This document is an Invitation for Bids (IFB) from the Town of Harvard, Massachusetts seeking qualified providers of Personal Wireless Services licensed by the FCC or wireless infrastructure providers to lease town land and develop a wireless facilities tower. The tower will be capable of supporting at least four wireless carriers and will occupy up to 2,500 square feet of land plus access and utility easements. The initial lease term is 10 years with two 5-year renewal options. Bids are due by October 30, 2023, and the successful bidder will be selected by November 2, 2023, with the lease anticipated to be executed by January 8, 2024. The town will hold a pre-bid conference on October 2, 2023 and allow site visits for prospective bidders.
Regarding pricing, the town requires a minimum base rent of $25,000 per year in the first year with an annual escalator of at least 2.5%, as well as a revenue share rate of at least 15% of additional revenue. The town reserves the right to waive any provision, reject any or all bids, or accept any bid that it deems in the best interest of the town. The successful bidder will be responsible for obtaining all necessary permits and approvals, including a special permit from the town's planning board.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Harvard, Massachusetts
Invitation for Bids from
Personal Wireless Service Providers or Infrastructure Providers for
Lease of Land to Construct and Operate a Wireless Facilities Tower at
The Town of Harvard
Hildreth House Parcel
(“Town of Harvard Tower Facility IFB”)
August 30, 2023
2 | P a g e
Contents I. Introduction
II. Tower Facility, Site and Lease Term
III. Objectives
IV. Outcome of Process
V. Design and Related Requirements
1. Compliance with Applicable Law and Regulations
2. Tower and Antenna Mounting
3. Ground Space and Equipment Shelters
4. Personal Wireless Service Facilities Only
5. Siting, Fencing, Grading and Landscaping
6. Cable Routing
7. Utility Needs
8. Lighting
9. Signage
10. Site Work and Time Limits on Routine Maintenance
11. Noise
12. Town Use
VI. List of Appendices
VII. Bid Submission Requirements and Process
1. Submission Checklist for Bidders
2. Bid Form
3. Lease Signing Fee
4. Bid Deposit (performance guarantee) and Replacement Bidders
5. Town’s Contact Person
6. Addenda
7. Pre-Bid Conference
8. Site Visit
9. Examination and Interpretation of Documents in Invitation for Bids Process
10. Form and Submission of Bids
11. Minimum Bid
12. Modification or Withdrawal of Bids
3 | P a g e
13. Deadline
14. Bids Binding and In Full Force and Effect
15. Evaluation Criteria
16. Town’s Reservation of Rights
17. Bids Become Property of the Town
VIII. Pre-Lease Process and Requirements
1. Select Board Vote Required
2. Site Plan Meeting and Balloon Test
3. Preliminary Site Plan
4. Execution of Lease After Vote By the Select Board
5. Post-Lease Contingencies and Rights of the Lessee
IX. Design Submissions
1. Preliminary Engineering Plans (Zoning Drawings)
2. Final Design Submissions (Construction Drawings)
X. Future Zoning and Other Permitting
XI. Appendix A Site Plans
XII. Appendix B – Definitions
XIII. Appendix C – Bid Submission Checklist
XIV. Appendix D – Bid Form
XV. Appendix E – Bid Information Sheet
XVI. Appendix F – Certificate of Tax Compliance
XVII. Appendix G – Certificate of Non-Collusion
XVIII. Appendix H – Lease (Placeholder)
XIX. Appendix I -- Section 125-27 Personal Wireless Communications Towers Overlay District
4 | P a g e
I. Introduction
The Town of Harvard (“Town”) is seeking bids from qualified providers of Personal
Wireless Services (“Wireless Providers”) licensed by the Federal Communications
Commission (“FCC”) and qualified Wireless Infrastructure Providers for the purpose of leasing Town land to develop and operate a wireless facilities tower with ground-level infrastructure occupying up to 2500 square feet (the “Site”), plus access and utility easements (collectively, the “Tower Facility“) for a period of up to twenty (20) years. The site is located on 15 Elm Street, Parcel 17C 036 (the “Parcel”).
The Town has determined that the Site is a prime location for wireless facilities. It is by the economic center of the Town. The area lacks adequate wireless service. The Site is on high ground. Town Meeting has approved the use of the Site, subject to the Select Board’s final approval. The Lessee is expected to charge Tenants at rates that are commensurate with the rates obtained in the region.
The Town seeks to enter a lease with a Successful Bidder for an initial term of 10 years, with two (2) 5-year options to renew.
The Town requires:
1. Base Rent: A bid amount of at least Twenty-five Thousand Dollars ($25,000) per year in the first year.
2. Escalator: An annual escalator of at least two and one- half percent (2.5%).
3. Revenue Share Rate: At least a 15% share of the Additional Revenue (see
Definitions in Appendix B) to be paid to the Town.
The Town reserves the right to: waive any provision(s) of this IFB, reject any or all bids, to accept any bid, or any part of a bid, or to do anything else it deems best in the interest of the Town, as set out in the Objectives in Section III below.
