C12_Att_10_-_Bid_Form.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Bldg 84 Heaters Federal contract opportunity
- Solicitation number
- N0025325Q0005
About this file
This is a bid form template (Attachment 10) for solicitation N0025325Q0005 to replace gas-fired unit heaters at Building 84 at Naval Base Kitsap, Keyport, WA. The Excel spreadsheet template includes sections for contractors to input detailed pricing breakdowns for labor, materials, and equipment costs, with example line items showing the expected level of detail for tasks like air handler installation, site mobilization/demobilization, and associated labor categories (HVAC Tech, Electrician, General Laborer, SSHO). The form includes calculations for overhead, G&A, profit, and bond costs to arrive at a firm fixed price proposal amount.
The associated contract opportunity is a small business set-aside solicitation issued by Naval Undersea Warfare Center Division Keyport for replacing four ceiling-mounted gas-fired unit heaters. The estimated contract value is $25,000-$100,000, using NAICS code 238220 (Plumbing, Heating, and Air-Conditioning). The government plans to award a single firm-fixed-price construction contract by January 7, 2025, using Low Price Technically Acceptable evaluation criteria under FAR Parts 13 and 36. An organized site visit is required, and contractors must be registered in SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025325Q00050001.pdf | ||
| C26_WD_WA20240109_mod5_12202024.pdf | ||
| C26_Concept_Drawing_REV01.pdf | ||
| C11_N0025325Q0005.pdf | ||
| C12_Att_07_-_Photographs_Distro_A.pdf | ||
| C12_Att_04_-_Contractors_Guide_to_Env_Compliance.pdf | ||
| C12_Att_06_-_Concept_Drwg_Distro_A.pdf | ||
| C12_Att_08_-_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C11b_Att_02_-_WA20240109_10252024.pdf | ||
| C12_Att_05_-_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_01_-_Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_13_-_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_03_-_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_12_-_Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_11_-_PPI_Form.docx | DOCX document | |
| C11d_Att_09_-_Past_Performance_References.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025325Q0005 | Contractor: | |
| PID Description: | Bldg 84 Replace Gas Fired Unit Heaters | Date: | |
| Project Location: | Naval Base Kitsap, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| Bldg 84 Replace Gas Fired Unit Heaters | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |