C27 - PDF dwgs_Part3.pdf
PDF 3 MB Posted
- Solicitation number
- 36c26120B0015
About this file
This document outlines a federal contract opportunity for electrical upgrades. The solicitation number is 36c26120B0015 and seeks to replace existing electrical infrastructure equipment at Building 12 through contract 654-20-3-6059-0055. The opportunity type is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 to upgrade electrical systems. Responses are due based on the standard FAR solicitation timeline and award will be made to a qualified contractor to complete the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C27 - PDF dwgs_Part1.pdf | ||
| Site Visit Sign In Sheet Bldg. 12 Elec.docx | DOCX document | |
| C27 - PDF dwgs_Part2.pdf | ||
| Wage Determination NV2020040 03.13.20.pdf | ||
| RFI FORM BLDG 12 ELEC UPGRADES.docx | DOCX document | |
| Contractor Badging - Guidance to Contractor_sy.pdf | ||
| 36C26120B0015.docx | DOCX document | |
| Combined Specs Bldg. 12 Elec Upgrades.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
1 2 3
Jf-<t--t--+------(E) INTERIOR WALL FINISH
0/FURRING CHANNELS
,,<f--+-----(E) MTL STUD WALL FRMG f------(E) EXT GFRC WALL FINISH mf-- - - - -�" GYP BD
20 GA. '"Z FURRING OR DBL
ANGLES TO FLUSH OUT (N) GYP BD
�II PLYWOOD BACKING
2"X2'X 16 GA CLOSURE ANGLE
f-7 -c4---;r 7'--7,"�
"F=:::=:�--'J' MOLD@ GYP BD
SEALANT
f-- - - --(E} CONG FON WALL
CONC SLAB 0/ AGGR BASE
FIBER EJ
FLOOR SLAB TO EXISITNG 3/4" = 1 '-0''
ALIGN---,
6"
SLAB □TL 0 1'-4"
1-- - - - -- HOLLOW METAL DOOR
REF ER TO SCHEDULE
�----- SILL SET IN MASTIC
�---- SEALANT OVER 1/'Z'
EXPANSION JOINT
FILLER
'I-�- EXTERIOR CONG.
STOOP
4�-#4 DOWEL TO SIDEWALK
@2411 0/c
HOLLOW METAL DOOR SILL 11/2" - 1'-0"
LINE@ CONG. STEM
WALL
INT. GYP. BD.
�' P LYWOOD
BAC�G
7"
¾• EJ TYP
1"0VERLAP
NOTE: CONC PEDESTAL
FON BASE DOESN'T
ALIGN WITH GFRC WRAP
@ STRUCT COL - THEREFOR
ALLOW'G FOR 1" OVERLAP
FOR FINISH TO FLUSHOLJT
DETAIL
NEW WALL TO (E) COLUMN
EIFS DETAIL
0 8'
SEALANT & BACKER ROD
SEE 16/AE 103
(E) GRFC WRAP @
STRUCT COL.
1 1/2'- 1'-0"
0 8' 17
-�1 _s s_u_ED_ F_ O_R _35_%_ R_�_1E_w ____________ --l- 01 _ro_61 _20 _20
_�1CONSULTANTISSUED FOR 65% REVIEW 02/27/2020
ISSUED FOR 90% CONSTRUCTION DOCUMENTATION 0313012020
□ ISSUED FOR CONSTRUCTION 0413012020
.��\ \ ,----- ",1
EPS INSULATION BOARD
MANUF. REINFORCING MESH
EMBEDDED IN BASE COAT
MANUF. DETAIL MESH - WRAPPED
TO BACKSIDE OF EPS 2' MIN,
BASE COAT
MANUF. AJRNvATER-RESISTIVE
BARRIER COATING
EFIS COLOR PRIME ON SURFACES
TO RECEIVE SEALANT
MANUF. ADHESIVE IN VERT. NOTCH'D
TROWEL APPLIED TO BACK OF EPS
EFIS FINISH - MATCH (E) BLDG
COMPATIBLE SEALANT WITH
CLOSED CEUL BACKER ROD
EXPANSION JOINT - lYP. NTS
16 EFIS DETAIL 0 12'
-- S• GYPSUM BOARD
-- METAL STUD FRAMING
ADHESIVE IN VERTICAL
NOTCHED TROWEL
CONFIGURATION APPLIED
TO BACK OF EPS
-:C.-.cc__c+-- INSULATION BOARD
--.--------1- - i" GYPSUM SHEATHING
-tce----�-----1-- AIR/WATER- RESISTIVE
BARRIER COATING
-t----c--'Tt-- BASE COAT
-i-----~- - 'PANZER' REINFORCING MESH
-+-����---- BASE COAT
-t-�=----- - REINFORCING MESH
EMBEDDED IN EIFS BASE COAT
+�����- - BASE COAT
,---"�+-- FINISH TO MATCH
EXISTING
HIGH IMPACT
EFIS WALL ASSEMBLY NTS
T.O. CONC CURB
EFIS DETAIL 0 12''
DR FRM = STEM WALL
le--- - - - --HOLLOW METAL DOOR
REFER TO SCHEDULE
�----- SILL SET IN MASTIC
�---- SEALANT OVER 1/2"
EXPANSION JOINT
FILLER
A.G. PAVING
MATCH (E)
PAVEMENT &
BASE
HOLLOW METAL DOOR SILL 1 1/2"- 1'-0"
a" rooLE□
RADIUS
AC. PAVING
MATCH (E)
PAVEMENT&
BASE
THRESHOLD 0 811
ELEC EQUIP. - SEE ELEC DWGS.
c---------ELEC. EQUIP.
6"
L_--1L _______ _
8"
ANCHOR BOLT - PER ELEC EQUIP
#4 DOWELS@ 24" 0.C. AROUND
PERIMETER OF PAD
211 AGGR. BASE
#4 BAR CONT.
EXT. CONCRETE EQUIPM'T PAD 1 1/2"- 1'-0"
13 CONG PAD 0 811
STAMP
CUT AND BEND TRACK WEB UP
TO FORM 2" RETURN. ATTACH
RETURN TO JAMB STUD W/2-
#10 SMS - TYP. DO SAME
(BEND DOWN STUD WEB) IF
STUD IS BELOW TRACK
362S125-54
CRIPPLE STUDS
@12"0.C.
362T125 -54
HEADER TRACK
AT DOOR JAMBS - PROVIDE
16 GAUGE STUDS - lYP.
A362S162-54
DBL MTL STUD JAMB
METAL STUD HEAD 1" = 1'-0"
12 METAL STUD FRMG 0 12'
BIRD/INSECT SCREEN
'J' MOLD & SEALANT
24 GA GI CLOSER FLASH'G
_3_ .. �I 2·
LOUVER WIDTH
R.O.
METAL LOUVER FIN
METAL LOUVER FRAME
WALL LOUVER JAMB 1 1/2" - 1 '-0"
LOUVER DETAIL 0 8''
BIRD/INSECT SCREEN
MANF STD. MULLION CONNECTION
METHOD
SECTION WIDTH SECTION WIDTH
MANF METAL STD. MUULION
WALL LOUVER MULLION 1 1/2'- 1'-0"
ANCHOR BOLT - PER
ELEC. EQUIP.
1" R TOOLED
EDGE
SE ELEC DWGS
1'-0" MIN.
LOUVER DETAIL 0 811
CONC. HOUSE KEEPING PAD
FOR ELEC. EQUIP.
#4 DOWELS@ 24" O.C. AROUND
PERIMETER OF PAD & NOT
LESS THEN ONE@ EA CORNER
OF PAD
#4 BARS@ 12" O.C. EA. WAY
CONC. SLAB W/ #3 BARS@ 18"
o.c.
2" AGGR. BASE
CONCRETE EQUIPMENT PAD 1 1/2' - 1'-0''
CONC PAD 0 811
Drawing Title
FILL DECK
FLUTES W/SAFING
EXISUNG FRMG/ /
(E) FLO ASSEMBLY
CbNCU/ ET DECK
INSUL *
4Q0T200• 4 DEFLECTION TRACK
W/2-#10 CREWS TO TRACK
36�250/ 4 UNPUNCHED TRACK
·W/27#10 CREWS TO STUD, TYP.SEALANT
SCRIBE GYP BO
TO (E) MTL DECK
CUT, REMOVE &
ADJUST (E) FRMG
DUE TO NEW
CONST.
(E) FRAMING
BACKER ROD & SEALANT
--1111,+--------�• PLYWOOD@ INT. WALL
tl--------362S162-54 METAL STUDS @12"0 C.
--1114--------�• GYP BOARD
llii!f�- - - - --1 �II (MIN.) EIFS O/i" EXTERIOR
GYP. SHEATHING - SEE 15/AE 103
WALL CONNECTION DETAIL 3/4" = 1'-0"
8 PARAU.EL CONDITION 0 1'-4"
,--��+---tt+-- --(E) SOFFIT FRM'G - FIELD VERIFICATION
REQ'D
--11<+-- - --WALL FRM'G TO STEEL DECK
ABV - SEE 4/AE 103
ltt- - - -�• PLYWOOD
-z:
lcJ----J1J-- - --BACKER ROD & SEALANT
24 GA GI CLOSER FLASH'G
_3•_· �I 2·
'l,-'1;-- - ----Jji",J"==...l:!V
LOUVER FRAME
I
BIRD�NSECT SCREEN
ci
I
I
0:
I(!)
iii
0 I 0: 0:
J
" /•, i
I
METAL LOUVER BLADE
J 6"
WALL LOUVER HEAD 1 1/211 - 1'--0"
6"
LOUVER DETAIL 0 8"
BIRD/INSECT SCREEN
FIXED MOUNT'G MANF. STD.
24 GA. GI FLASHING
LOUVER FRAME
SEALANT W/ BACKER ROD
WALL LOUVER BASE 1 1/211 - 1'--0"
6 LOUVER DETAIL 0 811
EFIS EXTERIOR FINISH - MATCH
EXISl'G
CLIP EFIS EDGE IF FINISH EXCEEDS
FACE OF DOOR FRAME - TYP,
HOLLOW METAL DOOR FRAME
DR ANCHOR APPROPRIATE TO FRMG
CONDITION
�DOOR
DBL'D 16 GA. STUDS @ DOOR
OPENING SEE 12/AE 103
i" PLYWOOD@ INT. WALLS
I" GYP. BOAJRD
DOORJAMB 1 1/2" - 1'-011
DOOR DTL
Phase
0 8'' 5
ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
ARCHITECTURAL DETAILS CONSTRUCTION
DOCUMENT
A/E:
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703
T. 949-399-0878 ", F. 949-399-0889 !k"'·· , IA U.S. Department
Approved: Project Director
FULLY SPRINKLERED
Fl�E FING
IN L.
I
I
I
I
I
I
////// ?_/#10 TEKpCREWS@ EA Ej)/6
/ OFGA STRAP//
/ / 7" "/ /
(E) FLOOR ASSEMBLY
16 GA. X 12" CLOSURE @
2411 O.C.
400T200-54 DEFLECllON TRACK
W/2-#1 0 SCREWS TO TRACK
362T250-54 UNPUNCHED TRACK
W/2-#10 SCREWS TO STUD, TYP.
-1111-----362S162-54 METAL STUDS@ 12" O.C.
>------ �I GYP BOARD
1111------i' PLYWOOD
==-=c==='"==77F':
el!---1it-----BACKER ROD & SEALANT
CUT, REMOVE
& ADJUST (E) EIFS
SUPPORT FRMG
& SEAL ANY EXPOSED
EDGES
lililf--+llf-----1 �11 (MIN.) EIFS O/j" EXTERIOR GYP.
SHEATHING - SEE 15/AE 103
WALL CONNECTION DETAIL 3/4' � 1'--0"
MATCH OUT
TO (E) BLDG
AC PAVING
MATCH EXIST'G
THICKNESS
BASE
PAVING
MATCH
EXIST'G
THICKNESS
BACKER ROD
&SEALANT
@EJ
Project Tille
PERPENDICULAR CONDITION 0 1'-4'
+-la+-- - - - - --1 �II EIFS - SEE 16/AE 103
F,,111---1111--------�, GYP. BOARD SHEATHING
--H!t-- - - - - --362S162-54 METAL STUDS
@12"0.C.
f---------�, INTERIOR GYP. BOARD
IIH--------�, PLYWOOD
0� 7"
HILTI X-U x 1' MIN. EMBEDMENT, @ 32" O.C. (ESR 2269)
BASE TRACK
'J' MOLD & SEALANT
CONC. FON. STEM WAUL
i'' FIBER EXPANSION JT.
5" CONCRETE SLAB W/ #3
BARS@ 18" 0.C.
2" AGGR. BASE
��HPY+L-M--#4 BARS VERT@24" O.C.
l--l---jf;-¢'9ii,,-+- -- #4 BARS
WALL BASE
WALL DETAIL
3/411 = 1 '--0"
0 1'-4'
19 GA �ETAySTUJJS �16"0.c. // // / / /
• LOCATE/4D )<EM9VE EJ<!ST'G WAL
EXTERl()R
FFINISfj AND)NSTf-LL
· 4" y;(DE)(2 GAUGE BLOQ�G . 24" O,c'. F9R NE)VSTU0 W /'FASrENING / //
/ / / A'"--c_c...---c I._¼-:._ / / . ./ .· /
/MATCH 1:X1sre Bu ING 12
_ __ ..;e _ __ .t:: _ __ WAL-L-f'.'HMG: _ __ - -- -- -- -- - -- - - -- -
20 GA. METAL FURRING
@ 16" o.c i" PLYWOOD BACK'G @ INT. WALL
(N) INTERIOR GYP BD - ALIGN
WITH FACE OF {E) FON WALL
�t-ilt---------EIFS WITI-1 FINISH TO MATCH EXIST'G
SEE 16/AE 103
[:;,c;j,, f---Jll---------w• EXT. GYP. SHEATH'G J;;<�<I f-ill--------20 GAUGE MTL STUDS@ 16" o.c.
_ _E1il,L_Jll::=-- - - - - -i" INTERIOR GYP. BD.
• --+--------NEW WALL CONSTRUCTION
WALL INTERSECTION
EXT TO NEW
3/4" � 1'-0"
0 1'-4" 2
EXIST'G SUSPENSION WIRE
FOR SOFFIT CEILING - FIELD
VERIFY (E) SYSTEM
SEALANT W/BACKER ROD
362S125-54 CRIPPLE STUDS@ 12 O.C.
362T125-54 HEADER TRACK -
CLIP & FOLD TRACK@ DOOR JAMB
& FASTEN W/2-#10 SCREWS - BOTH
SIDES
20 GAUGE GI DRIP
HOLLOW METAL DOOR FRAME
DOOR HEAD
DOOR DTL
1 1/2" - 1'-0'
0 811
Project Number
Design for Building 12 Electrical Upgrades
654-19-907
Building Number
Location 975 Kirman Ave., Reno, NV 89502
Issue Date April 30, 2020
Checked
LLC
Drawn Staff
Building 12
Drawing Number
AE 103
� Revisions: Date: Leslie Lewis Cooley, AIA
V ft of Veterans Affairs
"L ____________ :::=========================:::'.:====::'.!=========================::!.!======�==================::!.!===========��-=-=-=-�=-�==:::..:===-�=========================�==================�========�====�!::====::!.!=========:!J u:
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
LCooley Text Box Exp 12/31/20
MECHANICAL GENERAL NOTES
1. CODES USED IN THIS DESIGN: 2018 IBC, 2018 UMC, 2018 UPC, 2018 IECC, 2018 IFGC.
2. EXISTING EQUIPMENT, DUCTWORK AND PIPING LOCATIONS INDICATED IN THESE PLANS
ARE SHOWN FROM THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL
VERIFY TYPE, LOCATION AND SIZES TO ENSURE THEIR BID IS CORRECT TO MEET THE
INTENT OF THE WORK SHOWN ON THESE PLANS. ANY DISCREPANCY THAT WILL AFFECT
THE CONTRACTOR'S SCOPE OF WORK AND BID SHALL BE BROUGHT TO THE ENGINEER'S
ATTENTION FOR RESOLUTION. EXTRAS WILL NOT BE ALLOWED FOR FAILING TO
COMPLETE THE PRE-BID INVESTIGATION.
3. ALL EQUIPMENT, DUCTWORK AND PIPING SHALL BE INSTALLED TO MEET THE ADOPTED
BUILDING AND STRUCTURAL CODE REQUIREMENTS FOR SEISMIC RESTRAINT, INCLUDING
THE APPLICABLE PROVISIONS FOR THE AMERICAN SOCIETY OF CIVIL ENGINEERS
MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (STANDARD 7-05).
ALL EQUIPMENT, DUCTWORK AND PIPING SHALL BE INSTALLED TO PROVIDE A
VIBRATION-FREE INSTALLATION.
4. DUE TO THE SCALE OF THE DRAWINGS, NOT ALL OFFSETS, ELEVATIONS AND CHANGES IN
DIRECTION ARE SHOWN FOR CLARITY PURPOSES. THEREFORE, IT IS THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE REQUIRED ROUTING, CHANGES IN DIRECTION, HANGER
LOCATIONS AND EQUIPMENT LOCATIONS. THE CONTRACTOR SHALL COORDINATE WITH
ALL OTHER TRADES PRIOR TO COMMENCING WORK.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, SAW-CUTTING, CORING,
PATCHING AND SEALING OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF THE
EQUIPMENT, DUCTWORK AND PIPING INDICATED WITHIN THESE DRAWINGS. CUTTING,
NOTCHING AND BORING OF HOLES SHALL BE IN ACCORDANCE WITH THE LATEST
ADOPTED BUILDING AND STRUCTURAL CODES. ANY ROOF MOUNTED EQUIPMENT AND
PENETRATIONS SHALL BE VERIFIED WITH THE STRUCTURAL ENGINEER PRIOR TO
COMMENCING WORK.
6. THE CONTRACTOR SHALL NOT INSTALL ANY DUCTWORK OR PIPING WHICH OBSTRUCTS
THE REQUIRED SERVICE CLEARANCES OF ANY EQUIPMENT. THE CONTRACTOR SHALL
NOT ROUTE ANY DUCTWORK OR PIPING ABOVE ANY ELECTRICAL EQUIPMENT,
SWITCHGEAR, DISTRIBUTION PANELS, MOTOR CONTROL CENTERS, ETC PER THE
REQUIREMENTS OF THE ADOPTED ELECTRICAL CODE.
7. ACCESS DOORS ARE REQUIRED FOR ALL DAMPERS INSTALLED ABOVE INACCESSIBLE
LOCATIONS. COORDINATE SIZE, LOCATION AND COLOR WITH OWNER/GENERAL
CONTRACTOR PRIOR TO INSTALLATION.
8. MOUNT ALL THERMOSTATS AT 48” ABOVE FINISH FLOOR IN ACCORDANCE WITH ADA
STANDARDS. MOUNT ALL NON-ADJUSTABLE SENSORS AT 60” ABOVE FINISH FLOOR
UNLESS NOTED OTHERWISE.
9. DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. SHEET METAL SIZES ARE LARGER
THAN SHOWN WHEN INSTALLED WITH DUCT LINER.
10. COORDINATE THE FRAME, BORDER TYPE, COLOR AND QUANTITIES OF ALL AIR DEVICES
WITH THE ARCHITECT AND GENERAL CONTRACTOR PRIOR TO ORDERING.
11. PROPER CLEARANCES SHALL BE MAINTAINED FROM FRESH AIR INTAKES OR OPENINGS
TO THE BUILDING FROM ANY SOURCE OF EXHAUST AS REQUIRED BY ASHRAE STANDARD
62.1.
12. THE DETAILS SHOWN WITHIN THESE PLANS ARE DIAGRAMMATICAL AND MAY NOT
SHOW EVERY COMPONENT REQUIRED FOR INSTALLATION. THE CONTRACTOR SHALL
DETERMINE THE CORRECT MEANS AND METHODS OF INSTALLATION FOR THEIR WORK.
MECHANICAL ABBREVIATIONS
ABBV DESCRIPTION
AFF ABOVE FINISH FLOOR
ABBV DESCRIPTION
AFG ABOVE FINISH GRADE
BHP BRAKE HORSEPOWER
CFH CUBIC FEET PER HOUR
COP COEFFICIENT OF PERFORMANCE
DN DOWN
EAT ENTERING AIR TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HP HORSEPOWER
ABBV DESCRIPTION
LAT LEAVING AIR TEMPERATURE
LWT
MBH
OFCI
RPM
TYP
VFD
WB
LEAVING WATER TEMPERATURE
WET BULB TEMPERATURE
VARIABLE FREQUENCY DRIVE
TYPICAL
REVOLUTIONS PER MINUTE
OWNER FURNISHED, CONTRACTOR INSTALLED
1,000 BRITISH THERMAL UNITS PER HOUR
DIFFERENTIAL PRESSURE
TOTAL STATIC PRESSURE
TEST AND BALANCE WORK AND REPORT
STAINLESS STEEL
STATIC PRESSURE
SQUARE FEET
SEASONAL ENERGY EFFICIENCY RATIO
SMOKE DAMPER
STATIC PRESSURE (INCHES OF)
NOISE CRITERIA WITH VALUE
NORMALLY CLOSEDENERGY EFFICIENCY RATIO
DIRECT EXPANSION
WATER COLUMN (GAUGE)
UNIFORM PLUMBING CODE
UNLESS OTHERWISE NOTED
UNIFORM MECHANICAL CODE
UNIFORM BUILDING CODE
BTUH BRITISH THERMAL UNITS PER HOUR
DIRECT DIGITAL CONTROL
TAB
TSP
UBC
UMC
UON
UPC
WC
NEBB
"SP
SD
SEER
SF
SP
SSDDC
DP
DX
EER NC
NC-##
BOD BOTTOM OF DUCT
AABC AMERICAN AIR BALANCE COUNCIL
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERA-
TION, AND AIR CONDITIONING ENGINEERS
DB DRY BULB TEMPERATURE
DECIBELS, A-WEIGHTED MEASUREMENTdBA
DIAMETERDIA
FEET PER MINUTE
FULL LOAD AMPERES
FAHRENHEIT°F
FLA
FPM
FOOT or FEET
FIRE/SMOKE DAMPERFSD
FT
INTERNATIONAL PLUMBING CODE
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL BUILDING CODE
HERTZ
HEATING SEASONAL PERFORMANCE FACTOR
IBC
IMC
IPC
HSPF
Hz
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
PRESSURE REDUCING VALVE
PSIG
PRV
PSI
REMOTE VOLUME DAMPER
REFRIGERANT LIQUID/SUCTION
RELATIVE HUMIDITY
RVD
RH
RL/S
PARTS PER MILLION PPM
KILOWATTKW
POUNDSLBS
LOCKED ROTOR AMPERESLRA
MINIMUM
MINIMUM EFFICIENCY REPORTING VALUE
MINIMUM CIRCUIT AMPACITY
MIN
MCA
MERV
MAXIMUMMAX
NOT APPLICABLE
MANUAL VOLUME DAMPER
MAXIMUM OVERCURRENT PROTECTION
N/A
MOCP
MVD
NATIONAL ELECTRIC CODENEC
PRESSURE DROPPD
OUTSIDE AIR TEMPERATURE
NORMALLY OPEN
NOT IN CONTRACT
OAT
NIC
NO
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
OPPOSED BLADE DAMPEROBD
NATIONAL ENVIRONMENTAL BALANCING
BUREAU
TO ABOVETA
TO BELOWTB
FROM BELOW
FROM ABOVEFA
FB
Cv VALVE FLOW COEFFICIENT
RELOCATED(R)
(A) ABANDONED
(D) DEMOLISHED
EXISTING(E)
MECHANICAL GENERAL SYMBOL LEGEND
ABBVSYMBOL DESCRIPTION
ENLARGED PLAN DESIGNATION
ABBVSYMBOL DESCRIPTION
PLAN SHEET
SECTION DESIGNATION
SECTION SHEET
EXISTING ITEMS TO REMAIN
EXISTING ITEMS TO BE DEMOLISHED
POINT OF CONNECTION
POINT OF DISCONNECT
SHEET NOTE
REVISION NUMBER
EQUIPMENT TAG
(E)
(D)
POC
POD
REV
EQ
NEW ITEMS(N) ACCESS PANEL (CEILING & WALL)AP
A M2.1
A M5.1
RTU
LOUVER
SCALE: NONE
3 INTAKE LOUVER
M001
CAULK OPENING FOR
WEATHER SEAL
EXTERIOR
WALL
ANGLE IRON ON ALL SIDES
NOTE:
1. ANY SECTION OF UNUSED LOUVER IS TO BE BLANKED OFF WITH 2" RIGID BOARD INSULATION.
2. DUCT TRANSITIONS TO COMPLY WITH DUCT TRANSITION DETAIL.
SHEET METAL
SCREWS (TYP.)
EXHAUST FAN SCHEDULE
LOCATIONTAG MANUFACTURER
MODEL AIRFLOW
(CFM)
NOTES:
A. UNIT PERFORMANCE BASED ON AN ELEVATION 4,500 FEET ABOVE SEA LEVEL.
B. FANS ARE TO BE LISTED UNDER UL705, STANDARD FOR POWER VENTILATORS.
ACCESSORIES:
1. LINE VOLT THERMOSTAT.
2. NEMA-1 DISCONNECT SWITCH PRE-WIRED.
3. COOK MODEL GSH-39 GRAVITY SHUTTER.
4. COOK MODEL 45D WEATHER HOOD.
5. WIRE GUARD ON MOTOR SIDE.
6. WALL COLLAR.
FAN DATA
ESP
(IN WC)
ELECTRICAL DATA
VOLTS PHASE AMPS
WEIGHT
(LBS) ACCESSORIES
EF-1 COOK
30EW624D08
ELECTRICAL
ROOM 6,000 0.3 208 3 - 380 1, 2, 3, 4, 5, 6
SERVICE
EXHAUST
TYPE
PROP
WHEEL SPEED
(RPM)
HP
(W)
DRIVE TYPE
DIRECT
SONES
(dBA)
(70)
LOUVER SCHEDULE
TAG MANUFACTURER
MODEL
NOTES:
A. UNIT PERFORMANCE BASED ON AN ELEVATION OF 4,500 FEET ABOVE SEA LEVEL.
ACCESSORIES:
1. BIRD SCREEN.
2. FILTER RACK WITH (9) 24"X24"X1" AND (3) 24"X12"X1" FILTERS.
ACCESSORIESW
OP.
WEIGHT
(LBS)H
SIZE (IN) DEPTH
(IN)
FRAME
TYPE SERVICE AIRFLOW
(CFM)
FREE AREA
(SQ.FT.)
VELOCITY
(FPM)
SP DROP
(IN W.G.)MATERIAL
L-1 NAILOR
1606J 1, 272 -84 6 CHANNEL INTAKE 6,000 23.50 255 0.03ALUMINUM
SCALE: NONE
1 EXHAUST FAN INTERLOCK DIAGRAM
M001
T 120V
LINE VOLTAGE THERMOSTAT
120V
0V
DESCRIPTION OF OPERATION:
LINE VOLTAGE THERMOSTAT SET TO COOLING SET POINT OF 80°F (ADJ.). UPON
CALL FOR COOLING, LINE VOLTAGE THERMOSTAT TO CLOSE CONTACT
SENDING 120V TO EXHAUST FAN. FAN TO RUN UNTIL TEMPERATURE SET
POINT IS MET.
HVAC SYMBOL LEGEND
ABBVSYMBOL DESCRIPTION ABBVSYMBOL DESCRIPTION
SUPPLY AIR DUCT UP / DOWN
RETURN AIR DUCT UP / DOWN
OUTSIDE AIR DUCT UP / DOWN
EXHAUST AIR DUCT UP / DOWN
RETURN GRILLE / REGISTER
EXHAUST GRILLE / REGISTER
SUPPLY DIFFUSER, 1-WAY BLOW
SUPPLY DIFFUSER, 2-WAY BLOW
SUPPLY DIFFUSER, 3-WAY BLOW
SUPPLY DIFFUSER, 4-WAY BLOW
SA
RA
OSA
EA
RET
EX
SUPPLY DIFFUSER, SIDEWALL
THERMOSTAT (PROGRAMMABLE)
SWD
T
DIGITAL SENSOR (MULTI-FUNCTION)
SENSOR (TEMPERATURE)
OCCUPANCY SENSOR
HUMIDISTAT
DS
S
OCC
HUM
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CO2
CO
SUPPLY AIRFLOW
OUTSIDE AIRFLOW
RETURN AIRFLOW
EXHAUST AIRFLOW
SA
OSA
RA
EA
ROUND DUCTWORK SIZE (INCHES)
RECTANGULAR DUCTWORK SIZE (INCHES)
SQUARE TO ROUND TRANSITION
SINGLE LINE DUCTWORK (LINED)
DOUBLE LINE DUCTWORK
VARIABLE FREQUENCY DRIVEVFD
##"Ø
##"x##"
SINGLE LINE DUCTWORK
DOUBLE LINE DUCTWORK (LINED)
ROUND FLEXIBLE DUCTWORKFLEX
FIRE DAMPERFD
SD
FSD
MANUAL VOLUME DAMPER
REMOTE VOLUME DAMPER
TURNING VANE
OBD
PBD
BDD
MD
MVD
RVD
TV
SMOKE DAMPER
FIRE/SMOKE DAMPER
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
BACKDRAFT DAMPER
MOTORIZED DAMPER
SMOKE DETECTORSDT
UNDERCUT DOORUC
AIR FLOW SWITCHFSA
AIRFLOW STATIONAFS
T
S
D
O
H
CO2
CO
FD
V
R R
SD
FS
D
SD
U
REFRIGERANT LIQUID PIPINGRL
REFRIGERANT SUCTION PIPINGRS
EF
SCALE: NONE
4 WALL MOUNTED PROPELLER EXHAUST FAN WITH HOOD
M001
EXTERIOR
WALL
CAULK OPENING FOR
WEATHER SEAL
SHEET METAL SCREWS (TYP.)
1/4" BIRDSCREEN OR INSECT
SCREEN AS SCHEDULED
1" FILTER. REFER TO SCHEDULE
FOR QUANTITIES AND SIZING
FILTER RACK ASSEMBLY
SHEET METAL CAN FOR
FILTER RACK ATTACHMENT
DIRECT DRIVE FAN
FAN INLET GUARD
WITH WIRE MESH
UNISTRUT AND ALL THREAD ROD TO UNISTRUT
ABOVE. CONTRACTOR TO PROVIDE OTHER
SUPPORT METHOD DETAILS IF APPLICABLE.
45 DEGREE WEATHERHOOD
BACKDRAFT DAMPER
ANGLE IRON ON ALL SIDES
FIRE SPRINKLER NOTES
1. PLANS INDICATE GUIDELINES FOR FIRE SPRINKLERS. LICENSED CONTRACTOR IS TO
PROVIDE ALL PERMIT FEE, DESIGN, MATERIALS, FABRICATION AND INSTALLATION FOR A
COMPLETE AND OPERABLE FIRE SPRINKLER SYSTEM.
2. FIRE SPRINKLER SYSTEM IS TO BE HYDRAULICALLY DESIGNED WITH LATEST WATER
SUPPLY INFORMATION, SPRINKLER HEAD SPACING AND DENSITIES REQUIRED. FIRE
SPRINKLER SYSTEM PRESSURE IS TO BE A MINIMUM OF 10 PSI BELOW THE SYSTEM
DEMAND AVAILABLE PRESSURE.
3. THE FIRE SPRINKLER SYSTEM IS TO MEET ALL REQUIREMENTS OF THE NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA) STANDARDS 13 AND 24, 2017 NATIONAL ELECTRICAL
CODE (NEC), 2018 INTERNATIONAL BUILDING CODE (IBC), 2018 INTERNATIONAL
EXISTING BUILDING CODE (IEBC), AND APPLICABLE LOCAL STANDARDS INDICATED BY
THE LOCAL WATER DEPARTMENT OR STATE FIRE MARSHAL.
4. ALL SPRINKLER HEADS, PIPING, PIPE HANGERS AND SUPPORTS SHALL COMPLY WITH THE
LATEST EDITION OF NFPA 13 AND 24.
5. ADDITIONAL FIRE SPRINKLER HEADS, PIPING, PIPE HANGERS OR ASSOCIATED
EQUIPMENT SHALL COMPLY WITH NFPA 13 AND 24.
6. CONTRACTOR IS TO REVIEW ALL DESIGN AND CONSTRUCTION DOCUMENTS APPLICABLE
TO THE PROJECT SCOPE OF WORK AND DESIGN THEIR FIRE SPRINKLER SYSTEM AROUND
THE DISCIPLINES. CONTRACTOR VERIFIES THEY HAVE REVIEW ALL DISCIPLINES BY
SIGNING OFF ON THE SHOP DRAWINGS.
7. SPRINKLER HEAD LOCATIONS ARE TO BE COORDINATED WITH BUILDING OWNER PRIOR
TO SYSTEM COMPLETION.
8. CONTRACTOR IS TO VISIT SITE PRIOR TO BID TO OBSERVE ALL SITE CONDITIONS,
OBSTRUCTIONS, ETC.
9. CONTRACTOR IS TO SUBMIT COMPLETE SHOP DRAWINGS TO THE ENGINEER AND STATE
FIRE MARSHAL. SHOP DRAWINGS ARE TO INCLUDE COMPLETE DESIGN, CALCULATIONS,
EQUIPMENT CUT SHEETS AND OTHER APPLICABLE DESIGN INFORMATION. UPON
APPROVAL FROM STATE FIRE MARSHAL, CONTRACTOR IS TO FORWARD SHOP
DRAWINGS TO BUILDING OWNER FOR INSURANCE AND COORDINATION PURPOSES.
OWNER IS TO PROVIDE CONTRACTOR WITH APPROVAL TO PROCEED.
10. CONTRACTOR IS OBTAIN ALL APPROVALS INDICATED PRIOR TO INSTALLATION. IF IT IS
DETERMINED THAT THE CONTRACTOR INSTALLED FIRE SPRINKLER SYSTEM PRIOR TO
APPROVAL, SPRINKLER SYSTEM IS TO BE REVISED AS NECESSARY AS CONTRACTORS
COST.
11. FIRE SPRINKLER SYSTEM IS TO BE INSTALLED AND TESTED PRIOR TO INSTALLATION OF
CEILING SYSTEM. REMOVE, INSTALL CEILING AND REPLACE SPRINKLER HEADS AS
NECESSARY WITH ESCUTCHEONS AT EACH SPRINKLER HEAD.
12. UPON COMPLETION OF FIRE SPRINKLER SYSTEM INSTALL, CONTRACTOR IS TO FILL AND
TEST SYSTEM IN ACCORDANCE WITH NFPA 13, NFPA 24 AND OTHER APPLICABLE
TESTING REQUIREMENTS.
13. CONTRACTOR IS TO GUARANTEE THAT THE INSTALLED FIRE SPRINKLER SYSTEM IS A
COMPLETE AND OPERABLE SYSTEM THAT MEETS ALL APPLICABLE CODES AND
STANDARDS WHILE BEING FREE OF ANY DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM
DATE OF CERTIFICATION AND ACCEPTANCE OF THE WORK.
UNISTRUT AND ALL THREAD ROD TO STRUCTURE
ABOVE WITH BEAM CLAMP FOR ATTACHMENT TO
EXISTING STRUCTURE. CONTRACTOR TO PROVIDE
OTHER SUPPORT METHOD DETAILS IF APPLICABLE.
SCALE: NONE
2 SPACE TEMPERATURE SENSOR AND ALARM
M001
DESCRIPTION OF OPERATION:
ZONE TEMPERATURE SENSOR TO PROVIDE PROBE INPUT FOR DIGITAL
THERMOCOUPLE LIMIT CONTROLLER. UPON TEMPERATURE MEASUREMENT
GREATER THAN 85°F (ADJ.) THE LIMIT CONTROLLER SHALL SEND BINARY INPUT
ALARM SIGNAL TO EXISTING CONTROLS SYSTEM ALERTING OPERATOR OF HIGH
TEMPERATURE WITHIN SPACE.
BI - ZONE ALARM
S
AI - ZONE TEMPERATURE
ZONE TEMPERATURE
SENSOR
DIGITAL THERMOCOUPLE
LIMIT CONTROLLER
120V BY ELECTRICIAN
TX
24V
115 VAC, 24 VAC
TRANSFORMER
NEMA-1 ENCLOSURE
02/14/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
MECHANICAL:
SGF ENGINEERING
9441 DOUBLE DIAMOND PKWY, SUITE 13
RENO, NV 89521
775.591.4123
SEAN G. FREY, P.E.
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
April 30, 2020Revisions: Date: Leslie Lewis Cooley, AIA MRSF M001
MECHANICAL ABBREV., SYMBOLS,
NOTES, SCHEDULES AND DETAILS
4/30/2020
(E) ELEC. CONDUIT
TO REMAIN
(E) LIGHTING
(E) DUCT HIGH
EX
IS
T'
G
TR
AN
SF
O R
M
ER
EX
IS
T' G
TR
AN
SF
O
R M
ER
EXIST'G
TRANSFORMER
L
(72"x84") (B.O.L. 8" A.F.F.)
T
EF-1
EF
(E) FIRE SPRINKLER
BRANCH PIPING
(E) FIRE SPRINKLER
BRANCH PIPING
7 7 7 7
7 7 7 7
8 8
8 8
(E) BEAM
(E) BEAM
NEW ELECTRICAL GEAR
LIGHT (TYP.)
NEW ELECTRICAL GEAR
S11
(E) FANS TO REMAIN
(E) FIRE SPRINKLER
BRANCH PIPING
(E) BEAM
(E) LIGHT (TYP.)
NEW ELECTRICAL GEAR
NEW ELECTRICAL GEAR
NEW ELECTRICAL GEAR
02/14/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
MECHANICAL:
SGF ENGINEERING
9441 DOUBLE DIAMOND PKWY, SUITE 13
RENO, NV 89521
775.591.4123
SEAN G. FREY, P.E.
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
April 30, 2020Revisions: Date: Leslie Lewis Cooley, AIA MRSF M201
MECHANICAL FLOOR PLAN
MECHANICAL SHEET NOTES
1. THERMOSTAT, WIRING AND CONDUIT TO EQUIPMENT INDICATED.
2. FILTER RACK WITH (9) 24"X24"X1" AND (3) 24"X12"X1" FILTERS.
3. FAN WIRE GUARD LOCATED ON MOTOR SIDE FOR PROTECTION.
4. FAN WALL COLLAR WITH 43 1/2" X 43 1/2" WALL OPENING. LOCATE BOTTOM OF OPENING 72"
ABOVE FINISHED GRADE.
5. FAN WEATHER HOOD. CONTRACTOR TO VERIFY LOCATION WITH EXTERIOR TRANSFORMER SERVICE
CLEARANCE REQUIREMENTS.
6. EXISTING CEILING DEMOLISHED WITHIN NEW ROOM. ROOM TO BE EXPOSED TO METAL DECKING
ABOVE WITH UNKNOWN OBSTRUCTIONS WITHIN CEILING SPACE. CONTRACTOR TO VERIFY EXISTING
CEILING SPACE FOR OBSTRUCTIONS NOT SHOWN ON PLANS.
7. EXISTING FIRE SPRINKLER HEAD TO REMAIN.
8. EXISTING FIRE SPRINKLER HEAD TO BE REMOVED AND REPLACED WITH UPRIGHT SPRINKLER. LOCATE
UPRIGHT SPRINKLER HEAD A MAXIMUM OF 12" BELOW BOTTOM OF DECK PER 2019 NFPA SECTION
10.2.6.1.1.1. CONTRACTOR TO VERIFY PIPE AND HEAD LOCATION, ROUTING, AND OBSTRUCTION
RULES PER NFPA 13 PRIOR TO COMMENCING WORK.
9. CONNECT NEW SPRINKLER PIPING TO EXISTING PIPING AT LOCATION INDICATED.
10. NEW UPRIGHT SPRINKLER HEAD LOCATED A MAXIMUM OF 12" BELOW BOTTOM OF DECK PER 2019
NFPA SECTION 10.2.6.1.1.1. CONTRACTOR TO VERIFY PIPE AND HEAD LOCATION, ROUTING AND
OBSTRUCTION RULES PER NFPA 13 PRIOR TO COMMENCING WORK.
11. ZONE TEMPERATURE SENSOR AND ENCLOSURE LOCATED IN SPACE. WIRING BINARY INPUT BACK TO
CONTROL SYSTEM. REFER TO DETAIL 2/M001 FOR MORE INFORMATION.
4/30/2020
EXIST'G
SWITCHGEAR MSB-1 & MSB-2
EXIST'G
TRANSFORMER
12-TS2
EXIST'G
TRANSFORMER
12-TS1
EXIST'G
ATS
EXIST'G
MDH2 TO BE RELOCATED
NORTH WALL
(FUTURE ELEC ROOM)
2 3
(E) LIGHT FIXTURE
(E) PRIMARY FEEDERS IN
CONCRETE ENCASED DUCT BANK
(E) SECONDARY FEEDERS
(E) GROUND WELL
(E) GROUND WELL
(E) DRY TYPE XFMR &
DISCONNECT SWITCH
TO BE RELOCATED
(E) LIGHT FIXTURE
UP
(E) MV MANHOLE
1 FLOOR PLAN - EXISTING CONDITIONS
SCALE: 1/4"= 1'-0"
(E) 2000 KVA TRANSFORMER TO BE REPLACED WITH NEW AND INSTALLED AT SAME LOCATION.
(E) MSB-2 TO BE REPLACED WITH NEW AND INSTALLED IN NEW ELECTRICAL ROOM.
(E) MSB-1 TO BE REPLACED WITH NEW AND INSTALLED IN NEW ELECTRICAL ROOM.
(E) ATS TO BE REPLACED WITH NEW AND INSTALLED IN NEW ELECTRICAL ROOM.
(E) MDH2 TO BE PRESERVED DURING DEMO AND RELOCATED TO THE (N) SOUTH WALL NEXT
TO THE (E) TRANSFORMER AND (E) LOCAL DISCONNECT SWITCH.
RELOCATE ANY (E) RECEPTACLES, (E) CONDUITS, AND (E) MISC EQUIPMENT OR STORAGE TO
ALLOW FOR INSTALLATION OF (N) MSB-1, MSB-2, AND ATS.
(E) LIGHT LOCATED IN THE NEW ELECTRICAL ROOM TO BE REPLACED WITH (N) LIGHTING.
REPLACE SIX (6)(E) PANELBOARD COVERS/DOORS AND UPGRADE TO A (N) NEMA 3R RATED
COVER/DOOR. IN ORDER TO MINIMIZE WATER DAMAGE DUE TO WATER FROM SPRINKLERS
OR STEAM INFILTRATION WITH IN THIS ROOM. CONTRACTOR SHALL REPLACE EXISTING NEMA
1 JUNCTION BOXES WITH NEW NEMA 3R OR BETTER BOXES AND FLEX CONDUIT WITH NEW
SEAL-TIGHT FLEX CONDUIT. CONTRACTOR SHALL FIELD VERIFY QUANTITIES.
HNAGC: 277/480V, 42 SPACES, 20-1/8" X 38-1/8"
LNAGC: 120/208V, 3PH, 4WIRE, 225A, 42 SPACES, 20-1/8" X 35-1/8"
HECGB: 277/480V, 42 SPACES, 20-1/8" X 38-1/8"
LECGB: 120/208V, 3PH, 4WIRE, 225A, 42 SPACES, 20-1/8" X 35-1/8"
LEEGA: 120/208V, 3PH, 4WIRE, 125A, 42 SPACES, 20-1/8" X 35-1/8"
HEEGB: 277/480V, 42 SPACES, 20-1/8" X 44-1/8"
EXISTING EQUIPMENT SLATED FOR DEMOLITION SHALL REMAIN IN PLACE AND OPERATIONAL
UNTIL REDUNDANT NEW EQUIPMENT HAS BEEN INSTALLED AND PROVEN OPERATIONAL.
SHEET NOTES
2 ROOM J-1740 - REPLACE PANEL DOORS
SCALE: NONE
12/27/2019ISSUED FOR 35% REVIEW
02/21/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
3 SHORT CIRCUIT CALC - 25KV
SCALE: NONE
4 SHORT CIRCUIT CALC - 480V
SCALE: NONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
ELECTRICAL:
DINTER ENGINEERING, INC.
385 GENTRY WAY
RENO, NV 89502
775.826.4044
TIMOTHY A. PROCKISH, PE
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
APRIL 30, 2020 PKH KLK,GLRRevisions: Date: Leslie Lewis Cooley, AIA
DOCUMENT
04/28/2020
E301
ELECTRICAL EQUIPMENT PLAN
EXIST/DEMO & RM J-1740 PNL DOOR RPLCMENT
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
PROCKISH
AutoCAD SHX Text
TIMOTHY A.
AutoCAD SHX Text Exp. 12/31/19
AutoCAD SHX Text D
(E) PRIMARY CKT Q
(E) 12-TS1, 2000KVA
24940/14400 GND WYE
480V/277V GND WYE
PAD MOUNT TRANSFORMER
1200A
3Ø
3000A
3Ø
MAIN-1
(E) MAIN SWITCHBOARD 1 'MSB-1',
3000 AMPS, 480/277V, 3PH, 4 WIRE,
NEMA 1 ENCLOSURE.
(E) 2000 KVA TRANSFORMER TO BE REPLACED WITH NEW AND INSTALLED AT SAME
LOCATION.
INTERCEPT (E) PRIMARY FEEDERS AT EXISTING CABLE JUNCTION LOCATED IN (E)
MANHOLE, INSTALL (N) MV SW-1 & (N) MV SW-2 AND EXTEND NEW FEEDER TO (N) MV
SWITCHES AND (N) TRANSFORMERS
(E) MSB-2 TO BE REMOVED.
(E) MSB-1 TO BE REMOVED.
REROUTE AND EXTEND (E)FEEDER CONDUITS AS REQUIRED TO (N)MSB1 AND MSB2
AS SHOWN. REMOVE (E)CONDUCTORS AND REPLACE WITH (N)CONDUCTORS FROM
MSB TO LOAD WITHOUT SPLICES. PROVIDE PULLBOXES WHERE 360 DEGREE IN BENDS
IS EXCEEDED. SIZE (N)PULLBOXES AS REQUIRED FOR AVAILABLE SPACE, QUANTITY,
AND SIZE OF CONDUITS AND PER NEC 314.28. SEE 7/E302 FOR LOCATION OF LOADS.
(E) ATS TO BE REPLACED WITH (N) ATS. (N) ATS TO BE LOCATED IN NEW ELECTRICAL
ROOM.
REMOVE (E) CONCRETE OVER THE TOP ROW OF SPARE CONDUITS AT AREAS TO BE
INTERCEPTED AND EXTEND TO NEW PAD MOUNT MV SWITCHES. AFTER (E) SPARES
ARE EXTENDED TO NEW SWITCHES, REPLACE CONCRETE ENCASEMENT.
(E) GENERATOR START/STOP AND ATS COMMAND AND CONTROL TO (E) GENERATOR
CONTROL SYSTEM. EXTEND TO NEW ATS "ME" SEE DETAIL 3/E001.
ALL EXISTING LOAD ADD OR LOAD SHED PROGRAMMING AND ALL OTHER
COMMAND/CONTROL/MONITORING PROGRAMMING SHALL REMAIN UNCHANGED.
CONTRACTOR TO VERIFY ALL FEEDER SIZES AND TYPES IN THE FIELD PRIOR TO
COMMENCING WORK. NEW EXTENDED FEEDER CONDUCTORS SHALL MATCH
EXISTING SIZE, QUANTITY, AND TYPE.
ALL CONDUCTORS ARE COPPER UNLESS OTHERWISE NOTED.
(E)TRANSFORMERS 12-TS1 & 12-TS2 SHALL BE RECONNECTED TO CIRCUITS P&Q
THROUGH NEW MV SWITCHES AND WITH NEW CONDUCTORS WITH NEW LOAD BREAK
ELBOWS.
INTERCEPT EXISTING SPARE CONDUITS ROUTED TO THE (E) TRANSFORMERS
12-TS1&12-TS2. EXTEND CIRCUITS P&Q TO NEW MV SWITCHES AND CONNECT.
PROVIDE NEW 25KV CONDUCTORS FROM JUNCTION IN MANHOLE TO (N) SWITCHES
AND FROM (N) SWITCHES TO (E) TRANSFORMERS AND RECONNECT. CONTRACTOR
SHALL MAKE UP LOAD BREAK ELBOWS ON ONE END PRIOR TO PULLING CABLE IN
ORDER TO REDUCE OUTAGE DURATION.
SWITCHES SHALL BE EQUIPPED WITH 2-STAGE AUXILIARY SWITCH WITH DRY
CONTACTS FOR REMOTE CONFORMATION OF SWITCH POSITIONS. MONITORING OF
THESE CONTACTS IS N.I.C.
SHEET NOTES
(N) 12-TS1, 2000KVA
24940/14400 GND WYE
480V/277V GND WYE
PAD MOUNT TRANSFORMER
KK 3000A
3Ø
TIE
3000A
3Ø
MAIN-2
K
(E) MAIN SWITCHBOARD 2 'MSB-2',
3000 AMPS, 480/277V, 3PH, 4 WIRE,
NEMA 1 ENCLOSURE.
1200A
3Ø
600A
3Ø
800A
3Ø
800A
3Ø
600A
3Ø
1200A
3Ø
400A
3Ø
(E) ATS ME
1200A
3Ø
3000A
3Ø
MAIN-1
(N) MAIN SWITCHBOARD 1 'MSB-1',
3000 AMPS, 480/277V, 3PH, 4 WIRE,
65KAIC, NEMA 1 ENCLOSURE.
KK 3000A
3Ø
TIE
3000A
3Ø
MAIN-2
K
(N) MAIN SWITCHBOARD 2 'MSB-2',
3000 AMPS, 480/277V, 3PH, 4 WIRE,
65KAIC, NEMA 1 ENCLOSURE.
1200A
3Ø
600A
3Ø
800A
3Ø
800A
3Ø
600A
3Ø
1200A
3Ø
400A
3Ø
(N) ATS ME
(E) PRIMARY CKT P
(E) 12-TS2, 2000KVA
24940/14400 GND WYE
480V/277V GND WYE
PAD MOUNT TRANSFORMER
(N) 12-TS2, 2000KVA
24940/14400 GND WYE
480V/277V GND WYE
PAD MOUNT TRANSFORMER
1 1
3 4
TO
ATS
OIT-A
TO
ATS
C
TO
ATS
LS
TO
ATS
E
TO
GNHDP1
TO
GNHDP2
TO
ATS
OIT-B
6 6
M
PT
M
PT
N
G
N
G
TO
MDH1
AT PIPE SHOP
BLDG. #1
APPROX.
DISTANCE: 300LF
TO
PSG-1
LINE LEGEND
NEW
EXISTING/REMAIN
EXISTING/DEMO
12/27/2019ISSUED FOR 35% REVIEW
02/21/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
(N) 25KV MV SW-2 (N) 25KV MV SW-1
(E) 4" SPARE (TO 12-TS1)
(E) 4" SPARE (TO 12-TS2)
(E) 4" 24KV "Q" (TO 12-TS2)
(E) 4" 24KV "Q" (TO 12-TS1)
(E) 4" 24KV "P" (TO 12-TS2)
(E) 4" 24KV "P" (TO 12-TS1)
(E)4"C
SPARES
(N)
SW-2
FEEDS
12-TS2
(N)
12-TS2
(N)
12-TS1
1 RISER DIAGRAM FROM (E) MANHOLE TO (N) MV SWITCHES AND (N) TRANSFORMERS
SCALE: NTS
2 SINGLE LINE DIAGRAM (E) EQUIPMENT & (N) EQUIPMENT
SCALE: NONE
(7) 4"C, (28)#750MCM,
(7)400MCM GND, (7)400MCM ISO-GND
(7) 4"C, (28)#750MCM,
(7)400MCM GND, (7)400MCM ISO-GND
(3) 4"C, (12)#600MCM, (3) 3/0 GND, (3) 3/0 ISO-GND
(2) 3"C, (8)#250MCM, (2) #2 GND, (2) #2 ISO-GND
(3) 4"C, (12)#400MCM, (3) 2/0 GND, (3) 2/0 ISO-GND
(2) 3"C, (6)#350MCM,
(3) (2) #2 GND, (2) #2 ISO-GND
(3) 4"C, (12)#600MCM,
(3) 3/0 GND, (3) 3/0 ISO-GND
(3) 4"C, (12)#600MCM,
(3) 3/0 GND, (3) 3/0 ISO-GND
(3) 1/C #1/0CU, 28KV 4"C FEEDER (TYP) (3) 1/C #1/0CU, 28KV 4"C FEEDER (TYP)
(3) 4"C, (12)#400MCM, (3) 2/0 GND, (3) 2/0 ISO-GND
(2) 3"C, (6)#350MCM, (2) #2 GND, (2) #2 ISO-GND
A
A
SCALE: NTS
A-A RACEWAY ELEVATION AT MANHOLE
(N) DIGITAL
MULTI-METER
(N) DIGITAL
MULTI-METER
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
(E) CONCRETE ENCASED DUCT BANK
REMOVE (E) CONCRETE
(E) CABLE JUNCTION IN (E) MANHOLE
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
(N) #4/0 CU GROUND RING
SEE GROUND PLAN, DETAIL 5/E302
3 GENERATOR CONTROL DIAGRAM
SCALE: NTS
(E)
ATS-ME
GE/ZENITH
(N)
ATS-ME
TO
GEN CONTROL
EXTEND (E) COMMAND/CONTROL AND COMMUNICATIONS
CONDUCTORS IN (N) 3/4" C
REPLACE (E) CONDUCTORS WITH (N) 1-2/C#18 SHIELDED TWISTED PAIR, BELDEN 30737 (COMM) &
4#14AWG (START/STOP/LOAD SHED) - 3/4"C TO (E) GENERATOR CONTROL SWITCHGEAR "PSG-1".
REPLACE CONDUCTORS FROM (N)ATS TO (E)GENERATOR CONTROLS W/NO SPLICES, SEE 2ND
FLOOR ELECTRICAL ROOM PLAN,7/E302, FOR LOCATION.
INTERCEPT (E) CONTROL W/(N) J-BOX
AND EXTEND TO NEW LOCATION
(E) ATS-ME ASCO #5220 SERIES POWER
MANAGER TO BE RELOCATED TO (N) ATS-ME
OR REPLACE WITH NEW MATCHING UNIT
10 11 10 11
BOND TO (E) BUILDING
WATER AND GAS SERVICE
SPD SPD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
P
M
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
ELECTRICAL:
DINTER ENGINEERING, INC.
385 GENTRY WAY
RENO, NV 89502
775.826.4044
TIMOTHY A. PROCKISH, PE
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
APRIL 30, 2020 PKH KLK,GLRRevisions: Date: Leslie Lewis Cooley, AIA
DOCUMENT
04/28/2020
E001
SINGLE LINE DIAGRAM
EXISTING/REMAINING, DEMO, & NEW
30A
2Ø
30A
2Ø
(N)CKT 'Q'
(N)CKT 'P'
(E)CKT 'Q' TO BE REMOVED 7 (E)CKT 'P' TO BE REMOVED 7
(N)
SW-1
FEEDS
12-TS1
12 12
(E) MANHOLE
(E)4"C
W/CKTS
"P" & "Q"
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
PROCKISH
AutoCAD SHX Text
TIMOTHY A.
AutoCAD SHX Text Exp. 12/31/19
UP
W O
R K
I N
G
C
L E
A R
A N
C E
(E) MV MANHOLE
W O
R K
I N
G
C L
E A
R A
N C
E
W O
R K
I N
G
C L
E A
R A
N C
E
(E) SPRINKERS (TYP)
A
B B
B A A
C
C
D
D D
D
PNL 'LA'
CKT 2
PNL 'LA'
CKT 1
PNL 'LA'
CKT 4
PNL
MDH2
T
E
F
A
OI AND T
SERVER ROOM
B2263
SILVER
ELEVATOR
GOLD
ELEVATOR
S8 P11
STAIR
B1XDO3
EXHAUST STACKS TO ROOFBS3
C2303
ELECTRICAL
EQUIP
C2300
MICROBIOLOGY
ELECTRICAL
ROOM A
B2261A
B2261B
B2265
STORAGE
B2266
MECH/FP
B2267
LOAD SHARING
EQUIPMENT
ROOM
B2268
FMS SERVER ROOM
B2264
CONTROL
ROOM
B2262
VESTIBULE
B2261
ELECTRICAL ROOM B
SECURITY FENCE
FMS EQUIP
STORAGE
B2258
DEMARC
STORAGE
B2102B
ACCESS PANEL
B2259
39.3 42.8 39.6 59.0 54.7 34.9 42.7
56.3 52.7 53.2
73.5 77.0 75.1 76.4 60.6 62.6
64.5 69.7 71.2 67.8 54.6 51.0
62.3 67.6 71.2 71.8 64.0 49.2
73.6 79.0 79.7 84.1 77.1 73.9 71.6
66.8 72.1 72.5 77.1 71.6 69.5 68.5
45.2 48.8 50.1 51.6 49.7 48.2 46.7
2 FLOOR PLAN - NEW EQUIPMENT & ROOM LAYOUT
SCALE: 1/8"= 1'-0"
(N) MV SW-1
25KV PAD MOUNT SWITCH
(N) MV SW-2
25KV PAD MOUNT SWITCH
(N) MSB 2(N) ATS 'ME'
(N) MSB 1
INSTALL ELECTRICAL LIGHTING &
RECEPTACLES
(N) 12-TS1
(N) 12-TS2
1 (N) ATS-ME, MSB-1, & MSB-2 INTERFACE WITH (E) EQUIPMENT AND XFMRS
SCALE: 1/4"= 1'-0"
(E) MDH2 TO BE RELOCATED TO THE (N) SOUTH WALL NEAR THE (E) TRANSFORMER AND (E)
LOCAL DISCONNECT SWITCH.
(N) ELECTRICAL ROOM WALLS AND DOOR(S) TO BE INSTALLED FOLLOWING (N) EQUIPMENT
INSTALLATION AND PROVEN OPERATION.
(N) ROOM LIGHTING TO BE INSTALLED FOLLOWING DEMOLITION OF EXISTING EQUIPMENT,
CEILING, AND PRIOR/DURING THE INSTALLATION OF THE ELECTRICAL ROOM WALLS. (N)
ROOM LIGHTS SHALL BE CHAIN HUNG FROM OVERHEAD STRUCTURE AND SHALL MOUNT AT
HEIGHT OF EXISTING CEILING (BEING REMOVED).
CONTRACTOR MAY PROVIDE WIRE WAY ON TOP OF SWITCHGEAR AS REQUIRED AT THEIR
OPTION TO FACILITATE CONDUIT AND CONDUCTOR INSTALLATION.
(E) TRANSFORMER AND (E) LOCAL DISCONNECT SWITCH TO BE TO BE RELOCATED TO THE
(N) SOUTH WALL TO ALLOW FOR NEW EQUIPMENT CLEARANCES.
(E) CEILING TO BE REMOVED. MOUNT NEW PULL BOXES AND CONDUITS TO OVERHEAD
STRUCTURE
EXISTING EQUIPMENT SLATED FOR DEMOLITION SHALL REMAIN IN PLACE AND OPERATIONAL
UNTIL REDUNDANT NEW EQUIPMENT HAS BEEN INSTALLED AND PROVEN OPERATIONAL.
RELOCATE (E) PANEL MDH2 AND EXTEND AND RECONNECT (E) 200A FEEDER AND (2) 30AMP,
3PH FAN CIRCUITS. INSTALL (N) 15A, 3P CIRCUIT BREAKER FOR (N) XFMR-LA.
RELOCATE (E) XFMR AND (E) XFMR DISCONNECT SWITCH. EXTEND AND RECONNECT
EXISTING PRIMARY AND SECONDARY FEEDERS.
INSTALL (N) EF1 COMBO STARTER, NEMA SIZE '0' COMBINATION STARTER, FUSED
DISCONNECT SWITCH. CONNECT TO 120V THERMOSTAT FURNISHED WITH (N) EF1 EXHAUST
FAN. CONNECT TO 120V DAMPER CONTROL.
INSTALL (N) WALL MOUNTED XFMR-LA, 10KVA, 480V-120/208V, 3PH, 4W, DRY TRANSFORMER.
FEED (N) PANELBOARD 'LA'.
INSTALL (N) PANELBOARD 'LA' WITH 30A, 3P MAIN BREAKER.
(1) 15A - 3P CIRCUIT BREAKER - (N) EF1 DISCONNECT
(1) 20A - 1P CIRCUIT BREAKER - (N) ROOM RECEPTACLES
(1) 20A - 1P CIRCUIT BREAKER - (N) ROOM LIGHTS
(1) 20A - 1P CIRCUIT BREAKER - SPARE
(6) SPACES
INSTALL (N) FIRE ALARM SYSTEM PULL STATION DEVICE COMPATIBLE WITH EXISTING EST
FIRE ALARM SYSTEM. CONNECT TO EXISTING FIRE ALARM SYSTEM AND TEST TO VERIFY
DEVICE IS FULLY OPERATIONAL WITH FIRE ALARM SYSTEM. EXTEND (E) NOTIFICATION
CIRCUIT FROM SECOND FLOOR ELECTRICAL ROOM. REPROGRAM (E) EST SYSTEM TO
ACCEPT (N) ADDRESSABLE DEVICES.
INSTALL (N) FIRE ALARM SYSTEM HORN/STROBE DEVICE COMPATIBLE WITH EXISTING EST
FIRE ALARM SYSTEM. CONNECT TO EXISTING FIRE ALARM SYSTEM AND TEST TO VERIFY
DEVICE IS FULLY OPERATIONAL WITH FIRE ALARM SYSTEM. EXTEND (E) NOTIFICATION
CIRCUIT FROM SECOND FLOOR ELECTRICAL ROOM. REPROGRAM (E) EST SYSTEM TO
ACCEPT (N) ADDRESSABLE DEVICES.
SHEET NOTES
(N) ATS-ME, (N) MSB-1, & (N) MSB-2
(E) ATS-ME (TO BE REMOVED)
(E) TRANSFORMERS 12-TS1 & 12-TS2
(TO BE REPLACED WITH NEW)
(E) CONCRETE MOUNTING PAD
(E) RETENTION CURB
(N) MSB-1 DISTRIBUTION & MSB-1 MAIN
(N) MSB-1 & MSB-2 TIE BREAKER
(N) MSB-2 DISTRIBUTION
(N) ATS-ME
(N) MSB-2 MAIN
(N) CONDUITS AS REQUIRED (TYPICAL)
(E) PULL BOX (TO BE REMOVED)
(E) MSB-1 & (E) MSB-2 (TO BE
REMOVED)
(E) UG SECONDARY
FEEDERS TO BE
EXTENDED TO
(N) MSB-1 & MSB-2
RACK (N) RGS CONDUITS ON CEILING
INTERCEPT AND EXTEND (E)
CONDUITS WITH NEW CONDUCTORS
FROM MSB-1 & MSB-2 TO (E) LOAD.
(E) CEILING TO BE REMOVED
(E) WALL
(N) CONCRETE
HOUSEKEEPING PAD
(N) CONCRETE
HOUSEKEEPING PAD
4 ROOM LIGHTING CALCULATION
SCALE: NTS
(E) TRANSFORMER
3 ROOM LIGHTING & RECEPTACLES
SCALE: 1/8"= 1'-0"
A
A
(E) EQUIPMENT SHOWN FOR
REFERENCE ONLY
5 GROUNDING PLAN
SCALE: 1/8"= 1'-0"
6 GROUNDING WELL DETAIL
SCALE: NTS
TIE (N) GROUND
RING INTO (E)
GROUND GRID
TRAFFIC REINFORCED CONCRETE
COVER, CAST IRON OR PRECAST
CONCRETE MARKED "GROUND ROD"
HIGH IMPACT-GLASS REINFORCED PLASTIC
OR PRECAST CONCRETE ASSEMBLY
DRIVING STUD
SECTIONAL ROD COUPLING
BARE COPPER GROUNDING CONDUCTOR
SEE DETAIL 5/E302
CONCRETE PIPE EXTENSION MATERIAL
GROUND ROD CONNECTOR
3/4" X 10'-0"
COPPER GROUND ROD
(N) HVAC FAN
12/27/2019ISSUED FOR 35% REVIEW
02/21/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
E302
SCALE: 1/4" = 1'-0"
A-A (N) ATS ME, (N) MSB-2, & (N) MSB-1
TYP 4X
3/4" X 10' GROUND ROD IN TEST WELL
#4/0 CU MIN 18" BELOW GRADE
(E) MDH2
(E) CEILING TO BE REMOVED
(N) UNDERGROUND FEEDERS,
SEE PHASING DRAWING E303
(E) RECEPTACLES WITH CIRCUIT
AND MISC EQUIP TO BE REMOVED
(N) MV SW-1
25KV PAD MOUNT SWITCH
(N) MV SW-2
25KV PAD MOUNT SWITCH
(N) MSB 2(N) ATS 'ME'
(N) MSB 1
(N) 12-TS1
(N) 12-TS2
(N) EF1 EXHAUST FAN
(E) MDH2
(E) TRANSFORMER
(E) GROUND LOOP
(N) EF1 EXHAUST FAN
(E) CONDUIT TO REMAIN
AT TOP OF WALL
(E) CONDUIT TO REMAIN
AT TOP OF WALL
(N) PNL 'LA'
(N) PNL 'LA'
(N) XFMR-LA (WALL MOUNTED)
(N) PNL 'LA'
RELOCATED (E) MDH2
RELOCATED (E) XFMR DISCONNECT
RELOCATED (E) XFMR PAD MOUNTED
(N) EF1 DISCONNECT SWITCH
4-#10 & 1-#12 G, 3/4" C
2-#12 & 1-#12 G, 1/2" C
3-#12 & 1-#12 G, 1/2" C
4-#12 & 1-#12 G, 1/2" C
2-#12 & 1-#12 G, 1/2" C
BOND TO (E) METALLIC
WATER AND GAS MAIN
(N) FIRE ALARM SYSTEM PULL STATION13
(N) FIRE ALARM SYSTEM HORN/STROBE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
P
M
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
ELECTRICAL:
DINTER ENGINEERING, INC.
385 GENTRY WAY
RENO, NV 89502
775.826.4044
TIMOTHY A. PROCKISH, PE
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
APRIL 30, 2020 PKH KLK,GLRRevisions: Date: Leslie Lewis Cooley, AIA
DOCUMENT
04/28/2020
E302
ELECTRICAL EQUIPMENT PLAN
NEW/EXISTING EQUIPMENT & ELEVATION
7 2ND FLOOR PLAN - EXISTING EQUIPMENT & ROOM LAYOUT
SCALE: 1/8"= 1'-0"
(E)PNL
"GNHPP2"
(E)PNL
"GNHDP1"
(E)ATS "OITB"
(E)ATS "OITA"
(E)ATS "C"
(E)FACP
(E)ATS "E"
(E)ATS "LS"
(E)GEN
CONTROL
TO NOTIFICATION CIRCUITS AT 2ND FLOOR
ELECTRICAL ROOM, SEE 7/E302
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
PROCKISH
AutoCAD SHX Text
TIMOTHY A.
AutoCAD SHX Text Exp. 12/31/21
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
UP
(E) MV MANHOLE
(E) SPRINKERS (TYP)
INSTALL (N) UNDERGROUND
FEEDER FROM (N) MSB-1 TO
(N) 12-TS1 IN RGS.
1 FLOOR PLAN - PHASE 1 - INSTALL (2) (N) MV SWITCHES
SCALE: 1/8"= 1'-0" 2 FLOOR PLAN - PHASE 2 - INSTALL (N) MSB 1&2 AND ATS 'ME'
SCALE: 1/8"= 1'-0" 3 FLOOR PLAN - PHASE 3 - REMOVE & REPLACE (E) '12-TS1' & (N) UG FEED TO (N) MSB 1&2
SCALE: 1/8"= 1'-0"
4 FLOOR PLAN - PHASE 4 - EXTEND (E) FEEDERS TO (N) MSB 1 & 2 AND REMOVE (E) 12-TS2
SCALE: 1/8"= 1'-0" 5 FLOOR PLAN - PHASE 5 - REMOVE (E) MSB 1&2 AND (E) ATS 'ME'
SCALE: 1/8"= 1'-0" 6 FLOOR PLAN - PHASE 6 - FINAL EQUIPMENT CONFIGURATION
SCALE: 1/8"= 1'-0"
(E) 25KV CKTS P&Q
(E) MSB 1 & 2
(E) ATS 'ME'
(E) 12-TS1
(E) 12-TS2
INTERCEPT (E) 25KV P&Q UNDERGROUND
FEEDERS AND RECONFIGURE TO
(2) (N) PAD MOUNT SWITCHES
INSTALL (N) MV SW1
25KV PAD MOUNT SWITCHES ON CONCRETE
EQUIPMENT PAD AND RECONNECT TO (E) 12-TS1
INSTALL (N) MV SW2
25KV PAD MOUNT SWITCHES ON CONCRETE
EQUIPMENT PAD AND RECONNECT TO (E) 12-TS2
(E) MSB 1 & 2
(E) ATS 'ME'
(N) MSB 2(N) ATS 'ME'
(N) MSB 1
INSTALL (N) MSB 1 & 2 AND ATS 'ME'
ON (N) CONCRETE EQUIPMENT PAD
(N) UNDER GROUND
CONDUIT STUB-OUTS
(E) MSB 1 & 2
(E) ATS 'ME'
(N) UNDER GROUND
CONDUIT STUB-OUTS
(E) MSB 1 & 2 & ATS REMAINS
REQUIRES LIMITED OUTAGE TO CLOSE TIE AND FEED BOTH (N) & (E) MSB 1
& 2 FROM (E) 12-TS2.
RELOCATED (E) GROUND WELL AND (E) 25kVA TRANSFORMER AS
REQUIRED TO INSTALL (N) MSB1 UNDERGROUND FEEDER. SAWCUT &
PATCH EXISTING PAVEMENT TO MATCH EXISTING AS REQUIRED TO
INSTALL (N) UG FEEDER. CONTRACTOR SHALL INCLUDE IN BID, POTHOLING
OF ROUTE TO VERIFY AREA IS CLEAR OF UTILITIES AND STRUCTURES.
DE-ENERGIZE AND REMOVE (E) TRANSFORMER 12-TS1. MODIFY PAD AS
REQUIRED TO PREPARE FOR (N) TRANSFORMER 12-TS1. INSTALL (N) UG
FEEDER TO (N) MSB-1 AND CONNECT. INSTALL (N) TRANSFORMER 12-TS1
AND ENERGIZE.
EXISTING FEEDER TO BE DE-ENERGIZED AND REMOVED AFTER (N) 12-TS1
IS INSTALLED AND ENERGIZED. SEAL (E) CONDUITS AND ABANDON IN
PLACE. SEE NOTES 1 & 3.
PROTECT EXISTING GROUND IN PLACE. TEST TO ASSURE LESS THAN 25
OHMS RESISTANCE TO GROUND AND REUSE FOR NEW TRANSFORMERS
12-TS1 & 12-TS2.
PHASE 3 NOTES
REMOVE (E) 480V FEEDER
REMOVE (E) 12-TS1 & INSTALL (N) 12-TS1
REQUIRES COORDINATED COMMISSIONING WITH OPERATION OF
GENERATORS AND CONNECTIONS TO CONTROLS AND SCADA. EXTEND ATS
COMMAND AND CONTROL CONDUCTORS, INCLUDING GENERATOR
START/STOP CONTROL, IN CONDUIT FROM (E) ATS LOCATION TO (N) ATS
LOCATION. REFERENCE ATS CONTROL DETAIL 3/E001.
COORDINATE NEW WORK WITH REMOVAL OF (E) CEILING. CEILING WILL
REMAIN AS EXPOSED STRUCTURE. REFER TO ARCHITECTURAL PLANS.
REFER TO SINGLE LINE DIAGRAM (E001) FOR FEEDER SIZES AND
QUANTITIES. REQUIRES SHORT TIME OUTAGES AND LIMITED TO AREAS
AFFECTED BY INDIVIDUAL FEEDER CUT OVERS.
DE-ENERGIZE AND REMOVE (E) 12-TS2. MODIFY PAD AS REQUIRED TO
PREPARE FOR (N) 12-TS2. INSTALL (N) UG FEEDER TO (N) MSB2 AND
CONNECT. INSTALL (N) 12-TS2 AND ENERGIZE.
REROUTE (E) CONDUITS FROM (E) LOADS TO (N) MSB1 AND (N) MSB2.
REPLACE (E) WIRING AND PROVIDE (N) CONDUCTORS TO MATCH EXISTING
CONDUCTORS FROM (N) MSB1 AND (N) MSB2 TO EXISTING LOAD WITH NO
SPLICES. SEE SHEET E001.
PHASE 4 NOTES
REQUIRES OUTAGE OF 25KV CIRCUITS "P" & "Q"
INTERCEPT EXISTING SPARE CONDUITS ROUTED TO THE (E)
TRANSFORMERS 12-TS1&12-TS2. EXTEND CIRCUITS P&Q TO NEW MV
SWITCHES AND CONNECT. PROVIDE NEW 25KV CONDUCTORS FROM
JUNCTION IN MANHOLE TO (N) SWITCHES AND FROM (N) SWITCHES TO (E)
TRANSFORMERS AND RECONNECT. CONTRACTOR SHALL MAKE UP LOAD
BREAK ELBOWS ON ONE END PRIOR TO PULLING CABLE IN ORDER TO
REDUCE OUTAGE DURATION.
(E) TRANSFORMERS 12-TS1 & 12-TS2 SHALL BE RECONNECTED TO
CIRCUITS P&Q THROUGH NEW MV SWITCHES AND WITH NEW
CONDUCTORS WITH NEW LOAD BREAK ELBOWS.
(E) EQUIPMENT TO REMAIN IN SERVICE AT THIS PHASE AND PROTECTED IN
PLACE.
CONTRACTOR SHALL INCLUDE IN HIS BID, POTHOLING OF (E) DUCTBANK TO
VERIFY LOCATION AND DEPTH.
PHASE 1 NOTES
(E) MSB 1 & 2
(E) ATS 'ME'
(N) MSB 2(N) ATS 'ME'
(N) MSB 1
INSTALL (N) MSB 1 & 2
AND ATS 'ME'
(N) UNDER GROUND
CONDUIT STUB-OUT
INTERCEPT (E) FEEDERS &
EXTEND TO (N) MSB 1 & 2 & ATS
'ME' (TYP OF 8)
(N) EXPOSED OVERHEAD
FEEDERS TO (N) MSB 1&2
AND ATS 'ME'
INSTALL (N) PERMANENT
FEEDER FROM (N) 12-TS2 AND
RE-ENERGIZE (N) MSB 1 & 2
INSTALL NEW UG FEEDER
FROM (N) 12-TS2 TO (N) MSB2
REMOVE (E) MSB 1 & 2, ATS, AND METERING
COMPONENTS. RETAIN (E) PANEL BOARD
MDH2 AND (E) 25KV TRANSFORMER
W/DISCONNECT FOR RELOCATION.
REQUIRES LIMITED OUTAGE TO CONNECT (N) 12-TS2 FEEDER AND
DISCONNECT TEMP 12-TS1 FEEDER.
EXTEND (E) MSB2 FEEDER CONDUITS TO (N) MSB2. SAWCUT AND
PATCH EXISTING PAVEMENT TO MATCH EXISTING REQUIRED TO
INSTALL (N) UG FEEDER.
REMOVE EXISTING CONCRETE HOUSEKEEPING PAD. CUT AND FILL
ANY UNDERGROUND CONDUITS FLUSH WITH THE FLOOR SURFACE
AND ABANDON OR REMOVE. RETAIN (E) PANEL BOARD MDH2 AND
(E) 25KV TRANSFORMER W/DISCONNECT FOR RELOCATION.
PHASE 5 NOTES
REQUIRES LIMITED OUTAGE MANIPULATE MSB1 AND MSB2 MAIN AND TIE
BREAKERS.
REFERENCE E302 FOR LIGHTING, RECEPTACLES, AND CIRCUITING TO (N) PANEL
'LA'.
PHASE 6 NOTES
OPEN TIE BREAKER SO MSB 1
IS FED BY 12-TS1 AND MSB 2 IS
FED BY 12-TS2.
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
PHASE 2 NOTES
(N) MV SW1
(N) MV SW2
(N) MSB 2(N) ATS 'ME'(N) MV SW1
(N) MV SW2
(N) MSB 1
(E) ATS 'ME' AND (E) MSB-1 & MSB-2 SHALL REMAIN IN OPERATION AND
PROTECTED IN PLACE UNDER THIS PHASE.
(E) 12-TS1
(E) 12-TS2 (E) 12-TS2
(E) 480V FEEDER REMAINS(E) 480V FEEDER REMAINS
12/27/2019ISSUED FOR 35% REVIEW
02/21/2020ISSUED FOR 65% REVIEW
03/30/2020ISSUED FOR 90% CONSTRUCTION DOCUMENTATION
04/30/2020ISSUED FOR CONSTRUCTION
(E) FEEDER REMAINS
(E) GROUND WELL
(E) GROUND WELL
(N) MV SW1
(N) MV SW2
(N) MV SW1
(N) MV SW2
(N) MV SW1
(N) MV SW2
(N) 12-TS1
REMOVE (E) 12-TS2 & INSTALL (N) 12-TS2
(N) 12-TS1
(N) 12-TS2
RELOCATED (E) 25KVA
TRANSFORMER W/DISCONNECT
RELOCATED (E) MDH2
(N) 12-TS1
(N) 12-TS2
(N) MSB 2(N) ATS 'ME'
(N) MSB 1
(N) MSB 1
(N) MSB 2(N) ATS 'ME'
(N) HVAC EQUIP. REFERENCE
MECHANICAL DRAWINGS
(N) ELECTRICAL ROOM
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E) CONCRETE ENCASED DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(E)CONCRETE ENCASED
DUCT BANK
(N) PANEL 'LA' & XFMR-LA
1. PHASED CONSTRUCTION LAYOUTS DEPICTED HERE ARE SUGGESTIONS
BASED ON REQUIREMENT TO MAINTAIN OPERATION TO BUILDING 12 AS
MUCH AS PRACTICAL BY MAINTAINING SERVICE THROUGH A SINGLE
TRANSFORMER DURING CONSTRUCTION. CONTRACTOR MAY SUBMIT
MODIFIED PHASING PLAN AT THEIR OPTION. SUBMIT PLAN TO THE
CONTRACTING OFFICER FOR REVIEW PRIOR TO START OF WORK.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
P
M
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Pierce/Cooley Architects, Inc.
11871 Gonsalves St.
Cerritos, CA 90703 T. 949-399-0878 F. 949-399-0889
ELECTRICAL:
DINTER ENGINEERING, INC.
385 GENTRY WAY
RENO, NV 89502
775.826.4044
TIMOTHY A. PROCKISH, PE
Design for Building 12 Electrical Upgrades
975 Kirman Ave., Reno, NV 89502
654-19-907
Building 12 Project Director
APRIL 30, 2020 PKH KLK,GLRRevisions: Date: Leslie Lewis Cooley, AIA
DOCUMENT
04/28/2020
E303
ELECTRICAL EQUIPMENT PLAN
PHASES OF CONSTRUCTION
RELOCATED (E) DISCONNECT SWITCH
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
PROCKISH
AutoCAD SHX Text
TIMOTHY A.
AutoCAD SHX Text Exp. 12/31/21
| 09 AE103 Arch_Struct Details |
| 10 M001-Mechanical-DS |
| Sheets and Views |
| M001 MECHANICAL ABBREV., SYMBOLS, NOTES, SCHEDULES AND DETAILS |
| 11 M002-Mechanical-DS |
| Sheets and Views |
| M201 MECHANICAL FLOOR PLAN |
File details come from the government source that posted it. Updated .