Authorization for the Town to enter a lease pursuant hereto was granted by the Harvard
Annual Town Meeting on May 14, 2022 (Article 22). Final authority to enter into a lease is with the Select Board.
“Lease Commencement” shall occur the first day of the month after the Successful Bidder has obtained a building permit, provided that in no event shall Lease Commencement occur later than December 1, 2024, unless waived by the town at its sole discretion or
Successful Bidder is still diligently pursuing the necessary permits and defending open appeal.
5 | P a g e
The Successful Bidder shall timely apply for and diligently pursue all zoning approvals required for its occupancy and use. If the Town is required to obtain any zoning approvals under the applicable zoning bylaw, the Town will apply for and pursue such zoning approval, which costs of prosecution incurred by the Town shall be reimbursed by the
Successful Bidder and which approval shall then be a condition for any lease and sublease pursuant hereto. (A copy of Section 125-27 Personal Wireless Service Facilities of the Zoning Bylaws is attached here as Appendix I)
The Successful Bidder/Lessee shall be responsible for applying for all required governmental approvals necessary for the development and operation of the Tower Facility and each Wireless Facility attached thereto, and for vigorously and diligently defending on its own behalf all such governmental approvals granted to them for or at the Tower Facility, including any approvals, permits or licenses made by a board or commission of the Town
(including a special permit from the Harvard Planning Board) which are challenged by a third party in any administrative agency or trial level court, unless otherwise directed by the
Town. The Lessee is responsible for the Lessee’s costs thereof, including any attorney fees and legal costs and expenses and/or consultant costs. During such appeal period, the
Successful Bidder/Lessee does not have to make rental payments to the Town if the Lessee is unable to operate its Wireless Facility. In the event the trial court overturns the zoning board’s decision, including the issuance of a special permit, the Lessee is not required to further defend the Special Permit and has no further obligation for or under the Lease.
The timelines for events are as follows. All dates are subject to change by
Addendum. Additionally, all bids and bid prices shall remain firm and subject to acceptance by the Town until November 17, 2023 notwithstanding any date below.
Pre-Bid Conference October 2, 2023 at 10:30 A.M.
Deadline for Bids: October 30, 2023 at 2:00 P.M.
Selection of Successful Bidder on or before November 2, 2023.
Vote by the Select Board to enter into Lease – by November 07, 2023
Site Plan Meeting – within fourteen (14) days of the selection of Successful Bidder.
Preliminary Site Plan by Successful Bidder – by December 7, 2023
Execution of Lease(s): Anticipated by January 8, 2024.
Lease Commencement: Per Section I above
6 | P a g e
II. Tower Facility, Site and Lease Term
1. The Site where the Tower Facility is to be located is adjacent to the Town of
Harvard Hildreth House in the westerly portion of the parcel, which is wooded. The
“Site” includes a lease area of up to 2500 square feet plus access and utility easements as necessary (See Appendix A – Property (including plan of the parcel)) for a monopole tower capable of supporting the macro-cell facilities of four wireless carriers. The height of the tower shall be no more than 135 feet above ground. The specifics of the
Site development plan shall be negotiated between the Town and the Successful
Bidder prior to executing the Lease. The parcel on which the Site are located is shown on the Town of Harvard’s Assessors’ Map No. 17C Parcel 36.
2. The parcel on which the Site is to be located is, and will remain, the locus of an active Town of Harvard public services building. Use of the Site shall not interfere with town use and operations.
3. The Site is in the Wireless Overlay District and outside the neighboring Historic
District. The Hildreth House and potentially other buildings near the locus are more than
50 years old. The Successful Bidder is responsible for addressing any environmental, historic, archaeological, and tribal matters relating to the development of the Tower Facility.
The Harvard zoning bylaw presently has a 105-foot height limit that is anticipated to require a variance, if the 135-foot height is determined to be necessary, unless the bylaws change before the initiation of permitting. Other variances or waivers might be necessary.
Bylaws can be found at. https://ecode360.com/13697205 A photo of a crane test near the
Site is in Appendix A.
4. The Town makes no representations of any kind with respect to the Site, its adequacy to support the Tower Facility or prospective Tenants’ Wireless Facilities or its appropriateness for the intended use. Bidders will be permitted to inspect Town records relating to the Site and will have access to the Site to make visual inspections, perform surveys and/or radio tests, including crane tests, at their own expense, and otherwise to assure themselves that the Site will be suitable for the proposed Personal Wireless Service use, with the prior written approval of the Town which shall not be unreasonably denied.
The Town shall have the right to set reasonable conditions regarding the time, place and manner of such inspections, surveys or radio tests.
5. The compound area around the Tower base may be up to 2500 square feet within a single polygon whose shape may be determined by such factors as facility visibility, environmental limitations (e.g. wetlands or geology), topography and usability for the intended purpose. It is the intention of the Town to preserve as much tree cover as possible to provide maximum screening, particularly in the direction of the Town center. It has been determined by a crane test that the views from the center of Town are the most sensitive to the choice of location for the Tower and the protection of existing trees.
https://ecode360.com/13697205
7 | P a g e
6. The Lease shall be for an initial term of ten (10) years. The Lease shall automatically extend for up to two (2) additional five (5) year terms, if the Lessee has not given the Town written notice to terminate at least six (6) months prior to the end of such term. In the event of such extension of the term, all terms and conditions of the Lease shall remain in full force and effect, including the annual two and one-half percent increase in the rental payment.
7. Lease Commencement may be delayed during an appeal by a third party or a zoning or building approval or permit if it prevents the Lessee from operating the Tower Facility during the appeal period. In such case, Lease Commencement occurs upon the favorable termination of such appeal. If such an appeal and required cessation of use occurs after
Lease Commencement, the Lease term may be automatically extended for a period of time equal to the time of such delay.
8. The Town recognizes that the proposal is subject to zoning approval. To the extent that zoning approval requires a height that reduces the viability of the tower for four co-locators, the applicant may withdraw or renegotiate lease terms with the Town based on the reduced capacity.
9. The Site is suspected to have ledge that could affect construction. The Town makes no warranties with respect to conditions on the Parcel. The Town is open to modification of any lease requirements that are rendered infeasible by existing conditions, such as might be the case with underground utilities.
10. The Town expects that the visual impact of the project will be mitigated by the use of tree camouflage (a “monopine”). The final determination for leasing purposes will be made by the Town during the site-plan generation phase during which the Successful
Bidder will be required to conduct a balloon test at the location of the tower and present photo-simulations to the Select Board for a decision.
11. The Town may request space for public safety radio antennas and equipment, on a space-available basis that does not conflict with up to four wireless tenants, at no cost to the Town. The primary interest is in enabling Nashoba Valley Regional Dispatch District
(NVRDD) to operate from the Site. Details will be arranged at Lease negotiation. The costs of the equipment, installation and maintenance shall be covered by the Town (or NVRDD, as applicable).
III. Objectives
The Town’s objectives in offering this IFB are to:
1. Continue the use of the Site for the Town uses and operations;
8 | P a g e
2. Enable the provision of Personal Wireless Services near the center of Harvard in a manner consistent with good planning and design, while reasonably limiting visual and environmental impacts;
3. Maximize revenue to the Town of Harvard, consistent with Objectives No. 1 & 2, above;
4. Provide an opportunity, consistent with objectives 1, 2 and 3 above, for Wireless
Providers licensed by the FCC to provide Personal Wireless Services in Harvard, from the
Tower Facility thereby reducing the need for additional towers at other locations in the vicinity of the Town center.
5. Provide for improved public safety communications, to the extent it does not interfere with the foregoing.
IV. Outcome of Process
Rule for Award: The responsive and responsible bidder with highest Total Value will become the Successful Bidder.
Upon execution of the Lease, which shall substantially conform with the model lease herein appended as Exhibit H, the Successful Bidder becomes the Lessee. If the Lessee is a
Wireless Provider, the Lessee may operate a Wireless Facility at the Tower Facility at no additional charge. If the Lessee is a Wireless Infrastructure Provider, the Lessee may sublet one uniformly spaced aperture on the Tower and associated ground space to a First Tenant at no additional charge by the Town. The Tower Facility shall be designed and constructed to maximize the number of Personal Wireless Facilities that may occupy the Tower Facility as Tenants, up to the height limit authorized in zoning. It is the Town’s expectation that a tower height greater than the current 105-foot limit may be necessary to enable multiple
Wireless Providers to be Tenants and reduce the risk of needing more towers near the
Town center area.
The Lessee shall be responsible for the safe and effective operation, maintenance and repair of the Tower Facility and common infrastructure, in accordance with the terms of this IFB.
The Lessee shall also enforce in all sub-leases with Tenants compliance with the terms of the
Lease and applicable law and regulations.
V. Design and Related Requirements
1. Compliance with Applicable Law and Regulations
The Lessee’s proprietary and common infrastructure, wireless facilities, and all related installations shall be fully compliant with all applicable federal and state laws and regulations, including the Massachusetts Building Code, and with the bylaws and regulations of the Town, and shall not cause the Tower to be in non-compliance therewith.
9 | P a g e
2. Tower and Antenna Mounting
The dimensions, color and appearance of the Tower, Antenna Arrays and/or other equipment are subject to the Special Permit authority of the Planning Board, which determination(s) shall be deemed a Lease requirement. This IFB is based on the presumption that a monopine of good quality shall be installed.
Changes or additions to a Lessee’s or Tenant’s installation shall be designed so that the
Tower Facility remains within its inherent structural and spatial capacity and does not unfairly impede other Tenants or the Lessee from reasonable changes or additions of a commensurate degree. Lessee shall provide to the Town documentation, in advance, showing that any changes or additions or new attachments will comply with this requirement. This documentation is for the Town in its capacity as landlord and is separate from any requirements for zoning or building department authorizations.
3. Ground Space and Equipment Shelters
Equipment shelters are permitted at the Tower Facility provided they do not impede the reasonable co-location of other Wireless Providers on the site and satisfy zoning requirements for impacts, including without limitation visual and aesthetic.
4. Personal Wireless Service Facilities Only
Apart from services and equipment of the Town, pursuant to Paragraph 12, below, there shall be no services, equipment or storage at the Site, including on the Tower, other than are necessary to provide Personal Wireless Service from the Tower, unless otherwise authorized in writing by the Town in its sole discretion. The Tower Facility shall be unmanned. Subleasing Tenants may not further sublease their occupancies.
5. Siting, Fencing, Grading and Landscaping
The Site shall be positioned to minimize visual impacts in all directions, with particular attention to the ground-level view from the Hildreth House and its parking area and the skyline views from the center of town. The Successful Bidder shall coordinate site access and design with the Town. Driveway location, site clearing and tree removal shall be carefully planned to maximize screening. The Site shall be fenced, screened, graded and landscaped in a manner that is respectful of the Tower Facility’s residential and historic surroundings and shall comply with the requirements set forth in Section 125-27 of the
Town’s Zoning Bylaws. All cabinets, pads, equipment shelters, and equipment shall be screened from view to the greatest extent reasonably possible. Prior Lease Execution, an initial landscaping plan shall be subject to approval by the Town, which approval shall not be unreasonably withheld. The Town will allow the landscaping plan to be modified to satisfy the requirements of a Special Permit.
10 | P a g e
6. Cable Routing
Cable routing from the base station equipment to the Tower shall be neat and workmanlike, subject to any visual mitigations required under the Special Permit.
7. Utility Needs
Underground electrical and telecommunications utilities of sufficient capacity to serve all allowed uses on the Site shall be installed and maintained consistent with good engineering practices.
8. Lighting
External lighting at the Site shall be limited to that which is required to conduct emergency repairs and maintenance after dark, unless otherwise specifically authorized by the Town, and shall comply with the requirements set forth in applicable laws, bylaws and regulations.
There shall be no exterior motion detection lighting unless specifically authorized by the
Town.
9. Signage
There shall be no external signage at the Site by or for the Lessees, except if required by applicable law, or deemed, in the sole discretion of the Town, to be necessary for public safety. Customary safety and contact information signs may be posted on the compound fence in a neat, organized manner. The size, type, quality, shape and placement of any such sign shall comply with the requirements of Section 125-41 of the Town’s Zoning Bylaws, and shall be subject to approval by the Town, which approval may be denied by the Town in its sole discretion. Nothing herein shall prohibit or restrict any Town signage on the
Parcel
10. Site Work and Time Limits on Routine Maintenance
All site work shall be in compliance with all applicable laws, bylaws and regulations, including environmental requirements. No routine maintenance or construction/demolition shall be performed between the hours of 7:00 P.M. and 7:00 A.M.
11. Noise
Any equipment installed by Lessees shall comply with the noise requirements set forth in permits or approvals, including a Special Permit from the Harvard Planning Board, applicable laws, bylaws and/or regulations. Any noise-generating equipment installed at the Site shall incorporate technology that will achieve the quietest operation reasonably attainable, with the goal of the facility not being audible to neighboring parcels and outside Hildreth House and on its paved area.
11 | P a g e
12. Town Use
The Town shall have the right to use the Tower and the Site to accommodate communication antennas and associated equipment for the use by the police, fire and other departments of the Town, without charge, as long as it does not interfere with the operation and maintenance of the Personal Wireless Services of any Lessee. The Town shall be responsible for the cost of its equipment and its installation. It is anticipated that if such use is requested, it may include mounting one or more collinear (“whip”) antennas above the top of the structure and/or at lower elevations not to be occupied by wireless Tenants.
Structural design shall include this possibility.
VI. List of Appendices
The following appendices are referenced in the sections below.
Appendix A Property
Appendix B Definitions
Appendix C Bid Submission Checklist
Appendix D Bid Form
Appendix E Bid Information Sheet
Appendix F Certificate of Tax Compliance
Appendix G Certificate of Non-Collusion
Appendix H Lease
Appendix I Section 125-27 Wireless Communications Towers Overlay District
VII. Bid Submission Requirements and Process
1. Submission Checklist for Bidders
A bid submission checklist is included as Appendix C as a convenience to bidders only.
The Town is not responsible for errors or omissions in the checklist.
2. Bid Form
Bidders are responsible for accurately completing the Bid Form, attached hereto as
Appendix D. (See Paragraph 10 below for information on submitting bids.)
3. Lease Signing Fee
Every bid shall be accompanied by Lease Signing Fee in the amount of Seventy-five
Hundred Dollars ($7,500) in the form of a certified check, treasurer’s check or cashier’s check issued by a responsible bank or trust company and payable to the Town, to partially defray some of the costs incurred by the Town in the IFB process. Upon lease execution
12 | P a g e with the Successful Bidder or termination of the IFB with no award, the lease signing fee will be returned to all unsuccessful bidders.
