City of East Lansing Optimization Improvements_IFB-VOL II_2025-05-05.pdf
PDF 43 MB Posted
- Solicitation number
- 2025-010
- Issued by
- Grand Traverse County, Michigan
About this file
This document is an electrical design and specification file for the City of East Lansing's Water Resource Recovery Facility (WRRF) Operational Facilities and Treatment Optimization Improvements project. The project involves comprehensive electrical system upgrades, renovations, and modifications to the existing administration building, including removing existing equipment, upgrading electrical and instrumentation systems, and installing new network panels, lighting fixtures, power distribution equipment, and control systems. The work encompasses electrical demolition, installation of new motor control centers, mini power zones, lighting panels, network infrastructure, and card access systems across multiple facility locations. The project is issued for bidding with a bid date of 05/05/25 and covers extensive electrical system reconfigurations in the administration building, tunnels, and various plant process areas.
The electrical design documents detail precise technical specifications for system replacements, including new Rockwell control logic hardware, network switches, fiber optic cabling, power panels, and instrumentation interfaces. The project includes relocating existing equipment, installing new Cisco networking equipment, providing new UPS systems, and implementing upgraded control and monitoring infrastructure. Funding appears to be through the State Revolving Fund (SRF Project No. 5844-01), with the total project focused on optimizing the facility's electrical and operational capabilities. The specifications emphasize careful coordination, preservation of existing system functionality, and comprehensive system integration across multiple building and process areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N www.tetratech.com
CLIENT INFORMATION:PROJECT LOCATION:
PROJECT DESCRIPTION / NOTES:
Tt PROJECT No.: CLIENT PROJECT No.:
ISSUED:
CITY OF EAST LANSING, MICHIGAN
OPERATIONAL FACILITIES AND TREATMENT
OPTIMIZATION IMPROVEMENTS - SRF NO. 5844-01
EAST LANSING WRRF
1700 TROWBRIDGE RD. EAST LANSING, MI 48823
200-13045-22002
CITY OF EAST LANSING, MICHIGAN
3497 COOLIDGE RD
EAST LANSING, MICHIGAN 48823
PHONE: (517) 316-3930 FAX (517) 484-8140
RENOVATION OF WRRF ADMINISTRATION BUILDING FOR THE CITY OF EAST LANSING
SRF PROJECT NO. 5844-01
ISSUED FOR BIDS - 05/05/25
VICINITY MAP:
PROJECT LOCATION
VOLUME II
SHEET INDEX
VOLUME I
SHEET NO. GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES
G-100 CODE SUMMARY PLAN AND OCCUPANT LOAD
G-101 LIFE SAFETY PLAN -SECOND FLOOR
G-102 LIFE SAFETY PLAN -FIRST FLOOR
SHEET NO. CIVIL
C-101 OVERALL EXISTING SITE PLAN
C-102 ENLARGED PROPOSED SITE PLAN
C-103 ENLARGED PROPOSED SITE PLAN
C-501 CIVIL DETAILS
SHEET NO. STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-003 SPECIAL INSPECTIONS
S-004 SPECIAL INSPECTIONS
S-005 SPECIAL INSPECTIONS
S-101 ADMIN BUILDING BASEMENT PLAN
S-102 ADMIN BUILDING LOWER FLOOR PLAN
S-103 ADMIN BUILDING FIRST FLOOR PLAN
S-104 ADMIN BUILDING SECOND FLOOR
S-105 ADMIN BUILDING LOWER ROOF PLAN
S-106 HEADWORKS BUILDING WORK PLATFORM PLAN
S-107 NORTH AERATION TANKS CONSTRUCTION PLAN
S-108 EQ BASIN MODIFICATIONS PLAN
S-201 ADMIN BUILDING FRAMING ELEVATIONS
S-301 ADMIN BUILDING SECTIONS
S-302 ADMIN BUILDING SECTIONS
S-303 ADMIN BUILDING SECTIONS
S-304 ADMIN BUILDING SECTIONS
S-305 ADMIN BUILDING SECTIONS
S-306 ADMIN BUILDING SECTIONS
S-307
HEADWORKS BUILDING WORK PLATFORM SECTIONS AND
DETAILS
S-308 NORTH AERATION TANK MODIFICATION SECTIONS
S-309 EQ BASIN MODIFICATIONS SECTIONS
S-401 ADMIN BUILDING ENLARGED PLANS
S-501 STANDARD DETAILS
S-502 STANDARD DETAILS
S-503 STANDARD DETAILS
S-504 STANDARD DETAILS
S-505 STANDARD DETAILS
S-506 STANDARD DETAILS
S-901 ADMIN BUILDING PHOTOS
SD101 ADMIN BUILDING BASEMENT DEMO PLAN
SD102 ADMIN BUILDING LOWER FLOOR DEMO PLAN
SD103 ADMIN BUILDING FIRST FLOOR DEMO PLAN
SD104 ADMIN BUILDING SECOND FLOOR DEMO PLAN
SD105 ADMIN BUILDING LOWER ROOF DEMO PLAN
SHEET NO. ARCHITECTURAL
A-001 ABBREVIATIONS AND GENERAL NOTES
A-002 ARCHITECTURAL STANDARDS
A-101 FIRST FLOOR PLAN -NEW WORK
A-102 SECOND FLOOR PLAN -NEW WORK
A-103 ROOF PLAN -NEW WORK
A-104 FIRST FLOOR REFLECTED CEILING PLAN
A-105 SECOND FLOOR REFLECTED CEILING PLAN
A-201 EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-302 WALL SECTIONS
A-303 WALL SECTIONS
A-401 ENLARGED STAIR PLANS
A-402 STAIR SECTIONS
A-403 STAIR DETAILS
A-404 ENLARGED LOCKER ROOM PLANS AND ELEVATIONS
A-405 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-406 ENLARGED LAB PLAN AND INTERIOR ELEVATIONS
A-501 ARCHITECTURAL PARTITION TYPES
A-502 ARCHITECTURAL CASEWORK DETAILS
A-503 ARCHITECTURAL DETAILS
A-504 ROOF DETAILS
A-505 ROOF DETAILS
A-601 ARCHITECTURAL DOOR SCHEDULE AND DETAILS
A-602 ARCHITECTURAL WINDOW SCHEDULE AND DETAILS
A-603 ALUMINUM STOREFRONT AND ENTRANCES
A-801 FIRST FLOOR FINISH PLAN
A-802 SECOND FLOOR FINISH PLAN
A-803 FINISH SCHEDULE
A-804 FIRST FLOOR FURNITURE PLAN (FOR REFERENCE
A-805 SECOND FLOOR FURNITURE PLAN (FOR
A-806 FIRST FLOOR SIGNAGE PLAN
A-807 SECOND FLOOR SIGNAGE PLAN
A-808 SIGNAGE SCHEDULE AND DETAILS
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 SECOND FLOOR DEMOLITION PLAN
AD103 DEMOLITION ROOF PLAN
AD201 DEMOLITION ELEVATIONS
AD202 DEMOLITION ELEVATIONS
SHEET NO. PLUMBING
P-001 PLUMBING ABBREVIATIONS, LEGEND, & GENERAL NOTES
P-200 PLUMBING NEW WORK PLAN -BASEMENT
P-201 PLUMBING OVERALL PLANS -FIRST FLOOR
P-202 PLUMBING OVERALL PLANS -FIRST FLOOR
P-203 PLUMBING OVERALL PLANS -SECOND FLOOR
P-204 PLUMBING OVERALL PLANS -SECOND FLOOR
P-401 PLUMBING ENLARGED PLANS
P-402 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 SCHEDULES
P-901 ISOMETRIC DIAGRAMS
P-902 ISOMETRIC DIAGRAMS
PD100 PLUMBING DEMOLITION PLAN -BASEMENT
PD101 PLUMBING DEMOLITION PLAN -FIRST FLOOR
PD102 PLUMBING DEMOLITION PLAN -SECOND FLOOR
PD103 PLUMBING DEMOLITION PLAN -ROOF
SHEET NO. PROCESS
D-001 PROCESS LEGEND AND GENERAL NOTES
D-002 CHEMICAL FEED SCHEMATIC AND MODIFICATIONS
D-003 SAMPLING SCHEMATIC AND MODIFICATIONS
D-004 PROCESS FLOW DIAGRAM
D-005 CHANNEL MIXING SCHEMATIC
D-006 PRIMARY AND SECONDARY FLOW DIAGRAM
D-007 SLUDGE MODIFICATIONS FLOW DIAGRAM
D-101 EQ. BASIN MODIFICATION PLAN
D-102 VACTOR PAD PLAN AND SECTIONS
D-103 EQ BUILDING MODIFICATIONS PLAN
D-104 EQ BUILDING MODIFICATIONS SECTIONS
D-105 DIGESTER BUILDING LOWER LEVEL PLAN
D-106 DIGESTER BUILDING LOWER LEVEL SECTIONS
D-107 DIGESTER TANK COVER PLAN AND GAS STORAGE PLAN
D-108 SOUTH AERATION TANK PLAN
D-109 SOUTH AERATION HEAD BOX MODIFICATIONS
D-110 NORTH AERATION TANK PLAN
D-111 NORTH AERATION HEAD BOX MODIFICATIONS PLAN
D-112 NORTH AERATION TANK SECTIONS
D-113 PRIMARY INFLUENT CHANNEL MIXING PLAN
D-114 UV BUILDING LOW LEVEL PLAN
D-115 UV BUILDING DIFFUSER PLAN AND SECTIONS
D-501 DETAILS
D-502 DETAILS
D-601 SCHEDULES
DD101 SLUDGE STORAGE TANK DEMOLITION EL 805.00 PLAN
DD102 SLUDGE STORAGE TANK DEMOLITION EL. 815 PLAN
DD103 SLUDGE STORAGE TANK DEMOLITION EL. 831.00 PLAN
DD104 SLUDGE STORAGE TANK DEMOLITION PLAN AND SECTION
DD105 SLUDGE STORAGE TANK DEMOLITION PLAN AND SECTION
DD106 SLUDGE STORAGE TANK DEMOLITION PLAN AND SECTION
DD107 SLUDGE STORAGE TANK DEMOLITION SECTION
DD108 ADMIN BUILDING DEMOLITION EL 842.00 PLAN
DD109 ADMIN BUILDING DEMOLITION EL. 842.00 PLAN
DD110 ADMIN BUILDING DEMOLITION PLAN
DD111 ENLARGED PLAN & SECTION
DD112 CONTROL BUILDING LIME STORAGE DEMOLITION PLAN
DD113 CONTROL BUILDING LIME STORAGE DEMOLITION SECTION
DD114 UV BUILDING LOW LEVEL PLAN DEMOLITION
SHEET NO. MECHANICAL
M-001
MECHANICAL ABBREVIATIONS, LEGEND, & GENERAL
CONDITIONS
M-002 MECHANICAL GENERAL NOTES
M-101 MECHANICAL ZONING PLAN -FIRST FLOOR
M-102 MECHANICAL ZONING PLAN -SECOND FLOOR
M-201 MECHANICAL OVERALL PLAN -FIRST FLOOR
M-202 MECHANICAL OVERALL PLAN -SECOND FLOOR
M-203 MECHANICAL OVERALL PLAN -ROOF
M-204 MECHANICAL SITE PLAN -HHW ROUTING
M-205 HHW ROUTING PHOTOS
M-301 SECTIONS
M-302 SECTIONS
M-303 SECTIONS
M-401 MECHANICAL ENLARGED PLANS -FIRST FLOOR
M-402 MECHANICAL ENLARGED PLANS -FIRST FLOOR
M-403 MECHANICAL ENLARGED PLANS -SECOND FLOOR
M-404 MECHANICAL ENLARGED PLANS -SECOND FLOOR
M-405
MECHANICAL ENLARGED PLANS -SOLIDS HANDLING
BUILDING ROOF
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS CONTINUED
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES CONTINUED
M-701 MECHANICAL CONTROLS NOTES
M-702 MECHANICAL CONTROLS
M-703 MECHNICAL CONTROLS CONTINUED
M-704 MECHANICAL CONTROLS CONTINUED
M-705 MECHANICAL CONTROLS CONTINUED
M-706 MECHANICAL CONTROLS CONTINUED
MD100 MECHANICAL DEMOLITION PLAN -BASEMENT
MD101 MECHANICAL DEMOLITION PLAN -FIRST FLOOR
MD102 MECHANICAL DEMOLITION PLAN SECOND FLOOR
MD103 MECHANICAL DEMOLITION PLAN -ROOF
VOLUME II
SHEET NO. GENERAL
G-001 COVER SHEET
SHEET NO. ELECTRICAL
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL NOTES
E-003 ELECTRICAL NOTES
E-004
ELECTRICAL OVERALL EXISTING SITE PLAN EXISTING
TUNNELS PROPOSED WORK
E-005 ELECTRICAL SITE PLAN
E-006 ELECTRICAL SITE PLAN PROPOSED WORK
E-100 ELECTRICAL EXISTING ONE-LINE DEMOLITION
E-101 ELECTRICAL EXISTING ONE-LINE DEMOLITION
E-102 ELECTRICAL EXISTING ONE-LINE DEMOLITION
E-103 ELECTRICAL EXISTING ONE-LINE DIAGRAM DEMOLITION
E-104
ELECTRICAL EXISTING ONE-LINE DIAGRAM MCC-MB1,
MCC-MB2 ADMINISTRATION BUILDING (480V)
E-105 ELECTRICAL EXISTING ONE-LINE DEMOLITION
E-106
ELECTRICAL MCC-WA, AND MCC-AD ONE-LINE DIAGRAM -
PROPOSED WORK
E-107
ELECTRICAL MCC-WA, AND MCC-AD ONE-LINE DIAGRAM -
PROPOSED WORK
E-108
ELECTRICAL MCC-WA, AND MCC-AD ONE-LINE DIAGRAM -
PROPOSED WORK
E-109
ELECTRICAL MCC PARTIAL ONE-LINE DIAGRAMS PROPOSED
WORK
E-110
ELECTRICAL PARTIAL POWER PANEL DIAGRAM - PROPOSED
WORK
E-200 ELECTRICAL WIRING DIAGRAMS
E-201 ELECTRICAL WIRING DIAGRAMS
E-202 ELECTRICAL WIRING DIAGRAMS
E-203 ELECTRICAL LIGHT FIXTURE SCHEDULE
E-204 ELECTRICAL MINI POWER ZONE PANELBOARD SCHEDULES
E-205 ELECTRICAL LIGHTING PANEL PANELBOARD SCHEDULES
E-206 ELECTRICAL LIGHTING PANEL PANELBOARD SCHEDULES
E-207 ELECTRICAL LIGHT FIXTURE SCHEDULE
E-300
ELECTRICAL ADMINSTRATION BUILDING DEMOLITION
PHOTOS
E-301
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-302
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-303
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-304
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-305
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-306
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-307
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-308
ELECTRICAL ADMINISTRATION BUILDING DEMOLITION
PHOTOS
E-309
ELECTRICAL EXISTING ADMINISTRATION BUILDING ONE-LINE
DEMOLITION
E-310
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-311
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-312
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION, PROPOSED WORK
E-313
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-314
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-315
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-316
ELECTRICAL EXISTING CONTROL (MAIN) BUILDING
DEMOLITION
E-317 ELECTRICAL DEMOLITION PLAN SECOND FLOOR
E-318 ELECTRICAL DEMOLITION PLAN -ROOF
E-319
ELECTRICAL RAW SEWAGE PUMP STATION HIGH LEVEL PLAN
(FLOOR EL. 842.00)
E-320 ELECTRICAL RAW SEWAGE PUMP STATION DEMOLITION
E-321
ELECTRICAL SLUDGE STORAGE TANK DEMOLITION,
PROPOSED WORK
E-322
ELECTRICAL EXISTING ADMINISTRATION BUILDING
DEMOLITION
E-323
ELECTRICAL ADMINISTRATION BUILDING LABORATORY
OFFICES DEMOLITION
E-324 ELECTRICAL LABORATORY OFFICES DEMOLITION
E-325
ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
PLAN
E-326
ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
PLAN
E-327
ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
PLAN
E-328
ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
PLAN
E-329
ELECTRICAL EXISTING TUNNEL AREAS PROPOSED
LIGHTING/POWER PLAN
E-330 ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
E-331 ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
E-332 ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
E-333 ELECTRICAL EXISTING TUNNEL AREAS PROPOSED LIGHTING
E-334 FIRST FLOOR LIGHTING PLAN
E-335 SECOND FLOOR LIGHTING PLAN
E-336
ADMINISTRATION BUILDING FIRST FLOOR LIGHTING PLAN
AND CARD READER PROPOSED WORK
E-337
ADMINISTRATION BUILDING SECOND FLOOR LIGHTING PLAN
PROPOSED WORK
E-338
ADMINISTRATION BUILDING FIRST FLOOR POWER, AND
CONTROL PLAN PROPOSED WORK
E-339
ADMINISTRATION BUILDING FIRST FLOOR POWER, AND
CONTROL PLAN PROPOSED WORK
E-340
ADMINISTRATION BUILDING SECOND FLOOR POWER, AND
CONTROL PLAN PROPOSED WORK
E-341
ADMINISTRATION BUILDING SECOND FLOOR POWER, AND
CONTROL PLAN PROPOSED WORK
E-342 ADMINISTRATION BUILDING ROOF PLAN PROPOSED WORK
E-343 ELECTRICAL
E-344
ELECTRICAL EXISTING DIGESTER BUILDING LOWER LEVEL
PLAN, PROPOSED WORK
E-345
ELECTRICAL EXISTING DIGESTER BUILDING LOWER LEVEL
PLAN, PROPOSED WORK
E-346
ELECTRICAL DIGESTER TANK COVER PLAN, AND STORAGE
PLAN PROPOSED WORK
E-347 ELECTRICAL BASEMENT PLAN PROPOSED WORK
E-348
ELECTRICAL SOLIDS HANDLING BUILDING BASEMENT PLAN -
PROPOSED WORK
E-349
ELECTRICAL BLOWER/FLOTATION BUILDING PROPOSED
WORK
E-400 ELECTRICAL DETAILS
E-401 ELECTRICAL DETAILS
E-402 ELECTRICAL DETAILS
E-403 ELECTRICAL DETAILS
E-404 ELECTRICAL DETAILS
SHEET NO. INSTRUMENTATION
I-100 INSTRUMENTATION SYSTEM CONFIGURATION
I-101 INSTRUMENTATION SYSTEM CONFIGURATION
I-102 INSTRUMENTATION SYSTEM CONFIGURATION
I-103 INSTRUMENTATION SYSTEM CONFIGURATION
I-104
INSTRUMENTATION CARD ACCESS SYSTEM DIAGRAM,
DETAILS
I-200 INSTRUMENTATION PROCESS FLOW DIAGRAM
I-201
INSTRUMENTATION DIGESTION, AND DEWATERING
PROCESS FLOW DIAGRAM PROPOSED WORK
I-202
INSTRUMENTATION EXISTING PRIMARY, AND SECONDARY
FLOW DIAGRAM
I-203
INSTRUMENTATION EXISTING SLUDGE MODIFICATION FLOW
DIAGRAM
I-204
INSTRUMENTATION NETWORK PANELS NO.1, AND NO.2
LAYOUT, WIRING DIAGRAMS
I-300
INSTRUMENTATION EXISTING BLOWER I/O PANEL NO.3 RACK
3 WIRING DIAGRAM
I-301
INSTRUMENTATION EXISTING BLOWER I/O PANEL NO.2 RACK
2 WIRING DIAGRAM
I-302
INSTRUMENTATION EXISTING DIGESTER I/O PANEL NO.1
RACK 2 WIRING DIAGRAM
I-303
INSTRUMENTATION EXISTING DIGESTER I/O PANEL NO.1
RACK 2 WIRING DIAGRAM
I-304
INSTRUMENTATION EXISTING DIGESTER I/O PANEL NO.4
RACK 4 WIRING DIAGRAM
I-305
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 LAYOUT,
WIRING DIAGRAM
I-306
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 WIRING
DIAGRAM
I-307
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 WIRING
DIAGRAM
I-308
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 WIRING
DIAGRAM
I-309
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 WIRING
DIAGRAM
I-310
INSTRUMENTATION SWITCHGEAR I/O PANEL NO.1 WIRING
DIAGRAM
CIRCUIT BREAKER WITH STAB
CONNECTION
BACKGROUND PLAN AND ONE LINE SYMBOLS
SYMBOL DESCRIPTION
CONTROL SWITCH (SEL. OR P.B.)
SEE CIRCUITS FOR SPECIFIC TYPE
SYMBOL
SEE CIRCUITS FOR SPECIFIC TYPE
FLOAT SWITCH - FLOW SWITCH
TEMPERATURE - HUMIDISTAT SWITCH
(SUBSCRIPT=NO. OF STAGES)
LIMIT (PROXIMITY TYPE)
PRESSURE - VACUUM SWITCH
ELECTRICAL OR MECHANICAL
ALTERNATOR (SEE WIRING)
OVERLOAD SWITCH OR DEVICE
TERMINAL BOX
SOLENOID VALVE
PHOTOCELL LINE VOLTAGE
AS NOTED (LIGHTING PANEL,
CONTROL PANEL, DISTRIBUTION
PANEL, ETC.) WALL MOUNTED
JUNCTION BOX
TRANSFORMER
CONDUIT WITH CONDUIT SEAL
FITTING
CONDUIT EXPOSED
CONDUIT CONCEALED
E DIRECT BURIED CONDUIT
UG DIRECT BURIED CABLE
OH OVERHEAD LINE
DB UNDERGROUND DUCT BANK
CONCRETE ENCASED DUCT BANK
WITH CABLE LOCATIONS, AND SPARE
DUCTS AS INDICATED ON DRAWINGS
CABLE REEL
EDB EXISTING UNDERGROUND DUCT
BANK
MULTI-STACK ALARM LIGHTS
LOW VOLTAGE DISCONNECT
SWITCH
LOW VOLTAGE FUSE
(BELOW 600V)
RV
FVR
2S,2W
ALL STARTERS SHALL BE FULL
VOLTAGE, NON-REVERSING UNLESS
OTHERWISE INDICATED.
(FVR) FULL VOLTAGE REVERSING
(RV) REDUCED VOLTAGE
(2S, 2W) TWO SPEED, TWO WINDING
600V, 3 POLE MOLDED CASE
CIRCUIT BREAKER, FRAME &
RATING AS SHOWN
A-3
SINGLE PHASE, FRACTIONAL HP
MOTOR TO LOCATION INDICATED
(SEE NOTE 2 ON STANDARD NOTE
SHEET)
THREE PHASE LOAD WITH
IDENTIFICATION
HIGH VOLTAGE FUSE
(ABOVE 600V)
TAG NO. (BALLOON) FOR DEVICE
INDICATED
A-3
MCP OR
CP-1
FOR POWER (SEE NOTE 2 ON
STANDARD NOTE SHEET)
3/4"C(2/C#18SH)
CONDUIT AND WIRE RUN FROM
DEVICE INDICATED TO LOCATION
INDICATED
CAPACITOR, 3 PHASE, SIZE AS
INDICATED
DISCONNECT SWITCH (F) = FUSED,
(C) = CIRCUIT BREAKER
MAGNETIC STARTER
(BACKGROUND DRAWINGS ONLY)
COMBINATION MAGNETIC
STARTER FUSED UNLESS NOTED
(CIRCUIT BREAKER)
COMBINATION LIGHTING
CONTACTOR WITH
HAND-OFF-AUTO SWITCH
R MANUAL STARTER (R) =
REVERSING
CONTROL PANEL
UH-19
UNIT HEATER, 1/8 HORSEPOWER
LIGHTING ARRESTOR
A-3
LOW VOLTAGE HOME RUNS
120/208V, 120/240V (SEE NOTE 2
ON STANDARD NOTE SHEET)
NEMA 4 WATERTIGHT
NEMA 4X WATERTIGHT AND CORROSION
PROOF
NEMA 7 EXPLOSION PROOF - CLASS I,
DIVISION 1, GROUP D
NEMA 9 EXPLOSION PROOF - CLASS II,
DIVISION 1
KEYLOCK
SMOKE DETECTOR
EXIT LIGHT
FLUORESCENT LUMINAIRE
INCANDESCENT LUMINAIRE
HIGH INTENSITY DISCHARGE
LIGHT
EMERGENCY BATTERY PACK
DESK INTERCOM SET
CAMERA
DESCRIPTION
SELECTOR SWITCH /
PUSHBUTTON. FUNCTIONS AS
SHOWN IN WIRING DIAGRAMS
CURRENT TRANSFORMER, AND
RATIO (WITH NUMBER REQUIRED
SHOWN)
DRAW OUT CIRCUIT BREAKER
(ABOVE 600 VOLT)
DEVICE SYMBOL WITH TYPE
DEVICE
F FL
T M
L P V
ALT
OS
TB
PC
JB
1 2 3 4 5 6
L L L L
A
FT
FT
F C
SIZE 2
LC
CP
K
SD
E
EM
DS
PTZ
DOME CAMERA (PAN, TILT, ZOOM)
(3) 50/5
WIRING DEVICE SCHEDULE
125V, 2P, DUPLEX, 3W
20A, 120/277V SWITCH
5-20 R
SPST
SIMPLEX RECEPTACLE
QUAD RECEPTACLE
SYMBOL DESCRIPTION NEMA TYPE
TIMING RELAY COIL
TIMING RELAY COIL (OFF DELAY) 1
INDICATING LIGHT
PUSH-TO-TEST INDICATING LIGHT
SECONDARY
TRANSFORMER
MOLDED CASE CIRCUIT BREAKER
SELECTOR SWITCH - NORMALLY
OPEN
PUSHBUTTON OPERATOR WITH
MUSHROOM HEAD
THERMAL OVERLOAD
FIELD LOCATED
TERMINAL POINT
TERMINAL
LOW VOLTAGE FUSE
FUSIBLE TERMINAL BLOCK
CONTROL POWER TRANSFORMER
RECEPTACLE
NOTE: THE PLC I/O ADDRESS SHALL BE USED AS THE WIRING TAG SCHEME FOR ALL PANEL AND FIELD
CONTROL WIRING. COORDINATE WITH ELECTRICAL CONTRACTOR.
LIMIT SWITCH - NORMALLY OPEN
CONTROL RELAY CONTACT -
NORMALLY OPEN
CONTROL RELAY COIL
MAINTAINED STOP-START
PUSHBUTTON OPERATOR
MAINTAINED PUSH - PULL
OPERATOR
DESCRIPTION SYMBOL DESCRIPTIONSYMBOL
CONTROL CIRCUIT & PILOT DEVICE LEGEND
PRESSURE ACTUATED SWITCH
FLOW ACTUATED SWITCH
LIMIT SWITCH - NORMALLY
CLOSED - HELD OPEN
LATCHING CABLE SWITCH
MOMENTARY PUSHBUTTON
OPERATOR-NORMALLY CLOSED
MOMENTARY PUSHBUTTON
OPERATOR-NORMALLY OPEN
TIMING RELAY INSTANTANEOUS
CONTACTINST.
FLOAT ACTUATED SWITCH
TEMP. ACTUATED SWITCH
LIMIT SWITCH - NORMALLY
CLOSED
LIMIT SWITCH - NORMALLY OPEN -
HELD CLOSED
TIME DELAY FUSE
PUSHBUTTON OPERATOR
WITH MUSHROOM HEAD
FIELD LOCATED STOP BUTTON
CONTROL RELAY CONTACT -
NORMALLY CLOSED
TIMING RELAY
INSTANTANEOUS CONTACT
TWO COIL LATCHING RELAY
SELECTOR SWITCH OPERATOR
WITH FUNCTION SHOWN
TIMED CLOSED CONTACT ON
ENERGIZATION
TIMED OPEN CONTACT ON
DE-ENERGIZATION
TIMED OPEN CONTACT ON
ENERGIZATION
TIMED CLOSED CONTACT ON
DE-ENERGIZATION
ZERO SPEED OR
ANTI-PLUGGING SWITCH
PUSH-TO-TEST INDICATING
LIGHT
MAINTAINED STOP - MOMENTARY
START PUSHBUTTON (JOG)
SOLENOID OR CLUTCH
ELAPSED TIME INDICATOR
LOCAL TERMINALS WITH
EXTERNAL WIRING
120VAC TRANSFORMER
INST.
G
X1 X2
(F)
CR
CR
L
CR
U
X1 X2
ETI
R
H O
C
T
T
(F)
GENERAL DISCONNECT SWITCH
I.S.A. STANDARD LETTER FUNCTIONS
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
ANALYSIS, ANALOG
BURNER, FLAME
CONDUCTIVITY, COMMAND
DENSITY, SPECIFIC GRAVITY
VOLTAGE
FLOW RATE
GAGING
HAND, MANUAL
CURRENT
POWER
TIME, TIME SCHEDULE
LEVEL, LIGHT
MOISTURE, HUMIDITY
OVERLOAD
PRESSURE, VACUUM
QUANTITY
RADIOACTIVITY
SPEED, FREQUENCY, SOLENOID
TEMPERATURE, TURBIDITY
MULTIVARIABLE
VIBRATION, VISCOSITY
WEIGHT, FORCE
POSITION
ALARM
BATCH
CONTROL (FEEDBACK TYPE)
PRIMARY ELEMENT
RATIO
GLASS
HIGH
INDICATE
SCAN
CONTROL (NO FEEDBACK)
LOW
MIDDLE, MODULATE
ORIFICE
POINT
TOTALIZE, INTEGRATE
RECORD, PRINT, RECEIVE
SWITCH
TRANSMIT, TRANSFORM
MULTIFUNCTION
VALVE, DAMPER, LOUVER
DRIVE, ACTUATE
RELAY, COMPUTE
SYMBOL FIRST LETTER SUCCEEDING LETTERS
2 SYNC. TIMER 0-5 MIN.
27 SHORT TIME UNDERVOLTAGE
43 SELECTOR SWITCH
47 PHASE SEQUENCE & UNDERVOLTAGE
50/51 INSTANTANEOUS AND VERY INVERSE
51 VERY INVERSE
51G INVERSE GROUND FAULT
52/CS CONTROL SWITCH
59 INSTANTANEOUS OVERVOLTAGE
60 VOLTAGE BALANCE
62 TIME DELAY
64 SHORT TIME LOW PICK UP OVERVOLTAGE
69 LOCKOUT CONTROL SWITCH
83 MULTI-CONTACT AUXILIARY
86/HR MULTI-CONTACT AUX. HAND RESET
87 DIFFERENTIAL OVERCURRENT
LOSS OF EXCITATION
51V OVERCURRENT RELAY WITH VOLTAGE RESTRAINT
PROTECTIVE RELAY LEGEND
OVER/UNDER FREQUENCY RELAY
78 OUT OF STEP
67 DIRECTIONAL OVERCURRENT
NEUTRAL OVERCURRENT51N
49 THERMAL
25 SYNCHRONIZING
32 REVERSE POWER RELAY
38 TEMPERATURE
DEVICE NO. DESCRIPTION
PT POTENTIAL TRANSFORMER
CT CURRENT TRANSFORMER
A AMMETER
V VOLTMETER
PF POWER FACTOR METER
W WATTMETER
AP ALARM POINT
CPT CONTROL POWER TRANSFORMER
(2) (3) NUMBER OF DEVICES REQUIRED
ETI ELAPSED TIME METER
SYMBOL LEGEND
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
NOTE: FIBER, AND ETHERNET PATCH
CABLES SHALL BE THE FOLLOWING COLORS
PINK - BUSINESS NETWORK
YELLOW - VIDEO NETWORK
BLUE - SCADA/LAN NETWORK - WATER
ORANGE - PLC-I/O NETWORK
RED - AUDIO NETWORK (IP PHONE)
GREEN - SCADA/LAN NETWORK - WASTEWATER
COPPER, AND FIBER PATCH CABLES: (6 FEET IN LENGTH MINIMUM, EACH)
NOTE: I/O WIRE TAGS FOR CONTROL WIRING INSIDE ALL CONTROL PANELS TO BE POLYPROPYLENE.
NOTE:
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:2 5:
P
M
\\T T.
LO
C
AL
\IE
R \P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_E
LE
C
TR
IC
AL
L
EG
EN
D
.D W
G
SH
AN
K, J
AS
O
N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-001
EL
EC
TR
IC
AL
LE
G
EN
D
G. JONES
J. SHANK
G. JONES
OF 80
OR
IDENTIFICATION PLATE INFORMATIONLOAD SIZE
STARTER, AND TYPE
SWITCH, AND SIZE
3 KVAR
10HP SAMPLE PUMP
LOAD
IDENT.
3/4"C(4#12)
DISCONNECT
SWITCH
3/4"C(4#14)
FIELD MOUNTED PILOT DEVICES
THESE ITEMS SHOWN ON PLAN VIEW AS
(1) 2#14
3/4"C(4#10, 4#14)
CONDUIT SIZE, AND FILL
FUSE SIZE
WIRES TO CONTROL NO.1
TYPICAL LOCAL DISC. W/O.L. WHERE REQUIRED
LP-A(16)
LP-A(14)
(TAG A1)
(EXAMPLE CIRCUIT)
STARTER NAMEPLATE
NON-ISOLATED INPUT
AUX. STARTER CONTACT
TO MAIN CONTROL PANEL
7I-0101
STARTER CUBICLE
TERMINAL STRIP
STARTER CONTACTOR
COIL FOR MOTOR A1.
SEAL-IN CONTACT FROM
STARTER CONTACTOR A1
RELAY INTERLOCK FROM
MAIN CONTROL PANEL
ISOLATED PLC I/O POINT (TYP.)
SWITCH LOCATED AT
STARTER CUBICLE
PUSHBUTTON
FIELD MOUNTED
TAG THIS WIRE
A1-1A (TYP.)
PLC-I/O POINT/ADDRESS (TYP.)
120V
PUSHBUTTON FIELD MOUNTED
STARTER LIGHT
"RUNNING"
STARTER CONTROL TRANSFORMER
1 PHASE LOAD
20A60A
60A
A
A
A
MCC LEGEND EXAMPLE
X1 X2
R
A-1A-1
3-OL'S
A
(F)
HAND
OFF
AUTOSTOP
(F)
EXAMPLE PUMPA
H N
LP-A(12)
R H
C
C
(F)
(F)
(F)
(F)
TYPICAL 120V 3 POLE CONTACTOR
(EXAMPLE CIRCUIT)
A-1
TO MCP
CR-
TO MCP
START
1. PRIOR TO SUBMITTING A BID FOR THE WORK DETAILED UNDER THIS CONTRACT, BIDDER SHALL VISIT THE EAST LANSING ADMINISTRATION BUILDING, AND THE REST OF THE PLANT WHERE WORK IS SHOWN. THE BIDDER SHALL FULLY ACQUAINT ONESELF WITH EXISTING FIELD CONDITIONS AT EACH SITE. NO BULLETINS WILL BE WRITTEN FOR WORK DUE TO LACK OF VERIFICATION OF EXISTING SITE CONDITIONS AND WIRING.
2. NO WIRES SHALL BE TERMINATED TO TERMINAL STRIPS, OR OTHER EQUIPMENT WITHOUT FIRST VERIFYING SIGNAL TYPE. DAMAGES RESULTING FROM LACK OF VERIFICATION SHALL BE BORNE BY THE CONTRACTOR.
CONTRACTOR SHALL COORDINATE SIGNAL TYPE AND VOLTAGE WITH I/O CARDS SHOWN.
3. WITHIN CONTROL PANELS, NAMEPLATES SHALL BE PROVIDED TO INDICATE DIFFERENT VOLTAGE LEVELS WITHIN PANELS. ALSO, A NAME TAG (YELLOW BACKGROUND, RED LETTERING) SHALL BE LOCATED ON THE FRONT OF EVERY PANEL INDICATING THAT WHEN MAIN PANEL IS DISCONNECTED 120V IS STILL PRESENT FROM FIELD
DEVICES (YELLOW WIRING/ISOLATED INPUT CARDS.)
4. PHENOLIC TAGS ON FACE OF CONTROL PANELS TO HAVE WHITE BACKGROUND AND BLACK LETTERING (EXCEPT
WARNING TAGS; YELLOW BACKGROUND RED LETTERING).
5. PROVIDE SAFETY COVERS ON ALL 480V MOLDED CASE MAIN CIRCUIT BREAKERS TO INSULATE THE INCOMING CABLES AND SIDE CONDUCTORS FROM CONTACT. (TYP. FOR CONTROL PANELS.) PROVIDE BREAKER LOCKS FOR
PUMP CIRCUIT BREAKERS (MCP)AND MAIN PANEL BREAKERS.
6. REFER TO WIRING DIAGRAMS FOR ADDITIONAL INFORMATION ON ISOLATED I/O. A COMMON NEUTRAL MAY BE USED FOR SEVERAL ISOLATED INPUTS FROM THE SAME STARTER. PROVIDE NEUTRAL JUMPERS WIRES WITHIN
THE PANEL AS REQUIRED.
7. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN LIGHT LINE WEIGHTS ON THE DRAWINGS ARE EXISTING ITEMS TO REMAIN. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN HEAVY LINE WEIGHTS
ARE NEW THIS CONTRACT.
8. ITEMS SHOWN CROSSHATCHED (OR NOTED TO BE DEMOLISHED) ON THE DRAWINGS ARE EXISTING ITEMS TO BE
REMOVED, FROM SITE BY CONTRACTOR.
9. INSTALL A SINGLE CONDUCTOR INSULATED (RHW, THWN, OR XHHW) COPPER GROUND WIRE IN EACH CONDUIT, SIZE AS SHOWN ON DRAWINGS, OR AS A MINIMUM PER THE NATIONAL ELECTRICAL CODE. THIS GROUND WIRE SHALL BE CONNECTED AT EACH END TO THE EQUIPMENT GROUND. THIS ALSO INCLUDES INSTRUMENTATION DEVICES SUCH AS LEVEL, PRESSURE, FLOW TRANSMITTERS, LIMIT SWITCHES, CONDUITS, NETWORK AND I/O
CABLES.
10. THE FOLLOWING EXAMPLE COMPONENT IDENTIFICATION SHALL BE USED AS APPROPRIATE:
(F) FIELD MOUNTED, NOT AT STARTER OR OTHER CONTROL PANELS
(S) STARTER PANEL MOUNTED
(MCP) AT MAIN CONTROL PANEL
(1) AT CONTROL PANEL NO.1
(2) AT CONTROL PANEL NO.2
(TCP) AT TEMPERATURE CONTROL PANEL
11. REFER TO DETAIL SHEETS. CONTRACTOR SHALL FURNISH AND INSTALL HARDWARE AND APPURTENANCES (I.E.
PIPE TAPS, WETWELL BUBBLER TUBES, VALVES, COPPER TUBING, BALL VALVES, PNEUMATIC PIPING, SPOOL PIECES, ETC.) FOR FIELD DEVICES SHOWN (FLOWMETERS, PRESSURE TRANSMITTERS, LEVEL TRANSMITTERS, ETC.). WORK SHALL BE COORDINATED WITH OTHER TRADES (MECHANICAL INSTRUMENTATION, ETC.)
CONTRACTOR SHALL BE RESPONSIBLE FOR SYSTEM COORDINATION AND INSTALLATION.
12. ETHERNET AND FIBER OPTIC TERMINATIONS SHALL BE PERFORMED BY A QUALIFIED REPRESENTATIVE OF CABLE MANUFACTURER, THE CABLES SHALL BE TESTED. NO SPLICING SHALL BE PERMITTED OF FIBER OPTIC CABLES, BETWEEN PANELS. FIBERS SHALL BE TERMINATED AT PATCH PANELS, INCLUDING SPARES.
13. REFER TO THE CABLE MANUFACTURER'S RECOMMENDATIONS FOR MINIMUM BEND RADIUS FOR FIBER OPTIC CABLES. INSTALL NEW PULL BOXES (PB) AS REQUIRED FOR CONDUITS. SIZE PULLBOXES AS REQUIRED PER
FIBER OPTIC CABLE MANUFACTURERS RECOMMENDATIONS.
14. CONDUIT ENTERING CONTROL PANELS AND ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE FILLED WITH
DUCT SEAL, INCLUDING OPENINGS IN BOTTOM OF PANEL.
15. CABLES (INCLUDING FIBER, ETHERNET, CONTROL WIRE, ETC.) WHERE PASSING THROUGH A PULLBOX SHALL BE LABELED AND COMPLETELY IDENTIFIED WITH IDENTIFICATION NUMBERS AND ORIGINATION/DESTINATION. THIS
ALSO INCLUDES ALL CABLE BUNDLES ENTERING CONTROL PANELS, PULLBOXES, ETC.
16. CONTROL WIRES SHALL BE TAGGED WITH THE PLC I/O ADDRESS IN THE FIELD AND AT THE PANEL.
17. THE FIELD DEVICES SHOWN ON THE P&ID'S, ELECTRICAL BACKGROUNDS, AND DETAILS SHEETS MAKEUP THE FIELD DEVICE EQUIPMENT REQUIREMENTS. NOT ALL FIELD DEVICES REQUIRED ARE SHOWN ON THE P&ID'S.
18. UPS SELECTED SHALL BE COMPATIBLE WITH ISOLATION TRANSFORMERS. (TYP.)
19. REFER TO I/O DRAWING LAYOUT FOR ADDITIONAL SIGNALS NOT SHOWN ON P&ID FLOW DIAGRAMS.
20. CONTRACTOR SHALL OBTAIN THE SERVICES OF THE PVC COATED CONDUIT REPRESENTATIVE. (OCAL, OR ROBROY) TO INSPECT THE CONDUIT INSTALLATION AFTER THE FIRST FEW CONDUIT LENGTHS ARE INSTALLED OUTDOORS TO VERIFY THAT THE RACEWAY IS INSTALLED PER THE MANUFACTURERS RECOMMENDATIONS.
CONTRACTOR TO INSTALL JOINT, AND SEALING COMPOUND AS REQUIRED PER MANUFACTURER FOR SEALING
CONDUIT THREADS.
21. CONTRACTOR SHALL GROUND ALL EXTERIOR HANDRAILS, PROCESS PIPING, LIGHT POLES, CONDUIT RACKS, STRUT SUPPORTS, ETC. WITH GREEN INSULATED NO.6 AWG WIRE, RHW - USE. (TYP.)
22. REFER TO PROCESS DRAWINGS FOR EXACT LOCATIONS OF FLOW METERS VALVE ACTUATORS, AND PROCESS
EQUIPMENT.
23. FURNISH, AND INSTALL PHENOLIC NAMETAGS ON THE EXTERIOR OF ALL NEW CONDUITS (THIS PROJECT) CONTAINING E-FO, F.O., E-NET, POWER, SIGNAL, CONTROL WIRES/CABLES. NAMETAGS TO BE INSTALLED ON EACH CONDUIT AT EACH END, BETWEEN ENCLOSURES ORANGE BACKGROUND, WHITE LETTERING, FOR MULTIMODE FIBER, YELLOW BACKGROUND, WHITE LETTERING, SINGLEMODE FIBER, EXAMPLE: "24 - E-FO TFPP TO FPP-1". FOR POWER: "480V POWER FROM MCC-S TO MCC-B1". FOR CONTROL: "CONTROL WIRES - TO BPP".
FOR SIGNAL: "SIGNAL WIRES - TO BPP".
24. CONTRACTOR SHALL FURNISH AND INSTALL UL LISTED CONDUIT DRAINS ON ALL OUTDOOR RACEWAYS. DRAINS
SHALL BE RATED FOR NEMA 4 AND NEMA 7 APPLICATIONS.
25. CONTRACTOR SHALL SEAL ALL CONDUITS THAT PASS FROM WARM AREAS TO COLD AREAS WITH POLYWATER F
CONDUIT SEALANT.
26. CONTRACTOR SHALL SEAL ALL RACEWAYS AT THE FIELD INSTRUMENTS, DISCONNECT SWITCHES, FIELD STARTERS, WIREWAYS MANUAL MOTOR STARTERS, RACEWAY ENCLOSURES, ETC., THAT ARE OUTDOORS.
27. RACEWAY SEAL FITTINGS SHALL BE INSTALLED AND POURED ON ALL RACEWAYS THAT GO FROM INDOORS TO
OUTDOORS. SEAL FITTINGS TO BE PVC-RMC COATED.
28. PVC-RMC CONDUITS SHALL BE INSTALLED IN ACCORDANCE WITH THE PVC-RMC CONDUIT MANUFACTURER.
CONTRACTOR SHALL BE CERTIFIED BY THE MANUFACTURER OF THE PVC COATED CONDUIT MANUFACTURER AND SHALL SEAL ALL CONNECTIONS, COUPLINGS, JOINTS, ETC WITH MANUFACTURER SEALING COMPOUND AS
REQUIRED FOR OUTDOOR INSTALLATION.
29. NO STAMPED BOXES ARE PERMITTED FOR USE ANYWHERE ON THE PROJECT.
30. CONTRACTOR SHALL PROVIDE ASSET MANAGEMENT TAGS ON ALL NEW EQUIPMENT. COORDINATE WITH
OWNER.
31. SEAL CONDUITS INTO INSTRUMENTS WITH POLY WATER F. CONDUIT TO ENTER FROM BELOW AND NOT ABOVE
(TYP. ALL INSTRUMENTS, BOXES, AND ENCLOSURES.)
32. NO CONDUITS ARE TO BE INSTALLED IN ANY CONCRETE POURS (FLOORS OR WALLS). ANY DUCTBANKS INSTALLED UNDER A POUR SHALL BE CONCRETE ENCASED SEPARATELY FROM THE CONCRETE FLOOR POUR.
CONDUITS STUB-UPS THROUGH THE FLOOR SHALL BE PVC-RMC.
33. REFER TO INSTRUMENTATION DRAWINGS AND PROCESS DRAWINGS FOR INSTRUMENT MOUNTING
REQUIREMENTS.
34. TAG ALL FIBER OPTIC PATCH CABLES WITH DESCRIPTIVE NAMETAGS.
1. FIELD VERIFY CONDUIT ROUTING AT THE PLANT WITH OWNER. CORE HOLES AS REQUIRED TO SUIT
INSTALLATION OF THE CONDUITS SHOWN. PATCH WITH NON-SHRINK GROUT.
2. TURN OVER TO OWNER AT PROJECT COMPLETION OPERATION AND MAINTENANCE MANUALS (QUANTITY AS
SPECIFIED) TO OWNER.
3. IN ADDITION TO PATCH CABLES SUPPLIED FOR THE PROJECT, FURNISH 30-10FT LONG MULTIMODE DUPLEX FIBER OPTIC PATCH CABLES (SC-SC) CONNECTORS, AND 30-10FT. LONG CABLES WITH ST-ST CONNECTORS, AND 30-10FT CAT-6 PATCH CABLES FOR OWNERS USE. TURN OVER CABLES TO OWNER.
4. MULTIMODE FIBER OPTIC PATCH CABLES, AND ETHERNET PATCH CABLES SUPPLIED IN THE PROJECT SHALL
BE COLORED PURPLE.
5. FIBER OPTIC PATCH PANELS SHALL BE THE PRODUCT OF CORNING CABLE SYSTEMS. (RACK OR SURFACE
MOUNTED AS SHOWN", ST STYLE CONNECTORS, WITH QUANTITY OF BULKHEADS AS SHOWN.
1. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN LIGHT LINE WEIGHTS ON THE DRAWINGS ARE EXISTING ITEMS TO REMAIN. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN HEAVY LINE
WEIGHTS ARE NEW THIS CONTRACT.
2. ITEMS SHOWN OR NOTED TO BE DEMOLISHED ON THE DRAWINGS ARE EXISTING ITEMS TO BE REMOVED
FROM SITE BY CONTRACTOR UNLESS NOTED TO BE TURNED OVER TO OWNER.
3. FOR ITEMS INDICATED AS "FIELD LOCATE", THE CONTRACTOR SHALL FIELD VERIFY FOR INTERFERENCE
AND FOR LOCATIONS OF MOUNTING FLANGES, CONNECTION POINTS, ETC.
4. CONDUIT ROUTINGS SHOWN ON BACKGROUND PLANS ARE INTENDED ROUTINGS ONLY. EXACT CONDUIT ROUTINGS FOR CONDUITS, AND LENGTH SHALL BE FIELD LOCATED AND VERIFIED BY THE CONTRACTOR.
COORDINATE CONDUIT ROUTING IN FINISHED AREAS WITH OWNER. CONDUIT TO BE CONCEALED IN THESE
AREAS.
5. REFER TO THE CABLE MANUFACTURER'S RECOMMENDATIONS FOR MINIMUM BEND RADIUS FOR FIBER OPTIC CABLES. INSTALL NEW PULL BOXES (PB) AS REQUIRED FOR CONDUITS. SIZE PULL BOXES AS
REQUIRED PER FIBER OPTIC CABLE MANUFACTURERS RECOMMENDATIONS.
6. CONDUITS/RACEWAYS, PULL BOXES AND JUNCTION BOXES TO BE INSTALLED WITH 316 STAINLESS STEEL
CHANNEL STRUT. MINIMUM STRUT LENGTH TO BE 12 INCHES, WHERE POSSIBLE.
7. PANELS SHALL BE MOUNTED OFF WALLS WITH STRUT, CONDUITS SHALL BE MOUNTED ON STRUT
INCLUDING SINGLE RUNS.
8. CONDUIT ENTERING CONTROL PANELS AND ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE FILLED WITH
DUCT SEAL, INCLUDING OPENINGS IN BOTTOM OF PANELS, AND EQUIPMENT.
9. REPAIR SIDEWALKS AND ROADWAYS DUE TO SITE WORK ADDITIONS, THE EXTENT OF THE REPAIR REQUIRED SHALL BE FIELD VERIFIED PRIOR TO BIDS IN CONJUNCTION WITH THE WORK SHOWN IN THE CONTRACT DOCUMENTS. PRIOR TO TRENCHING, FIELD LOCATE EXISTING GAS LINES, TELEPHONE LINES, SPRINKLER LINES, ETC. COORDINATE WITH OWNER
10. PULL CORDS SHALL BE INSTALLED IN CONDUITS CONTAINING NETWORK CABLES, AND FIBER OPTIC CABLES.
11. CORE HOLES AS REQUIRED TO SUIT INSTALLATION OF CONDUIT AND WIRING/CABLING AS SHOWN. FIELD
VERIFY EXACT EXTENT OF WORK REQUIRED.
12. FURNISH PULL BOXES FOR FIBER OPTIC CABLE. COORDINATE EXACT BENDING RADIUS WITH
MANUFACTURER.
13. NEW CONDUITS INSTALLED THIS CONTRACT WITH FIBER OPTIC CABLES ARE TO BE LABELED WITH PHENOLIC TAGS (AT BEGINNING TO END) TO INDICATE THE NUMBER OF STRANDS, ORIGINATION AND
DESTINATION. TAGS TO BE COLOR CODED ORANGE FOR MULTIMODE.
14. WHERE NEW CONDUITS SHOWN TO BE INSTALLED PASS UNDER ROADWAYS, CONDUITS SHALL BE
CONCRETE ENCASED.
15. PRIOR TO EXCAVATION, FIELD LOCATE EXISTING UTILITIES. COORDINATE WITH OWNER.
16. AREAS WHERE CAMERAS ARE SHOWN TO BE INSTALLED SHALL BE CLASSIFIED AS NEMA 4, UNLESS CALLED
OUT OTHERWISE.
17. THE ASSOCIATED INSTRUMENTATION DRAWINGS SHOW EXISTING WIRES AND TERMINAL NUMBERS REQUIRED TO PROPERLY INTERFACE WITH NEW EQUIPMENT. THIS INFORMATION WAS COLLECTED FROM AS-BUILT DRAWINGS AND EXTENSIVE FIELD VERIFICATION. THE INFORMATION SHALL BE USED AS A GUIDE IN RE-TERMINATION. IT SHALL REMAIN THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE WIRING AND TO REVISE TO SUIT AS REQUIRED. CHANGES IN THE CONTRACT OR COST WILL NOT BE GRANTED FOR THIS COORDINATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE PROPOSED WORK SHOWN.
18. CONDUIT ROUTINGS SHOWN ON BACKGROUND PLANS ARE PROPOSED ROUTINGS ONLY. EXACT CONDUIT ROUTINGS AND LENGTH SHALL BE FIELD LOCATED AND VERIFIED BY THE CONTRACTOR. COORDINATE CONDUIT ROUTING IN FINISHED AREAS WITH OWNER. CONDUIT TO BE CONCEALED IN THESE AREAS.
19. RACEWAYS, PULL BOXES AND JUNCTION BOXES TO BE INSTALLED WITH 316 STAINLESS STEEL FASTENERS SUPPORTS, AND THREADED ROD, ETC. (CHANNEL STRUT TO ALSO BE STAINLESS STEEL). MINIMUM STRUT
LENGTH TO BE 12 INCHES, WHERE POSSIBLE. TYPICAL FOR NEMA 12, 4, AND 7 AREAS.
20. WIRING FOR STARTERS SHALL BE IN ACCORDANCE WITH NEMA CLASS II B STANDARDS. SUBMIT
ENGINEERED SHOP DRAWINGS FOR ALL STARTERS SHOWN TO BE WIRED.
21. WIRE NUMBERS (1, 3, 5, ETC.) SHALL BE PREFIXED WITH STARTER TAG NUMBERS. THE WIRE NUMBER AFTER THE PREFIX SHALL BE THE MANUFACTURER'S WIRE NUMBERING SYSTEM. WIRE MARKERS SHALL BE USED
AT EACH WIRE TERMINATION POINT.
22. IN AREAS WHERE EQUIPMENT AND CONDUIT IS REMOVED, REPAIR WALL AND FLOOR SURFACES AS REQUIRED TO MATCH SURROUNDING AREA. WHERE DEVICES ARE REMOVED FROM CONCEALED BOXES, FURNISH AND INSTALL A BLANK COVER ON THE BOX.
23. FIBER OPTIC CABLE SHALL BE AS CALLED OUT ON SYSTEM CONFIGURATION DRAWINGS, MULTIMODE, ALL
DIELECTRIC, SUITABLE FOR INSTALLATION UNDERGROUND IN WET CONDUIT.
NOTES:
GENERAL CONSTRUCTION NOTES:
GENERAL NOTES:
PLAN VIEWS
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:2 3:
P
M
O :\P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_E
LE
C
TR
IC
AL
N O
TE
S.
D W
G
SH
AN
K, J
AS
O
N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-002
EL
EC
TR
IC
AL
N
O
TE
S
G. JONES
J. SHANK
1. FURNISH AND INSTALL BARE 4/0 GROUND CONDUCTORS FOR BONDING THE NEW BUILDING ADDITION STEEL TO THE EXISTING GROUND SYSTEM IN THE ELECTRICAL ROOM. BOND EACH SIDE 3 TIMES. INSTALL BARE 4/0 CONDUCTORS IN 1 INCH PVC
SCHEDULE 80 CONDUIT(S).
2. EXISTING PCB LIGHT FIXTURE BALLASTS SHALL BE DISPOSED OF PROPERLY.
3. CONTRACTOR TO FIELD VERIFY EXISTING DEMOLITION REQUIRED FOR THE AREAS SHOWN TO BE DEMOLISHED THIS CONTRACT.
CONTRACTOR TO DEMOLISH AT A MINIMUM CONDUIT, WIRE, DISCONNECT SWITCHES, MANUAL MOTOR STARTERS, PUSHBUTTON STATIONS, CONTROL STATIONS, LIGHTING TRANSFORMERS, PANELBOARDS, LIGHT SWITCHES, OUTLETS, MOTORS, TEMPERATURE SWITCHES, DAMPERS, ACTUATORS, TEMPERATURE CONTROLS WIRING, FIELD INSTRUMENTS, EMERGENCY FIXTURES, EXIT FIXTURES, CONTROL PANELS, MOTOR CONTROL CENTERS, POWER PANELS, CONTACTORS, POWER/CONTROLS/SIGNAL WIRING, ETC.
4. INCLUDE AS PART OF THIS BID TO UPDATE THE PLANTS EXISTING ARC FLASH ANALYSIS. OBTAIN THE SKM FILES FROM THE OWNER, UPDATE THE FILES FOR THE WORK SHOWN ON THE CONTRACT DRAWINGS, AND RETURN THEM TO THE OWNER.
INCLUDE IN BID TO PRINT NEW ARC FLASH LABELS, AND INSTALL THEM. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. STUDY SHALL BE UPDATED BY SCHNEIDER ELECTRIC OR EATON. TURN OVER UPDATED SKM FILES TO OWNER AT
COMPLETION OF PROJECT.
5. NEW CONDUIT INSTALLED INDOORS SHALL BE RMC. OUTDOOR CONDUIT SHALL BE PVC-RMC. SUPPORT CONDUIT AS REQUIRED WITH STAINLESS STEEL STRUT, THREADED ROD, AND HANGERS AS REQUIRED. BOXES SHALL BE NEMA 12. STAMPED BOXES ARE
NOT PERMITTED.
6. INSTALL NEW LIGHTING TRANSFORMERS AND PANELBOARDS WHERE SHOWN. POUR 4 INCH THICK CONCRETE PAD FOR NEW
LIGHTING TRANSFORMERS.
7. DEMOLISH EXISTING EXTERIOR WALL PACKS. TURN OVER TO OWNER. INSTALL NEW WALL PACKS AS SHOWN.
8. RELOCATE EXISTING PLANT VIDEO SECURITY MONITOR AND VIDEO COMPUTER. RELOCATE EXISTING SCADA THIN CLIENT
COMPUTERS AND MONITORS TO NEW CONTROL ROOM DESKS.
9. REWORK THE EXISTING SINGLE MODE FIBER OPTIC CABLE FROM THE CURRENT INTERNET SERVICE PROVIDER EVERSTREAM.
INSTALL A 12 STRAND SINGE MODE FIBER OPTIC CABLE BETWEEN NP NO.1 AND NP NO.2. CONNECT EXISTING IT SWITCHES AND ROUTERS TO MAINTAIN EXISTING REMOTE CONNECTIVITY FOR THE EXISTING BUSINESS NETWORK AND REMOTE ACCESS AS
WELL AS THE IP PHONE NETWORK. COORDINATE RECONNECTIONS WITH OWNER IT DEPARTMENT.
10. PROVIDE TEMPORARY POWER AS REQUIRED DURING THE ENTIRE CONSTRUCTION PROCESS IN ORDER TO MAINTAIN PLANT
OPERATIONS IN THIS EXISTING ADMINISTRATION BUILDING DURING THE CONSTRUCTION.
IN ADDITION TO THE WORK SHOWN ON THE CONTRACT DRAWINGS THE CONTRACTOR SHALL INCLUDE THE FOLLOWING LABOR, MATERIALS, AND EQUIPMENT AS NOTED BELOW IN THEIR BASE BID AS PART OF THE OVERALL CONTRACT DRAWINGS.:
11. INCLUDE IN BID TO FURNISH AND INSTALL 10-30A MOLDED CASE SQUARE D CIRCUIT BREAKER BUCKETS TO FIT WITHIN THE EXISTING SQUARE D MOTOR CONTROL CENTERS AT THE PLANT. BUCKETS TO INCLUDE DOORS AND NEW NAMETAGS.
COORDINATE EXACT INSTALLATION LOCATIONS WITH ENGINEER. BREAKERS TO HAVE LSI ADJUSTMENTS. MATCH EXISTING
RATINGS.
12. INCLUDE IN BID TO FURNISH AND INSTALL 6- SIZE 1 SQUARE D COMBINATION MOTOR STARTERS EACH IN A NEMA 4 STAINLESS STEEL ENCLOSURE. STARTERS TO INCLUDE MOLDED CASE MAIN BREAKER, CONTROL POWER TRANSFORMER, H-O-A SELECTOR SWITCH, 2 SPARE AUXILIARY CONTACTS, RUN LIGHT, ELAPSED TIME INDICATOR, SOLID STATE OVERLOAD RELAY. CONNECT EXISTING FLOAT SWITCH CONTACT IN AUTO POSITION FOR EXISTING SUMP PUMPS. INCLUDE IN BID TO FURNISH AND INSTALL 400 FEET OF 1 INCH RMC CONDUIT WITH 4#10 WIRES FOR POWERING THESE STARTERS FROM EXISTING SQUARE D MOTOR CONTROL CENTERS. ASSUME CONDUIT SHALL BE INSTALLED 20 FEET ABOVE FINISHED FLOOR. INCLUDE STRUT AND RACK
SUPPORTS AS REQUIRED.
13. INCLUDE IN BID TO FURNISH AND INSTALL AN ADDITIONAL 25 - TYPE A LIGHT FIXTURES AS DIRECTED BY ENGINEER. SEE SHEET E-207. INCLUDE IN BID TO FURNISH AND INSTALL 3 ADDITIONAL SINGLE POLE LIGHT SWITCHES EACH IN A NEMA 4 ENCLOSURE.
INCLUDE IN BID TO FURNISH AND INSTALL 200 FEET OF 1 INCH RMC CONDUIT WITH 3#10 WIRES AS DIRECTED BY OWNER/ENGINEER. INCLUDE STRUT AND RACK SUPPORTS AS REQUIRED. INCLUDE IN BID TO FURNISH, AND INSTALL 3 ADDITIONAL LIGHTING CONTACTORS AS DIRECTED BY OWNER/ENGINEER. CONTACTORS TO MATCH LC NO.1 WIRING DIAGRAM.
SEE SHEET NO.202
14. INCLUDE IN BID LABOR AND MATERIALS AND TESTING TO REROUTE AND RE-TERMINATE THE FOLLOWING EXISTING FIBER OPTIC CABLES: A 48 STRAND MULTIMODE FIBER CABLE WITH SC CONNECTORS, A 48 STRAND MULTIMODE FIBER CABLE WITH ST STYLE CONNECTORS, A 12 STRAND SINGLE MODE FIBER OPTIC CABLE WITH ST STYLE CONNECTORS, A 12 STRAND MULTIMODE FIBER OPTIC CABLE WITH ST STYLE CONNECTORS AND A 24 STRAND MULTIMODE FIBER OPTIC CABLE WITH ST STYLE CONECTORS AND A 24 STRAND SINGLE MODE FIBER OPTIC CABLE WITH ST STYLE CONNECTORS. COORDINATED WITH OWNER/ENGINEER.
15. INCLUDE IN BID TO FURNISH AND INSTALL 250 FEET OF 4 INCH PVC SCHEDULE 80 CONDUIT ASSOCIATED WITH THE REWORK OF THE INTERNET SERVICE PROVIDER'S FIBER OPTIC CABLE EVERSTREAM. COORDINATE INSTALLATION OF INTERNET SERVICE PROVIDERS FIBER OPTIC CABLE WITH EVERSTREAM. INCLUDE STRUT AND RACK SUPPORTS AS REQUIRED.
16. INCLUDE IN BID TO FURNISH, AND INSTALL 200 FEET OF 2 INCH RMC CONDUIT AND 4#8 WIRES AS DIRECTED BY OWNER.ENGINEER. ASSUME CONDUIT SHALL BE INSTALLED AT A HEIGHT OF 20 FEET. INCLUDE STRUT AND RACK SUPPORTS AS
REQUIRED.
17. INCLUDE IN BID TO FURNISH AND INSTALL 150 FEET OF 2 INCH PVC SCHEDULE 80 CONDUIT WITH 1-12 STRAND 50 MICRON MULTIMODE FIBER OPTIC CABLE AND 1-12 STRAND 9/125 MICRON SINGLE MODE FIBER OPTIC CABLE AS DIRECTED BY
OWNER.ENGINEER. CABLES SHALL BE INSTALLED IN SAME CONDUIT.
18. IN ADDITION TO THE WORK SHOWN AND DESCRIBED ABOVE, CONTRACTOR SHALL INCLUDE IN BID AN ADDITIONAL 160 HOURS OF
LABOR AS DIRECTED BY OWNER/ENGINEER.
19. ANY OF THE ABOVE CONDUIT/WIRE, FIBER LABOR NOT USED SHALL BE DELETED FROM CONTRACT FOR CREDIT.
NOTES:
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:2 3:
P
M
O :\P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_E
LE
C
TR
IC
AL
N O
TE
S_
II.
D
W G
SH
AN
K, J
AS
O N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-003
EL
EC
TR
IC
AL
N
O
TE
S
G. JONES
J. SHANK
4''G
4''G 4''G 4''G 4''G 4''G
FM FM FM
FM FM FM FM FM
o o o o o o o E E E E E E
E
GUIDE RAIL
o o o o oooo o o o o o oooo o 12"S x x x x x x
PL
xx x x x x x x x x x x x x x x x
PL
x x x x xxxxxx
PL
x x x x x x x x
PL
x x x x x x x x
HEAVY
WOODS
C
ITY O
F EAST LAN
SIN
G
C
ITY O
F LAN
SIN
G
RED C
EDAR R
IV
ER
N.W .S
. 8
.25 ' E
12"S 12"S o o o
EX
IS
TI
N
G 8'
Ø C
.I.
W
.M
EX
IS
TI
N
G
" I N
LE
T
SE
W
ER
C & 0 R.R. 5. 3+09
PL
E E E E E E E o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o
FH
HEADWORKS
BUILDING
o o o o o oooo x x o o o o o o o o o o o o o o o o o o xxx o o o o
60"SS
60"SS
EXISTING TUNNEL
x x x x x xxxxxxxxxx x x x x x x
P P P P
P
P
G
G G
G
G
60"SS
0+00 1+00 2+00 3+00 3+51.26 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xo o o o o o
825826827828829
824823 825826827828829
825824
831 832 833 834 x x x x x
823822
EXISTING BIOP-2 (WALKWAY)
EXISTING DIOP-6 (TUNNEL)
EXISTING PPTF (TUNNEL)
EXISTING MPZ-TF (TUNNEL)
EXISTING MPZ-AB4
(WALKWAY)
EXISTING HWPP
(ELECTRICAL ROOM)
TA
N
K N
O .8
TA
N
K N
O .9
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
BLOWER AND
ELECTRICAL
BUILDING
EQUALIZATION
BASIN
FL CL TANK
STORAGE
FINAL SETTLING
TANK NO.7
FINAL SETTLING
TANK NO.6
FINAL SETTLING
TANK NO.5
TERTIARY
FILTER
BUILDING
FINAL
SETTLING
TANK NO.4
FINAL
SETTLING
TANK NO.1
FINAL
SETTLING
TANK NO.2
FINAL
SETTLING
TANK NO.3
TANK NO.10
TANK NO.9
TANK NO.8
TANK NO.7
TANK NO.6
TANK NO.5
PR
IM
AR
Y
TA
N
KS
AE
R
AT
IO
N T
AN
KS
PR
IM
AR
Y
TA
N
KS
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
TANK NO.5
TANK NO.6
TANK NO.7
FLOTATION/
BLOWER
BUILDING
SLUDGE
STORAGE
TANKS
ADMINISTRATION
BUILDING
CONTROL
BUILDING
PRIMARY
SWITCHGEAR ROOM
SOLIDS
LOADING
ADDITION
BLENDING
TANK NO.1
BLENDING
TANK NO.2
CHP UNIT
DIGESTER
GAS STORAGE
ROLL OFF
BUILDING
FINAL TANK NO.8
FINAL TANK NO.9
RAS
PUMPING
EXISTING RASIOP
(ELECTRICAL ROOM)
EXISTING BIOP-1 (WALKWAY)
EXISTING MPZ-AB3
(WALKWAY) EXISTING BIOP-6
(TUNNEL)
EXISTING BPP
(ELECTRICAL ROOM)
EXISTING TFPP
(SECOND FLOOR)
RADIO PANEL
EXISTING MPZ-FB (TUNNEL)
EXISTING DIOP-8 (TUNNEL)
EXISTING PPFB (TUNNEL)
NEW PP2. SEE
SHEET E-110 FOR
WORK REQUIRED.
EXISTING SOUTH GALLERY
TUNNEL CONTROL PANEL.
SEE SHEET I-101 FOR
WORK REQUIRED. NEW PP1. SEE
SHEET E-110 FOR
WORK REQUIRED. EXISTING BIOP-4 (ELECTRICAL ROOM)
PROPOSED SGIOP-1
(ELECTRICAL ROOM) EXISTING SGIOP
(ELECTRICAL ROOM)
EXISTING LP-F (ELECTRICAL ROOM)
EXISTING DIOP-3 (ELECTRICAL ROOM)
EXISTING LP-E (ELECTRICAL ROOM)
DIOP-4
DIGESTER BUILDING
EXISTING DPP (ELECTRICAL ROOM)EXISTING FCP-10 (LOWER LEVEL)
EXISTING FCP-11 (LOWER LEVEL)
EXISTING DIOP-2 (PROCESS ROOM)
DIOP-1 (LOWER LEVEL)
EXISTING FCP-12
(LOWER LEVEL)
MPZ-B (OUTDOORS)
PROPOSED MPZ-TF1
PROPOSED MPZ-D3
SOLIDS HANDRAIL BUILDING
PROPOSED MCC-D3
EXISTING MCC-FB1, MCC-FB2
MCC-TF1, AND MCC-TF2 -
ELECTRICAL ROOM.
PROPOSED MPZ-FB1
EXISTING BIOP-3 (OUTDOORS)
EXISTING MPZ-AB5 (WALKWAY)
LP-TF1 (SECOND FLOOR)
EXISTING NORTH GALLERY
TUNNEL CONTROL PANEL. SEE
SHEET I-101 FOR WORK REQUIRED.
SEE SHEET I-101 FOR
WORK REQUIRED.
EXISTING CONTROL
BUILDING PANEL.
SEE SHEET I-101 FOR
WORK REQUIRED.
EXISTING RAW
SEWAGE PUMP
ROOM. EXISTING
DIOP-7. (TUNNEL)
SEE SHEET I-101 FOR
WORK REQUIRED.
SEE ABOVE FOR EXISTING
PLC I/O POINTS, MPZ'S,
AND MCC LOCATIONS.
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:2 7:
P
M
O :\P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_S
IT
E
PL
AN
T
U N
N
EL
S.
D
W G
SH
AN
K, J
AS
O N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-004
EL
EC
TR
IC
AL
O
VE
R
AL
L
EX
IS
TI
N
G S
IT
E
PL
AN
EX
IS
TI
N
G T
U N
N
EL
S
PR
O
PO
SE
D
W O
R K
OVERALL EXISTING SITE PLAN, AND EXISTING TUNNEL PLANS - PROPOSED WORK
N
HEADWORKS
BLDG
SCALE:
25' 50' 100'
1" = 50'
SCALE: 1"=50'
(SEE ALSO SHEETS E-325, AND E-338 FOR WORK REQUIRED)
NOTES:
1. FIELD LOCATE CONDUIT ROUTING IN TUNNELS FOR MPZ-FB1 TO MCC-FB1, MPZ-TF1 TO MCC-TF1, AND
MPZ-D3 TO MCC-D3. SEE THIS SHEET FOR LOCATIONS.
2. FOR THE MOTION SENSORS, AND LIGHTING CONTACTORS IN TUNNELS CONNECT TO SPARE I/O
POINTS AT EXISTING PLC PANELS. COORDINATE WITH TETRATECH ON I/O CONNECTIONS.
G. JONES
J. SHANK
o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o oooooo o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o oo o o o
SD
SD DRAIN
SD
ELEC
MW-
SH FIRE
ARS
ARS
ARS
SS
SS
SS
ARS
ARSARSARSARS
FF ELEV 842.18
FF ELEV 838.61
FF ELEV 838.50
FF ELEV 838.64
FF ELEV 843.26
FF ELEV 841.44
FF ELEV 841.77 FF ELEV 841.63FF ELEV 839.83
FF ELEV 842.22
G
G
G
G
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH VAULT
MH VAULT
TB
TB
GV
EM
EM
TV
10" APPLE
10"
8"
8"8" 10"
10"
10"
12"
12"
12"
14"
14"
OE
OE
OE
BRICK BLDG.
F.F. 839.83
M
ET
AL
B
LD
G
. 2
F.
F.
.4
AERATION
TANKS
BIT.
BIT.
BIT.
BIT.
BIT.
BIT.
BIT.
BIT.
GRASS
GRASS GRASS
GRASS
C O
N C
W.S.E. = 835.3 (±)
(DECEMBER 17, 2015)
SLUICE GATE
xx xx xx
"S
S
36"SS
36"SS
"S
S
"S
S
G
G
G
G
G
G
G
G
G
G
EQ BASINBUILDING
EQ BASIN
P P
P P
P
P
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
TANK NO.5
TANK NO.6
TANK NO.7
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
PRIMARY TANKS
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .9
AREATION TANKS
PR
IM
AR
Y
TA
N
KS
TANK NO. 10
TANK NO. 9
TANK NO. 8
TANK NO. 7
TANK NO. 6
TANK NO. 5
TA
N
K N
O .8
FINALSETTLINGTANK
GAS
METERBLDG.
FILTER PADEL. 837.62
CL
BLDG.
FL CL TANKSTORAGE
BLOWERBLDG.
