CDRL A001.pdf
PDF 291 KB Posted
- Attached to
- Cargo Door Down Lock Installation Kit Federal contract opportunity
- Solicitation number
- FA8526-23-Q-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final Solicitation.pdf | ||
| EDL.pdf | ||
| Packaging Requirements.pdf | ||
| CDRL A002.pdf | ||
| Transportation Data.pdf | ||
| C-17_PSE_Solicitation_Template-FA8526-XX-Q-XXXX-Rev_B.xlsx | XLSX spreadsheet | |
| CDRL A003.pdf | ||
| Mandatory Shipping Documents.pdf | ||
| NDA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DD 250 REQ
16. REMARKS
DIST STATEMENT
REQUIRED
AS OF DATE
DATE OF FIRST SUBMISSION
SUBMISSION
a.
Draft b.
Reg
H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
A
C17/PSE/17G110678-1 FD2060-23-30128
A001 FIRST ARTICLE TEST/INSPECTION PROCEDURES AND
PLAN (FAT/IPP)
INSTL KIT - CARGO CYL PSTN RING
DI-NDTI-82327/T AFLCMC/WLE (C-17 Engr)
DD
A D
See Blk 16 See Blk 16
See Blk 16
The DID shall be tailored as follows:
1. Delete 3.1.f(4)
2. In paragraph 3.8 delete the phrase "software version".
3. In all sub-paragraphs of section 3 where "test and inspection" is shown, delete "test and".
4. In paragraph 3.7 delete the phrase "and for the testing".
5. Delete 3.9.b and 3.9.c.
6. Restructure paragraph 3.9.e(2) to read "Any Pass or Fail result forms, or other result forms shall be included in the FAT/IPP. Result forms included in Acceptance Test Procedures (ATP), that are part of the TDP provided to the contractor, shall be included."
7. In paragraph 3.10b delete the phrase "planned for testing".
Blk 7:
The Government will accept the Receiving Report through WAWF upon final delivery.
Blk 8:
The FAT/IPP will be approved by C-17 SPO Support Equipment
Engineering.
Blk 10, 11, 12, 13:
The contractor shall submit an initial draft FAT/IPP in accordance with the contracted schedule. The Government engineer shall have 60 business days to review the initial draft FAT/IPP. The contractor shall continue to revise the FAT/IPP until the Government engineer is satisfied that the FAT/IPP meets all the necessary requirements of this CDRL. After the Government engineer approves the draft FAT/IPP and notifies the PCO and contractor through email communication, the contractor shall submit the invoice in WAWF for Government final approval of the FAT/IPP.
Julian Stevenson
AFLCMC/WLE; DSN 468-6745
See Blk 16
12-Oct-22
AFLCMC/WLE (C17 Eng)
235 Byron Street, Suite 19A
Robins AFB, GA 31098
E-copy
Searchable Adobe PDF 1 1 1
Email to:
See Block 16
DoD SAFE (as necessary) 1
The PCO
08-Nov-22
2 1 1
1 2
Reset
CONTRACT DATAREQUIREMENTSLIST
A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
16. REMARKS (Continued)
A
C17/PSE/17G110678-1 FD2060-23-30128
Blk 14;
The FAT/IPP shall be submitted in a single, searchable Adobe PDF file and submitted by Email. If the FAT/IPP is greater that 15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.
NOTE: Any changes to the FAT/IPP after approval must be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the PCO per contracting regulations and public law.
The draft FAT/IPP shall be submitted to the PCO and the following email addresses:
Julian.Stevenson@us.af.mil j.brittain@us.af.mil
AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil