C12_Att_10_-_Bid_Form.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Bldg 84 Heaters Federal contract opportunity
Solicitation number
N0025325Q0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is a bid form template (Attachment 10) for solicitation N0025325Q0005 to replace gas-fired unit heaters at Building 84 at Naval Base Kitsap, Keyport, WA. The Excel spreadsheet template includes sections for contractors to input detailed pricing breakdowns for labor, materials, and equipment costs, with example line items showing the expected level of detail for tasks like air handler installation, site mobilization/demobilization, and associated labor categories (HVAC Tech, Electrician, General Laborer, SSHO). The form includes calculations for overhead, G&A, profit, and bond costs to arrive at a firm fixed price proposal amount.

The associated contract opportunity is a small business set-aside solicitation issued by Naval Undersea Warfare Center Division Keyport for replacing four ceiling-mounted gas-fired unit heaters. The estimated contract value is $25,000-$100,000, using NAICS code 238220 (Plumbing, Heating, and Air-Conditioning). The government plans to award a single firm-fixed-price construction contract by January 7, 2025, using Low Price Technically Acceptable evaluation criteria under FAR Parts 13 and 36. An organized site visit is required, and contractors must be registered in SAM.gov.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025325Q0005Contractor:
PID Description:Bldg 84 Replace Gas Fired Unit HeatersDate:
Project Location:Naval Base Kitsap, Keyport, WA
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Bldg 84 Replace Gas Fired Unit Heaters
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount

File details come from the government source that posted it. Updated .