This Addendum No. 1 to the Hawaii Department of Defense Hawaii Army National Guard contract for Building 46 MEDCOM Renovations at Kalaeloa, Oahu clarifies and supplements the original contract documents through attachments and responses to bidder inquiries. The addendum provides hazardous materials reports, fire alarm shop drawings, and specification details for hollow metal doors and frames. Key clarifications address material substitutions including SOPRA Iso insulation options, roofing membrane alternatives, and toilet partition selections; answers to 25 contractor questions covering bid document access, material specifications, Buy America requirements, hazardous material surveys, structural repair scope, MEP system coordination, contractor licensing requirements, ceiling replacement protocols, and project award methodology. The document confirms that asbestos was detected in the existing roof and requires abatement under Section 13280, while pollution insurance is required only if Bid Alt #7 Roof Replacement is awarded. Critical design clarifications specify that door frame face widths should match existing 4-inch header conditions rather than the specified 2-inch standard, beveling is not required for door openings, all new MEP work shall be concealed above ceilings with necessary ceiling replacements included in base bid costs, and surface-mounted devices are permitted on existing CMU walls while recessed installation is required on new walls.

The addendum establishes that an A or B contractor license is required for the prime bidder, prohibiting C-13 license holders, and that base bid work encompasses specific first, second, and third-floor architectural demolition and renovation items with additional architectural work available through additive alternates. Fire alarm system requirements include installation of a new automatic and manual fire alarm system with transmission of alarm, supervisory, and trouble signals to an approved supervising station listed as either UUFX or UUJS by Underwriters Laboratory or meeting Factory Mutual Research Approval Standard 3011, with system supervision and leased telephone lines to be arranged by the owner. The fire alarm design features addressable circuits with Class A performance requirements, emergency voice evacuation capabilities, and comprehensive device coverage across all three floors including heat detectors, smoke detectors, manual pull stations, door holders, and speaker/strobe combinations with specified candela ratings and mounting height requirements per NFPA 72. The hollow metal doors and frames specification references SDI A250.8 Level 3 extra-heavy-duty construction with 1-3/4 inch thickness, metallic-coated steel face sheets, and full-profile welded frames with prime finish, establishing detailed performance, material, fabrication, and installation standards consistent with industry specifications and applicable codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF HAWAII

DEPARTMENT OF DEFENSE

HAWAII ARMY NATIONAL GUARD

PROJECT TITLE:

CA-202505-C BUILDING 46 MEDCOM RENOVATIONS, KALAELOA,

OAHU, STATE OF HAWAIʻI, DEPARTMENT OF DEFENSE, HAWAII

ADDENDUM NO. 1

The items listed hereinafter are hereby made a part of the contract for the above-mentioned project and shall govern the work taking precedence over previously issued contract documents governing the items mentioned. Receipt of this addendum is to be acknowledged on page OF-8 of the proposer’s packet.

CLARIFICATIONS:

1. Hazmat Reports have been attached to the end of this Addendum as Attachment #1.

2. Fire Alarm Shop Drawings have been attached to the end of this Addendum as Attachment #2.

3. Specification Section 08111 – Hollow Metal Doors and Frames has been attached to the end of this Addendum as Attachment #3.

4. Requests for Substitution

SECTION/ITEM SPECIFIED

BRAND

SUBSTITUTE OR

ALTERNATE

VARIANT

FEATURES

RESPONSE

07210, 2.01, A. ASTM C 1289,

Type I or II 20

PSI, R-20

minimum

SOPRA Iso Insulation, ASTM C 1289

Type I or II, 20

PSI, R-20

minimum

None No exceptions taken to proposed substitution, provided it meets the specifications.

Subject to further review and comments during the formal submittal process.

07210, 2.01, B. Tapered EPS Foam 2.0 lb.

density, ASTM C 578 Type I

SOPRA Iso

TAPERED

Insulation, ASTM C 1289

1. PolyIso No exceptions taken to proposed substitution, provided it meets the specifications.

Subject to further review and comments during the formal submittal process.

07531, 1.04, C.1.,2. & 3.

15-Year NDL warranty with 105 MPH Wind Rider

20-Year NDL with 105 MPH Wind Rider

(SOPREMA

Platinum Warranty)

1. Exceeds specified warranty term

No exceptions taken to proposed substitution, provided it meets the specifications.

Subject to further review and comments during the formal submittal process.

07531, 2.02, A.1.

60 MIL TPO

Membrane

ASTM D 6878

SOPREMA

SENTINEL P-

150 60 MIL PVC

Membrane, ASTM 4434, Type III

1. PVC

Membrane

No exceptions taken to proposed substitution, provided it meets the specifications.

Subject to further review and comments during the formal process.

10161, 2.01, A.

(Solid Plastic Toilet Partitions and Urinal Screens)

Hiny Hiders Toilet Partitions

None Proposed substitution will only be approved on condition that color selection is fire-tested.

Subject to further review and comments during the formal process.

5. Questions and Answers have been answered on HIePro and are listed below.

1. There are no bid documents posted (plans & specs.) or link to download. How do we get these?

I apologize. Plans and Specs will be uploaded to HIePRO on Monday, August 3. In the meantime, they can be viewed here: https://dod.hawaii.gov/hieng/plans-and-specs/building-46-medcom-renovations-kalaeloa-oahu-hiarng/

2. The drawings indicate hollow metal doors and frames; however, no corresponding specification section was found in Division 08. Please provide the applicable specifications for the hollow metal doors and frames, including material, gauge, finish, and fire-rating requirements.

Response: Specification Section 08111 - Hollow Metal Doors and Frames has been added.

3. Is there a Buy America(n) requirement for this project? If so, are fixtures complying with TAA (Trade Agreement) acceptable?

Response: There is no Buy America Act requirement for this project.

4. Is Pollution Insurance coverage required for this project per Item 3D of Attachment S5?

Response: Pollution insurance will be required only if Bid Alt #7 Roof Replacement is awarded.

5. During our review of the contract documents, the scope of work for the solid surface material was identified; however, no specific information was found regarding the manufacturer, product type, color, or grade. Please provide the requested information.

Response: Manufacturer: Corian Solid Surface, Color: Silver Birch, or approved equal. For more information, please refer to SECTION 06220 - SOLID SURFACE COUNTERTOPS

6. Please provide the company name of the Fire Alarm vendor / contact for this building Response: Refer to attached fire alarm shop drawings for the recently installed system.

7. Specification Section 01715 references an Asbestos/Lead/Hazardous Material Survey, but the report for the existing roof is missing. Please provide the hazardous material survey for the existing roof.

Response: Refer to prior hazardous material surveys included with this addendum.

8. Locations and quantities of concrete deficiencies are not shown on the drawings.

Please provide the scope quantities for the spall and crack repair details referenced in section 03930 and structural drawings. Additionally, please confirm whether this work is included in the base bid or under the alternates.

Response: Grid F7 on Plan S-102 Base Bid

9. Per specification section 01715, the state's hazardous material survey indicates that asbestos was not detected for this project. Please confirm if this understanding is correct.

Response: Previous testing performed by the state has determined that the roof contains asbestos. Work related to asbestos is included in Section 13280. Refer to prior hazardous material surveys included with this addendum.

10. Door details indicate a bevel at door openings, but existing CMU and concrete walls are not currently beveled. Please clarify if beveling is required for new, existing, or all wall openings.

Response: Beveling is not required. Door opening edge profiles/details to match existing conditions.

11. Per sheet A-601, all new hollow metal door frames show a standard 2" face width;

however, the existing door frames have a 4" header face. Please confirm if 2" frame faces are required or if 4" header faces should be provided to match existing conditions.

Response: Provide 4” header faces to match existing conditions.

12. The room finish schedule indicates existing ceilings are to remain, except where replacement is specified. Please clarify if new ductwork, cable trays, piping, and related utilities are to be exposed and surface-mounted below the existing drywall ceilings where ceilings are retained.

Response: All work will be concealed above ceilings. Ceilings shall be replaced wherever necessary to install new MEP work, and all associated costs for repair and finishing shall be included under the base bid. Extent of ceiling replacement is expected to be coordinated between subcontractors and all costs included.

13. Can a contractor holding only a C-13 license be the general contractor on this job?

Response: No. An A or B license is required to be the prime bidder.

14. What is the difference between base bid electrical and the additive alternatives listed for electrical?

Response: Refer to description of base bid items shown on E-001, and additive alternates listed on following sheets. In general the base bid is to include all electrical panels, metering switchboard, and feeders, as well as any branch circuiting associated with the new layouts (also called out as “Base Bid” on drawings).

15. Should base bid include finishes for ceiling, painting, and flooring?

Response: Refer to response to Question #19.

16. The painting and flooring on the first and second floors of Building 46 look fairly new. What is the scope for painting and flooring?

Response: Refer to response to Question #19.

17. Where is the elevator?

Response: Elevator is identified throughout drawings. Refer to floor plans with room tag

“ELEV”.

18. Is the HVAC system to be a Toshiba brand?

Response: Basis of design manufacturer has been provided on mechanical schedules, but the contractor is not restricted from using other brands of matching performance characteristics.

19. What is the difference between the base bid and the three additive alternatives for architecture on the three floors?

Response:

Base Bid:

First Floor Rooms:

- 106 Lactation Room, 108 Storage, 110 Electrical 1A, 112 Telecom, 114 Mechanical

- 015 Corr 1D

- 115 Women’s RR, 116 Janitor, 117 Men’s RR

- 107 Pad Check-Out, 109 Pad Office, 111 Med Records, 113 Storage, 016 Corridor 1E

- Wall demolition/refinishing for existing wall demising existing Offices 105/107 and Offices 106/108 -Opening/repair of chase walls to install any MEP utilities -Construction of associated walls/finishes in the specific vicinity of the plumbing fixtures at 118 EKG, 119 IMMZ/CHOL A, 121 IMMZ/CHOL B, Dental 122, 123, 124, 125, 127 Hearing Room

Second Floor Rooms:

-214 Jan -215 Women’s RR -218 Men’s RR -024 Corridor 2D

Third Floor Rooms:

-314 Men’s RR -315 Jan -319 Women’s RR -320 Men’s Shower, 321 Women’s Shower

Additive Alternate:

1st floor , 2nd floor and 3rd floor architectural demo and new work, all work not included in base bid.

20. Is the existing HVAC system and concrete pad below to remain, since they are fairly new?

Response: Refer to mechanical drawings for scope associated with the existing equipment and pads.

21. How are ceilings to remain if ductwork is running through it? Do the ceilings need to be replaced?

Response: Refer to response to Question #12 above.

22. Is the roof substrate a concrete slab?

Response: Yes, roof substrate is concrete slab.

23. How many new water heaters are to be installed?

Response: Refer to equipment schedules on plumbing drawings.

24. Since existing CMU walls are to remain, can controllers and other devices be surface-mounted?

Response: Yes, where devices are shown on existing CMU walls, the devices and conduits will be surface mounted. Where devices are installed on new walls, the devices and conduits shall be recessed.

25. Will the project be awarded based on the total of Base Bid and all Additive Alternates or is it possible that some Additive Alternates may be included but not others?

Response: Project will be awarded according to the best interests of the State.

CA-202505-C Addendum

Attachment #1

BLDG 46 HAZMAT Report

Inventory Pages 1-18

Summary Pages 19-27

Attachment #2

BLDG 46 Fire Alarm Shop Drawings

SYMBOL DESCRIPTION PART NUMBER

HEAT DETECTOR

ES-1000X

RELAY MODULE

W/ STANDARD BASE

MANUAL PULL STATION

SD365PHOTOELECTRIC SMOKE DETECTOR

B300-6W/ STANDARD BASE118

ANN-801

FL-PS101

DOOR HOLDER4

WALL MOUNTED SPEAKER/STROBE

SPCWL

DEVICE LEGEND

FIRE ALARM CONTROL PANEL

BOOSTER POWER SUPPLY

FIRE ALARM ANNUNCIATOR PANEL

QTY

DUCT SMOKE DETECTOR

MONITOR MODULE

BG-12LX

D365PL

CRF-300

MMF-300

FM998

SPSWLED

CEILING MOUNTED SPEAKER

FACP#

BPS #

FAA #

HWF2V-COM1 CELLULAR DIALERFAC #

S

D

2 REMOTE TEST STATION RTS151KEY

F

MM

RM

DH

SSU006851 DOCUMENT BOXDOC

CEILING MOUNTED SPEAKER/STROBE SPSCWLED97

C

S C

H365 B300-6

SURGE SUPPRESSOR 120V 4 DTK-120HWLOK

AC

ECC-LOC3 LOCAL OPERATOR CONSOLELOC

ECC-50/1001 EMERGENCY VOICE EVACUATION PANEL

EVAC

W/ SMOKE DETECTOR SD365R

FPL FPLR FPLP THHN TFFN

X X X

X X X

X X X X X

X X X

X X X

X X X

X X X X X

X X X

ADDRESSABLE CIRCUIT (SLC)

NOTIFICATION DEVICES (NAC)

DOOR HOLDER

ANNUNCIATOR BUS PRIMARY

EXTERNAL AUDIO RISER

REMOTE TEST STATION

AUX / POWER (24VDC)

AUDIO - SPEAKER STP SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

UTP SOLID

TYPETAG DESCRIPTION GAUGE

18 AWG

14 AWG

14 AWG

18 AWG

14 AWG

14 AWG

14 AWG

18 AWG

ALL CABLES ARE FOR INDOOR INSTALLATIONS. UNDERGROUND CABLE / WIRE MUST BE LISTED FOR INSTALLATION IN WET CONDITION.

NOTE:

FIRE ALARM WIRE LEGEND

A

B

D

G

AR

K

P

S

X X

FPL FPLR FPLP THHN TFFN

X X X

X X X

X X X X X

X X X

X X X

X X X

X X X X X

X X X

ADDRESSABLE CIRCUIT (SLC)

NOTIFICATION DEVICES (NAC)

DOOR HOLDER

REMOTE TEST STATION

AUX / POWER (24VDC)

AUDIO - SPEAKER STP SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

UTP SOLID

TYPETAG DESCRIPTION GAUGE

18 AWG

14 AWG

14 AWG

18 AWG

14 AWG

14 AWG

18 AWG

ALL CABLES ARE FOR INDOOR INSTALLATIONS. UNDERGROUND CABLE / WIRE MUST BE LISTED FOR INSTALLATION IN WET CONDITION.

NOTE:

FIRE ALARM WIRE LEGEND

A

B

D

K

P

S

X X

2 COND. SOLID X X

CEILING MOUNTED STROBE6 SCWLED

X X XTRIGGER CIRCUIT 2 COND. SOLID 14 AWG

TR

X XX X X2 COND. SOLID 14 AWG X X

IM-12180W/ 12VDC 18AH BATTERY

IM-12550W/ 12VDC 55AH BATTERY

IM-12120W/ 12VDC 12AH BATTERY

IM-1270W/ 12VDC 7AH BATTERY1

W/ SAMPLING TUBE DST5

BB-55FW/ CABINET1

X X XLOC BUS CONNECTION 2 COND. SOLID 18 AWG

L

X X X18 AWG

FA-01

5" (127mm)

90" MIN (2286mm MIN) ABOVE FINISHED

FLOOR (OTHER MOUNTING HEIGHTS SHALL

BE PERMITTED BY THE AHJ PROVIDING IT

MEETS THE SOUND LEVEL OUTPUT REQUIRED.)

NFPA 72 AUDIBLE APPLIANCE 6" MIN

(152.4mm MIN) BELOW FINISHED CEILING

F I R EF I R E

FINISHED

WALL

DEVICE MOUNTING HEIGHT REFERENCE

PER NFPA 72

VISUAL APPLIANCE MOUNTING HEIGHT CONSIDERATIONS IN SLEEPING ROOMS

1. MIN DISTANCE IN SLEEPING ROOMS IS 24" (610mm) FROM CEILING TO TOP

OF LENS FOR 110CD STROBES WITHIN 16' OF THE PILLOW

2. 177CD STROBES, USED IN SLEEPING ROOMS, CAN BE WITHIN THE 24"

(610mm) MINIMUM DISTANCE FROM THE CEILING. THE HIGHER INTENSITY

IS TO COMPENSATE FOR A POSSIBLE SMOKE LAYER.

AUDIBLE/VISUAL

& VISUAL ONLY

APPLIANCES

SYNCHRONIZE MORE

THAN TWO APPLIANCES

IN ANY FIELD OF VIEW.

NOTE: REFER TO THE PROPER DEVICE

INSTALLATION INSTRUCTIONS

FOR BACKBOX MOUNTING HEIGHT.

NOTE: MEASUREMENTS

SHOWN ARE TO THE CLOSEST

EDGE OF THE DETECTOR.

THE 4" REQUIREMENT FOR SMOKE DETECTORS HAS

BEEN REMOVED FROM THE 2010 EDITION OF NFPA 72

CEILING MOUNTED

SMOKE/HEAT

DETECTOR

ACCEPTED HERE

12" (MAX)

(305mm MAX)

HEAT DETECTORS

NEVER HERE

WALL MOUNTED

SMOKE/HEAT

DETECTOR

4" (102mm)

4" (102mm)

3' (914mm)

MINIMUM

A/C SUPPLY

OR RETURN

DIFFUSER

REF. 80" MIN (IBC)

(2032mm MIN) REF. 96"

MAX (IBC) (2440mm MAX)

ABOVE FINISHED FLOOR

FINISHED

FLOOR

MAGNETIC

DOOR

HOLDER

F I R E

FIRE

PHONE

JACK

FOR CEILING HEIGHTS LESS THAN 86" (2180mm), THE VISUAL LENS MOUNTING HEIGHT SHALL BE

WITHIN 6" (150mm) OF THE CEILING.

96" MAX (NFPA, ADA)

(2440mm MAX)

ABOVE FINISHED FLOOR

TO TOP OF LENS

48" MAX (ADA) (1219mm) 48" MAX (NFPA, ADA) (1219mm MAX)

42" MIN (NFPA) (1067mm MIN)

MEASUREMENTS SHOWN ARE

TO TOP OF PULL HANDLE

MANUAL PULL

STATION

TO EXIT DOOR

5' (MAX.)

(1524mm)

DOOR

WIDTH

LESS 3"

(76mm)

80" MIN (ADA)

(2032mm MIN)

80" MIN (NFPA)

(2032mm MIN)

TO BOTTOM OF LENS FIRE

FIRE

AUDIBLE ONLY

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

COVER SHEET.

PROJECT INFORMATION

1. THIS SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE

SPECIFICATIONS AND STANDARDS APPROVED BY THE AUTHORITY HAVING

JURISDICTION.

2. ALL DEVICES AND APPLIANCES SHALL BE LOCATED AND MOUNTED SO THAT

ACCIDENTAL OPERATION OR FAILURE IS NOT CAUSED BY VIBRATION OR

JARRING.

3. EQUIPMENT SHALL BE INSTALLED IN LOCATIONS WHERE CONDITIONS DO

NOT EXCEED THE VOLTAGE, TEMPERATURE, AND HUMIDITY LIMITS SPECIFIED IN

THE MANUFACTURER'S PUBLISHED INSTRUCTIONS.

4. THE SECONDARY POWER SUPPLY SHALL AUTOMATICALLY PROVIDE POWER

TO THE PROTECTED PREMISES SYSTEM WITHIN 10 SECONDS WHENEVER THE

PRIMARY POWER SUPPLY FAILS TO PROVIDE THE MINIMUM VOLTAGE REQUIRED

FOR PROPER OPERATION.

5. INITIATING DEVICES OF THE MANUAL OR AUTOMATIC TYPE SHALL BE

SELECTED AND INSTALLED SO AS TO MINIMIZE NUISANCE AND

UNINTENTIONAL ALARMS.

6. ALL FIRE ALARM DEVICES SHALL COMPLY FULLY WITH ALL A.D.A.

REQUIREMENTS.

7. REQUIRED SIGNALS SHALL NOT BE LOST, INTERRUPTED, OR DELAYED BY

MORE THAN 10 SECONDS AS A RESULT OF THE PRIMARY POWER FAILURE.

MEDCOM BUILDING 46

91-1227 ENTERPRISE AVENUE

KAPOLEI, HI 96707

FIRE ALARM SYSTEM

SCALE: NTS

NVICINITY MAP

HAWAII BUILDING CODE 2021(IBC 2021) NOT AMENDED

HAWAII RESIDENTIAL CODE 2021(IRC 2021) NOT AMENDED

HAWAII ELECTRICAL CODE 2023(NFPA 70, 2023) NOT AMENDED

HAWAII FIRE ALARM CODE 2019(NFPA 72, 2019)

HAWAII FIRE CODE 2021(NFPA 1, 2021) AMENDED

HAWAII FIRE SPRINKLER CODE 2019(NFPA 13, 2019) NOT AMENDED

JURISDICTIONS WITHIN THE STATE MAY HAVE AMENDMENTS TO THE STATE ADOPTED

CODE. CHECK WITH THE LOCAL JURISDICTION AUTHORITY FOR MORE DETAILS.

APPLICABLE CODES & STANDARDS

OCCUPANCY TYPE(S):

B Business Group

SCOPE OF WORK

REPLACED AN OUTDATED PANEL,DEVICES AND INSTALL A NEW AUTOMATIC AND MANUAL

FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS.

ALL WIRING TO BE CLASS A.

AUTOMATIC FIRE ALARM SYSTEM SHALL TRANSMIT THE ALARM, SUPERVISORY AND TROUBLE

SIGNALS TO AN APPROVED SUPERVISING STATION. THE SUPERVISING STATION SHALL BE

LISTED AS EITHER UUFX OR UUJS UNDERWRITERS LABORATORY OR SHALL MEET THE

REQUIREMENTS OF FACTORY MUTUAL RESEARCH APPROVAL STANDARD 3011. SUPERVISION

OF SYSTEM AND LEASED TELEPHONE LINES SHALL BE ARRANGED BY THE OWNER.

AHJ:

CITY OF HONOLULU (HFD) WITH DOD OVERLAYS

SCOPE OF WORK

AREA SMOKE DETECTOR

SMOKE DETECTOR - AT FACP

SMOKE DETECTOR - FOR DOOR RELEASING SERVICE

SMOKE DETECTOR IN UNITS - SUPERVISORY

MANUAL PULL STATION

AREA HEAT DETECTOR

DUCT DETECTOR AT HVAC FAN - SUPERVISORY

ACTIVATION OF EMERGENCY COMMUNICATIONS MESSAGE

MAIN FLR. ELEV. LOBBY SMOKE DETECTOR

ELEVATOR LOBBY SMOKE DETECTORS (EXCEPT PRIMARY FLR)

ELEVATOR MACHINE ROOM SMOKE DETECTOR

FIRE ALARM PRIMARY/SECONDARY POWER FAILURE

FIRE ALARM SYSTEM LOW BATTERY

OPEN CIRCUIT

GROUND FAULT

NOTIFICATION CIRCUIT (NAC) - SHORT

LOSS OF COMMUNICATION PATH (INCLUDING CELLULAR DIALER FAILURE)

AC

TI

VA

TE

C O

M M

O N

A

LA

RM

S

IG

N

AL

IN

D

IC

AT

O

R

AC

TI

VA

TE

A

UD

IB

LE

A

LA

RM

S

IG

N

AL

AC

TI

VA

TE

C O

M M

O N

S

UP

ER

VI

SO

RY

S

IG

N

AL

IN

D

IC

AT

O R

AC

TI

VA

TE

A

UD

IB

LE

S

UP

ER

VI

SO

RY

S

IG

N

AL

AC

TI

VA

TE

C O

M M

O N

T

RO

UB

LE

S

IG

N

AL

IN

D

IC

AT

O R

AC

TI

VA

TE

A

UD

IB

LE

T

RO

UB

LE

S

IG

N

AL

AC

TI

VA

TE

A

PP

RO

PR

IA

TE

D

EV

IC

E

LO

CA

TI

O

N

IN

D

IC

AT

O

R

ANNUNCIATION

AC

TI

VA

TE

A

LL

A

UD

IB

LE

E

VA

CU

AT

IO

N

S

IG

N

AL

S

AC

TI

VA

TE

A

LL

V

IS

IB

LE

E

VA

CU

AT

IO

N

S

IG

N

AL

S

D

IS

PL

AY

PR

IN

T

CH

AN

GE

O

F

ST

AT

US

TR

AN

SM

IT

A

LA

RM

S

IG

N

AL

T

O S

UP

ER

VI

SI

N G

ST

AT

IO

N

TR

AN

SM

IT

S

UP

ER

VI

SO

RY

S

IG

N

AL

T O

S

UP

ER

VI

SI

N

G

ST

AT

IO

N

TR

AN

SM

IT

T

RO

UB

LE

S

IG

N

AL

T O

S

UP

ER

VI

SI

N

G

ST

AT

IO

N

AC

TI

VA

TE

E M

ER

GE

N

CY

C O

M M

UN

IC

AT

IO

N S

(S

PE

AK

ER

S / S

TR

O

BE

S)

NOTIFICATION

M

AI

N F

LO

O

R

EL

EV

AT

O R

RE

CA

LL

AL

TE

RN

AT

E

FL

O O

R

EL

EV

AT

O R

RE

CA

LL

EL

EV

AT

O

R H

AT

F

LA

SH

RE

LE

AS

E

M

AG

N

ET

IC

AL

LY

H

EL

D

S M

O

KE

D O

O

RS

SH

UT

D O

W N

A

SS

O

CI

AT

ED

F

AN

RE

M

O

TE

LY

D

IS

PL

AY

A

CT

IV

E

ST

AT

US

FIRE SAFETY CONTROL

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

AutoCAD SHX Text

STREET HILO, HI 96720

S L1-D40

S L1-D41

S L1-D42

S L1-D43

S L1-D44

S

L1-D01 SL1-D06 S

L1-D08 S

L1-D09

S L1-D25

S L1-D27S L1-D32

S L1-D35

S L1-D39

S L1-D38

S L1-D37

S L1-D36

S L1-D34

S L1-D33

SL1-D31

S L1-D26 S

L1-D23

F L1-M13

SL1-D07

F L1-M11

FACP

FAC

DOC

AC

F L1-M10

S L1-D24

C

FA.N2-07

0.5W S2-07

C

FA.N2-01

0.5W S2-01

DH

DH

S L1-D30

C

FA.N1-14

0.5W S1-12

C

FA.N1-13

0.5W S1-11

C

FA.N1-070.5W

S1-07 DH

DH

C

FA.N3-14

0.5W S3-14

C

FA.N3-13

0.25W S3-13

C

FA.N1-10

0.5W S1-08

C

FA.N1-11

0.5W S1-09

C

FA.N2-02

0.25W S2-02

C

FA.N2-03

0.25W S2-03

C

FA.N2-04

0.25W S2-04

C

FA.N2-05

0.25W S2-05

C

FA.N2-06

0.25W S2-06

C

FA.N3-01

0.25W S3-01

C

FA.N2-12

0.25W S2-12

C

FA.N2-11

0.25W S2-11

C

FA.N2-10

0.25W S2-10

C

FA.N2-09

0.25W S2-09

C

FA.N2-08

0.25W S2-08 C

FA.N1-06

0.25W S1-06

C

FA.N1-05

0.25W S1-05

C

FA.N1-04

0.25W S1-04

C

FA.N1-120.5W

S1-10 F L1-M06S

L1-D29

S L1-D28

RM L1-M09FIRE HAT

RM L1-M08ALT. RECALL

RM L1-M07PRIMARY RECALL

L1-D03

L1-D02

S L1-D04

S L1-D05

FL1-M02

FA.N1-02

0.5W S1-02

F L1-M03

FA.N1-03

0.5W S1-03

F L1-M01 15

FA.N1-01

0.5W S1-01

102 104 106 108 110 123

122121120

109107105103

STAIRS

STAIRS

UP

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11

BOILER ROOM ELEC.

ROOM

MECH.

ROOM

ENTRWAY

LOBBY

DAY

ROOMMEN

WOMEN

FAA

LO

C

EVAC

FIRE COMMAND

CENTER

FA.N1-08

FA.N1-09

TO UP

B,S

FROM UP

RETURN TO

EVAC & BPS-1

B,S

B,S

A,2B,2S A,2B,2S

A,2B,2S

A,2B,2S

A,2B,2S A,2B,2S

A,2B,2S

A,2B,2S

A,2B,2S

A,2B,2S

A,2B,2S

A,2B,2S

B,S

A,B,S

A,B,S A,B,S

A,B,S

A,B,S

A

AA

AR,B,G,P,L,S

A,B,S A,2B,2S

P

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,G,P,S

A,B,G,P,S

A,B,G,P,S

B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,SA,B,S

A,B,S

A,B,SA,B,S

A,B,S A,B,S A,B,S

A,B,S

A,B,S B,S

A A

D D

HOME RUN

G

TO LOC-2 AT 2ND

FLOOR NEAR

MIDDLE STAIR

AR,L,P

RETURN TO

EVAC & BPS-1

A,B,S

AC

AC

RM

L1-M12

FROM BPS-1 AT

3RD FLOOR

P

RML1-M05

A

S L1-D10

S L1-D11

S L1-D12

S L1-D13

S L1-D14

SL1-D15S

L1-D19

S L1-D21

S L1-D22

S L1-D20

S L1-D18

S L1-D17

S L1-D16

FL1-M04FA.N3-14

C

FA.N3-07

0.5W S3-07

C

FA.N3-11

0.25W S3-11

C

FA.N3-12

0.25W S3-12

C

FA.N3-10

0.25W S3-10

C

FA.N3-09

0.25W S3-09

C

FA.N3-08

0.25W S3-08

C

FA.N3-03

0.25W S3-03

C

FA.N3-02

0.25W S3-02

C

FA.N3-04

0.25W S3-04

C

FA.N3-05

0.25W S3-05

C

FA.N3-06

0.25W S3-06

125 127 129 131 133

STAIRS

130128126124

11 12 13 15 16 17

A

B

C

D

E

B,S

A,B,S

A,B,S A,B,S A,B,S A,B,S A,B,S

A,B,SA,B,S

A,B,S

A,B,SA,B,S

A,B,S

A,B,SA,B,S

A,B,S

RETURN TO

EVAC & BPS-1

102 104 106 108 110 123 125 127 129 131 133

STAIRS

130128126124

122121120

109107105103

STAIRS

STAIRS

UP

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17

A

B

C

D

E

BOILER ROOM ELEC.

ROOM

MECH.

ROOM

ENTRWAY

LOBBY

DAY

ROOMMEN WOMEN

FA-02

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

FIRST FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

FIRST FLOOR PART-A

FIRE ALARM FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

FIRST FLOOR PART-B

FIRE ALARM FLOOR PLAN

SCALE: NTS

NKEY PLAN

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

GENERAL NOTES:

1. ALL CEILINGS ARE ASSUMED TO BE 10' A.F.F., SMOOTH CONSTRUCTION UNLESS

NOTED OTHERWISE.

2. MINIMUM CONDUIT SIZE SHALL BE 3/4"

3. ALL EXPOSED CONDUITS SHALL BE GRC (GALVANIZED RIGID METALLIC

CONDUIT). ALL CONCEALED CONDUITS SHALL BE EMT (ELECTRICAL METALLIC

TUBING). ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE 40 UNLESS

NOTED.

4. MINIMUM CIRCUIT PERFORMANCE REQUIREMENTS:

IDC - INITIATING DEVICE CIRCUIT SHALL BE CLASS A

NAC - NOTIFICATION APPLICATION CIRCUIT SHALL BE CLASS A

SLC - SIGNALING LINE CIRCUIT SHALL BE CLASS A

5. ALL LOOPS SHALL HAVE OUTGOING AND RETURN CONDUCTORS IN SEPARATE

CONDUIT.

6. CLASS A CIRCUITS SHALL BE INSTALLED SUCH THAT THE OUTGOING AND

RETURN CONDUCTORS ARE SEPARATED 1 FOOT WHERE THE CABLE IS INSTALLED

VERTICALLY AND 4 FEET WHERE THE CABLE IS INSTALLED HORIZONTALLY. THE

OUT GOING AND RETURN CIRCUIT CONDUCTORS ARE PERMITTED TO BE

INSTALLED IN THE SAME CONDUIT FOR A MAXIMUM DISTANCE OF 10 FEET

WHERE THE OUTGOING AND RETURN CONDUCTORS ENTER OR EXIT THE DEVICE.

7. "T- TAPPING" OF ANY CLASS "A" CIRCUIT IS PROHIBITED.

8. "ALLOW 3FT. OF CONDUCTOR LENGTH BETWEEN THE 120VAC SURGE

SUPPRESSOR AND THE PROTECTED EQUIPMENT. THIS WILL ALLOW THE UNIT

TIME TO REACT".

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

L1-D49

S L1-D48

S L1-D47

S L1-D46

S L1-D45

S L1-D84

S L1-D83

S L1-D80

S L1-D79

S L1-D64

S L1-D62

S L1-D60

S L1-D57

SL1-D56S

L1-D53

S L1-D51

S L1-D50

S L1-D52

S L1-D54

S L1-D55

S L1-D58

S L1-D59

S L1-D63

S L1-D65

F L1-M14

FL1-M15

C 1.N2-07

0.5W S4-29

C

1.N1-01

0.5W S4-01

C 1.N1-05

0.5W S4-03

C

1.N1-07

0.25W S4-05

C

1.N2-010.25W

S4-36

C

1.N2-03

0.25W S4-33

C

1.N2-04

0.25W S4-32

C

1.N2-05

0.25W S4-31

C

1.N2-06

0.25W S4-30

C

1.N2-18

0.25W S4-18

C

1.N2-12

0.5W S4-24

C

1.N2-11

0.25W S4-25

C

1.N2-10

0.25W S4-26

C

1.N2-09

0.25W S4-27

C

1.N2-08

0.25W S4-28

C

1.N2-17

0.25W S4-19

C

1.N2-14

0.25W S4-22

C

1.N2-13

0.25W S4-23

C 1.N1-02

0.5W S4-02

S C 0.5W S4-34

FL1-M16

C

1.N2-02

0.25W S4-35

S L1-D61

C

1.N1-06

0.25W S4-04

D L1-D82

D L1-D81

RM

L1-M19

RM

L1-M18

1.N2-15

0.5W S4-21

1.N2-16

0.5W S4-20

STAIRS

STAIRS

UPDN

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11

202 204 206 208 210 218

217215213

207205203

TELECOM AND

ELECTRICAL ROOM

MECH.

ROOM

LOC 2

1.N1-03

1.N1-04

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A

A A

A

A,B,S

A,B,S

A,B,SA,B,S

A,B,S

A,B,S

A,B,S

A,B,SA,B,SA,B,S

A,B,S

A,B,S

A,B,S A,B,S A,B,S

A,B,S

A,B,S B,S

B,S

A

A

A

K

B

S

FROM LOC-1 AT 1ST

FLOOR NEAR LOBBY

TO LOC-3 AT 3RD

FLOOR NEAR

MIDDLE STAIR

AR,L,P

AR,L,P

HOME RUN TO

EVAC AT 1ST

FLOOR

FROM BPS-1 AT 3RD FLOOR

& EVAC AT 1ST FLOOR IN

FIRE COMM. CENTER

SB

HOME RUN TO BPS-1

AT THIRD FLOOR

HOME RUN TO BPS-1

FROM BPS-1 AT

THIRD FLOORB

FROM 1ST FLOOR &

UP TO 2ND FLOOR

FROM 3RD FLOOR &

DN TO 1ST FLOOR

S L1-D78

S L1-D77

S L1-D76

S L1-D75

S L1-D74

SL1-D73S

L1-D69

S L1-D67

S L1-D66

S L1-D68

S L1-D70

S L1-D71

S L1-D72

FL1-M17

C

1.N1-13

0.5W S4-12

C

1.N1-09

0.25W S4-08

C

1.N1-08

0.25W S4-06

C

1.N1-10

0.25W S4-09

C

1.N1-11

0.25W S4-10

C

1.N1-12

0.25W S4-11

C

1.N1-17

0.25W S4-16

C

1.N1-18

0.25W S4-17

C

1.N1-16

0.25W S4-15

C

1.N1-15

0.25W S4-14

C

1.N1-14

0.25W S4-13

S C 0.5W S4-07

A

B

C

D

E

11 12 13 15 16 1714

220 222 224 226 228

227225223221219

STAIRS

A,B,S A,B,S A,B,S A,B,S

A,B,S

A,B,S

A,B,S

A,B,SA,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

B

HOME RUN TO BPS-1

AT THIRD FLOOR

A,B,S

STAIRS

STAIRS

UPDN

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 1714

202 204 206 208 210 218 220 222 224 226 228

227225223221219

217215213

207205203

TELECOM AND

ELECTRICAL ROOM

STAIRS

MECH.

ROOM

FA-03

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

SECOND FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

SECOND FLOOR PART-A

FIRE ALARM FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

SECOND FLOOR PART-B

FIRE ALARM FLOOR PLAN

SCALE: NTS

NKEY PLAN

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

GENERAL NOTES:

1. ALL CEILINGS ARE ASSUMED TO BE 10' A.F.F., SMOOTH CONSTRUCTION UNLESS

NOTED OTHERWISE.

2. MINIMUM CONDUIT SIZE SHALL BE 3/4"

3. ALL EXPOSED CONDUITS SHALL BE GRC (GALVANIZED RIGID METALLIC

CONDUIT). ALL CONCEALED CONDUITS SHALL BE EMT (ELECTRICAL METALLIC

TUBING). ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE 40 UNLESS

NOTED.

4. MINIMUM CIRCUIT PERFORMANCE REQUIREMENTS:

IDC - INITIATING DEVICE CIRCUIT SHALL BE CLASS A

NAC - NOTIFICATION APPLICATION CIRCUIT SHALL BE CLASS A

SLC - SIGNALING LINE CIRCUIT SHALL BE CLASS A

5. ALL LOOPS SHALL HAVE OUTGOING AND RETURN CONDUCTORS IN SEPARATE

CONDUIT.

6. CLASS A CIRCUITS SHALL BE INSTALLED SUCH THAT THE OUTGOING AND

RETURN CONDUCTORS ARE SEPARATED 1 FOOT WHERE THE CABLE IS INSTALLED

VERTICALLY AND 4 FEET WHERE THE CABLE IS INSTALLED HORIZONTALLY. THE

OUT GOING AND RETURN CIRCUIT CONDUCTORS ARE PERMITTED TO BE

INSTALLED IN THE SAME CONDUIT FOR A MAXIMUM DISTANCE OF 10 FEET

WHERE THE OUTGOING AND RETURN CONDUCTORS ENTER OR EXIT THE DEVICE.

7. "T- TAPPING" OF ANY CLASS "A" CIRCUIT IS PROHIBITED.

8. "ALLOW 3FT. OF CONDUCTOR LENGTH BETWEEN THE 120VAC SURGE

SUPPRESSOR AND THE PROTECTED EQUIPMENT. THIS WILL ALLOW THE UNIT

TIME TO REACT".

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

L1-D118

S L1-D119

S L1-D120

S L1-D121

S L1-D122

S L1-D85

S L1-D86

S L1-D87

S L1-D88

S L1-D103

S L1-D105

S L1-D107

S L1-D110

SL1-D111S

L1-D114

S L1-D116

S L1-D117

S L1-D115

S L1-D113

S L1-D112

S L1-D109

S L1-D108

S L1-D104

S L1-D102

F L1-M23

C 1.N4-06

0.5W S5-26

C

1.N3-01

0.5W S5-01

C

1.N3-06

0.25W S5-04

C

1.N4-02

0.25W S5-30

C

1.N4-03

0.25W S5-29

C

1.N4-04

0.25W S5-28

C

1.N4-05

0.25W S5-27

0.25W S5-16C

1.N3-18

0.25W S5-17

C

1.N4-110.5W

S5-21

C

1.N4-10

0.25W S5-22

C

1.N4-09

0.25W S5-23

C

1.N4-08

0.25W S5-24

C

1.N4-07

0.25W S5-25

C

1.N3-19

0.25W S5-18

C

1.N3-20

0.25W S5-19

C

1.N4-12

0.25W S5-20

C 1.N3-02

0.5W S5-02

C

1.N4-01

0.25W S5-32

C

1.N3-05

0.25W S5-03

FL1-M21

BP

S

S L1-D106

S C 0.5W S5-31

STAIRS

STAIRS

DN

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11

302 304 306 308 310 318

317315313

307305303

LOC 3

1.N3-03

1.N3-04

FROM 2ND FLOOR

DN TO 2ND FLOOR

A,B

A,B,S

A,B,SA,B,S

A,B,S

A,B,S

A,B,S

A,B,SA,B,S

A,B,S A,B,S

A,B,S

A,B,S A,B,S A,B,S A,B,S

A,B,S

B,S

A

B,S

A

B,S

A,S A,B,S A,B,S

A,B,S

B

A,B

A,B

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

B

A,B

A,B

S

MM

L1-M22

BPS-1 TROUBLE

HOME RUN

TO EVAC

FROM LOC-2 AT

2ND FLOOR NEAR

MIDDLE STAIR

AR,L,P

AR,L,P

FROM EVAC AT FIRST FLOOR

IN FIRE COM. CENTER

S

HOME RUN TO BPS-1

RETURN TO EVAC

AT 1ST FLOOR

AC

S L1-D89

S L1-D90

S L1-D91

S L1-D92

S L1-D93

S L1-D94

S L1-D98S L1-D100

S L1-D101

S L1-D99

S L1-D97

S L1-D96

S L1-D95

F L1-M20

C 1.N3-12

0.5W S5-11

C

1.N3-08

0.25W S5-06

C

1.N3-07

0.25W S5-05

C

1.N3-09

0.25W S5-08

C

1.N3-10

0.25W S5-09

C

1.N3-11

0.25W S5-10

C

1.N3-16

0.25W S5-15

C

1.N3-17

0.25W S5-16

C

1.N3-15

0.25W S5-14

C

1.N3-14

0.25W S5-13

C

1.N3-13

0.25W S5-12

S C

0.5W S5-07

A

B

C

D

E

11 12 13 15 16 1714

320 322 324 326 328

327325323321319

A,B,S

A,B,S A,B,S A,B,S A,B,S

A,B,S

A,B,S

A,B,S

A,B,S

A,B,S A,B,S

A,B,S

A,B,S A,B,S

A,B,S

STAIRS

STAIRS

DN

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 1714

302 304 306 308 310 318 320 322 324 326 328

327325323321319

317315313

307305303

FA-04

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

THIRD FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

THIRD FLOOR PART-A

FIRE ALARM FLOOR PLAN

0 4' 8' 16'

SCALE:

COPY SCALE BAR FOR EACH SCALE NEEDED

SELECT SCALE, THEN REGEN DRAWING TO UPDATE FIELD

1/8" = 1'-0"

N

THIRD FLOOR PART-B

FIRE ALARM FLOOR PLAN

SCALE: NTS

NKEY PLAN

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

PART-A PART-B

GENERAL NOTES:

1. ALL CEILINGS ARE ASSUMED TO BE 10' A.F.F., SMOOTH CONSTRUCTION UNLESS

NOTED OTHERWISE.

2. MINIMUM CONDUIT SIZE SHALL BE 3/4"

3. ALL EXPOSED CONDUITS SHALL BE GRC (GALVANIZED RIGID METALLIC

CONDUIT). ALL CONCEALED CONDUITS SHALL BE EMT (ELECTRICAL METALLIC

TUBING). ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE 40 UNLESS

NOTED.

4. MINIMUM CIRCUIT PERFORMANCE REQUIREMENTS:

IDC - INITIATING DEVICE CIRCUIT SHALL BE CLASS A

NAC - NOTIFICATION APPLICATION CIRCUIT SHALL BE CLASS A

SLC - SIGNALING LINE CIRCUIT SHALL BE CLASS A

5. ALL LOOPS SHALL HAVE OUTGOING AND RETURN CONDUCTORS IN SEPARATE

CONDUIT.

6. CLASS A CIRCUITS SHALL BE INSTALLED SUCH THAT THE OUTGOING AND

RETURN CONDUCTORS ARE SEPARATED 1 FOOT WHERE THE CABLE IS INSTALLED

VERTICALLY AND 4 FEET WHERE THE CABLE IS INSTALLED HORIZONTALLY. THE

OUT GOING AND RETURN CIRCUIT CONDUCTORS ARE PERMITTED TO BE

INSTALLED IN THE SAME CONDUIT FOR A MAXIMUM DISTANCE OF 10 FEET

WHERE THE OUTGOING AND RETURN CONDUCTORS ENTER OR EXIT THE DEVICE.

7. "T- TAPPING" OF ANY CLASS "A" CIRCUIT IS PROHIBITED.

8. "ALLOW 3FT. OF CONDUCTOR LENGTH BETWEEN THE 120VAC SURGE

SUPPRESSOR AND THE PROTECTED EQUIPMENT. THIS WILL ALLOW THE UNIT

TIME TO REACT".

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

L1-D01 L1-D02

F L1-M01 L1-D03

S L1-D04

F L1-M02

F L1-M03

S L1-D05

S L1-D06

S L1-D07

S L1-D08

S L1-D09

S L1-D10

S L1-D11

S L1-D12

S L1-D13

S L1-D14

F L1-M04

S L1-D15

S L1-D16

S L1-D17

S L1-D18

S L1-D19

S L1-D20

S L1-D21

S L1-D22

S L1-D23

S L1-D24

S L1-D25

S L1-D26

S L1-D27

F L1-M06

RM

L1-M07

PRIMARY RECALL

RM

L1-M08

ALT. RECALL

RM

L1-M09

FIRE HAT

S

L1-D28 S

L1-D29 F

L1-M10

S L1-D30

F L1-M11

S L1-D31

S L1-D32

S L1-D33

S L1-D34

S L1-D35

S L1-D36

S L1-D37

S L1-D38

S L1-D39

F L1-M13

S L1-D40

S L1-D41

S L1-D42

S L1-D43

S L1-D44

S L1-D45

S L1-D46

S L1-D47

S L1-D48

S L1-D49

F L1-M14

S L1-D50

S L1-D51

S L1-D52

S L1-D53

S L1-D54

S L1-D55

S L1-D56

S L1-D57

S L1-D58

S L1-D59

F L1-M15

F L1-M16

S L1-D60

S L1-D61

S L1-D62

S L1-D63

S L1-D64

S L1-D65

S L1-D66

S L1-D67

S L1-D68

S L1-D69

S L1-D70

S L1-D71

S L1-D72

S L1-D73

F L1-M17

S L1-D74

S L1-D75

S L1-D76

S L1-D77

S L1-D78

S L1-D79

S L1-D80

RM

L1-M18

AHU SHUT DOWN

D

L1-D81 D

L1-D82

RM

L1-M19

AHU SHUT DOWN

S

L1-D83 S

L1-D84

S L1-D85

S L1-D86

S L1-D87

S L1-D88

S L1-D89

S L1-D90

S L1-D91

S L1-D92

S L1-D93

F L1-M20

S L1-D94

S L1-D95

S L1-D96

S L1-D97

S L1-D98

S L1-D99

S L1-D100

S L1-D101

S L1-D102

S L1-D103

S L1-D104

S L1-D105

S L1-D106

S L1-D107

F L1-M21

S L1-D108

S L1-D109

S L1-D110

S L1-D111

S L1-D112

S L1-D113

S L1-D114

S L1-D115

S L1-D116

S L1-D117

F L1-M23

S L1-D118

S L1-D119

S L1-D120

S L1-D121

S L1-D122

FA.N1-01

0.5W S1-01

FA.N1-02

0.5W S1-02

FA.N1-03

0.5W S1-03

C

FA.N1-04

0.25W S1-04

C

FA.N1-05

0.25W S1-05

C

FA.N1-06

0.25W S1-06

C

FA.N1-07

0.5W S1-07

FA.N1-08

FA.N1-09

C

FA.N1-10

0.5W S1-08

C

FA.N1-11

0.5W S1-09

C

FA.N1-12

0.5W S1-10

C

FA.N1-13

0.5W S1-11

C

FA.N1-14

0.5W S1-12

C

FA.N2-01

0.5W S2-01

C

FA.N2-02

0.25W S2-02

C

FA.N2-03

0.25W S2-03

C

FA.N2-04

0.25W S2-04

C

FA.N2-05

0.25W S2-05

C

FA.N2-06

0.25W S2-06

C

FA.N2-07

0.5W S2-07

C

FA.N2-08

0.25W S2-08

C

FA.N2-09

0.25W S2-09

C

FA.N2-10

0.25W S2-10

C

FA.N2-11

0.25W S2-11

C

FA.N2-12

0.25W S2-12

C

FA.N3-01

0.25W S3-01

C

FA.N3-02

0.25W S3-02

C

FA.N3-03

0.25W S3-03

C

FA.N3-04

0.25W S3-04

C

FA.N3-05

0.25W S3-05

C

FA.N3-06

0.25W S3-06

C

FA.N3-07

0.5W S3-07

C

FA.N3-08

0.25W S3-08

C

FA.N3-09

0.25W S3-09

C

FA.N3-10

0.25W S3-10

C

FA.N3-11

0.25W S3-11

C

FA.N3-12

0.25W S3-12

C

FA.N3-13

0.25W S3-13

C

FA.N3-14

0.5W S3-14

C 1.N1-01

0.5W S4-01

C 1.N1-02

0.5W S4-02

1.N1-03

1.N1-04

C 1.N1-05

0.5W S4-03

C 1.N1-06

0.25W S4-04

C 1.N1-07

0.25W S4-05

C 1.N1-08

0.25W S4-06

C 1.N1-09

0.25W S4-08

C 1.N1-10

0.25W S4-09

C 1.N1-11

0.25W S4-10

C 1.N1-12

0.25W S4-11

C 1.N1-13

0.5W S4-12

C 1.N1-14

0.25W S4-13

C 1.N1-15

0.25W S4-14

C 1.N1-16

0.25W S4-15

C 1.N1-17

0.25W S4-16

C 1.N1-18

0.25W S4-17

C 1.N2-01

0.25W S4-36

C 1.N2-02

0.25W S4-35

C 1.N2-03

0.25W S4-33

C 1.N2-04

0.25W S4-32

C 1.N2-05

0.25W S4-31

C 1.N2-06

0.25W S4-30

C 1.N2-07

0.5W S4-29

C 1.N2-08

0.25W S4-28

C 1.N2-09

0.25W S4-27

C 1.N2-10

0.25W S4-26

C 1.N2-11

0.25W S4-25

C 1.N2-12

0.5W S4-24

C 1.N2-13

0.25W S4-23

C 1.N2-14

0.25W S4-22

1.N2-15

0.5W S4-21

1.N2-16

0.5W S4-20

C 1.N2-17

0.25W S4-19

C 1.N2-18

0.25W S4-18

C 1.N3-01

0.5W S5-01

C 1.N3-02

0.5W S5-02

1.N3-03

1.N3-04

C 1.N3-05

0.25W S5-03

C 1.N3-06

0.25W S5-04

C 1.N3-07

0.25W S5-05

C 1.N3-08

0.25W S5-06

C 1.N3-09

0.25W S5-08

C 1.N3-10

0.25W S5-09

C 1.N3-11

0.25W S5-10

C 1.N3-12

0.5W S5-11

C 1.N3-13

0.25W S5-12

C 1.N3-14

0.25W S5-13

C 1.N3-15

0.25W S5-14

C 1.N3-16

0.25W S5-15

C 1.N3-17

0.25W S5-16

C 1.N3-18

0.25W S5-17

C 1.N3-19

0.25W S5-18

C 1.N3-20

0.25W S5-19

C 1.N4-01

0.25W S5-32

C 1.N4-02

0.25W S5-30

C 1.N4-03

0.25W S5-29

C 1.N4-04

0.25W S5-28

C 1.N4-05

0.25W S5-27

C 1.N4-06

0.5W S5-26

C 1.N4-07

0.25W S5-25

C 1.N4-08

0.25W S5-24

C 1.N4-09

0.25W S5-23

C 1.N4-10

0.25W S5-22

C 1.N4-11

0.5W S5-21

C 1.N4-12

0.25W S5-20

S C

0.5W S4-34

S C

0.5W S5-07

S C

0.5W S5-31

SCALE: NOT TO SCALE

FIRE ALARM RISER DIAGRAM

120V BY OTHERS

FACP DOC

AC

FACEVAC

S C

0.5W S4-07

120V BY OTHERS

BPS 1

K K

MM

L1-M22

BPS-1 TROUBLE

A

S

B

S

B

S

B

S

B

B

S

B

B

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

S

S

S

B

B

B

B

B

B

B

S

S

DH DH

ACAC

AC

TR

HOME

RUN

TR

RM

L1-M12

RM

L1-M05

D

DH DH

D

P

A

EVACFACP

AR,L,P

BPS 1

TR

LOC 1

LOC 2

LOC 3

AR,L,P

PANEL TO PANEL CONNECTION DETAIL

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

AR,L,P

AR,L

TR

FAA

G G

G,P

FPL FPLR FPLP THHN TFFN

X X X

X X X

X X X X X

X X X

X X X

X X X

X X X X X

X X X

ADDRESSABLE CIRCUIT (SLC)

NOTIFICATION DEVICES (NAC)

DOOR HOLDER

ANNUNCIATOR BUS PRIMARY

EXTERNAL AUDIO RISER

REMOTE TEST STATION

AUX / POWER (24VDC)

AUDIO - SPEAKER STP SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

UTP SOLID

TYPETAG DESCRIPTION GAUGE

18 AWG

14 AWG

14 AWG

18 AWG

14 AWG

14 AWG

14 AWG

18 AWG

ALL CABLES ARE FOR INDOOR INSTALLATIONS. UNDERGROUND CABLE / WIRE MUST BE LISTED FOR INSTALLATION IN WET CONDITION.

NOTE:

FIRE ALARM WIRE LEGEND

A

B

D

G

AR

K

P

S

X X

FPL FPLR FPLP THHN TFFN

X X X

X X X

X X X X X

X X X

X X X

X X X

X X X X X

X X X

ADDRESSABLE CIRCUIT (SLC)

NOTIFICATION DEVICES (NAC)

DOOR HOLDER

REMOTE TEST STATION

AUX / POWER (24VDC)

AUDIO - SPEAKER STP SOLID

2 COND. SOLID

2 COND. SOLID

2 COND. SOLID

UTP SOLID

TYPETAG DESCRIPTION GAUGE

18 AWG

14 AWG

14 AWG

18 AWG

14 AWG

14 AWG

18 AWG

ALL CABLES ARE FOR INDOOR INSTALLATIONS. UNDERGROUND CABLE / WIRE MUST BE LISTED FOR INSTALLATION IN WET CONDITION.

NOTE:

FIRE ALARM WIRE LEGEND

A

B

D

K

P

S

X X

2 COND. SOLID X X

X X XTRIGGER CIRCUIT 2 COND. SOLID 14 AWG

TR

X XX X X2 COND. SOLID 14 AWG X X

X X XLOC BUS CONNECTION 2 COND. SOLID 18 AWG

L

X X X18 AWG

FA-05

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

RISER DIAGRAM &

PANEL TO PANEL

CONNECTION ARC.

RISER NOTES:

1. RISER IS A DIAGRAMMATICAL REPRESENTATION OF

THE SYSTEM ARCHITECTURE IN BUILDING CROSS

SECTION. IT IS NOT INTENDED TO REPRESENT

ACTUAL WIRE RUNS, PANEL CONFIGURATIONS OR

PENETRATIONS. REFER TO FLOOR PLANS AND PANEL

DETAILS FOR CIRCUIT ROUTING AND

CONFIGURATION INFORMATION.

2. ALL WIRING SHALL COMPLY WITH APPLICABLE

ELECTRICAL CODES. REFER TO 'APPLICABLE CODES &

STANDARDS' ON SHEET FA-01 FOR SPECIFIC CODE

REFERENCES.

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

FA-06

SHEET:

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

CALCULATIONS

FACP BATTERY CALCULATION FACP VOLTAGE DROP CALCULATIONS

EVAC ECC 50/100 BATTERY CALCULATION

DB LOSS CALCULATION

BPS-1 BATTERY CALCULATION BPS-1 VOLTAGE DROP CALCULATIONS

HWF2V-COM BATTERY CALCULATION

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

FA-07

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

WIRING DETAIL

PSE-10 + ZNAC-PS

ES-1000X CABINET MOUNTING

ES-1000X WIRING

NOTE: VALUES IN

PARENTHESES ARE IN

CENTIMETERS (CM).

0.88” (2.24)

1.63” (4.14)

6.755” (17.16)

Semi-Flush Mounting Do not recess box more than 3.875” (9.84cm) into wall to avoid covering venting holes on top of box.

6.0” (15.24)

1.63” (4.14)

1.19” (3.02)

2.50” (6.35) 3.85”

(9.78)

8.913” (22.64)

Semi-flush mounting holes

20.0” (50.8)

10.187” (25.88)

Semi-flush mounting holes

2.50” (6.35)

13.0” (33.02)

3.513” (8.92)

1.06” (2.69)

20.50” (52.07)

16.0” (46.04) 6.755” (17.16)

2.07” (5.26)

1.875” (4.76)

1.875” (4.76)

2.25” (5.72)

2.25” (5.72)

2.25” (5.72)

2.25” (5.72)

1.875” (4.76)

1.875” (4.76)

7.50” (19.05)

4.56” (11.58)

13.61” (34.57) 2.958” (7.51)

6.638” (16.86)

5.758” (14.63)

3.28” (8.33)

1.57” (3.99) 1.85”

(4.70)

Power-limited Circuits (Class 2)

Non-power-limited Circuits

Power-limited Circuits (Class 2) maintain minimum 0.25” between power-limited and non-power-limited circuits wiring

4XTMF

SLC-3LS

IPOTS-COM

AC

Power

Grounding stud (see Figure 2.4)

Non power-limited (Class 1) Supervised Telephone Circuit to batteries

Ground cables (2) #71073 wire nut

Power-limited Circuits (Class 2)

Power-limited Circuits (Class 2)

Power-limited Circuits

Power-limited Circuits

(Class 2) (Class 2)

Power-limited Circuits (Class 2)

AC Power Nonpower-limited Circuit to batteries nonpower-

Power-limited Circuits (Class 2) limited circuit ec cu lp w r.w m f

ECC-50/100 WIRING DETAILS FL-PS10 WIRING

12 VDC 7AH BATTERY 12 VDC 7AH BATTERY

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

AutoCAD SHX Text

STREET HILO, HI 96720

AutoCAD SHX Text S1

AutoCAD SHX Text S8

AutoCAD SHX Text S7

AutoCAD SHX Text S6

AutoCAD SHX Text S5

AutoCAD SHX Text S4

AutoCAD SHX Text S3

AutoCAD SHX Text S2

AutoCAD SHX Text

GLOBAL

AutoCAD SHX Text

OUTPUT 7

AutoCAD SHX Text

OUTPUT 6

AutoCAD SHX Text

OUTPUT 5

AutoCAD SHX Text

OUTPUT 4

AutoCAD SHX Text

OUTPUT 3

AutoCAD SHX Text

OUTPUT 2

AutoCAD SHX Text

OUTPUT 1

AutoCAD SHX Text

PROGRAMMING SWITCHES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 7

AutoCAD SHX Text

NC

AutoCAD SHX Text C

AutoCAD SHX Text

TROUBLE

AutoCAD SHX Text

NO

AutoCAD SHX Text

NC

AutoCAD SHX Text C

AutoCAD SHX Text

AC TRBL

AutoCAD SHX Text

NO

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text 120VAC, 50/60 Hz, 6.2A MAX

AutoCAD SHX Text

FAIL-SAFE SHOWN ENERGIZED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BATTERY

AutoCAD SHX Text

ON

AutoCAD SHX Text

AutoCAD SHX Text

EOL

AutoCAD SHX Text

IN 3

AutoCAD SHX Text

EOL

AutoCAD SHX Text

AutoCAD SHX Text

IN 2

AutoCAD SHX Text

IN 1

AutoCAD SHX Text

AutoCAD SHX Text

EOL

AutoCAD SHX Text

EOL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EOL

AutoCAD SHX Text

EOL

AutoCAD SHX Text

AutoCAD SHX Text J8

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TB8

AutoCAD SHX Text

TB9

AutoCAD SHX Text

TB10

AutoCAD SHX Text

TB11

AutoCAD SHX Text

TB12

AutoCAD SHX Text

TB13

AutoCAD SHX Text

TB14

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OUT 7

AutoCAD SHX Text

TB8

AutoCAD SHX Text

TB9

AutoCAD SHX Text

TB10

AutoCAD SHX Text

TB11

AutoCAD SHX Text

TB12

AutoCAD SHX Text

TB13

AutoCAD SHX Text

TB14

AutoCAD SHX Text

ZNAC-PS

AutoCAD SHX Text

120VAC, 20A DEDICATED CKT.

AutoCAD SHX Text

PSE-10 CABINET

AutoCAD SHX Text

47KΩ EOLR

AutoCAD SHX Text

FCM MOUNTS INSIDE

AutoCAD SHX Text

NAC1 RETURN

AutoCAD SHX Text

NAC1

AutoCAD SHX Text

NAC2 RETURN

AutoCAD SHX Text

NAC2

AutoCAD SHX Text

NAC3 RETURN

AutoCAD SHX Text

NAC3

AutoCAD SHX Text T7 B-

AutoCAD SHX Text T8 A-

AutoCAD SHX Text T9 A+

AutoCAD SHX Text T10

AutoCAD SHX Text T11

AutoCAD SHX Text

MMF-300

AutoCAD SHX Text T6 B+

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T2

AutoCAD SHX Text T1

AutoCAD SHX Text T3

AutoCAD SHX Text T4

AutoCAD SHX Text T5

AutoCAD SHX Text

AutoCAD SHX Text

SLC

FA-08

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

WIRING DETAIL

HWF2V-COM WIRING DETAIL

FM-998 WIRING DETAIL

ECC-50/100 & ECC-LOC WIRING DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

FA-09

OF SHEETS

DATE:

PROJECT NUMBER:

SCALE:

PR

O

JE

C

T:

EL

EC

TR

IC

AL

C

O N

TR

AC

TO

R

DRAWING TITLE:

RE-WORK:

M

ED

CO

M

B U

IL

DI

N G

-1

EN

TE

RP

RI

SE

A

VE

N U

E

KA

PO

LE

I, HI

FIRE ALARM SYSTEM

WIRING DETAIL

For use with the following models: SPSRL, SPSWL, SPSRL-P, SPSWL-P, SPSRL-SP, SPSWL-CLR-ALERT, SPSCRL, SPSCWL, SPSCWL-P, SPSCWL-SP, SPSCWL-CLR-ALERT, SPRL, SPWL, SPCRL, SPCWL

Candela Range

110^

135^

177*

Note: Refer to Floorplans for candela ratings

Connection Drawing for System Sensor Speaker, Speaker/Strobes

115*

150*

185^ *Ceiling Mount Devices Only ^Wall Mount Devices Only

From Previous Devices or FACP

STROBE

STROBE

SPEAKER

SPEAKER

Verify EOLR Value Based on the associated Signal Circuit Control Panel

SPEAKER TAP SELECTOR

Note: "T" Tapping is not allowed

To Next Device or Return to Power Supply

"E" Cable is a Shielded cable. This shield needs to be spliced through and insulated from ground

Mounting

ANN-80 WIRING

BG-12LX

NOTE: SET DEVICE ADDRESS PER DRAWING

BEFORE INSTALLATION

NOTE: SET DEVICE ADDRESS PER DRAWING

BEFORE INSTALLING OF DETECTOR HEAD

6 7 8 9

1415 01

6 7 8 9

TENS ONES

FIRE-LITE

DETECTOR BASE

TO NEXT

SLC DEVICE

FROM FACP OR

PREVIOUS SLC DEVICE

ADDRESS SETTING IS LOCATED

ON THE DETECTOR. SHOWN ON

BASE FOR REFERENCE ONLY.

ADDRESSABLE

SLC LOOP

CABLE, TYP.

B300-6

1- 2+ 3 4 0 1

6 7 8 9

TENS ONES

LED

FIRE-LITE

BG-12LX

TO NEXT

SLC DEVICE

FROM FACP OR

PREVIOUS SLC DEVICE

ADDRESSABLE

SLC LOOP

CABLE, TYP.

From FACP or Previous Addressable Device

To Next Addressable Device (If Applicable)

SLC (-)

SLC (+)

678910

AddressLoop

567 8 9

OnesTens

T9 T8 T7 T6

T1

IDC RETURN (-)

IDC RETURN (+)

IDC OUT (+)

IDC OUT (-)

T2

MMF-300

MMF-300

NOTE: SET DEVICE ADDRESS PER DRAWING

BEFORE INSTALLATION

COMM.

LINE (+)

COMM.

LINE

COMM.

LINE (–)

UL/FM LISTED

CONTROL

PANEL

1ST

DETECTOR

IN LOOP

2ND

DETECTOR

IN LOOP

D365 PL

NOT USED

NOT USED

COMM +

OUT (CONV ONLY) +

COMM –

RA/RTS –

RA +

RTS +

RTS151/RTS151KEY

H0633-02

JUMPER

RTS151KEY

From FACP or Previous

Addressable Device

To Next Addressable

Device or FACP (If Applicable)

The Installing Contractor shall locate this device within 3-feet of device to be controlled.

The Installing Contractor shall determine if the control circuit requires a normally open or normally closed operation.

SLC (-)

SLC (+)

678910

AddressLoop

567 8 9

OnesTens

T9 T8 T7 T6

T1

N.C. 2 N.O. 2

COMM 1

N.C. 1

T2

UNUSED

N.O. 1

T4

T5

T10COMM 2

CRF-300

CRF-300

NOTE: SET DEVICE ADDRESS PER DRAWING

BEFORE INSTALLATION

AutoCAD SHX Text

AutoCAD SHX Text

Z,S ELECTRICAL 122 HAILI

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text 09/23/2025

AutoCAD SHX Text

AutoCAD SHX Text

STREET HILO, HI 96720

AutoCAD SHX Text

(-) GROUND

AutoCAD SHX Text

(+) 24V DC

AutoCAD SHX Text

(A) ANN-BUS

(B) ANN-BUS

Attachment #3

BLDG 46 Specification Section 08111

Hollow Metal Doors and Frames DoD Job No. CA-202505-D 08111 - 1

SECTION 08111 – HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.01 SUMMARY:

A. Section Includes:

1. Exterior hollow-metal doors and frames.

2. Hollow-metal panels where indicated.

B. Related Requirements:

1. Division 01 – General Requirements: Administrative, procedural, and temporary work requirements.

2. SECTION 08710 – FINISH HARDWARE

3. SECTION 08800 – GLAZING

4. SECTION 09901 – PAINTING

1.02 REFERENCES

A. ASTM International (ASTM)

1. ASTM A153/A153M – Standard Specification for Zinc Coating (Hot-Dip) on Iron and

Steel Hardware

2. ASTM A653/A653M – Standard Specification for Steel Sheet, Zinc-Coated or Zinc- Iron Alloy-Coated by the Hot-Dip Process.

3. ASTM A879/A879M – Standard Specification for Steel Sheet, Zinc Coated by the

Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface.

4. ASTM A1008/A1008M – Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Required Hardness, Solution Hardened, and Bake Hardenable.

5. ASTM A1011/A1011M – Standard Specification for Steel, Sheet and Strip, Hot-

Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength.

B. Steel Door Institute (SDI)

1. SDI A250.4 – Test Procedure and Acceptance Criteria for Physical Endurance for

Steel Doors, Frames, Frame Anchors and Hardware Reinforcings

2. SDI A250.6 – Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames

3. SDI A250.8 – Specifications for Standard Steel Doors and Frames

4. SDI A250.10 – Test Procedure and Acceptance Criteria for Prime Painted Steel

DoD Job No. CA-202505-D 08111 - 2

Surfaces for Steel Doors and Frames

5. SDI A250.11 – Recommended Erection Instructions for Steel Frames

1.03 SUBMITTALS

A. Submit in accordance with SECTION 01300 – SUBMITTAL PROCEDURES.

B. Pre-Construction Submittals:

1. Product Data: Manufacturer’s descriptive data for each type of door, frame, core, accessory, and finish.

2. Shop Drawings: Indicate elevations, dimensions, profiles, metal thicknesses, hardware preparations and reinforcements, anchors, joints, field splices, glazing, accessories, and adjacent construction.

3. Door and Frame Schedule: Use the same opening references indicated on the

Drawings and coordinate with the final Door Hardware Schedule.

C. Informational Submittals:

1. Product Test Reports: For each type of hollow-metal door and frame assembly, prepared by a qualified testing agency.

2. Oversize Construction Certification: For fire-rated assemblies exceeding the size limitations of labeled assemblies, where applicable.

1.04 QUALITY ASSURANCE

A. Manufacturer Qualifications: Manufacturer specializing in hollow-metal doors and frames with a minimum five years documented experience.

B. Installer Qualifications: Minimum five years experience in work of this Section.

1.05 DELIVERY, STORAGE AND HANDLING

A. Deliver hollow-metal work palletized, packaged, or crated to protect against damage during transit and storage. Do not use nonvented plastic

B. Deliver welded frames with two removable spreader bars tack welded to jambs at the bottom of frames

C. Store hollow-metal work vertically under cover, with heads up, on minimum 4-inch-high wood blocking.

D. Provide minimum 1/4-inch space between stacked doors to permit air circulation. Protect factory-finished units from damage

PART 2 – PRODUCTS

2.01 MANUFACTURERS

A. Provide products by a qualified hollow-metal manufacturer regularly engaged in manufacturing doors and frames complying with this Section

DoD Job No. CA-202505-D 08111 - 3

B. Substitutions: In accordance with Division 01 requirements.

2.02 EXTERIOR HOLLOW-METAL DOORS AND FRAMES

A. Extra-Heavy-Duty Doors and Frames: SDI A250.8, Level 3.

1. Physical Performance: Level A in accordance with SDI A250.4.

2. Doors:

a. Type: As indicated in the Door and Frame Schedule

b. Thickness: 1-3/4 inches.

c. Face: Metallic-coated steel sheet, minimum 0.053-inch thickness, with minimum

A60 coating

d. Edge Construction: Model 2, seamless.

e. Core: Manufacturer’s standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core.

3. Frames:

a. Material: Metallic-coated steel sheet, minimum 0.053-inch thickness, with minimum A60 coating.

b. Construction: Full-profile welded.

4. Exposed Finish: Prime.

B. Hollow-Metal Panels: Provide panels of the same materials, construction, and finish as adjacent door assemblies.

2.03 FRAME ANCHORS

A. Jamb Anchors:

1. Stud-Wall Type: Designed to engage studs, welded to backs of frames, and not less than 0.042 inch thick.

B. Floor Anchors: Formed from the same material as frames, minimum 0.042 inch thick, with two holes for fasteners at monolithic concrete slabs

2.04 MATERIALS

A. Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel, Type B, suitable for exposed applications.

B. Hot-Rolled Steel Sheet: ASTM A1011/A1011M, Commercial Steel, Type B, free of scale, pitting, and surface defects; pickled and oiled.

C. Metallic-Coated Steel Sheet: ASTM A653/A653M, Commercial Steel, Type B.

D. Frame Anchors: ASTM A879/A879M, Commercial Steel, 12G coating designation, mill

DoD Job No. CA-202505-D 08111 - 4 phosphatized. Hot-dip galvanize anchors built into exterior walls in accordance with ASTM A153/A153M, Class B.

E. Inserts, Bolts, and Fasteners: Hot-dip galvanized in accordance with ASTM A153/A153M.

F. Power-Actuated Fasteners in Concrete: Corrosion-resistant fastener system suitable for the application indicated.

G. Mineral-Fiber Insulation: ASTM C665, Type I, unfaced slag- or rock-wool fiber with maximum flame-spread index of 25 and smoke-developed index of 50.

2.05 FABRICATION

A. Fabricate hollow-metal work rigid, free of defects, warp, and buckle, and accurately formed to required sizes and profiles. Factory fit and assemble units where practical.

B. Close door top edges with flush closures of the same material as face sheets. Provide bottom closures or channels where required for weather stripping.

C. Provide weep-hole openings at bottoms of exterior doors and seal joints in top edges against water penetration.

D. Fabricate frames in sections only where required by shipping or handling limitations;

provide alignment plates or angles at joints of the same metal thickness as frames.

E. Weld floor anchors to jamb bottoms with at least four spot welds per anchor, except provide anchor clips or countersunk holes for slip-on drywall frames.

F. Provide jamb anchors in number and spacing required by SDI A250.8 and the wall construction indicated.

G. Provide three silencers at strike jambs of single-door frames and two silencers at heads of double-door frames, except at weather-stripped frames.

H. Factory prepare doors and frames for hardware in accordance with SDI A250.6, BHMA A156.115, the Door Hardware Schedule, and approved templates.

2.06 STEEL FINISHES

A. Prime Finish: Clean, pretreat, and apply manufacturer’s standard primer.

1. Shop Primer: Fast-curing, lead- and chromate-free primer complying with SDI A250.10 and compatible with specified field-applied…