4. Bid Deposit (performance guarantee) and Replacement Bidders
The Lease Signing Fee shall also serve as a bid guarantee. A Successful Bidder that does not execute the Lease under this IFB shall forfeit its Lease Signing Fee, which shall be kept by the Town, and the bidder with the next highest Total Value becomes the Replacement
Successful Bidder. The Lease Signing Fee of the Replacement Successful Bidder is then at risk until a Lease is executed, unless Town terminates the IFB process. In the appointment of a Replacement Successful Bidder, the Town will reasonably amend the schedule to afford any Replacement Successful Bidder time to negotiate and execute a Lease.
5. Town’s Contact Person
The contact person for all information or questions regarding this IFB is:
Marie Sobalvarro
Chief Procurement Officer
Town Hall
13 Ayer Road
Harvard, MA 01451
Telephone No.:
978-456-4100 x330
E-Mail: msobalvarro@harvard-ma.gov
6. Addenda
It is intended, but not guaranteed, that addenda will be e-mailed or otherwise provided/posted by the Town to all parties to whom an IFB has been issued. All Bidders are cautioned it is their responsibility to verify the number of addenda which have been issued and to secure any needed copies from the Town. Prior to submitting a bid, Bidders are encouraged to ask the Town Contact Person (above) for addenda they may not have received. Failure to review all addenda prior to bid submission shall in no way relieve any bidder from the provision(s) of the addenda.
7. Pre-Bid Conference
A non-mandatory pre-bid conference will be held by the Town at the site of the Tower on October 2, 2023 at 10:30 A.M., at which time the bid process will be discussed, and any relevant questions will be responded to at that time or accepted for a later response.
13 | P a g e
8. Site Visit
In addition to the site visit at the above referenced Pre-Bid Conference, prospective bidders may visit the Site by making arrangements through the Town Contact Person.
9. Examination and Interpretation of Documents in Invitation for Bids Process
a. Each bidder shall carefully examine the IFB documents to obtain a thorough understanding.
b. The failure of any bidder to thoroughly examine the IFB documents or to visit and examine the Site shall in no way relieve it of any obligation with respect to its bid or any responsibility assigned it under the Lease.
c. Statements as to conditions, including plans, measurements, dimensions, calculations, estimates, encumbrances and location of structures, etc. are made solely to assist bidders. The Town does not guarantee or represent their accuracy. Each bidder must satisfy itself, by its own examination and research regarding all conditions affecting its interests and make its bid in reliance thereon.
d. Interpretation of the provisions of the IFB will be made by the Town, provided the
Town determines such interpretation is of sufficient importance that a response is warranted, and such request is received with sufficient time available to reasonably respond to the inquiry. Requests for interpretation shall be in writing and sent to the Town Contact Person.
Oral or telephone interpretations, if made, shall be strictly informal and not legally binding.
e. Bidders are required to communicate all errors and discrepancies found in the
IFB, in writing, to the Town Contact Person.
10. Form and Submission of Bids
a. Bids must be submitted on the forms provided.
b. All blank spaces provided on the bid forms shall be filled in by type or ink and shall be legible. Where space is provided, sums shall be expressed both in words and in figures. In case of discrepancy between the two, the words shall govern.
c. No interlineation, additions, alterations or erasures shall be made on the forms.
d. All bids shall be signed by a person authorized to do so on behalf of the bidder.
e. All bidders must submit the following forms, copies of which are enclosed herewith as part of the Bid Submission Package:
i. Bid Form (Appendix D).
ii. Bid Information Sheet Responses – Required from Bidders (Appendix E).
ii. Certificate of Tax Compliance (Appendix F).
iii. Certificate of Non-Collusion (Appendix G).
Also required to be included in the bid submission package is the:
14 | P a g e
iv. Lease Signing Fee/Bid Deposit (Section VII, Paragraphs 3 & 4 above).
The bid submission package (all required forms, fee and deposit) shall be submitted to the Town Contact Person (See Paragraph 5 above) by the Bid Deadline (See
Paragraph 13 below) in a sealed envelope marked on the outside as follows:
“Bid – Town of Harvard Tower Facility IFB”
“Do Not Open Until Bid Opening Day”
Bidder’s Company Name
Authorized Representative’s Name
Bidder’s Address
Bidder Representative’s E-Mail Address
Bidder Representative’s Telephone Number
11. Minimum Bid
The minimum bid is Twenty-five Thousand Dollars ($25,000) per year in the first year (Base
Rent), to which shall be applied an annual Escalator of at least two and one-half percent
(2.5%) for each subsequent year of the first 10-year term of the Lease and, as applicable, to each year of the two successive 5-year renewal terms. A Revenue Share Rate that is at least
15% of Additional Revenue (see Definitions in Appendix B) shall also be offered by the bidder.
12. Modification or Withdrawal of Bids
Modifications or withdrawal of bids will be permitted provided that written notice of such modification or withdrawal is received by the Select Board’s Office prior to the opening of the bids.
