This is a Questions and Answers document for a Consulting Engineering Services Request for Proposal issued by Chevy Chase Village, Maryland. The Village is seeking proposals from a single consulting engineering firm to provide services including stormwater drainage and runoff management on private and public property, traffic engineering, planning, and surveying. The consulting firm may assign different consultants to specialized tasks as needed, though only one primary firm will be retained. The document addresses clarifications regarding submission requirements, including that Certificates of Good Standing must be current within 30 to 90 days of submission and that letters of interest require signatures from authorized officers, which may be provided as original hard copies, scanned versions, or authorized digital signatures.
Key technical requirements established through the Q&A process specify that the Village relies on Montgomery County Department of Public Services and Maryland Department of the Environment Environmental Site Design criteria in addition to Village ordinances per Chapter 8-BUILDINGS-AND-BUILDING-REGULATIONS, and that land surveying deliverables must be provided in Maryland State Plane coordinates (NAD83/NAVD88) for integration into the Village's GIS asset management database. Traffic engineering services must follow standardized Maryland Department of Transportation State Highway Administration and Institute of Transportation Engineers guidelines, including 24 to 48-hour automated traffic recorder volume and speed counts with 85th percentile speed threshold analysis. Hourly rates are to remain firm for the contract term and should be all-inclusive of mileage, overhead, and profit as detailed in the Scope of Work billing rules. The Village indicated that no Minority Business Enterprise requirements apply to this solicitation, attendance at evening Board meetings will generally occur virtually with travel time being non-billable, and no addenda have been issued at the time of this Q&A document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chevy Chase Village
Submitted Questions for RFP – Consulting Engineering
1. Is the Village looking to hire multiple consultants to perform the services mentioned in the scope of work?
Answer – No there is only the one consulting company.
2. Are the consultants required to work on all things mentioned in the scope pf work or can they specialize in a particular area like traffic engineering and planning?
Answer – We will work with one firm, if you assign different consultants to tasks that is up to you.
3. Is there an MBE requirement?
Answer – No.
4. How should attendance at evening Board meetings be billed, especially when travel time is expressly non-billable?
Answer – Most instances will only require the engineer attend virtually.
5. How current must the Certificate of Good Standing be at the time of submission?
Answer – Within 30-90 days.
6. On page 6 of the RFP and 4 of the PDF in Section A. Cover Page/ Letter of Interest, can you clarify what letter v. “PDF of original signature of authorized officer of the Bidder” would entail?
Answer – The letter of interest needs to have a signature on it. An authorized digital signature can be used, or a hard copy can be signed and scanned.
7. On page 9 of the RRP and 7 of the PDF Section 11. Materials to be submitted with bid, letter d) “Subcontracting Information, as described in Item 24 of this Instructions to Bidders” do you mean to reference Item 23?
Answer – That should be #23 Subcontracting, not #24 Interpretation.
8. Stormwater Management (SWM) & Plan Review Baseline: For private and public site plan/drainage reviews, does the Village rely strictly on Montgomery County DPS and MDE Environmental Site Design (ESD) criteria, or are there specific supplemental Village ordinances or overland flow restrictions we should incorporate into our review procedures?
Answer – Yes: See Sec. 8-25 at the following link:
https://www.chevychasevillagemd.gov/DocumentCenter/View/4246/Chapter-
8-BUILDINGS-AND-BUILDING-REGULATIONS0122
9. Geospatial & GIS CAD Standards: For land surveying task orders (boundary, ROW plats, topographic mapping), are deliverables required in MD State Plane coordinates (NAD83/NAVD88) with specific layering/attribute schemas for direct integration into the Village's GIS asset management database?
Answer – Yes
10. Traffic Calming & Speed Study Methodology: For traffic engineering task orders, does the Village follow standardized MDOT SHA / ITE guidelines (e.g., 24/48-hour ATR volume/speed counts, 85th percentile speed thresholds, and warrant analysis for speed humps/calming devices)?
Answer – Yes
11. Addenda Acknowledgment: Please confirm if any addenda have been issued to date for this solicitation so that we may properly acknowledge them within our submittal.
Answer – No addenda have been issued at this time.
12. Since the hourly rates are to remain firm for the term of the contract, could you please clarify if these rates should be all-inclusive (covering items such as mileage, overhead, and profit)?
Answer – See page 3 of the Scope of Work (page 13 of the PDF) under Billing Rules and Methods of Payment. Also see page 1 of the Bid Sheet (page 32 of the
PDF).