CDRL A002.pdf
PDF 291 KB Posted
- Attached to
- Cargo Door Down Lock Installation Kit Federal contract opportunity
- Solicitation number
- FA8526-23-Q-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C-17_PSE_Solicitation_Template-FA8526-XX-Q-XXXX-Rev_B.xlsx | XLSX spreadsheet | |
| CDRL A003.pdf | ||
| CDRL A001.pdf | ||
| Final Solicitation.pdf | ||
| EDL.pdf | ||
| Packaging Requirements.pdf | ||
| Transportation Data.pdf | ||
| Mandatory Shipping Documents.pdf | ||
| NDA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DD 250 REQ
16. REMARKS
DIST STATEMENT
REQUIRED
AS OF DATE
DATE OF FIRST SUBMISSION
SUBMISSION
a.
Draft b.
Reg
H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
A
A002 FIRST ARTICLE TEST/INSPECTION PROCEDURES AND
REPORT (FAT/IPR)
DI-NDTI-82326/T
The DID shall be tailored as follows:
1. Delete 3.1.f(4)
2. In paragraph 3.7 delete the phrase "software version".
3. In all sub-paragraphs of section 3 where "test and inspection" is shown, delete "test and".
4. In paragraph 3.6 delete the phrase "and for the testing".
5. Delete 3.8.b and 3.8.c.
6. Restructure paragraph 3.9.a(2) to read "Any Pass or Fail result forms, or other result forms shall be included in the FAT/IPR. Result forms included in Acceptance Test Procedures (ATP), that are part of the TDP provided to the contractor, shall be included."
7. Delete paragraphs 3.9.d and 3.9.e.
8. In paragraph 3.12e delete the word "tested".
9. In paragraph 3.12f replace the word "test" with "inspection".
Blk 7:
The Government will accept the Receiving Report through WAWF upon final delivery of the FAT/IPR.
Blk 8:
The FAT/IPR will be approved by C-17 SPO Support Equipment
Engineering.
Blk 10, 11, 12, 13:
The contractor shall submit an initial draft FAT/IPR in accordance with the contracted schedule. The Government engineer shall have 60 business days to review the initial draft FAT/IPR. The contractor shall continue to revise the FAT/IPR until the Government engineer is satisfied that the FAT/IPR meets all the necessary requirements agreed to in the contract. After the Government engineer approves the draft FAT/IPR and notifies the PCO through email communication, the PCO will contact the contractor and the contractor shall submit the invoice in WAWF for Government final approval of the FAT/IPR invoice. The contractor shall not ship the FA until after FAT/IPR approval.
1 1 1
1 2
C17/PSE/17G110678-1 FD2060-23-30128
Julian Stevenson AFLCMC/WLE; DSN 468-6745 12-Oct-22 08-Nov-22
INSTL KIT - CARGO CYL PSTN RING
AFLCMC/WLE (C-17 Engr)
DD
A D
See Blk 16
See Blk 16
See Blk 16
See Blk 16 AFLCMC/WLE (C17 Eng)
235 Byron Street, Suite 19A
Robins AFB, GA 31098
E-copy
Searchable Adobe PDF
Email to:
See Block 16
DoD SAFE (as necessary)
The PCO
1 2 1
Reset
CONTRACT DATAREQUIREMENTSLIST
A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
16. REMARKS (Continued)
A
C17/PSE/17G110678-1 FD2060-23-30128
Blk 14:
The FAT/IPR shall be submitted in a single, searchable Adobe PDF file and submitted by Email. If the FAT/IPR is greater that
15MB in size, the Government will accept delivery through DoD Safe Access File Exchange (SAFE) (https://safe.apps.mil) to the PCO.
The draft FAT/IPR shall be submitted to the PCO and the following email addresses:
Julian.Stevenson@us.af.mil j.brittain@us.af.mil AFLCMC.WLMB.AFLCMCWLMPSECSE@us.af.mil
2 2
File details come from the government source that posted it. Updated .