CDRL A003.pdf

PDF 286 KB Posted

Attached to
Cargo Door Down Lock Installation Kit Federal contract opportunity
Solicitation number
FA8526-23-Q-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Cargo Door Down Lock Installation Kit, newest first.
File Type Posted
C-17_PSE_Solicitation_Template-FA8526-XX-Q-XXXX-Rev_B.xlsx XLSX spreadsheet
CDRL A001.pdf PDF
Final Solicitation.pdf PDF
Mandatory Shipping Documents.pdf PDF
NDA.pdf PDF
EDL.pdf PDF
Packaging Requirements.pdf PDF
CDRL A002.pdf PDF
Transportation Data.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DD 250 REQ

16. REMARKS

DIST STATEMENT

REQUIRED

AS OF DATE

DATE OF FIRST SUBMISSION

SUBMISSION

a.

Draft b.

Reg

H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001

Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

A Item Unique Identification (IUID)

C17/PSE/17G110678-1 FD2060-23-30128

A003 ITEM UNIQUE IDENTIFICATION (IUID) MARKING PLAN INSTL KIT - CARGO CYL PSTN RING

DI-MGMT-81803A/T AFLCMC/WLMB (C-17 PM)

DD

A D

See Blk 16 See Blk 16

See Blk 16

1. After contract award the contractor shall request serial numbers via email from the procuring office program manager. The request shall be made through the program management group email, AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil.

2. The format for the Serial Numbers required to be listed on all ID plates, permanent markings on equipment, and other documents shall be in the format of CAGE-XXXX, where "CAGE" is the Contractor's Commercial and Government Entity code and "XXXX" is a sequential number assigned by the procuring activity. In the event that the technical data package contradicts this format, this CDRL takes precedence.

NOTE: See MIL-STD-130 (current revision as of the date of contract signing) for more information on IUID.

Blk 4:

The DID is tailored as follows:

1. Delete paragraph 3.3.3 in its entirety.

Blk 7:

The Government will accept the Receiving Report for the Marking Plan through WAWF after engineering approval of the draft plan.

Blk 10, 11, 12, 13:

The contractor shall submit the draft Marking Plan in conjunction with the

First Article Test/Inspection Procedures and Plan (FAT/IPP) (CDRL A001) if an FAT/IPP is required. Otherwise, the draft Marking Plan shall be delivered 75 days after contract award.

The Government shall have 60 days to review and approve the initial draft Marking Plan. The contractor shall continue to revise the Marking Plan until the Government Engineer is satisfied that the Marking Plan meets all the necessary requirements of this CDRL. After the Government engineer approves the draft Marking Plan and notifies the PCO and contractor through email communication, the contractor shall submit the invoice in WAWF for Government final approval of the Marking Plan.

Cont. on Next Page

Julian Stevenson

AFLCMC/WLE; DSN 468-6745

See Blk 16

12-Oct-22

AFLCMC/WLMB (C-17 PM)

235 Byron Street, Suite 19A

Robins AFB, GA 31098

E-copy

Searchable Adobe PDF

Email to:

See Blk 16 1 1

Digital Data 1

08-Nov-22

1 1 1

1 2

Reset

CONTRACT DATAREQUIREMENTSLIST

A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

16. REMARKS (Continued)

A Item Unique Identification (IUID)

C17/PSE/17G110678-1 FD2060-23-30128

Blk 14:

The Marking Plan shall be submitted in a single, searchable Adobe PDF file and submitted by Email. If the Marking Plan is greater that 15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.

NOTE: Any changes to the Marking Plan after approval shall be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the PCO per contracting regulations and public law.

The draft IUID Marking Plan shall be submitted to the PCO and the following email addresses:

Julian.Stevenson@us.af.mil j.brittain@us.af.mil

AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil

2 2

File details come from the government source that posted it. Updated .