Centennial & Sun Cup Mine Remediation Project_Part1.pdf
PDF 2 MB Posted
- Solicitation number
- IFB1 PKAA 2016000370 2
- Issued by
- Washington County, Colorado
About this file
This is a bid solicitation document from the State of Colorado, Division of Reclamation, Mining and Safety (DRMS), for the Centennial & Sun Cup Mine Remediation Project (Bid Number PKA-16-770). The project involves stabilizing severely eroding uranium mine waste rock piles through earthwork, drainage channel reconstruction, and revegetation at inactive mines located in Disappointment Valley, San Miguel County, approximately 12 miles southeast of Slick Rock and 42 miles southwest of Naturita. The scope of work includes mine waste relocation (approximately 46,500 cubic yards across multiple sites), erosion control installation (approximately 2,200 linear feet of silt fence), excavation of borrow material (approximately 4,250 cubic yards), construction of drainage channels with in-stream structures, placement of plant growth media (approximately 6,540 cubic yards), and revegetation of approximately 9.1 acres. A mandatory pre-bid meeting and site showing was scheduled for June 21, 2016, at 10:00 a.m. at the intersection of Highway 141 and San Miguel County Road 16R, with attendance required for all bidders. Bids were due by 4:00 p.m. on July 6, 2016, and bid opening occurred on July 7, 2016, at 10:00 a.m. The project completion period is 82 calendar days from the Notice to Proceed, with anticipated construction dates between August 29, 2016, and November 18, 2016. Award will be made to the lowest responsive and responsible bidder meeting all requirements and criteria.
Special requirements mandate that contractors demonstrate successful completion of at least three stream channel construction projects utilizing design documents and totaling a minimum of 3,000 linear feet, with detailed documentation of project details, personnel qualifications, equipment used, and verification of work performed. Contractors must also demonstrate ability to execute Centennial and Sun Cup tasks concurrently within the 82-day schedule. The project is partially funded through a Cooperative Agreement between DRMS and Freeport-McMoRan, an Interagency Agreement between the Colorado Water Conservation Board and DRMS, and Federal grant money from the U.S. Department of Interior, Bureau of Land Management (CFDA 15.236). Bid guarantees of five percent of the total bid price are required for all bids over $50,000, and performance and payment bonds at 100 percent of the original contract price are mandatory. Liquidated damages are assessed at $400 per day for delays beyond the contract completion date. If the bid amount is between $50,000 and $149,999, ten percent retainage is withheld; if $150,000 or over, five percent retainage applies. The contractor must comply with Colorado labor requirements (80 percent Colorado labor), OSHA safety standards, Americans with Disabilities Act requirements, and must develop and submit a comprehensive Project Safety, Health, and Environmental Action Plan addressing specific radiological hazards associated with abandoned uranium mines, including dust control, personal dosimetry monitoring, and exposure limitations not to exceed 2 rem annually.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO BID
Project Name: Centennial & Sun Cup Mine Remediation Project Bid Number: PKA-16-770
Fund: FMMR Pre-Bid Meeting Date: Tues., June 21, 2016 Time: 10:00 am Bid Submittal Date: Wed., July 6, 2016 Time: 4:00 pm Bid Opening Date: Thurs., July 7, 2016______Time: 10:00 am_____
To: Purchasing Agent Division of Reclamation, Mining and Safety Total Bid $ 1313 Sherman St., Rm. 215 Receipt of Addenda Nos.
Denver, Colorado 80203 is Hereby Acknowledged
1. BID: The undersigned bidder proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the base bid above indicated, and according to the attached Bid Schedule.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
4. BID GUARANTY: This Bid is accompanied by the required Bid Guaranty. You are authorized to hold said Bid Guaranty for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Director, Division of Reclamation, Mining and Safety may retain said Bid Guaranty, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and any other documents required by the Special Conditions.
5. TIME OF COMPLETION: The bidder agrees to complete the entire project within 82__ calendar days from the Notice to
Proceed, subject to Article 33 TIME OF COMPLETION and Article 39 LIQUIDATED DAMAGES, of The General Conditions of the Contract. If awarded this work, the bidder agrees to begin work within ten (10) days from the date of the Notice to proceed and agrees to prosecute the work with due diligence to completion.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, he must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance and any other documents required by the Special Conditions within ten (10) days from the date of the Notice of Award.
7. LATE BIDS: Unless there are extraordinary circumstances for which the Purchasing Director may approve a bid received after the time and date due it will be rejected per R-24-103-202a-07(a), Colorado Procurement Code and Rules.
8. The right is reserved to waive informalities and to reject any Bid.
(TYPE/PRINT NAME UNDER ALL SIGNATURES) Dated this day of , 20__
THE BIDDER
Signature
Name and Title (Typed or Printed)
Company Name
Address
Phone #
Signatures: If the Bid is being submitted by a Corporation, the Bid should be signed by an officer, i.e., President or Vice President.
If the Bid is being submitted by an individual or a partnership, the Bid shall so indicate and be properly signed.
Centennial and Sun Cup Mine Remediation Project Bid Schedule
PKA-16-770
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
TASK
DESCRIPTION
QTY
UNIT
UNIT PRICE
AMOUNT
FUNDING
SOURCE
1.
Special Requirements
N/A
$ 0.00
2.
Mobilize/Demobilize
Lump Sum
FMMR
3.
SHEAP
4.
Access Road Improvement
5.
Centennial Mine Waste Relocation and Construction of Drainage Channel
5.1
Erosion Control - Silt Fence
Linear Foot (LF)
$ _______/LF
5.2
Mine Waste Relocation
35,000
Cu. Yds.
$ _______/CY
5.3
Excavate Borrow Material
2,200
5.4
Construct Drainage Channels
CWCB &
5.5
Plant Growth Media Placement
4,840
5.6
Revegetation
Acres
$ _______/AC
6.
Relocation of Sun Cup Mine Waste Rock Pile East
6.1
6.2
Hydrologic Control on Roads above the Sun Cup Mine
6.3
Excavate Borrow Material
2,050
6.4
7,500
6.5
1,250
6.6
1.5
7.0 ADDITIONAL TASKS
7.1
Construct Rolling Dip(s)
Each
$ ______/each
7.2
Equipment Rental - Excavator
Hours
$ _______/Hr
7.3
Bulldozer
7.4
Articulated Dump Truck
7.5
7.6
Compost
Dry Tons
$ _______/Dry Ton
7.7
1.0
8.0
ADDITIONAL TASKS: Relocation & Construction Of Drainage Channel at the Sun Cup Mine Waste Rock Pile West
8.1
8.2
4,000
8.3
Construct Drainage Channel
CWCB &
8.4
8.5
0.6
GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $__________________
State Form SBP-6.14 Rev. 9/2006
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
BID BOND
Institution/Agency:
Project No./Name:
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.
WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.
NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, and Certificates of Insurance, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.
IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this day of , A.D., 20 .
(Corporate Seal) THE PRINCIPAL
Company Name
ATTEST
Address (including city, state and zip) Secretary Phone number:
Name (Print) Signature
Name (Print) and Title
SIGNATURES If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.
If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.
(Corporate Seal) THE SURETY
By __________________________________________ Secretary Attorney-in-Fact
THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.
FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER OF
ATTORNEY WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.
As of 8/16/2012
LIST OF EQUIPMENT OFFERED
Under the headings below, list all equipment which you offer to perform the work described in the Bid. Please see “List of Equipment Offered” in the Special Conditions.
ITEM
MAKE
MODEL NUMBER
SERIAL NUMBER
YEAR
MANUFACTURED
THIS PAGE MUST BE RETURNED WITH YOUR BID
OR THE BID MAY BE CONSIDERED NON-RESPONSIVE
PAGE 1 OF 1 PAGE
SPECIAL CONDITIONS
Centennial & Sun Cup Mine Remediation Project
PROJECT LOCATION
The inactive Centennial and Sun Cup Uranium Mines are located on lands managed by the U. S.
Bureau of Land Management (BLM) in Disappointment Valley, approximately 12 miles southeast of the town of Slick Rock and 42 miles south west of Naturita, in western San Miguel County. San Miguel County Road 16R is approximately 7 miles east of Slick Rock and 36 miles west of Naturita on Colorado Highway 141. The Centennial and Sun Cup mines are located 6 miles south of Hwy 141 on County Road 16. Please see attached Maps.
WORK SUMMARY
The project work will include stabilizing severely eroding waste rock with earthwork to reduce steep slopes, reconstruction of drainage channels impacted by mine waste and revegetation of the waste rock piles.
PRE-BID MEETING AND SITE SHOWING
A mandatory pre-bid meeting and site showing will be held at the intersection of Highway 141 and San Miguel County Road 16R on Tuesday, June 21, 2016 at 10:00 a.m. Group will meet, sign in and carpool to the project site. Please see attached Pre-bid Meeting and Project Location Map.
The purpose of the Pre-Bid meeting is to afford potential bidders the opportunity to inspect the proposed work and access conditions. Attending the entire Pre-Bid meeting is mandatory.
Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms to register their attendance. It is the bidder's responsibility to make certain their attendance is recorded on the sign-in sheet. Each individual may represent him/herself or a single company for the purpose of bidding. Signing the Pre-Bid Meeting attendance list to represent more than one person or company is not permitted. Failure to sign-in and sign out, as directed by the Project Manager, will be cause for rejection of a bid.
Please review Meeting Requirements PRIOR to the meeting. All interested bidders MUST attend. Bidding documents must be obtained prior to the pre-bid meeting. Please bring bidding documents with you to the pre-bid meeting. Any Documents that cannot be loaded to the VSS System are the ONLY documents that will be distributed at the Pre-Bid Meeting.
THIS PRE-BID MEETING INVOLVES INSPECTION OF HAZARDOUS AND UNSTABLE MINE
WASTE ROCK SLOPES. THE SAFETY OF PROSPECTIVE BIDDERS IS OF UTMOST
IMPORTANCE TO THE DIVISION OF RECLAMATION, MINING AND SAFETY.
Bidders are cautioned that, notwithstanding any remarks or clarifications given at this meeting and site showing, all terms and conditions of the contract documents remain unchanged unless they are changed by written amendment issued by the OWNER. If the answers to questions, or any amendment to the contract documents create ambiguities, it is the responsibility of the bidder to seek clarification prior to submitting a bid.
SPECIAL REQUIREMENTS: See Task 1, below, for Submittal Requirements
1) Contractor must demonstrate previous experience in, and successful completion of, three
(3) projects that included construction of stream channels utilizing design documents.
2) Contractor must be able to work the Centennial and Sun Cup Tasks of the project concurrently to complete the project within the 82 calendar day work schedule.
BID SUBMITTAL
The Deadline for all bids to be submitted is no later than 4:00 p.m. on Wednesday, July 6, 2016.
All bids need to be submitted electronically via Colorado Vendor Self Service (ColoradoVSS) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService, or sealed bids in single copy, for the work described herein, will be received until the date and time specified above at the Colorado Division of Reclamation, Mining and Safety, 1313 Sherman Street, Suite 215, Denver, Colorado 80203.
Vendors: Please Note that Attachments in VSS can only be 2 MB each with a total of 10 MB.
A responsive bid must include the following, properly completed:
• Bid Form
• Bid Schedule
• Bid Bond
• List of Equipment
• Special Requirements
This is a sealed bid. Telegraphic or electronic (FAX, Western Union, Telex, etc.) bids will NOT be accepted directly by the Division of Reclamation, Mining and Safety in response to this bid.
Bid Form. Bids shall be submitted on the bid form furnished. Bids must be manually signed in ink.
All bid items must be priced or the bid will be disqualified. In case of error in the extension of price, the unit price shall govern. If a Bid Schedule is included it must also be returned with the bid. The quantities listed on which unit prices are requested are estimates only. The prices indicated on the Bid Schedule and included in the Contract Documents shall include the cost of all labor and materials, equipment and services, and all other expenses necessary for the completion of the work. Alternate bids will not be accepted. Bids must be signed as follows:
If the Bidder is a corporation: The bid must be signed by an officer (President or Vice President), and the title indicated.
If the Bidder is a proprietorship: The Owner must sign the bid and print or type his name, the business name.
If the Bidder is a partnership: The majority or general partner must sign the bid. The same person must sign the contract, if awarded. Also include the company name.
Bid Bond. A bid bond is required for all jobs over $50,000.00. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. If a bid bond is submitted, the State form shall be used. An irrevocable letter of credit is not acceptable as a bid guarantee. Bid guarantees, other than bid bonds, will be returned (a) to unsuccessful bidders as soon as practicable after the opening of bids, and (b) to the successful bidder upon execution of https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService such further contractual documents and bonds (including any necessary coinsurance or reinsurance agreements) as may be required by the bid as accepted.
Failure to furnish a bid guarantee in the proper form and amount by the time set for opening of bids may be cause for rejection of the bid.
If the successful bidder, upon acceptance of his bid by the OWNER, fails to execute such further contractual documents, and give such bond(s) (including any necessary coinsurance or reinsurance agreements) as may be required within ten (10) days after receipt of the Notice of Award, the contract may be terminated for default. In such event the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the amount of his bid, and the bid guarantee shall be available toward offsetting such difference.
BID OPENING DATE
The bid opening date for this project is Thursday, July 7, 2016 at 10:00 am.
All bid openings are open to the public and bidders are welcome to attend and record the bid results. A written tabulation of the Bid results will be available to those bidders who submit an email address or a clearly-visible, self-addressed, stamped envelope with their bid. Please allow two weeks for receipt of Bid results. Telephone requests cannot be honored because of time constraints.
Performance and Payment Bonds – ARE REQUIRED for bids over $50,000.00.
The contractor shall furnish a labor and material payment bond for 100 percent of the original contract price and a performance bond for 100 percent of the original amount of the contract. The bonds are required by State Law, Title 24-105,202,203, C.R.S., as amended. The bonds shall be submitted using the State forms. A certified or cashier’s check or bank money order may be accepted in lieu of the bonds. If a surety other than a bond is used, the State will hold fifty percent (50%) of the surety until the final settlement date and fifty percent (50%) for six (6) months after the final settlement date.
RETAINAGE
If the bid amount is between $50,000.00 and $149,999.00, 10 percent retainage will be withheld until the project has been satisfactorily completed and advertised. If the bid amount is $150,000.00 or over, 5% retainage will be withheld until the project has been satisfactorily completed and advertised.
List of Equipment Offered. The List of Equipment Offered form must be returned with each bid.
All equipment to be used on the project must be listed. The CONTRACTOR must own, have a current lease for the equipment intended to be used to perform the work, or must furnish a statement of arrangements to rent, or otherwise procure, adequate equipment to perform the work.
Inclusion of a piece of equipment on the List of Equipment Offered represents a commitment to devote that piece of equipment to the project work for the entire duration of the project. If several contractors propose to join together to perform the work under this contract, equipment owned or controlled by each should be listed and the owner identified. A contract will not be awarded to a bidder who in the opinion of the OWNER (a) does not have adequate equipment, or (b) does not have firm and satisfactory arrangements to obtain adequate equipment to perform the work described in the Invitation and Bid.
If the List of Equipment Offered is not submitted with the bid, the bid may be considered non-responsive.
BID AWARD
Award will be made with reasonable promptness, by written notice to the low responsive and responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for bid.
These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, corrected if necessary for errors in price extension and/or addition, on the Bidder's equipment if a List of Equipment Offered is required with the bid, and capability to meet the performance time requirements. The GRAND TOTAL PRICE will be used for comparing bids only.
To be considered responsive and responsible, bidders may not have a Below Standard "(1)", OVERALL (Final) performance rating in the Colorado Contract Management System (CMS), for any construction project completed for Colorado in the last five years, per C.R.S. 24- 105-1(2)
Additive Alternates. The lowest responsible bid, taking into account the Colorado resident bidder preference, Article 14 of the General Conditions, will be determined by and the contract will be awarded on the base bid plus all additive alternates, to the extent that the addition of alternates results in a sum total within available funds to finance the contract. Additive alternates will be used in determining the lowest responsible bidder, adding in the numerical order listed. An equal number of alternates shall be added to the base bid of each bidder within funds available to finance the contract for the purposes of determining the lowest responsible bidder. If this bid exceeds such amount, the right is reserved to reject all bids.
GENERAL BID SPECIFICATIONS
The Colorado Inactive Mine Reclamation Program General Bid Specifications 2009, which include General Conditions, Standard Work Specifications, and Standard Drawings and Figures are intended to complement these Special Conditions. The Special Conditions combined with the General Bid Specifications 2009 form the complete Invitation and Bid document. Please refer to the Standard Work Specifications for all applicable types of work required in the Special Conditions. The General Conditions apply to all work covered in the Special Conditions. Copies of the General Bid Specifications are available at the Pre-Bid Meeting or from the Division of Reclamation, Mining and Safety (CDRMS), 1313 Sherman Street, Room 215, Denver, Colorado 80203 (303) 866-3567.
PROJECT DATES
The project is scheduled for construction between Monday, August 29, 2016 and Friday, November 18, 2016. This includes ten (10) days mobilization time. These dates are tentative and may change.
TIME OF COMPLETION
The time of completion allowed for the project is 82 calendar days after receipt of the Notice to Proceed. This includes ten (10) days mobilization time.
LIQUIDATED DAMAGES
The liquidated damages for this project will be $400.00 per day. Please see General Conditions, Article 39.
NOTICE OF AWARD AND EXECUTION OF DOCUMENTS
A Notice of Award will be sent to the apparent low bidder with reasonable promptness. The contract signing date and time will be set for fourteen (14) days after the bid is awarded. The Division of Reclamation, Mining and Safety must receive the following:
(a) Executed Agreement;
(b) Fully-executed Performance and Payment Bonds, accompanied by appropriate Power of Attorney, if required;
(c) Certificates of Insurance showing proof of required coverage and Additional Insured Endorsement;
(d) Project schedule;
(e) AML Contractor Ownership and Control Form;
(f) Minority (MBE)/women (WBE) Business Participation form;
(g) Three-Way Agreement for Reclamation Activities, if required by the Special
Conditions;
(h) A list of all subcontractors to be used on the project, the work tasks and dollar value to be subcontracted to each, and
(I) Completed W-9 forms, if required (for contractors new to the State).
(j) Project Schedule
Please consult Articles 2-7 of the General Conditions.
If the above documents are not submitted properly by the contract signing date, the Division of Reclamation, Mining and Safety may elect to award the contract to the next lowest bidder. Bidders are advised to keep close contact with CDRMS during this period.
THREE-WAY AGREEMENT
A three way "Agreement for Reclamation Activities" is not required for this job. Please see Article 4 of the General Conditions for the applicable insurance requirements.
CONDITIONS AFFECTING THE WORK
In addition to examining the drawings and specifications, completion schedule, and other instructions, bidders shall visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, including average climatic conditions and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work.
PROJECT FUNDING
This project is partially funded through monies made available to the State of Colorado through the Cooperative Agreement between DRMS and Freeport-McMoRan and an Interagency Agreement between the Colorado Water Conservation Board and the Colorado Division of Reclamation, Mining & Safety.
This project is also partially funded by Federal grant money made available to the State of Colorado through the U.S. Department of Interior, Bureau of Land Management through CFDA 15.236.
AMERICANS WITH DISABILITIES ACT
All programs, services and activities of the Department of Natural Resources, Division of Reclamation, Mining and Safety and the Colorado Mined Land Reclamation Board are operated in compliance with the Americans with Disabilities Act. Questions, complaints and requests for additional information may be directed to ADA Coordinator, Department of Natural Resources, 1313 Sherman Street, Room 415, Denver, CO 80203.
CORA DISCLOSURE
To the extent not prohibited by federal law, this Contract and the performance measure and standards under CRS 24-103.5-101, if any, are subject to public release through the Colorado Open Records Act, CRS 24-72-101, et. seq.
STATEWIDE CONTRACT MANAGEMENT SYSTEM
[This section shall apply when the Effective Date is on or after July 1, 2009 and the maximum amount payable to Contractor hereunder is $100,000 or higher]
By entering into this Contract, Contractor agrees to be governed, and to abide, by the provisions of CRS §24-102-205, §24-102-206, §24-103-601, §24-103.5-101 and §24-105-102 concerning the monitoring of vendor performance on state contracts and inclusion of contract performance information in a statewide contract management system.
Contractor’s performance shall be evaluated in accordance with the terms and conditions of this Contract, State law, including CRS §24-103.5-101, and State Fiscal Rules, Policies and Guidance.
Evaluation of Contractor’s performance shall be part of the normal contract administration process and Contractor’s performance will be systematically recorded in the statewide Contract Management System. Areas of review shall include, but shall not be limited to quality, cost and timeliness. Collection of information relevant to the performance of Contractor’s obligations under this Contract shall be determined by the specific requirements of such obligations and shall include factors tailored to match the requirements of the Statement of Project of this Contract. Such performance information shall be entered into the statewide Contract Management System at intervals established in the Statement of Project and a final review and rating shall be rendered within 30 days of the end of the Contract term. Contractor shall be notified following each performance and shall address or correct any identified problem in a timely manner and maintain work progress.
Should the final performance evaluation determine that Contractor demonstrated a gross failure to meet the performance measures established under the Statement of Project, the Executive Director of the Colorado Department of Personnel and Administration (Executive Director), upon request by the Department of Natural Resources, and showing of good cause, may debar Contractor and prohibit Contractor from bidding on future contracts. Contractor may contest the final evaluation and result by: (i) filing rebuttal statements, which may result in either removal or correction of the evaluation (CRS §24-105-102(6)), or (ii) under CRS §24-105-102(6), exercising the debarment protest and appeal rights provided in CRS §§24-109-106, 107, 201 or 202, which may result in the reversal of the debarment and reinstatement of Contractor, by the Executive Director, upon showing of good cause.
INDEMNIFICATION
Contractor shall indemnify, save and hold harmless the State, its employees and agents, against any and all claims, damages, liability and court awards including costs, expenses and attorney fees and related costs, incurred as a result of any act or omission by Contractor or its employees, agents, subcontractors, or assignees pursuant to the terms of this contract.
PROJECT WORK DESCRIPTION
The attached General Conditions of the Contract and Purchase Order Terms and Conditions apply to all work.
TASK 1 SPECIAL REQUIREMENTS
1) Contractor must demonstrate successful completion of a minimum of three (3) projects that included construction of stream channels utilizing design documents. Contractor must provide a list of at least three (3) stream restoration projects totaling a minimum of 3,000 linear feet of perennial or ephemeral stream. For each project, the following information shall be provided:
a. Name and purpose of project, its location, and date of construction.
b. Name and contact information of owner, project manager, designer; and name and contact information of the contact, if other than the owner, who can discuss the project.
c. Name, contact information and qualifications of the Superintendent and Senior Operator.
d. Information on equipment (numbers and types) used in the project.
e. Verification that at least 50% of the work was performed by personnel directly employed by the Contractor or subcontractor.
f. Description of condition of stream before and after restoration.
g. Description of projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be used to further evaluate qualification.
h. Summaries of other project elements including tree removal, earthwork, and ground treatments.
i. Satisfactory installation of in-stream rock structures including vanes, cross vanes, wing deflectors, constructed cascade and riffle complexes, and similar structures.
j. Experience with by-pass pumping; dewatering; the use of and construction of coffer dams.
k. Methods used to control sedimentation and erosion.
2) Contractor must be able to demonstrate how work will progress at the Centennial and Sun Cup Tasks of the project to complete the project within the 82 calendar day work schedule.
Please specify anticipated schedule of equipment, labor and materials procurement and delivery.
Measurement and Payment There is no measurement and payment for this Task. This is a zero dollar line item in on the bid schedule.
TASK 2 MOBILIZATION/DEMOBILIZATION
Mobilization/Demobilization shall include the cost of moving equipment, personnel and supplies into the project site, minimal improvement of roads, and removal of the remaining supplies, trash and equipment at the completion of the project, according to Section 1 of the 2009 General Bid Specifications. CONTRACTOR will check with San Miguel County Road and Bridge Department to inquire about the need for a Right of Way or Access Permit. Mike Horner, San Miguel County Road and Bridge Superintendent’s telephone number in Norwood is (970) 327-4835.
To mitigate the spread of noxious weeds from one area to another, there will be a mandatory inspection of all equipment and vehicles to be used during the course of construction at the project site. Prior to inspection, it is the responsibility of the CONTRACTOR to employ whatever cleaning methods are necessary to ensure that all equipment is free of soils, seeds, vegetative matter and other debris that could contain or hold seeds. Equipment shall be considered clean when a visual inspection determines the equipment free of such materials. The CONTRACTOR will be required to notify the PROJECT MANAGER in advance of mobilizing equipment on site to arrange for inspection in Naturita, CO. Disassembly of equipment components will not be required.
Measurement and Payment Measurement and payment for Mobilization/Demobilization shall be conducted and paid in accordance with the 2009 General Bid Specifications Section 1.5. Payment for this TASK will be reflected in a lump sum bid under TASK 2 on the Bid Schedule. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice.
TASK 3 PROJECT SAFETY, HEALTH, AND ENVIRONMENTAL ACTION PLAN (SHEAP)
The job will involve working around inactive uranium mine features, radioactive mine waste rock piles and hazards, and it is the responsibility of the CONTRACTOR to be aware of all OSHA regulations which apply to this contract. This task includes all the Contractors expenses for employee time, labor, materials, and safety equipment and safety training necessary for preparing and executing a job safety plan. The Successful Bidder will be required to prepare the Project Safety Plan (SHEAP) and submit it for review and approval to the DRMS. The CONTRACTOR is required to develop and implement a Project Safety Plan in conjunction with project implementation. PROJECT MANAGER must receive the Project Safety Plan within five (5) working days of Notice to Proceed date. It is expected that the Project Safety Plan will be comprehensive and sufficiently detailed so that every member of the work crew (including sub-contractors) on site understands their responsibilities and the responsibilities of CONTRACTOR to ensure a safe and injury free work place.
The Project Safety Plan must be submitted to:
Camille Price P.O. Box 2927 Telluride, CO 81435 Camille.price@state.co.us
At a minimum, the plan MUST provide specific, detailed responses to the list of safety concerns presented in ATTACHMENT A - SHEAP, that are likely to present themselves during the course of Project completion. When developing the Project Safety Plan, please list specific types of equipment to be provided by CONTRACTOR, including subcontractor(s), in order to address the safety concern, or specifically state the actions to be taken by CONTRACTOR, including crew and subcontractor(s) in order to address the safety concern.
Gamma Radiation readings measured at the various site locations are also provided in
ATTACHMENT A - SHEAP.
Measurement and Payment There will be no measurement for payment. Payment for this TASK will be reflected in a lump sum bid under TASK 3 on the Bid Schedule. This lump sum bid will cover all costs for developing and implementing the Project Safety Plan, including writing and revising the plan as required, provision and maintenance of safety equipment, conduct of daily safety meetings and all other items necessary and incidental to meeting the specifications of this TASK and of the Project Safety Plan.
Payment shall be made as this TASK is completed and approved by Project Manager. Payment for this TASK will be made only on the final (before retainage) invoice.
TASK 4 ACCESS ROAD IMPROVEMENT
Furnish and install two Corrugated Metal Pipes (culverts), one measuring 36 inches in diameter by 20 feet in length to be installed at the first creek crossing, and the second measuring 36 inches in diameter by 30 feet in length at the Sun Cup Mine creek crossing location, as marked in the field and as directed by the PROJECT MANAGER. The culvert at the first creek crossing will need to be banded to the downstream end of an existing culvert measuring 36 inches in diameter by 20 feet in length. Riprap protection (6-inch median diameter non-acid forming, non-radioactive, durable rock riprap) will be constructed at the downstream end of the joined culvert at the first creek crossing and at both ends of the Sun Cup Mine creek crossing. Non-radioactive soil from the immediate vicinity will be placed at a depth of six inches (6 in.) inches beneath the newly installed culverts to protect them from punctures. Non-radioactive soil from the immediate vicinity will be placed and compacted over the newly installed culverts to increase the width of the road, mailto:Camille.price@state.co.us providing a driving surface capable of supporting the heavy equipment and material transport trucks to be utilized for this project. Culverts and roads constructed across them will be left in good condition and in functioning order at the completion of the project.
The access road will need to be graded and maintained throughout the project to provide a smooth drivable surface from the access gate to the Centennial Mine site, to facilitate worker traffic, equipment and material transport to the Centennial and Sun Cup Mines. Multiple rolling dips will require construction and maintenance to control drainage resulting from precipitation events, as directed by the PROJECT MANAGER. Rolling Dips will be located above and below each switchback, and at locations directed by PROJECT MANAGER. The road surface and rolling dips will be left in functioning order and good condition at the completion of the project. Please see Attachment B - Technical Specifications for rolling dip design specifications.
Measurement and Payment There will be no measurement for payment. Payment for this TASK will be reflected in a lump sum in TASK 4 of the Bid Schedule. The amounts in TASK 4 will cover all costs for furnishing and installing the culverts; riprap placement; soil placement and compaction; and, rolling dip construction, as described above. The bid price must be sufficient to cover all costs, direct and incidental, for materials and workmanship required to complete the specified work. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice. Payment shall be made as this TASK is completed and approved by PROJECT MANAGER.
TASK 5
CENTENNIAL MINE WASTE RELOCATION AND CONSTRUCTION OF DRAINAGE CHANNEL
TASK 5.1 EROSION CONTROL - SILT FENCE - AT THE CENTENNIAL MINE
All areas disturbed during reclamation work will have erosion control measures installed prior to any ground disturbance, and removed after revegetation is completed, at locations specified in the Stream Channel Designs for the Centennial Mine, to be provided at the pre-bid meeting, and as directed by PROJECT MANAGER.
CONTRACTOR shall furnish all materials and install approximately 900 linear feet of Silt Fence, as specified in Section 22, EROSION CONTROL Specifications, in the 2009 General Bid Specifications, and as directed by PROJECT MANAGER.
Additional sediment controls will be covered in TASK 5.4.
CONTRACTOR shall remove Silt Fence after revegetation has been completed, as directed by the
PROJECT MANAGER.
Measurement and Payment Measurement for payment for this TASK will be by the linear foot of silt fence installed prior to any ground disturbance, and removed after revegetation per the above referenced Standard Work Specifications of the 2009 General Bid Specifications and project designs specified in these Special Conditions. The price shall include all of the CONTRACTOR’s costs to furnish and install complete Erosion Control Measures in accordance with these Special Conditions and the 2009 General Bid Specifications. The price bid shall include all costs for labor, materials, equipment and all other items necessary for Erosion Control as described in these specifications. Payment for this TASK will be for the amount bid in TASK 5.1 of the Bid Schedule. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice. Payment shall be made as this TASK is completed and approved by PROJECT MANAGER.
TASK 5.2 MINE WASTE RELOCATION AT THE CENTENNIAL MINE
Mine waste relocation, site grading and drainage channel excavation shall be performed as shown on Drainage Channel Design for the Centennial Mine, to be provided at the pre-bid meeting, according to these Special Conditions, ATTACHMENT B - Technical Specifications and the 2009 General Bid Specifications.
Approximately 35,000 cubic yards of uranium waste rock material will be relocated to construct the drainage channel and create stable slopes no steeper than 3H:1V. Excavation of waste rock will be conducted to provide the finished channel profiles, elevations, grades, sinuosity, and construction of scour pools and sediment basins, as specified in the Drainage Channel Designs for the Centennial Mine.
Any non-radioactive topsoil exposed during mine waste excavation will be salvaged and stockpiled for use as plant growth medium, as directed by the PROJECT MANAGER.
Waste rock will be excavated to expose native ground and relocated to construct the drainage channel in native ground and create stable slopes no steeper than 3H:1V in the centerline of the “Water Bars”, located south of the main Centennial drainage channel, as shown in the Drainage Channel Designs for the Centennial Mine.
The final one foot (1’) of subsurface mine waste fill material shall not be compacted. Final graded surfaces will be roughened with a track excavator so that storm-water or snow melt runoff is either contained or travels so slowly that sediment is not transported from the site, and water collects to promote plant growth, as specified in ATTACHMENT B - Technical Specifications. Surface roughening will occur prior to plant growth media placement in order to prevent burial of plant growth media.
Earthwork shall be conducted according to the Technical Specifications provided in ATTACHMENT B, as directed by PROJECT MANAGER.
Any visible dust production during site earthwork will be minimized by performing the work simultaneously with applying water by truck, or as directed by PROJECT MANAGER.
Measurement and Payment Measurement for payment for this TASK will be by the cubic yard of material placed per the project designs specified in this bid document. Volume of material placed will be determined from a pre-and post-construction aerial survey conducted by the OWNER at the site. The post-construction survey will be conducted after mine waste has been relocated, and before plant growth media is placed on the ground surface. This TASK shall include all costs for mine waste relocation, drainage channel excavation, site grading, surface roughening and dust control at the Centennial Mine, as shown in the Drainage Channel Designs for the Centennial Mine, and as specified in these Special Conditions, ATTACHMENT B - Technical Specifications, and the 2009 General Bid Specifications. Payment for this TASK will be for the amount bid in TASK 5.2 of the Bid Schedule.
The bid price must be sufficient to cover all costs, direct and incidental, for materials and workmanship required to complete the specified work. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice. Payment shall be made as this TASK is completed and approved by PROJECT MANAGER.
TASK 5.3 EXCAVATE BORROW AREA
An area measuring approximately 200 ft. by 50 ft. by 6 feet deep, will be excavated from the native hillside north of the Centennial waste rock pile to provide additional area for the re-located mine waste to be placed, as shown in the Drainage Channel Design for the Centennial Mine.
The top 3 feet of non-radioactive materials (approximately 1,100 cu. yds.) will be salvaged and stockpiled for use as plant growth material, as directed by the PROJECT MANAGER.
The bottom 3 feet of materials (approximately 1,100 cu. yds.) may be used as the “Angular Compacted Material”, as specified in the Drainage Channel Design for the Centennial Mine.
The excavated borrow areas will be grubbed of all vegetation. The grubbed vegetation will be salvaged and distributed over revegetated areas, as directed by PROJECT MANAGER, to be paid for in TASK 5.7, Revegetation at the Centennial Mine Waste Rock Pile and TASK 6.5, Revegetation at the Sun Cup Mine Waste Rock Pile East.
Measurement and Payment Measurement for payment for this TASK will be by the cubic yard of material excavated from the borrow area. Volume of material excavated will be determined by calculating the depth of soil material excavated from the disturbed acreage. Payment for this TASK will be for the amounts bid in TASK 5.3 of the Bid Schedule. The amounts bid in TASK 5.3 will cover all costs for completing the work tasks described above. The bid prices must be sufficient to cover all costs, direct and incidental, for materials and workmanship required to complete the specified work. Invoices are to
TASK 5.4 CONSTRUCT DRAINAGE CHANNELS AT THE CENTENNIAL MINE
This Task shall include all costs for transporting and placing “Angular Compacted Material”, and boulders for use in constructing vane and cross vane arms, scour pools, bank stabilization and sediment pond inlet and outlet structures in the excavated drainage channel at the Centennial Mine, as specified in the Drainage Channel Design for the Centennial Mine, these Special Conditions, ATTACHMENT B - Technical Specifications, and the 2009 General Bid Specifications.
Placement of “Angular Compacted Materials” is required to establish final channel grades.
Approximately 1,100 cu. yds. of non-radioactive “Angular Compacted Material”. The “Angular Compacted Material”, to be provided as specified in TASK 5.3, is comprised of six-inch (6 in.) to two-feet (2 ft.) diameter rock and fines, will be placed and compacted to a depth of three (3) feet in the low flow channel area, identified as “between the water’s edge”, as specified in the Drainage Channel Design for the Centennial Mine.
Approximately 785 cu. yds. of non-radioactive boulders, each measuring approximately three feet (3 ft.) long, by two feet (2 ft.) wide, by two feet (2 ft.) high, are required to construct instream vane and cross vane arms, scour pools, bank stabilization and sediment pond inlet and outlet structures, as specified in the Drainage Channel Design for the Centennial Mine.
Non-radioactive earthen and rock materials may be salvaged from BLM lands within a 2-mile radius of the project site, if approved, and as directed by the PROJECT MANAGER.
Acquisition of boulders may be obtained by the use of drilling and expandable grout; no blasting will be permitted on site. If inadequate volume of materials are available on site, the remainder must be purchased.
Any and all disturbances at BLM Borrow Sites will be returned to approximate original contours, or as directed by PROJECT MANAGER, and revegetated per ADDITOINAL TASK 7.7, as directed by the PROJECT MANAGER.
FOR BIDDING INFORMATION ONLY: Quantity of rocks and boulders shall include procuring and placing volumes required to match the designs shown on the Drainage Channel Designs for the Centennial Mine. Procurement and placement of rocks and boulders will be paid on a lump sum basis regardless of the amount of material that has been excavated or placed. There will be NO measurement for cut or fill quantities.
There will be no measurement for payment for this TASK. Payment shall be for the lump sum bid price. This TASK shall include all of the CONTRACTOR’S costs of whatever nature to transport and install “Angular Compacted Material”, rocks and boulders, as specified in the Drainage Channel Designs for the Centennial Mine, these Special Conditions, and the General Bid Specifications, 2009. The price bid shall include all costs for labor, materials, equipment and all other items necessary to complete the tasks described in these specifications. Payment for this TASK will be for the amount bid in TASK 5.4 of the Bid Schedule. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice. Payment shall be made as this TASK is completed and approved by PROJECT MANAGER.
TASK 5.5
PLANT GROWTH MEDIUM PROCUREMENT AND PLACEMENT AT THE CENTENNIAL MINE
Approximately six (6) acres of re-graded and roughened surface areas shall be covered with six inches (6 in.) of non-radioactive, earthen material that is comparable to surrounding in-place surface material and shall be suitable for plant growth (approximately 4,840 cu. yds.).
Approximately 1,100 cu. yds. of plant growth material will be made available, as described in TASK
5.3. At the application rate of six inches (6 in.) 1,100 cu. yds of material will cover an area of approximately 1.3 acres.
Approximately 800 cu. yds. of material was salvaged from the hillside south of the Sun Cup Waste Rock Pile East, as specified in Task 6.3. At the application rate of six inches (6 in.) 800 cu. yds.
will cover an area of approximately one (1) acre.
Additional non-radioactive earthen plant growth materials may be salvaged from BLM lands within a 2-mile radius of the project site, if approved, and as directed by the PROJECT MANAGER. If inadequate volume of materials are available on site, the remainder must be purchased from a site(s) that has all required permits and approvals.
Soil analyses of any purchased material must be provided to verify that the material meets the following specifications of a suitable plant growth medium:
Earthen material with:
• Less than 25 % rocks (no larger than one inch in diameter) by weight;
• A medium loamy texture (U.S. Department of Agriculture Soil Classification
System of either: very fine sandy loam, loam, silt loam or silt);
• pH between 6 and 8;
• An Exchangeable Sodium Percentage of less than 12, and,
• A minimum organic matter content of 3%.
Any and all disturbance at BLM Borrow Sites will be returned to approximate original contours, or as directed by Project Manager, and will be revegetated per ADDITOINAL TASK 7.7, as directed by the PROJECT MANAGER.
The plant growth media will be revegetated pursuant to Bid Item 5.6.
Measurement and Payment Measurement for payment for this TASK will be by the cubic yard of material placed on the graded and roughened ground surface per the project designs specified in these Special Conditions, ATTACHMENT B – Technical Specifications, and the 2009 General Bid Specifications. Volume of material placed will be determined by calculating a six inch depth of soil material placed of over the total disturbed acreage requiring plant growth medium placement. Payment for this TASK will be for the amounts bid in TASK 5.5 of the Bid Schedule. The amounts bid in TASK 5.5 will cover all costs for completing the work tasks described above. The bid prices must be sufficient to cover all costs, direct and incidental, for materials and workmanship required to complete the specified work. Invoices are to be accompanied by Daily Job Logs summarizing the work included in the invoice. Payment shall be made as this TASK is completed and approved by PROJECT
MANAGER.
TASK 5.6 REVEGETATION REQUIREMENTS AT THE CENTENNIAL MINE
Revegetation of all areas disturbed during construction at the Centennial Mine, approximately 6 acres, will be revegetated according to the Section 20, REVEGETATION, and Specifications in the 2009 General Bid Specification AND as specified in these Special Conditions.
Mulch Two (2) tons of certified weed free mulch per acre will be applied to the ground surface. Mulch will be provided by CONTRACTOR, and will conform to Section 20 of the Revegetation Specifications in the 2009 General Bid Specifications. All mulch must be certified as noxious weed-free or noxious seed-free by an authorized State or County Officer. Documentation of certification must be provided to PROJECT MANAGER prior to application of mulch. The mulch will be evenly distributed over the ground surface. As the roughened slopes will not be conducive to utilizing a crimper, the CONTRACTOR may crimp the mulch with the teeth of an excavator bucket, or by hand, using a flat bladed shovel.
Commercial fertilizer, to be supplied by CONTRACTOR is required for this project.
Seed will be supplied by the OWNER. The BLM-recommended seed mix will be used at all areas.
Grubbed vegetation previously stockpiled will be placed on revegetated ground surfaces, as directed by the PROJECT MANAGER.
Measurement and Payment Measurement for payment for this TASK will be by the acre of disturbed ground per the project designs specified in this bid document, as determined by the PROJECT MANAGER. Payment for this TASK will be for the amount bid in TASK 5.6 of the Bid Schedule. Payment for this TASK will cover all costs for completing the work per the above referenced Standard Work Specifications of the 2009 General Bid Specifications and project designs specified in this bid document. The bid price must be sufficient to cover all costs, direct and incidental, for materials and workmanship required to complete the specified work.
This is the start of the file's text. The full file is on GovTribe.