UPDATED_Drawing_Specifications.pdf

PDF 916 KB Posted

Attached to
Linen Storage Shelving Federal contract opportunity
Solicitation number
CAMPBELLBACHWMG0006
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Linen Storage Shelving, newest first.
File Type Posted
Drawing_Specifications.pdf PDF
Minimum_Essential_Characteristics.docx DOCX document
Drawing_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: US Army BACH Clean Linen - Mobile System

Scale

1/4" = 1' C

Front

RAC7RSCS01

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

U

CBCB CB CBCB

X

8' -1

X

X

X

X

31'4"

X

48"

2"

X

X

X

2'

3/ 4"

X

24"

X

47"

X

48"

X

8' -4

/2

XX

DOCK

X

48" 48"

7'-2"

X

XX

X60

48"

X

X

X

FI

E

LD

X

3'-7"

'1

/4

X

48"

VE

R

IF

Y

X

X

'1

/4

Text Box

GASKET SEAL

CLOSURE

ROLL UP DOOR CLOSURE

U 4

STATIC 4-POST CLOSED SHELVING w/TAMBOUR DOOR 60"Wx24"Dx76 1/4"H

U 1

MOBILE 4-POST CLOSED SHELVING w/TAMBOUR DOOR 60"Wx24"Dx74 3/4"H

U 3

30"Wx24"Dx76 1/4"H

U 2

STATIC 4-POST CLOSED SHELVING w/TAMBOUR DOOR 60"Wx24"Dx76 1/4"H

76 1/4"

Double Units

Uprights

55 3/4"

Full Depth

1 3/4"

2 3/4"

No. of Openings

Rail Type

Ref. Shelves

76 1/2"

2 3/4"

16 3/4"

None

Floor/Ramp

Upright Height

Safety

None

16 3/4"

Dual Flange

High Pressure Laminate

None

All Closed

None - Mobile Support

74 3/4" & 76 1/4"

Shelving Characteristics

1" on Both Sides

HD Plain / Solid Top

Mechanical Assist

15 1/4"

16 3/4"

Guidance

Wheelhouse System Characteristics

Drive Type 16 3/4"

16 3/4"

4 or 2

Back Panels

Front Base

None

ARAC7 Steel Surface Mounted

Support Type

None

18 1/4" Bump Extension

Dividers Per Op.

Shelf Type

76 1/4"

HANGING

GARMENT ROD16 3/4"

End Panels

Sweep

74 3/4"

Type

Sitting On Floor

HD File Support

4-Post

Stationary Units

16 3/4"

Location Denoted by "X"

NOTE: GASKET SEAL PROVIDED ON TOP SHELVING EDGE AND VERTICAL EDGES AT FRONT AND REAR

Install To Blanchfield Army Community Hospital 650B Joel Drive Fort Campbell, KY 42223

(270) 956-0296 johnett.lopez.civ@mail.mil

Bill To Blanchfield Army Community Hospital 650B Joel Drive Fort Campbell, KY 42223

Group Name Description

Mobile MA System w/ 4-Post Shelving

Spacesaver DF/MA mechanical assist high-density storage unit complete per the attached drawing (GK-311719 B1). Complete and to consist of:

(5) Mech. Assist carriages with 4-post storage shelving; overall 20’L x 48”W

(2) Static shelving ranges; total length 17.5’L

(1) Static shelving ranges; total length 20’L

Surface mounted (floorless) equipment installation requires minimum site conditions, per the manufacturer. NOTE: Equipment includes both GSA and ‘open market’ materials

Installation tolerances when shimming: Do not exceed variation from level listed below:

a. Maximum Variation Across All Rails (up to 5 rails or 12 feet) 3/8 inch

b. Maximum Variation from Rail to Rail: 1/8 inch

c. Maximum Variation in 12 feet of Rail Length, Along Any Rail: inch and Maximum

Variation in 2 feet of Rail Length (Flatness): 1/8 inch

Manufacturers’ standard finishes.

Handling, & Local Delivery

All freight and handling are included. Materials to be consolidated and stored locally to allow for coordination with installation schedule.

Installation Labor All work to be completed based on the proposed installation schedule (below) and approved drawing set. Installation managed and supervised by factory-certified technical staff (sub-contracted installation is not acceptable).

Installation: New product only; based on after-hours and weekend work schedule

Removal: Disassembly and disposal of existing equipment; based on after-hours and weekend work schedule williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight

1.

Installation Statement of Work

Receive and enter order

Field verify room dimensions and confirm layouts

Review all design layouts and bills of materials for accuracy

Place order with manufacturer and confirm delivery dates

Coordinate multiple delivery/installation dates/times with end users

Receive equipment. Inspect all components. If damage is indicated, verify and file claim report with carrier and re‐order damaged components

Unload trucks & inside deliver all materials to room for installation

Uncrate materials and dispose of trash

Install mobile shelving system per factory specifications in accordance with agreed upon layout

Leave area clean upon completion

Order damaged/shorted parts

Provide complete user orientation of all aspects of equipment

Blanchfield Army Community Hospital Environmental Services Linen Storage Project

Project Scope

Due to advanced equipment age and an increased requirement for storage capacity a replacement high-density storage system has been requested. Our recommendation is for a similar mechanical assist high-density storage unit with the following improvements:

1. Increased storage capacity and capacity utilization

2. Improved dust control

3. Low profile guidance rail to improve clean conditions

4. Improved hanging coat storage

Current Capacities

Bulk linen is stored on standard storage shelving; all sections are 64”H with three openings section. In addition nine carts are used for bulk linen and three carts are used for hanging lab coats. Total capacities:

Bulk Linen: 2,556 cubic feet Lab Coats: 18 feet

Proposed Equipment

Spacesaver DF/MA mechanical assist high-density storage unit complete per the attached drawing (GK-311719 B1) and to consist of:

(5) two-sided movable ranges with 4-post shelving with four openings; overall 74”H x 48”D x 20’L

(2) single-sided fixed ranges with 4-post shelving with four openings; overall 76”H x 24”D x 17’ 6”L

(1) single-sided fixed range with 4-post shelving with one hanging opening and bulk storage opening; 76”H x 24”D x 20’L

All shelving is enclosed with back panels (tag: X), aluminum tambour roll-up doors and side and top rubber dust seals (noted on drawing). Total capacities:

Bulk Linen: 2,960 cubic feet (+15%) Lab Coats: 20 feet williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight

Blanchfield Army Community Hospital Environmental Services Linen Storage Project

PERFORMANCE WORK STATEMENT

Removal - Existing Equipment Provide all labor and equipment required to remove existing high-density shelving.

Materials to be processed for disposal or DRMO; not parts sorting or packaging is included. No other site work is included (e.g. patching, cleaning). All stored linens to be removed by EVS before the start of work. Transport to on-post disposal site is included;

off-load of truck only.

Freight / Local Warehousing / Delivery All freight and handling are included. Materials to be consolidated and stored locally to allow for coordination with installation schedule. Delivery to main BACH loading dock based on scheduled time. All materials to be staged in proximity to the installation site.

Trash removal to BACH dumpster.

Equipment Installation All work to be completed based on the proposed installation schedule (below) and approved drawing set. Installation managed and supervised by factory-certified technical staff (sub-contracted installation is not acceptable). Pre-installation work includes confirming room dimensions and confirming manufacturers bill of materials. Delivery scheduling included. Area to be left clean at the completion of work. User orientation to be scheduled and coordinated to meet staff schedules.

Proposed Installation Schedule

Day Task Responsibility

Weds PM BACH staff to remove all stored materials in preparation for installation

BACH

Thurs KD and remove existing installed equipment

P2

Thurs PM Equipment delivery and staging P2

Fri AM/PM Remaining clean-up / prep of new cleared area

BACH

Sat AM/PM Installation P2

Sun AM/PM Installation P2 williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight williemae.guidry Highlight

GK-311719_A1_REVISED_030818
Drawing
Drawing
Q-08738-20180116-0654(rev2)
BACH Scope rev2
BACH_LINEN
GSAHDMobileShelving_TC_1113_Price
Patterson Pope Profile 2 2015 P

File details come from the government source that posted it.