. However, the City may choose to award the contract on the basis of the base bid alone or the base bid and any selected alternate bid item or combination of selected alternate bid items. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. In case of discrepancy between the unit price and the item cost set forth for a unit basis item, the unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the “Item Cost” column, then the amount set forth in the “Item Cost” column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the unit price.
Notice to Proceed will be given initially for the Total Base Bid Schedule ONLY. No guarantee is made that a Notice to Proceed will be issued for any part of the project other than the Total Base Bid Schedule. The Owner reserves the right to proceed with each Bid Schedule separately without impact to the price paid to the Contractor for any other portion of the Contract.
The Contractor shall include all costs for mobilization of equipment to perform all of the work required by the Total Base Bid Schedule. No additional monies will be paid for mobilization or demobilization.
PROJECT NO. ST-2027-04, NIB 27-003CA
BIDDER SELF-PERFORMANCE VERIFICATION FORM
This form is intended to assist the Bidder in verifying its compliance with Subsection 2-3 of the Standard Specifications for Public Works Construction and the Special Provisions.
(1) Total $ amount of the Work to be performed by subcontractors: $ .
(2) Specialty Items (to be performed by subcontractors): This must be filled in by Agency.
Item No. $ .
Item No. $ .
Item No. $ .
Item No. $ .
Item No. $ .
Subtotal: $ .
(3) Net subcontracted amount (Line 1 – Line 2): $ .
(4) Contract Price (Grand Total from the Schedule of Prices: $ .
(5) Contract Price less Specialty Items to be performed by Subcontractors (Line 4 – Line 2): $ .
(6) Percentage to be self-performed:
([Line 5 – Line 3]/Line 5 x 100) $ .
If Line 6 is less than 50%, the amount of work to be self-performed is not in conformance with Subsection 2-3 of the Standard Specifications for Public Works Construction and the Special Provisions.
CA\DD\02000.50111\10151761.2 2 (UPDATED: 01-19)
ADDENDA ACKNOWLEDGEMENT
The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents.
Name of Bidder:
Address:
Telephone No:
By:
(Signature)
(Printed Name)
(Title)
Addenda No:
Dated:
CA\DD\02000.50111\10151761.2 3 (UPDATED: 01-19)
REFERENCES
The following are the names, addresses, telephone numbers and email addresses for a minimum of THREE (3) public agencies for which the BIDDER has performed similar work within the past three (3) years.
1.
Name and Address of Owner.
Name, Telephone Number and Email Address of person familiar with project.
Contract Amount Type of Work Date Completed
2.
Name and Address of owner.
3.
4.
5.
The following are the names, addresses, telephone numbers and email addresses of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.
CA\DD\02000.50111\10151761.2 4 (UPDATED: 01-19)
CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
CA\DD\02000.50111\10151761.2 5 (UPDATED: 01-19)
BID BOND
The makers of this bond are, ________________________________________________, as Principal, and ______________________________________________________________, as Surety and are held and firmly bound unto the City of Corona, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to CITY for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated ____________, _____, for
Citywide Sidewalk Improvements Phase II, Project No. ST-2027-04, NIB 27-003CA
If the Principal does not withdraw its bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.
Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.
In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this _______ day of ________________, 20____, the name and corporate seal of each corporation.
(Corporate Seal)
Principal
(Corporate Seal)
Surety:
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate)
CA\DD\02000.50111\10151761.2 6 (UPDATED: 01-19)
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California }
} ss.
County of __________________________ }
On before me, personally appeared
Here Insert Name and Title of the Officer
Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Place Notary Seal Above Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title of Type of Document:
Document Date:
Number of Pages:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer’s Name:
Signer’s Name:
Individual Individual Corporate Officer Title(s): Corporate Officer Title(s):
Partner - Limited General Partner - Limited General Attorney in Fact Right Thumbprint of
Signer Top of thumb here
Attorney in Fact Right Thumbprint of Signer Top of thumb here
Trustee Trustee Guardian or Conservator Guardian or Conservator Other: Other:
Signer is Representing: Signer is Representing:
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
CA\DD\02000.50111\10151761.2 7 (UPDATED: 01-19)
DESIGNATION OF SUBCONTRACTORS
In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, each Bidder shall set forth below: (a) the name and the license number and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (1/2%) of the Contractor’s Total Bid Price. Notwithstanding the foregoing, if the work involves streets and highways, then the Contractor shall list each subcontractor who will perform work or labor or render service to Contractor in or about the work in an amount in excess of one-half of one percent (1/2%) of the Contractor’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information. If Contractor does not list a subcontractor below which Contractor would otherwise be required by law to list then the Contractor shall be deemed to have agreed that it is fully qualified to perform that Work, and that it shall perform that portion itself.
Description of Work Subcontractor
Location, License No. & DIR Registration Number of
Subcontractor
% of the Work
CA\DD\02000.50111\10151761.2 8 (UPDATED: 01-19)
INFORMATION REQUIRED OF BIDDERS
A. INFORMATION ABOUT BIDDER
[**Indicate not applicable (“N/A”) where appropriate.**]
NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.
Type, if Entity:
Bidder Address:
DIR Registration Number Telephone Number
License No. Expiration Date Class of License
Email Address
B. CONTRACTOR’S INDUSTRIAL SAFETY RECORD
Number of Serious OSHA Violations within the last 2 years and the number of Willful OSHA Violations within the last 5 years (must state zero if none):
___ Serious ___ Willful ___ Repeat ___ Other ___ Unclass _____ Total
C. VERIFICATION AND EXECUTION
These Bid Forms shall be executed only by a duly authorized official of the Bidder:
I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:
CA\DD\02000.50111\10151761.2 9 (UPDATED: 01-19)
NON-COLLUSION DECLARATION
(TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID)
The undersigned declares:
I am the _________________________________________________ [title] of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .