CA FLAP 111(1) Beckwourth Final Plans.pdf
PDF 6 MB Posted
- Solicitation number
- 6982AF21Q000011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - 6982AF21Q000011 Revegatation - Beckwourth Genesee Road.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Know what'sbelow.
before you dig.Call
R www.call811.com
R
D E P
A T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
To Reno
44 Miles
BeckwourthTo Portola
5 Miles
C ro c k e r
M o u n ta in R d
G e n e se e
R oad
B e c k w o u rth
Genesee Road
Eureka
SAN
FRANCISCO
LOS
ANGELES
San
Diego
Sacramento
OREGON
N
EV
A D
A
ARIZONA
MEXICO
Redding
KEY MAP OF CALIFORNIA
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Project Location
STA 1218+00
BEGIN SCHEDULE A
STA 1471+00
END SCHEDULE A
Scale in Miles
20 4
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT MANAGER LEAD DESIGNER
DENVER, CO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CHIEF OF ENGINEERING
DATE:
RECOMMENDED:
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
Grading
Biotic Soil Amendment, Fiber Rolls, Seeding, Bonded Fiber Matrix, and
TYPE OF CONSTRUCTION:
MICHAEL DAIGLER SEBASTIAN GUZMAN
PLANS FOR PROPOSED
CA FLAP 111(1)
BECKWOURTH - GENESEE ROAD
PLUMAS NATIONAL FOREST
PLUMAS COUNTY
SCHEDULE A - VARIOUS SITES
:0
P
M
J u ly
F S
N
C A
\c a -1
(1
R o a d w a y
C A
F L
A P
(1
C
A D
D S h e e ts
\A -G e n s h t\
T T
L U
S .d g n
STATE PROJECT
NUMBER
SHEET
CA
CA FLAP 111(1)
A1
BECKWOURTH GENESEE RD
jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
J u n e
S h e e t
C
A \c a
-1 (1
R o a d w a y
C A
F L
A P
(1
C
A D
D
S h e e ts \A
-G e n s h t\ s y m
.d g n
STATE PROJECT
NUMBER
SHEET
CA
A2
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
N
CP
36 31
36 31
0.00EL.
Area of Biotic Soil Amendment, Seeding, and Bonded Fiber Matrix
:4
J u n e
S h e e t
C
A \c a
-1 (1
R o a d w a y
C A
F L
A P
(1
C
A D
D
S h e e ts \A
-G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CA
A3
ˆ
ˆ
ˆ
ˆ
ˆ
S T
A T E H
IG
H W
A Y
T A
N K
S
W A
T E
R
T A
N K
T A
N K
T A
N K
T A
N K
T A
N K
T A
N K
T A
N K
D I
D I
STO
P
U S F S B
D Y L
IN
E
U S F S B
O U
N D
A R
Y U S F S B
O U
N D
A R
Y
U S F S B
O U
N D
A R
Y
U S F S B
O U
N D
A R
Y
S
L S
O U
T
P
IN
E T
N R
E S
U S F S B
O U
N D
A R
Y
U S F S B
O U
N D
A R
Y
TANK
TANK
TANK
P A
V E
M E
N T G
R A
V E
L
STATE PROJECT
A
M N C
A c a R o a d w a y
C A F
L A
P
C
A D
D S h e e ts A G e n s h t\
C A S it e P la n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S e b a s ti a n .g u z m a n
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
Sheet 1 of 2
SITE PLAN
Main St.
Maintenance Yard
Plumas Co. Beckwourth Ranch
Ceresola
FS 23N30
Beckwourth - Genesee Road
FS 24N52X
4000'2000'0
Scale in Feet
C a li fo rn ia S ta te H ig h w a y
National Forest boundary m il e s
T o R e n o m il e s
T o P o rt o la
To Pappas Camp
FS 23N53
A4
Site 1
Site 2
Site 3
Site 4
Site 6
Site 5
Site 7
Site 8
Station 1218+00
Begin Schedule A
DI
.5 http://denver.craigslist.org/pts/3962112643.html
Sheet 2 of 2
SITE PLAN
No Scale
Dotta Canyon
FS 24N32
Flynn Residence Private Drive
Crocker Mountain Road
4000'2000'0
Scale in Feet
Campground Crocker Creek
A5
Site 9
Site 10
Site 11
Site 12
Site 13
Site 14
Station 1471+00
End Schedule A
3 3
.8
5675.80 5 .8
5675.70
D
IR
E C
T
IO
N S
S T
O P
B E
C K M
IL
E
G E
N E S
E
N A
T . F
O R . 7
N
T I
N T
E R
S E
C T I O
N
P A
V E
M E
N T G
R A
V E
L
C A
C A
P T
8 2
ˆ
ˆ
S ° 4
' 1
" W , 8
.6
T
IE
T
O P
O B P -1
P O
B P
A R
C E L
P -1
T I E T
O P
O B P
S
' 3
E , 1
.1
POB PARCEL
P33-1
V O
L . 2
, P
G . 6
, 1
' U
S F S R
O A
D E
A S
E M
E N
T
STATE PROJECT
A
M N C
A c a R o a d w a y
C A F
L A
P
C
A D
D S h e e ts A G e n s h t\
C A S it e P la n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S e b a s ti a n .g u z m a n
NUMBER
SHEET
CA
:0
J u ly
M is c e ll a n e o u s S u m m a r ie s
C A
\c a
\R o a d w a y
C
A F
L A
P
\C
A D
D
S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
SUMMARY OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
CA
B1
5260 5265
5305 5
0 5
5355 5360
5385 5390
N A
T I O
N A
L F
O R
E S
T B
O U
N D
A R
Y
NATIONAL FOREST BOUNDARY
USFS AC E 1/16 C-C S10 1989
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
1218+00 TO 1221+00
PLAN SHEET
200'100'0
Scale in Feet
Sta. 1218+00
Begin Schedule A
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1218+00 - 1223+50, Lt.
Site 1 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1218+00 - 1226+00, Rt.
Site 2
C1
OUTCROP
ROCK
OUTCROP
ROCK
OUTCROP
ROCK
OUTCROP
ROCK
OUTCROP
ROCK
OUTCROP
ROCK
54255430
5570 5
5575 5575
55600
N A T
IO
N A
L F
O R
E S
T B
O U
N D
A R
Y
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
C2
1221+00 - 1253+00
PLAN SHEET
200'100'0
Scale in Feet
200'100'0
Scale in Feetand Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1232+00 - 1245+00, Rt.
Site 3 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1232+00 - 1245+00, Rt.
Site 3
5+00
0+00
60 5665
5730 5735
5 5
5 5
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
C3 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1256+00 - 1260+00, Lt.
Site 4
200'100'0
Scale in Feet
200'100'0
Scale in Feet
1253+00 - 1284+00
PLAN SHEET
0 5865
DITCH
DITCH
DITCH
DITCH
DITCH
DITCH
TR
EES
S C
ATTER
ED
TR
EES
S C
ATTER
ED
DITCH
DITCH
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1284+00 - 1296+00, Rt.
Site 5 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1286+00 - 1295+00, Lt.
Site 6
1284+00 - 1315+00
PLAN SHEET
200'100'0
Scale in Feet
C4
5 5
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1320+00 - 1325+00, Rt.
Site 7 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1336+00 - 1344+00, Rt.
Site 8
C5
1315+00 - 1345+00
PLAN SHEET
0 5
57105710
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet
1345+00 - 1376+00
PLAN SHEET
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1372+00 - 1375+00, Rt.
Site 10
C6 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1358+00 - 1364+00, Lt.
Site 9
5660 5660
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet
C7
1376+00 - 1406+00
PLAN SHEET
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1393+00 - 1396+00, Rt.
Site 11
5590 559
F L A
G P
O L E
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U S
E R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
C8
1406+00 - 1437+00
PLAN SHEET
200'100'0
Scale in Feet
200'100'0
Scale in Feet
5540 5540
5540 55
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet
C9
1437+00 - 1467+00
PLAN SHEET
200'100'0
Scale in Feet and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1440+00 - 1444+00, Lt.
Site 12
STATE PROJECT
T
IM
E
D
G N
D
A T
E
U
S E
R
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
CA FLAP 111(1)
200'100'0
Scale in Feet
Sta. 1471+00
End Schedule A
200'100'0
Scale in Feet
C10
1467+00 - 1497+00
PLAN SHEET
and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1467+00 - 1471+00, Lt.
Site 13 and Bonded Fiber Matrix
Biotic Soil Amendment, Seeding, Sta. 1467+00 - 1471+00, Rt.
Site 14
0 1
0 1 side of fiber roll material on uphill
Place excavted Wood stakes
Fiber roll
Slope
Fill slope uphill side of fiber roll
Place excavted material on uphill side of fiber roll
Place excavted material on
Fill or cut slope
Stagger joints (typ.)
along contours
Install fiber rolls
151V:2H and steeper
30Between 1V:3H and 1V:2H
45Between 1V:4H and 1V:3H
601V:4H or flatter spacing (ft)
Fiber Roll Maximum �9" Slope Gradient
FIBER ROLL SPACING TABLE*
NOTE:
1. Repair all rills or gullies and properly compact prior to installation.
2. Install fiber rolls along slope contours. For any 20' section of fiber roll, do not allow the fiber roll to vary more than 5% from level.
3.Stake fiber rolls in place with 1 "x 1" or 1" � wood stakes. Space stakes 4' o.c. max. on slopes and 2' o.c. max. culverts. Stake fiber rolls 6-inches from each end.
4. Drive stakes into undisturbed soil at least 12" deep. Expose stakes 2" above top of fiber roll.
5. For fiber rolls on bare soil, construct trenches parallel to the contour.
Place fiber rolls in continuous contact with trench bottom and sides.
Tamp soil backfill against upstream side of fiber roll to ensure storm water is forced to flow through fiber roll rather than under it.
NO SCALE
FIBER ROLL JOINT DETAIL
D irection of ru n off
*Approximate spacing shown. Adjust spacing as needed dut to project-specific conditions.
FIBER ROLL LAPPING DETAIL
S lo p e
S ta k e
C le a ri n g
L im it
Flow
Trench 2" min.
FIBER ROLL AS PERIMETER CONTROL
INSTALLATION DETAIL
Flow
Trench 2" min.
STAKE DETAIL
FIBER ROLL SLOPE LAYOUT
Flow
3054" or larger
4530" to 48"
6024" or smaller
Fiber Roll length (ft)�9" Culvert Size
FIBER ROLL AT CULVERTS*
Pay lim its
Pay lim its ove rlap12" mi n.
m in m in spacing table See Fiber roll
FIBER ROLL
09/2020REVISED: 12/2017
:4
J u ly
C
-5
S h e e t]
C
A \c a -1
(1
R o a d w a y
C A
F L A
P
(1
C
A D
D S h e e ts
\F -1
\C
-5
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
157-A
DETAIL APPROVED FOR USE 01/2011
STATE PROJECT
NUMBER
SHEET
CA
BECKWOURTH GENESEE RD
F1
NO SCALE
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1 the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
C
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
NOTE:
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
S
T D
C
A c a R o a d w a y
C A F
L A
P
C
A D
D S h e e ts T S td
.d g n
J u n e
STATE PROJECT
NUMBER
SHEET
T1CA
BECKWOURTH GENESSE RD
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
ROAD WORK
END
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices Flagger location
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
(optional)
W13-1P
(optional)
W16-2P
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
Flagger location
WORK
ROAD
AHEAD
NO SCALE
MPH
FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
S
T D
C
A c a R o a d w a y
C A F
L A
P
C
A D
D S h e e ts T S td
.d g n
J u n e
STATE PROJECT
NUMBER
SHEET
T2CA
MEDIAN SHOULDER
SHOULDER
I
I
I A
I A
I A
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
REVISED STANDARD PLAN RSP T25
NO SCALE
ROAD
AHEAD
WORK
ATTENUATOR
IMPACT
LANE
CLOSED
W3-4
C30A(CA)
W7-3aP
WORK AREA
SPACE
BUFFER
100' MAXIMUM
PROTECTED AREA (1)
100' MAXIMUM
PROTECTED AREA (N)
SPACE
BUFFER
MOBILE BARRIER SYSTEM
WORK AREA
SPACE
BUFFER
100' MAXIMUM
PROTECTED AREA (1)
100' MAXIMUM
PROTECTED AREA (N)
ROAD
AHEAD
WORK
ATTENUATOR
IMPACT
CLOSED
SHOULDER
SPACE
BUFFER
W3-4
NOTE:
BE
PREPARED
SHOULDER
CLOSED
X MILES
NEXT
BE
PREPARED
TRAFFIC CONTROL SYSTEM
MOBILE BARRIER WITHIN REVERSIBLE
SHOULDER TRAFFIC CONTROL SYSTEM
MOBILE BARRIER WITHIN
A
TO STOP
TO STOP
SEE NOTE 1
SEE NOTE 1
REPOSITIONING MOBILE BARRIER
TRAFFIC CONE
FAS SUPPORT OR TRAILER
TEMPORARY TRAFFIC CONTROL SIGN
TRAFFIC CONE (OPTIONAL)
TYPE II FLASHING ARROW SIGN
PORTABLE CHANGEABLE MESSAGE SIGN
LEGEND:
SEE TABLE 2 SEE TABLE 2
SEE TABLE 2
SEE TABLE 2
See Standard Plan T9 for tables.
as the barrier moves within the work area.
not placed while the mobile barrier is stationary, but must be placed or replaced
Channelizing devices shown adjacent to the mobile barrier may be removed or
2.
1.
FOR REQUIRED TRAFFIC CONTROL DEVICES AND SPACING.
ONLY, SEE TRAFFIC CONTROL SYSTEM STANDARD PLANS
TRAFFIC CONTROL DEVICES SHOWN FOR REFERENCE
RSP T25 DATED APRIL 16, 2021 SUPPLEMENTS THE STANDARD PLANS BOOK DATED 2018.
NOTE:
Devices (MUTCD).
Uniform Traffic Control control according to the Manual
Provide temporary traffic1.
T3
635-A
MOBILE WORK ZONE
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
P
M N C
A c a R o a d w a y
C A F
L A
P
C
A D
D S h e e ts T r s p t2
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r S e b a s ti a n .g u z m a n
NUMBER
SHEET
CA
File details come from the government source that posted it. Updated .