13. Deadline
Bids are due by October 30, 2023 at 2:00 p.m. (unless extended by Addendum) at the office of the Contact Person, at which time they will be opened publicly.
14. Bids Binding and In Full Force and Effect
All bids shall remain in full force until lease execution. Subject to an affirmative vote by the Select Board to enter into the respective Lease(s), the Successful Bidders shall thereafter execute the Lease with the Town by January 8, 2024, unless extended at the sole discretion of the Town. Lease commencement shall occur the first day of the month after the Successful Bidder has obtained a building permit, provided that in no event shall Lease Commencement occur later than December 1, 2024, unless waived by the
Town at its sole discretion. By submission of its bid, each bidder agrees that if it is a
Successful Bidder it shall enter a Lease with the Town that incorporates the requirements of this IFB, and that they accept the terms and conditions of this IFB, including the Lease
15 | P a g e
Terms as set out in Appendix H, as may be finalized by the Town consistent with this
IFB.
15. Evaluation Criteria
The responsive and responsible bidder with the highest Total Value bid will be awarded a long-term ground lease with the Town. See Appendix B Definitions. A responsible bidder is any bidder whose responses to the Bid Information Sheet in Appendix E are determined by the Town, at its sole discretion, to be satisfactory. A responsive bidder is any bidder whose response to this IFB is determined by the town to have complied with the terms of this IFB.
16. Town’s Reservation of Rights
a. The Town reserves the right to withhold the award to a Successful Bidder and withhold a lease when, in the reasonable judgment of the Town, the bidder(s) is unable, after written request of the Town, to furnish satisfactory evidence confirming adequate ability – financial, legal or otherwise – to comply with the requirements of this IFB throughout the term of the Lease.
b. The Town also reserves the right to reject any or all bids, to accept any bid, or any part of a bid, to waive any informalities or to do anything else it deems to be in the best interest of the Town, including, but not limited to, a determination by the Town that any or all leasing pursuant to this IFB will not further the one or more of the Objectives set out in
Section III above.
17. Bids Become Property of the Town
All bids and related materials submitted in response to the IFB shall become the property of the Town and will not be returned to bidders unless otherwise determined by the Town in its sole discretion.
VIII. Pre-Lease Process and Requirements
1. Select Board Vote Required
The grant of a Lease is contingent upon a vote by the Select Board. All bids shall remain in full force and effect until lease execution.
2. Site Plan Meeting and Balloon Test
Within fourteen (14) days of the selection of the Successful Bidder by the Town in accordance with the IFB, the Town will hold a site plan meeting at the Harvard Town Hall
16 | P a g e with the Successful Bidder regarding the development of a preliminary site plan. A balloon test shall be conducted proximate to the site plan meeting (before, during or after, as agreed between the parties).
3. Preliminary Site Plan
The Lessee shall no later than December 7. 2023, prepare and provide to the Town a
Preliminary Site Plan. The Preliminary Site Plan shall consist of a plot plan of the Site showing the existing and proposed locations and dimensions of the components of the
Tower Facility including the Tower and common infrastructure, as well as any Wireless
Facilities intending to occupy the Tower Facility on or near Lease Commencement. The preliminary plan shall also show the location of the Site on the Parcel, and the existing access and utility easements. A proposed driveway and utilities access route shall also be shown. Trees shall be mapped for girth, type and height and proposed tree removal shall be shown. Other factors affecting the siting of the Tower Facility, such as wetlands or ledge, shall be presented. Photo-simulations based on the balloon test shall be submitted with the Preliminary Site Plan. The Town shall make the final determination as to all matters and issues arising from the Preliminary Site Plan, consistent with the provisions of this IFB. This may require revisions to the Preliminary Site Plan for further discussion and approval prior to moving forward with the design process.
4. Execution of Lease After Vote By the Select Board
Subject and subsequent to a vote by the Select Board to enter into the Lease, the Successful
Bidder shall execute a Lease substantially conforming to the one provided by the Town
(Appendix H) by January 8, 2024. Lease Commencement shall occur the first day of the month after the Successful Bidder has obtained a building permit, provided that in no event shall Lease Commencement occur later than December 1, 2024, unless waived by the Town at its sole discretion or delayed by Lessee’s diligent defense of an appeal .
5. Post-Lease Contingencies and Rights of the Lessee
Lease Commencement is Contingent Upon Grant of Required Permits, including (i) any
Zoning Relief required from the Zoning Board of Appeals and a Special Permit Being
Granted by the Harvard Planning Board, the Town of Harvard Special Permit Granting
Authority, pursuant to Section 125-27 of the Zoning Bylaws (Appendix I), and (ii) the grant of applicable building permits for the Wireless Facility. After Lease Execution, Lessee shall apply for, and diligently pursue in good faith, a Special Permit, any other necessary zoning relief and any required building permits.
17 | P a g e
IX. Design Submissions
1. Preliminary Engineering Plans (Zoning Drawings)
The Lessee shall, within sixty (60) days after the execution of the Lease, and prior to the submission of any application for a Special Permit or other relief, prepare and submit its
Zoning Drawings and environmental/historical assessments to the Town. The Town may comment on and propose changes to the Preliminary Engineering Plans. The preliminary engineering plans shall be subject to approval by the Town, which shall not be unreasonably withheld.
2. Final Design Submissions (Construction Drawings)
a. Conditioned upon the approval of the Preliminary Engineering Plans by the Town, the
Lessee shall prepare the Final Design Plans and such other information regarding the
Tower Facility requested by the Town. A copy of the final design submission intended for submission to the Building Commissioner for building permits shall be provided to the Town. The Final Design Plans shall be subject to approval by the Town, which approval shall not be unreasonably denied. Approval by the Town is required prior to the Lessee’s application for a building permit.
b. The Final Design Plans shall not be finalized nor submitted to the Town until after the grant of a Special Permit and other necessary relief. The final design plan shall be submitted to the Town no later than thirty (30) days after said date upon which a building permit application could be granted.
c. Following construction and close-out of the building permit, the Final Design Plans shall be updated to as-built drawings and submitted to the Town.
X. Future Zoning and Other Permitting
The Town, as Lessor, will support applications for extensions of Special Permit authorization by Lessee and Tenants, as well as other subsequent permitting approval, that are not in conflict with the terms of the Lease hereunder, or if in conflict, are otherwise acceptable to the Town at the time
18 | P a g e
XI. Appendix A Site Plans
Parcel 36 is highlighted below. Area to locate is in the vicinity of the oval.
19 | P a g e
Topography is shown below:
20 | P a g e
Photo of crane test.
Crane is in paved area, about 140 ft to the right of the area to locate. (Approximate tower position at orange mark)
Crane tip is about 135 ft above the ground of the area to locate.
21 | P a g e
XII. Appendix B – Definitions
Additional
Revenue
The revenue obtained by the Lessee from all but the First Wireless
Provider occupying the Tower Facility.
Base Rent The fixed rental amount offered in the first year (which must equal or exceed the minimum amount set in this IFB) and which is increased annually by the amount of the Escalator.
Escalator A percentage (which must equal or exceed the minimum amount set in this IFB) that shall be applied annually to increase the Base Rent.
First Wireless
Provider
On a Tower owned and occupied by a Wireless Provider or its affiliate:
The Lessee.
On a Tower owned and occupied by a Wireless Infrastructure Provider:
The Wireless Provider whose antennas and associated equipment occupy the highest position on the Tower. (Over time the highest occupant might change, in which case the party designated as First
Wireless Provider will change) change, and the calculations based on the First Wireless Provider shall change accordingly.
Lease
Commencement
Lease commencement is when the obligation of the Lessee to pay rent begins. (See Section I.)
Lessee Successful Bidder who has executed a Lease with the Town under this
IFB.
Parcel As shown on Town of Harvard’s Assessors’ Map No. 17C, Parcel 36.
Personal
Wireless
Service
Personal Wireless Services as defined by 47 USC §332 (c)(7)(C)(i).
Revenue Share
Rate
The percentage of the Additional Revenue that is offered to the Town
IFB Invitation For Bids
Site An area in the western portion of the Parcel as shown in Appendix A.
Successful
Bidder
A bidder that:
(1) has submitted a responsive and responsible bid that meets or exceeds the minimum bid criteria (Base Rent, Escalator, Revenue Share
Rate); and
(2) has a Total Value that is the greatest of all responsive and responsible bidders.
22 | P a g e
Tenant A sublessee of the Lessee
Total Value The valuation of a bid based on the following hypothetical:
The sum of
1) The first ten years’ Base Rent with the annual Escalator applied, plus
2) The ten-year sum of a hypothetical projected Additional Revenue multiplied by the Revenue Share Rate, wherein the hypothetical projected Additional Revenue is calculated as follows:
a. Three Tenants paying an assumed rent of $30,000 per year in the first year, escalated per the Escalator. Each year the amount each of the three Tenants pays the Lessee is increased by the same escalator that applies to the Base Rent.
Tower Facility A monopole wireless tower capable of supporting at least four Wireless
Facilities, associated ground-level infrastructure occupying up to 2500 square feet, plus access and utility easements all located at the Site
Lessee Successful Bidder who has executed a Lease with the Town under this
IFB.
Wireless Facility An installation belonging to one Wireless Provider that consists of antennas and associated equipment and utilities services that is intended to deliver Personal Wireless Services (short for personal wireless service facility which is formally defined in 47 USC §332 (c)(7)(C)(ii)).
Wireless
Infrastructure
Provider
An entity not acting as a Wireless Provider that builds towers and other assets at which Wireless Providers install their Wireless Facilities. (most commonly known as a “tower company”)
Wireless
Provider
Holder of Federal Communications Commission license(s) to operate a
Personal Wireless Service in Harvard.
23 | P a g e
XIII. Appendix C – Bid Submission Checklist
The following submission checklist is provided for the convenience of bidders. Bidders are required to read the IFB carefully, including Section VIII “Bid Submission Requirements and Process”.
The following five (5) items must be included in each Bid Submission Package*:
1. Bid Form (Appendix D).
2. Bid Information Sheet Responses - Required from Bidders (Appendix E).
3. Lease Signing Fee in the amount of Seventy-five Hundred Dollars ($7,500).
(Company check not accepted.) (IFB - Section VIII, Paragraph 3).
4. Certificate of Non-Collusion (Form enclosed as Appendix G).
5. Certificate of Tax Compliance (Form enclosed as Appendix F).
Each of the above must be included in one sealed envelope marked on the outside as follows:
“Bid – Town of Harvard Tower Facility IFB”
“Do Not Open Until Bid Opening”
Bidder’s Company Name:
Authorized Representative’s Name:
Bidder’s Address:
Bidder’s E-Mail Address:
Bidder’s Telephone No.:
and submitted to the Contact Person:
Marie Sobalvarro
Chief Procurement Officer
Town Hall
13 Ayer Road
Harvard, MA 01451
24 | P a g e
XIV. Appendix D – Bid Form
The Undersigned hereby declares that the Bidder has carefully examined the “Town of Harvard
Tower Facility IFB”.
The Undersigned hereby makes a bid to which said Bidder agrees to be legally bound in accordance with the terms and conditions of the IFB as follows:
Base Rent (no less than $25,000/year in the first year):
(Dollar Amount in Numerals) (Dollar Amount in Words)
Annual Escalator (no less than 2.5%/year for the term of the Lease):
(Percentage in Numerals) (Percentage in Words)
Revenue Share Rate (no less than 15%):
(Percentage in Numerals) (Percentage in Words)
Name of Bidder: _______________________________________________
Business Address of Bidder: _______________________________________________
E-Mail Address of Bidder Representative:_____________________________________
Telephone No. of Bidder Representative: _____________________________________
Signature and Printed Name of Individual Authorized to Submit Bid:
Signature (Must be signed in ink) Printed Name:
Date: (A Certificate of Corporate Vote, if applicable, is encouraged, but not required.)
25 | P a g e
XV. Appendix E – Bid Information Sheet
(Bidders Must Respond to the Below Requests for Information)
Bidders may submit the below information in any reasonable form, including attaching pages to this Bid Information Sheet.
i. Evidence that the bidder is either a Wireless Provider (see definitions for capitalized terms) licensed to operate in Harvard, Massachusetts, or a Wireless
Infrastructure Provider with experience building and operating wireless towers in Massachusetts.
ii. Evidence of the bidder’s financial ability to develop, permit and construct the
Tower facility.
iii. A list of at least three wireless towers that the bidder has built and currently operates in Massachusetts, including address, tower type and height, names of wireless carriers presently occupying the tower.
iv. Name and contact information for each landlord holding the ground lease for the towers listed in iii above. The Town may contact such landlords for references. Material lapses in bidder’s performance under tower ground leases in Massachusetts may be grounds for a determination of non-responsible status of a bid.
v. Such other information that the bidder believes to be relevant to its bid or helpful to the Town’s understanding of the bidder’s ability to perform under the Lease.
Based on this information, the Town will determine if the bidder is a responsible bidder.
26 | P a g e
XVI. Appendix F – Certificate of Tax Compliance
Pursuant to M.G.L. c. 62, sec. 49(a), the undersigned, authorized to sign this Certificate on behalf of the bidder, certifies under the pains and penalties of perjury that to the best of his/her knowledge and belief, the bidder has complied with all laws of the Commonwealth of Massachusetts regarding taxes.
Name of Bidder
Company Name
Signature and Printed Name of Individual Authorized To Submit This Certificate:
Signature (Must be signed in ink) Printed Name
27 | P a g e
XVII. Appendix G – Certificate of Non-Collusion
The undersigned, authorized to sign this Certificate on behalf of the bidder, certifies under the pains and penalties of perjury, that to the best of his/her knowledge and belief:
1. The bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any bidder or person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any person to fix the bid price or any other element of the bid of the bidder or any other bidder.
2. The subject bid is in all respect bona fide, fair and made without collusion or fraud with any other person.
3. As used in this Certificate, the word “person” shall include any natural person, joint venture, partnership, corporation, or other business or legal entity.
Name of Bidder:
(Company Name)
Signature and Printed Name of Individual Authorized to Submit This Certificate:
Signed under the pains and penalties of perjury:
Signature (Must be signed in ink) Printed Name
28 | P a g e
XVIII. Appendix H – Lease (Placeholder)
29 | P a g e
XIX. Appendix I Section 125-27 Personal Wireless Communications Towers Overlay District
| Cell Tower Document 7.26.2023 original mcs revised by tpb with input from DMandBJ - DM final look - WNJ final look 083023.pdf |
| Scanner_20230830_142734 |
File details come from the government source that posted it. Updated .