SL
U
D G
E
ST
O R
AG
E
TA
N
KS
MOTORBLDG.
CONTROLBLDG.
OFFICELOCKERROOM #5
PRIMARYSWITCHGEARROOM
STM MH 400
RIM 840.89
12" RCP WNW IE 835.79
ELECTRICALBLDG.
838.00
838.95
838.00
837.00
839.49
841.00
842.02
841.67
841.00
841.54
841.17
839.75
843.00
841.40 xx xx xx xx xx xx xx o o o o o o o oo o o o o xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx
SOLIDSLOADING
DIGESTERBUILDING
BLENDINGTANK NO. 1
BLENDINGTANK NO. 2
DIGESTER
CHP UNIT
FUTURE
DIGESTER
GAS
STORAGE
GAS
FLARE
8" BS
8" WAS 8" PS
2" SPD
2" SPD
10" BG
12" D
14" D
8" THS
0.75" NG
10" BG
0.75" NG
10" BG
o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o oo
3/4" IPW
6" NG
2" D
2" D
2" D
D B
D B
DB
DB
DB
DB
DB
DB
DB
D B
D B
8" D
S
" O
F
6" NG
2" NG
MH NO.5
D B
D B
DB
DB
D B
D B
D B
D B
D B
DB
DB
DB
DB
MH NO.1
DIOP-3
MCC-D4
MCC-D3
MCC-D5
MCC-D6
DIOP-4
SEE NOTES
DIOP-1
MCC-D2
NEMA 7 AREA
NEMA 7
AREA
NEMA 7
AREA
NEMA 7 AREA
NEMA 7 AREA
EQUALIZATION BASIN
NEMA 7 AREA
BLOWER
BUILDING
BARE 4/0
BARE
4/0
SEE NOTE NO.4.
EQUALIZATION BASIN/
PARKING LOT - TOP
CIOP
BARE 4/0 TO GROUND MAT. (TYP.)
BARE 4/0
(TYP.)
DPP
MCC-D1
TRANSFORMER SE-2.
ADMINISTRATION BUILDING. SEE ELECTRICAL,
AND INSTRUMENTATION DRAWINGS.
EXISTING MCC-SE-2.
15KV PRIMARY SWITCH SE-2.
SEE NOTES ON
SHEET E-006, AND
E-105 FOR WORK
REQUIRED..
EXISTING LP-A
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:2 7:
P
M
O :\P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_E
LE
C
TR
IC
AL
S
IT
E
PL
AN
.D
W G
SH
AN
K, J
AS
O N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-005
EL
EC
TR
IC
AL
SI
TE
P
LA
N
G. JONES
J. SHANK
G. JONES
OF 80
N
SCALE:
15' 30' 60'
1" = 30'
EXISTING DRAWING FROM PREVIOUS
PROJECT. PROPOSED WORK SHOWN BOLD,
CROSSHATCHED, AND/OR CIRCLED
NOTE:
DEMOLISH EXISTING CONDUIT/WIRE FOR TRANSFORMER SE-2, DIGESTER,
MCC-SE-2, PP1, AND PP2. TURN OVER ALL EQUIPMENT TO OWNER. REMOVE
EXISTING 15 KV, AND 480V WIRING. CAP ALL HOLES IN CONCRETE PAD, AND
IN BUILDING WITH DUCT SEAL.
PROPOSED WORK AREAS - THIS
CONTRACT. SEE ALSO OTHER SITE
PLANS, AND BACKGROUND PLANS FOR
REST OF CONTRACT WORK REQUIRED.
REMOVE MCC-SE-1. TURN OVER TO OWNER.
SEAL HOLES IN PAD WITH DUCT SEALANT.
DEMOLISH
EXISTING
CONCRETE PAD.
INSIDE
ELECTRICAL
ROOM
SEE NOTE AT LOWER RIGHT.
NOTE:
WITHIN EXISTING TUNNEL, DEMOLISH EXISTING SLUDGE PUMPS, CONTROL
VALVES, LEVEL TRANSMITTERS, FLOW METERS, MOTOR STARTERS, VFD'S,
AND ASSOCIATED CONDUIT/WIRE FOR POWER, CONTROL, AND SIGNAL
BACK TO POWER SOURCE, AND CONTROL PANEL.
DPP
LP-A SPARE
BREAKER
1"C(3#10)1"C(2 - 50 MICRON MULTIMODE FIBER ZIP CORDS)
P
P
1"C(20#14) EACH.
1"C(3-2/C#16SH) EACH.
1 1/2"C(4#8)
1"C(20#14) EACH.
1"C(3-2/C#16SH) EACH.
1 1/2"C(4#8)
MECHANICAL ROOM
NO SCALE
MOTOR CONTROL CENTER D1
PARTIAL ONE-LINE DIAGRAM
100A 3"C(4#1/0) D1
44 DH-2
100A
DPP1"C(20#14)
1"C(3#10)
HRP1"C(20#14)
3"C(4#1/0)NEMA 7 RATED
T
CONNECT TO SPARE I/O AT DPP.
COORDINATE WITH TETRATECH.
D1
LOCATED ON ROOF.
NEMA 7 AREA.
MCC-SE-1
REMOVE MCC-SE-1. TURN OVER TO OWNER.
SEAL HOLES IN PAD WITH DUCT SEALANT.
NEMA 4
AREA
RECIRCULATION PUMPS
NEMA 7 RATED
D1
LOCATED ON ROOF
60-INCH
RELIEF
SEWER
54-INCH
INFLUENT
SEWER
D
IG
ES
TE
R
BL
D G
B-MW
B-?
xx xx xx xx xxOEOEOE
OE OE OE OE
xx
823824
825824
825 826 827 82
7 830 833 834
835830825
822823
828827826825824823822
825826827
837 83
83882
8 837
82582
823824825 826827
828829
855857
825826827
830835
830 835
4''G
4''G 4''G 4''G 4''G 4''G
FM FM FM
FM FM FM FM FM
o o o o o o o
RB-3
E E E E E E
W .1
+1
14" M.J.C.I.
RB-2
E
GUIDE RAIL
o o o o oooo o o o o
RB-1
o oooo o
RB-4
14" M.J.C.T
EQ. BASIN EFF. TO
PRI. TANK NO.4
8"°C.I.
DISCH'G.
12"° M.J.C.I.
PIPE
12"S
INV.829.4 INV.829.5
PL
x x x x x x
PL
xx x x x x x x x x x x x x x x x
PL
x x x x xxxxxx
PL
x x x x x x x x
PL
x x x x x x x x
INK 828.0
HEAVY
WOODS
C
ITY O
F EAST LAN
SIN
G
C
ITY O
F LAN
SIN
G
EXIST. 48" BYPASS SEWER
RED C
EDAR R
IV
ER
N.W .S
. 8
.25 ' E
E.B.1 I-496 ABOVE
EX
.C
O N
C W
AL
K
12"S 12"S
1-496 EXIT ROAD
EX
IS
T
" E
FF
LU
EN
T o o o
EX
IS
TI
N
G 8'
Ø C
.I.
W
.M
EX
IS
TI
N
G
" I N
LE
T
SE
W
ER
#6 #2
BITUMINOUS PAVEMENT
C & 0 R.R. 5. 3+09
#5
PL
E E E E E E E o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o
FH
60"SS 54"SS
"S
S
18"SS
"S
S
"S
S
BLENDING
TANK NO.1
BLENDING
TANK NO.2
CHP UNIT
o o o o o o o o o o o o o o o o o o oooo x x o o o o o o o o o o o o o o o o o o xxx o o o o
CHEMICAL
FEED
BUILDING
60"SS
60"SS 54"SS
EXISTING TUNNEL
x x x x x xxxxxxxxxx x x x x x x
5+15
0+00
1+00
2+
3+00
4+00
5+
0+
1+
1+89
P P P P
P
P
0+00 1+00
2+00 3+00 4+00
5+00
6+
6+
0+
1+
2+
2+
G
G G
G
G
"S
S
"S S
"S
S
"S
S
18"SS
60"SS
0+00 1+00 2+00 3+00 3+51.26
845 840
830831 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xo o o o o o x x x x x
0+
1+
1+
.4
0+
0+
.4
0+00 1+00
2+00
3+00
4+00 5+00
6+00
7+00
8+00
9+00
9+90.37
DIGESTER
GAS
STORAGE
FUTURE
DIGESTER
GAS FLARE
BLOWER/
FLOTATION
BLDG
SOLIDS
UNLOADING
BLDG
HEADWORKS
BLDG
TANK NO.4 TANK NO.1
TANK NO.2TANK NO.3
FINAL
SETTLING
TANK 7
FINAL
SETTLING
TANK 6
FINAL
SETTLING
TANK 5
TERTIARY
FILTER
BLDG
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
TANK NO.5
TANK NO.6
TANK NO.7
TANK NO.1
TANK NO.2
TANK NO.3
TANK NO.4
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .1
TA
N
K N
O .9
TA
N
K N
O .8
TANK NO.5
TANK NO.6
TANK NO.7
TANK NO.8
TANK NO.9
TANK NO.10
EQUALIZATION
BASIN
EQUALIZATION
BLDG
NORTH AERATION TANKS
SOUTH AERATION TANKS
JUNCTION CHAMBER
RETURN
SLUDGE
PUMP
STATION
FINAL
SETTLING
TANK 8
FINAL
SETTLING
TANK 9
MDOT PROPERTY BOUNDARY
NORTH AERATION/BLOWER BLDG
NORTH PRIMARY TANKS
SOUTH PRIMARY TANKS
EXISTING TFPP
(SECOND FLOOR)
LP-TF1 (SECOND FLOOR)
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
4/
/2
:3 0:
P
M
O :\P
R O
JE
C
TS
\L
AN
SI
N G
\IE
R
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\E
\R
ED
ES
IG
N \E
-0
_S
IT
E
PL
AN
_P
R .D
W G
SH
AN
K, J
AS
O N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-13045-22002
O
PE
R
AT
IO
N
AL
F
AC
IL
IT
IE
S
AN
D T
R
EA
TM
EN
T O
PT
IM
IZ
AT
IO
N
IM
PR
O
VE
M
EN
TS
CI
TY
O F
EA
ST
L
AN
SI
NG
, M
IC
HI
G
AN
C O
O
LI
D G
E R
D
EA
ST
L
AN
SI
N G
, M I, PH
O N
E:
.3
.3
0, F
AX
: 5
.4
.8
/0
5/
IS
SU
ED
F
O R
B
ID
S
E-006
EL
EC
TR
IC
AL
SI
TE
P
LA
N
PR
O
PO
SE
D W
O R
K
G. JONES
J. SHANK
G.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .