C05_Salient_Characteristics_-_Attach_002.pdf

PDF 80 KB Posted

Attached to
PARKER DAM UPS BATTERY REPLACEMENT Federal contract opportunity
Solicitation number
140R3024R0018
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document appears to be the Salient Characteristics attachment for the Parker Dam UPS Battery Replacement solicitation, Solicitation Number 140R3024R0018. The key details are:

The required battery must be compatible with the existing Liebert UPS, bypass, and battery cabinets at the Parker Dam site. The battery must meet the EnerSys Data Safe DX UPS Battery Performance Specification, including 60 batteries with 4-cells per battery, a 20-year life at 25°C, and specific voltage and capacity ratings. The contractor must use the existing battery racks and provide battery covers, flame arresters, and stainless steel connection hardware. At least 8 hours of maintenance and testing training must be provided. The contractor is responsible for shipping, storage, and proper disposal of the old batteries. Two complete service manuals, both bound and electronic, must be provided with the battery delivery.

View the file

Other files for this federal contract opportunity

Other files attached to PARKER DAM UPS BATTERY REPLACEMENT, newest first.
File Type Posted
C05_Emergency_Evacuation_Procedures_EL_408_00_-_Attach_004.pdf PDF
C05_Combined_Synopsis.pdf PDF
C05_EnerSys_4DX-7_Spec_Sheet_-_Attach_003.pdf PDF
Sol_140R3024R0018.pdf PDF
C05_Clauses___Provisions.pdf PDF
C05_140R3024R0018_RFP.pdf PDF
C05_Emergency_Evacuation_Procedures_EL_391_00_-_Attach_005.pdf PDF
C05_SOW_-_Attach_001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parker Dam UPS Battery Replacement

Required Salient Characteristics

BATERY

INTERGRATION

1) Battery must be compatible with Parker’s:

a) Liebert, Model No. 38SA060A0A00 UPS Cabinet

b) Liebert, Model No. FxA07C6NN63, Bypass Cabinet

c) Liebert, Model No. 38UP08BCB8, Battery Cabinet

BATTERY

PERFORMANCE

SPECIFICATIONS

1) Must meet EnerSys Data Safe DX UPS Battery Performance Specification sheet attached for 4DX-7 Battery (Attachment 003).

2) 60 batteries with 4-cells per battery, 2.25 VDC per cell, rated at 9 volts.

3) Nominal Specific Gravity at 77 Degrees F. - 1.215.

4) Normal Floating Voltage at 77 Degrees F. - 540.00

5) Equalizing Voltage - 566.40 (2.36 volts/cell).

6) Rated Capacity (Ampere-Hours) - 368 AH at 8-Hour Rate.

7) Battery Life: 20 years at 25 degrees Celsius (77 degrees Fahrenheit) under float service applications.

8) Commissioning test must be preformed to ensure all above specifications are met.

BATTERY RACK

CONFIGURATION

1) Contractor must use Parker’s existing battery racks:

a) Contractor must confirm all dimensions and verify new batteries fit on existing racks in the same configuration as the current system.

BATTERY COVERS,

FLAME ARRESTER,

AND CONNECTION

HARDWARE

1) Clear plastic covers shall be provided to protect the tops of the battery terminals. The terminal covers will cover the entire terminal so that the series connections are finger-safe.

2) Each battery cell must be equipped with a flame arrester.

3) All connection hardware between batteries shall have stainless steel bolted connections. Electrical connection bars or cables between the batteries, (as recommended by the battery manufacturer). All hardware shall meet the manufacturer’s recommendations.

OPERATION&

MAITENANCE

TRAINING

1) A minimum of 8 hours of training shall be provided on maintenance and testing of batteries. Training material for up to 6 people shall be provided.

During the testing of the batteries, this may be considered part of the training, such as the field portion of training.

WARRANTY 1) Manufacture’s suggested warranty.

SHIPPING, STORAGE, &

PROTECTION

1) Comply with manufacturer's installation instructions for rigging, unloading, and transporting units. Unit shall be stored and handled per manufacturer’s instructions.

2) Protect units from physical damage.

3) Deliveries accepted Monday – Thursday from 0700 - 1600

4) Shipped to:

Attn: Bureau of Reclamation

Parker Dam

2209 Parker Dam Road

Parker Dam, CA 92267.

OPERATING MANUAL 1) Two complete sets of service manuals to be provided with the delivery of batteries including: operating instructions, technician manuals, maintenance procedures, and an illustrated parts breakdown shall be furnished. Provide service manuals, both bound copies, and electronic PDF copies, shall contain complete parts identification lists.

DISPOSAL

OF BATTERIES

1) Contractor shall provide documentation, Universal Hazardous Waste

Manifest, Bill of Lading for disposal of batteries.

2) All of the batteries that are removed must be recycled in accordance with

California state law and Federal EPA requirements by the contractor at a recycling facility of their choice. A Certificate of Recycle shall be provided back to the government.

OTHER

REQUIREMENTS

NOTE:

File details come from the government source that posted it. Updated .