C-2 RFQ Attachment 2 - Specifications.pdf
PDF 907 KB Posted
- Attached to
- Shadow Bay Well Federal contract opportunity
- Solicitation number
- 1204R420Q0026
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C-2 RFQ Attachment 5 - OHA Conditional Approval Letter.pdf | ||
| C-2 RFQ Attachment 3 - DOL Wage Decision OR20200027.pdf | ||
| C-1 RFQ 1204R420Q0026 - Shadow Bay Well.pdf | ||
| C-2 RFQ Attachment 4 - Fire Protection Suppression.pdf | ||
| C-2 RFQ Attachment 1 - Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE PROJECT SPECIFICATIONS
5/19/2020 Shadow Bay Campground Water Well 01025 - 1/3 Measurement and Payment
SECTION 01025
MEASUREMENT AND PAYMENT
1. PART 1 - GENERAL
1.01 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
C. Not all units and measurement methods may be used under this Contract.
1.02 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computation shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting, and erosion control blankets shall be along slope lines.
2. For structures they shall be measured according to neat lines shown on the Drawings or as altered by the CO, in writing, to fit field conditions.
3. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurement shall be made parallel to the item being measured.
4. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions.
Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
1.03 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
2. Linear Foot (LF): Measurement of work along its length from point-to-point;
parallel to the base or foundation. Do not measure overlaps.
5/19/2020 Shadow Bay Campground Water Well 01025 - 2/3 Measurement and Payment
3. Lump Sum (LS): One complete unit, not directly measured. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
1.04 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that causes a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
2. PART 2 – PRODUCTS (NOT USED)
3. PART 3 – EXECUTION (NOT USED)
4. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
END OF SECTION
5/19/2020 Shadow Bay Campground Water Well 01200 - 1/1 Mobilization
SECTION 001200
MOBILIZATION
1. PART 1 - GENERAL
1.01 SUMMARY
A. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
B. This work includes providing project site fire protection equipment, additional personnel and supplies for construction activities during fire hazard restrictions as required by USFS Middle Fork Ranger Station.
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION (NOT USED)
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
4.02 BASIS OF PAYMENT
A. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01200-1 Mobilization Lump Sum
5/19/2020 Shadow Bay Campground Water Well 02520 - 1/8 Wells
SECTION 02520
WELLS
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies the drilling, casing, developing, sealing and test pumping of a potable water well. New well will be located as shown on drawings with final approval made in the field by the CO.
B. Well Performance Requirement: New well shall be drilled to a minimum depth of 100 feet and produce a minimum of 20 gpm of water to be acceptable.
1.02 RELATED SECTIONS
A. 02730 Well Abandonment B. 332100 Well pump and Controls
1.03 SUBMITTALS
A. Submit 1 copy of the State of Oregon Water Supply Well Report (Well Driller’s
Log with Pumping Test) to the CO within 15 days of well completion.
B. Submit 1 copy of Laboratory Water Quality Test results to the CO within 15 days of well completion.
C. Submit (Original Document) Well Registration application to the State of Oregon with required fee(s) within 15 days of well completion.
D. Submit 1 copy of State of Oregon Well Registration application to the CO within
15 days of well completion.
E. Submit 1 copy of (New) Well Abandonment (Optional Item – If work is completed) within 15 days of well completion.
1.04 REGULATORY REQUIREMENTS
A. Except where these specifications are more stringent, all aspects of Contractor's drilling, construction, development of the well, and abandonment, if ordered by the CO, shall comply with the Oregon Administrative Rules for Well Construction issued by the Oregon Water Resources Department.
1.05 PROJECT CONDITIONS
A. Existing site is a developed campground, conduct operations to protect existing roads and other features. Campground is open to the public throughout the duration of the project. The contractor shall be responsible to conduct work in a manner to minimize disruption to the public.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Casing.
5/19/2020 Shadow Bay Campground Water Well 02520 - 2/8 Wells
1. New, black welded steel: ASTM A53, bearing factory markings of conformance.
2. Size, Weight and Wall Thickness. Conform to the following:
SIZE MINIMUM WALL
(Inches) THICKNESS (Inches)
8 0.250
3. Lengths.
a. 5 foot minimum lengths.
4. Joints.
a. Electric arc welded.
B. Liner (perforated and non-perforated)
1. PVC, ASTM F-480, SDR 26 (Type 160), ASTM D-1784, meeting ANSI/NSF standard 61, with solvent welded or threaded flush joints; 6” nominal size:
minimum wall thickness of .255”. Minimum 5’ lengths.
C. Pitless Adapter Unit
1. Manufacturers:
a. Merrill Manufacturing, Model MHB300 or approved equivalent conforming to standards of PAS-97(04).
b. Bury Depth to be 30" from surface (same as trench depth). No minimum or maximum bury depths required by manufacturer.
D. Access Port.
1. Nongalvanized steel coupling with removable pipe plug; or Weldolet by
Bonney Forge Inc., Mount Union, PA; or approved equal. Provide 1-1/2 inch diameter opening.
E. Sanitary Seal.
1. Bolted, sanitary type, with rubber gasket and grommeted holes for all pipes with power and control cables passing through it. Provide with temporary threaded SCH 80 PVC plugs / mechanical seals in openings, or other method approved by CO, to protect well from any contamination until pump is installed.
F. Drilling Water.
1. Suitable for domestic consumption.
G. Cement Grout.
1. Mix Proportions.
a. Portland Cement with a maximum of 6 gallons of water per sack of cement. Up to 5 percent Bentonite clay, by weight, may be added.
2. Cement.
a. Type II or III Portland Cement.
3. Water.
a. Suitable for domestic consumption.
5/19/2020 Shadow Bay Campground Water Well 02520 - 3/8 Wells
H. Bentonite.
1. Commercial Bentonite, fine grained, impervious, with at least 50 percent
Bentonite and 0.5 mm maximum size of remaining portion. Bentonite shall not be used at depths greater than 50 feet below ground level.
I. Drilling Fluids.
1. A commercial agent used to aid in removal of cuttings. Bentonite may be used only with approval of the CO.
3. PART 3 - EXECUTION
3.01 SITE PREPARATION
A. Locate and protect all underground utilities.
B. Stake location of new well. Refer to Construction Section 3.02 A.
C. Stake and mark limits of brush clearing needed for construction for approval by
Contracting Officer.
D. Clear brush and trees 5-inches in diameter or smaller within clearing limits and within 6 inches of ground surface. Mulch woody material while cutting using a vehicle mounted brusher or with a mulching machine. Spread mulch over the ground up to 3 inches thick.
E. Provide, erect, and maintain temporary vehicle barrier to prevent public vehicle access during drilling operations, orange safety fencing and other security measures, including traffic controls, as necessary to minimize potential safety hazards created by construction activities. The Contractor shall be responsible for maintaining safety measures at all times during the Contract.
F. Exercise precautions to prevent foreign materials and surface water from entering drilled hole.
G. The Contractor shall protect the adjacent terrain and surface water from siltation and contamination. Construct an (above ground) settling basin to contain the drilling fluid, cuttings and compounds and provide a means to filter sediment prior to discharging excess water.
3.02 CONSTRUCTION
A. Location of New Well.
1. New well shall be located to the South / West of existing pump house building.
Refer to the attached Site Plan for general area. There is an existing 3-inch PVC intake pipe from Waldo Lake to the pump house with surface valve boxes. Protect all piping from damage. Locate well as close to pump house as possible while maintaining required setbacks and outside of existing pipe zones.
2. Mark well location for approval by CO.
B. Temporary Surface Casing.
1. Furnish, install, and remove all temporary surface casing necessary to support the walls of the larger well bore where the grout surface seal is to be placed.
C. Plumbness and Alignment of Wells.
5/19/2020 Shadow Bay Campground Water Well 02520 - 4/8 Wells
1. Plumbness.
a. Drill well vertical. Axis of well shall not deviate from vertical by more than casing inside diameter for each 100 feet of depth.
2. Alignment.
a. Alignment shall be such that a 20 foot plummet will pass all sections of the well easily.
D. Grouting.
1. Utilize cement grout to shut off unsatisfactory water horizons or to stabilize caving formations. Place grout utilizing a grout pump and tremie.
E. Minimum Length of Permanent Casing.
1. The CO will determine the actual depth to which the permanent well casing shall extend; however, the casing will extend no less than 18 feet below the ground surface. Provide centering guides to keep the permanent well casing centered in the oversize drill hole.
2. The permanent well casing shall extend a minimum of 18 inches above finished soil grade (Allowance for 12 inches above concrete slab - Not in this Contract) to the following depths as applicable:
a. If drill hole passes through sound, uncreviced, consolidated rock formation, case a minimum of 5 feet into the rock formation. If an unconsolidated formation exists below the rock formation, continue the permanent well casing or well screen to the bottom of the formation or to the bottom of the well, whichever is deeper.
b. If drill hole passes through unconsolidated formations and no significant clay lenses, case a minimum of 5 feet below static water level. Continue the permanent well casing or well screen to the well bottom.
c. If drill hole passes through unconsolidated formation with a significant clay layer, case a minimum of 5 feet into clay layer. If an unconsolidated formation exists below the significant clay layer, continue the permanent well casing or well screen to the bottom of the formation or to the bottom of the well, whichever is deeper.
F. Grout Surface Seal.
1. Construct the grout surface seal in the presence of the CO.
2. The annular space between the permanent well casing and the drill hole shall be completely filled and sealed with cement grout or bentonite to comply with applicable State regulations and the following:
a. Diameter of upper drill hole: Drill the annular space a minimum of 4 inches in diameter larger than the nominal diameter of the permanent well casing and at least 18 feet below the ground surface.
3. Temporary Surface Casing Removal.
a. Remove all temporary surface casing necessary to support the walls of the larger well bore while placing the grout surface seal.
4. Grout Surface Seal Placement.
5/19/2020 Shadow Bay Campground Water Well 02520 - 5/8 Wells
a. Construct grout surface seal by placing or forcing grout from the bottom upward between the permanent casing and the open hole or temporary surface casing.
b. Slowly remove the temporary surface casing as the annular space is filled with grout. Alternately, the temporary surface casing may be removed immediately after the grout has been placed, but not later than 1/2 hour after initial introduction of grout into the hole.
c. Complete the surface seal by topping off the fresh grout or bentonite after settlement occurs and within 1/2 hour after initial placement of the grout surface seal.
G. Permanent Casing Installation.
1. Joints.
a. Weld casing segments to form continuous, watertight casing in area to be cased. Prepare and weld casing as follows:
1) Cut casing ends square.
2) Bevel end to be joined.
3) Align casing segments.
b. Join segments together using electric arc welder. Use sufficient number of passes to completely fill slot formed. Proportion placing of weld material to provide a minimum of 3 full passes within the slot area. Remove slag from welded area between passes.
2. Pitless Adapter Unit
a. Install pitless adapter in accordance with manufacturer’s recommendations. Maintain the integrity of the surface seal and restore seal in disturbed areas. Install temporary threaded PVC plug to seal exterior opening until discharge piping is connected.
3. Access Port.
a. Weld access port 6 inches below finish top of the permanent casing.
H. Develop the well using either of the following methods:
1. Development by Surging.
a. After the well screen has been installed or the casing has been perforated, develop well by surging unless other methods are approved in writing by the CO.
b. Do not use surge block inside the screen or opposite casing perforations.
Surge by natural drilling action of the drilling machine. Start surging at a slow rate and gradually progress to a maximum rate. Continue surging until no more fines can be brought into the well or until ordered to stop by the CO.
c. Continue well development until water from well is clear and free of fines.
2. Development by Air Jetting.
a. Development of completed well, with screen in place, performed by air jetting method. Development shall start at the bottom of the screen or perforations gradually working toward the top, so that all fines are pulled through the screen and forced out of the well. Continue development
5/19/2020 Shadow Bay Campground Water Well 02520 - 6/8 Wells
(may require more than 1 pass) until no more fines can be brought into the well or until ordered to stop by the CO.
I. Well liner
1. Install well liner. Liner to extend from well bottom to 2 inches below top of casing. Secure sections with solvent welds minimizing the number of joints.
Install lifting holes at top of liner.
2. Perforations: If perforated liner becomes necessary, perforate a 20-foot section and place at depth specified by the CO. Pattern and type to be approved by the CO. Perforated liner to have a minimum of 20% opening and may be factory or field perforated. Install 20 feet of non-perforated liner below the perforated liner for settling of well fines or as field directed by the CO.
3.03 FIELD QUALITY CONTROL
A. Pumping Test.
1. Complete standard (1-hour minimum) well flow test. Provide portable submersible pump, record static water elevation, pump elevation, drawdown elevation, flow rate (yield) and duration.
3.04 CLEANING AND DISINFECTION.
A. Clean and disinfect the well upon completion of well development. Disinfection may be done prior to test pumping.
1. Cleaning.
a. Thoroughly clean the well by removing all foreign substances and if required, swab with alkalis to remove oil and grease.
2. Disinfection.
a. After cleaning, disinfect the well with chlorine solution of sufficient strength to provide a 50 mg/l chlorine residual in all parts of well.
b. Disinfect as follows:
1) Dump concentrated chlorine solution into well.
2) Agitate well water from top to bottom with a bailer or other method approved by CO for at least 30 minutes.
3) After agitating, wash the walls of the casing above water level thoroughly with water bailed from the well.
4) Leave chlorine solution in the well for a period of at least 12 hours.
5) Test chlorine residual. If less than 10 mg/l remain, repeat disinfection process.
6) After disinfection, pump well at desired yield for a minimum of 30 minutes, or until no chlorine residual remains.
B. Bacteriological Laboratory Test Samples.
1. Samples of water shall be collected by the Contractor and tested for bacteriological and inorganic chemical quality at Contractor’s expense at an independent laboratory after cleaning and disinfection is complete. Provide copies of tests to the CO.
5/19/2020 Shadow Bay Campground Water Well 02520 - 7/8 Wells
3.05 ABANDONING WELL
A. Abandonment of new well shall be performed in accordance with Specification
02730 when directed in writing by the CO.
3.06 CLEAN UP
A. Remove all construction related debris, including drill tailings from National Forest Land and dispose in a sanctioned area. Leave the site in a neat and orderly condition.
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Site Preparation – Refer to Section 3.01
1. Measurement will be of the hours of time the Contractor spends clearing any vegetation for access to well drilling location.
B. Surface Seal.
1. Surface Seal: Measurement will be of the linear feet of depth of larger hole drilled and sealed, including drilling and all material used in the surface seal including grout, permanent steel casing, access port, and drive shoe.
C. Drilling for 6” Diameter Liner.
1. Measurement will be of the linear feet of depth of open hole measured from bottom of surface seal to the bottom of the hole.
D. 6” Diameter Liner.
1. Measurement will be of the linear feet of liner furnished and installed.
E. 6” Diameter Perforated Liner.
1. Measurement will be of the linear feet of perforated liner installed.
F. Well Development.
1. Measurement will be of the hours of time the Contractor spends developing the well, including Water Supply Well Report (drilling logs and pumping test), disinfection, and biological laboratory test and well registration application.
G. Standby Time.
1. Measurement will be of the hours of standby time, ordered in writing by the
CO, based on an 8 hour day, 5 day week.
H. 8” Diameter Permanent Casing.
1. Measurement will be of the linear feet of liner furnished and installed.
I. Pitless Adaptor.
1. Measurement will be lump sum for the pitless adapter furnished and installed.
J. State of Oregon Well Registration Fee
1. Measurement will be for actual fee paid to State of Oregon (for Well Registration). Contractor shall complete all required paperwork during Well Development. Submit receipts for reimbursement of fee paid.
5/19/2020 Shadow Bay Campground Water Well 02520 - 8/8 Wells
A. Payment will be at the Contract unit price for each item as designated below.
B. Payment will be made under:
02520-1 Site Preparation Hour 02520-2 Surface Seal Linear Foot 02520-3 Drilling for 6” Diameter Liner Linear Foot 02520-4 6” Diameter Liner Linear Foot 02520-5 6” Diameter Perforated Liner Linear Foot 02520-6 Well Development Hour 02520-7 Standby Time Hour 02520-8 8” Diameter Permanent Casing Linear Foot 02520-9 Pitless Adapter Lump Sum 02520-10 State of Oregon Well Registration Fee Lump Sum
5/19/2020 Shadow Bay Campground Water Well 02730 - 1/3 Well Abandonment
SECTION 02730
WELL ABANDONMENT
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies the abandonment of an existing well and the possible abandonment of a new well specified for construction under this contract.
1.02 RELATED SECTIONS
A. 02520 Wells
1.03 SUBMITTALS
A. Submit completed Well Abandonment Start Card and all State required forms to the State and a copy of each to the CO. Forms to be approved by the State Water Resources Department and shall include as a minimum all requirements listed in the OAR 690-205-0080(7) and OAR 690-220-0030(2).
1.04 REGULATORY REQUIREMENTS
A. Except where these specifications are more stringent, all aspects of abandonment shall comply with the Administrative Rules for Abandonment of Wells as issued by the Oregon Water Resources Board.
1.05 PROJECT CONDITIONS
A. Existing site is a developed campground, conduct operations to protect existing roads and other features.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Cement Grout
1. Cement grout used to seal a well shall be composed of a uniformly mixed slurry of Portland cement or High Early Strength Type III Portland cement and potable water, or High-alumina cement and potable water, mixed in the following proportions (Type of cement; Gallons of Water Per Sack of Dry Cement, respectively):
a. Portland Cement; 4-1/2 to 6 gal./ sack
b. High Early Strength Type III Portland Cement; 5-1/2 to 6-1/2 gal./sack
c. High-alumina Cement; 4-1/2 to 6 gal./sack
B. Additives to increase fluidity, reduce shrinkage, or control time of set may be used in a cement grout mixture. Expanding agents such as aluminum powder may be used at a rate not exceeding 0.075 ounce (one level teaspoonful) per sack of dry cement. The powder shall not contain polishing agents. The addition of bentonite clay to a cement grout mixture is permissible but shall not in any case exceed five percent (5%) by weight of dry cement. Calcium chloride may be added to a Portland cement grout to accelerate the set but shall not exceed two pounds per
5/19/2020 Shadow Bay Campground Water Well 02730 - 2/3 Well Abandonment sack of dry cement. High-alumina cement and Portland cement of any type shall not be mixed together for use in a well.
C. Cement types other than those set forth herein shall not be used as a sealing material in a well. In no case shall sand or aggregate be added to cement grout seal mixtures.
3. PART 3 - EXECUTION
3.01 ABANDONMENT OF EXISTING WELL (NOT USED)
A. Remove pump assembly and salvage for use on new well.
B. Remove existing drop pipe, pump rod and cylinder in a manner to prevent damage and deliver to ________.
C. Remove concrete slab (approximately 8’ square).
3.02 ABANDONMENT OF NEW WELL (OPTIONAL)
A. New well to be constructed under this contract shall be abandoned only when ordered in writing by the CO as a result of insufficient yield or poor quality.
3.03 ABANDONMENT – GENERAL
A. If casing or liner is not removed from the well, the casing or liner shall be thoroughly ripped or perforated in such a manner as to allow grout to migrate outside the casing or liner and totally fill the annular space between the casing or liner and the drill hole wall.
B. If the casing or liner is removed from the well, the well shall be plugged and sealed in accordance with OAR 690-220-0030 through OAR 690-220-0050 and shall be filled with concrete grout as the casing is being removed.
C. Use cement grout to seal the well. Use pressure equipment to introduce cement grout into the well by using a tremie beginning at the bottom of the well and working up. Plug the well in accordance with State regulations and standards to within 1 foot of the finish grade.
D. Remove the well casing a minimum of one foot below the surrounding grade. Fill the remaining hole with native topsoil and grade to blend with adjacent contours.
3.04 DISPOSAL
A. All demolished materials shall be removed from National Forest land and disposed of in accordance with applicable laws.
3.05 CLEAN UP
A. Remove all construction related debris from National Forest Land and dispose in a sanctioned area. Leave the site in a neat and orderly condition.
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Measurement will be for all work items including all incidental items, for each well abandoned to State of Oregon Requirements.
5/19/2020 Shadow Bay Campground Water Well 02730 - 3/3 Well Abandonment
A. Payment will be made under:
02730-1 Well Abandonment (New Well) (Optional) Lump Sum
USDA Forest Service Project Specifications
5/19/2020 Shadow Bay Campground Water Well 01 77 00.00 - 1
SECTION 01 77 00
PROJECT CLOSEOUT
PART 1 GENERAL
1.01 DESCRIPTION
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2 PRODUCTS
2.01 CLEANING MATERIALS
A. As recommended by the manufacturer of surface to be cleaned or refinished.
PART 3 EXECUTION
3.01 CLEANING/REFINISHING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site.
B. Apply touch-up paint or otherwise refinish surfaces that are damaged due to work of this contract to original condition.
3.02 PROJECT RECORD DRAWINGS
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all water lines shall be identified by dimensions from permanent structures (building corners, signs, etc.).
B. Keep record drawings current. Make record drawings available to the Contracting Officer for inspection at any time and at invoices. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress payment. At the completion of the project the Contracting Officer shall review the redline markup drawings for preparation of the electronic files.
C. On completion of the total project, modify existing electronic design drawings to reflect the record drawing markups. Submit both electronic and marked up project record drawings. Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings. All drawings shall be both hardcopy and electronically submitted. Design drawings are in AutoCAD Version 2014.
3.03 OPERATOR TRAINING
A. Provide a minimum of 6 hours of operator training for the new systems installed.
B. Use the Operations and Maintenance manuals as training tools during operator training.
5/19/2020 Shadow Bay Campground Water Well 01 77 00.00 - 2
3.04 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
3.05 PROJECT RECORD DRAWINGS: AS SPECIFIED ABOVE.
A. Guarantees and Bonds: As specified in individual sections.
B. Spare Parts and Materials: As specified in individual sections.
C. Operations and Maintenance Manuals: As specified in section 01 78 23.
D. All keys, locks, valve keys, spare parts and instruction materials as required or requested by the Contracting Officer.
3.06 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request. Certification shall include a listing of significant items that are not complete in accordance with the contract and shall indicate the schedule date for the completion of these items. Upon receipt of written certification project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits.
If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs.
C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection. All re-inspection costs may be charged in accordance with the Inspection of Construction clause of the contract.
3.07 ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Acceptance will be issued.
PART 4 - MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price as shown on the Schedule of items.
5/19/2020 Shadow Bay Campground Water Well 02 41 13 - 1
SECTION 02 41 13
SELECTIVE SITE DEMOLITION
PART 1 - GENERAL
1.01 DESCRIPTION
A. The work of this section consists of demolition and removal of abandoned utilities. The work includes backfilling and grading.
B. Related Sections: Section 31 25 00 – Sediment and Erosion Control Measures
1.02 SUBMITTALS
A. As specified in Section 01 77 00.
B. Schedule for shutting off water system.
1.03 QUALITY ASSURANCE
A. Comply with safety requirements for demolition, Oregon OSHA.
1.04 PROJECT CONDITIONS
A. Keep dust to a minimum at removal site and on haul roads. Use sprinklers or water trucks as necessary.
B. Pump wet well and inlet pipe is near Waldo Lake. Prevent erosion and sediment entering Waldo Lake.
1.05 CLOSEOUT SUBMITTALS
A. As specified in Section 01 77 00.
B. Project record drawings showing all abandoned utilities not required.
PART 2 - PRODUCTS
2.01 BACKFILL MATERIALS
A. Native soils, stone, gravel, or sand, free from debris, frozen materials, and roots and other organic matter. Native soils shall be screened so that aggregates no larger than 4” shall be placed for backfill and compacted. Backfill may be the spoils from utility
B. PEA GRAVEL
Round, water-worn, washed, sound, durable, uniform, evenly graded Rock which is free of soft, friable, thin, elongated or laminated Pieces, disintegrated Material, Organic Matter, Oil, Alkali, or other Deleterious Substance. Maximum Size: 1/2 inch
C. SAND
Fine granular material naturally produced by Rock disintegration and free from Organic Material, Mica, Loam, Clay, and other Deleterious Substances.
PART 3 - EXECUTION
3.01 PREPARATION
A. Protect buildings, structures, utilities, and vegetation to remain.
B. Install erosion control measures as required to prevent erosion and sediment entering
Waldo Lake.
3.02 DEMOLITION
5/19/2020 Shadow Bay Campground Water Well 02 41 13 - 2
A. At existing pump wet well: Remove and dispose of existing pump, piping, electrical conduit/wiring, and appurtenances inside 48” diameter x approximately 12 feet deep concrete pump wet well (precast manhole). Remove and dispose of cover and top concrete riser section(s) to nearest joint (3 feet min depth from surface). Cut and remove pipe, electrical conduit/wiring within 2 feet of structure and abandon remaining sections. Dewater wet well and crush or punch 1 foot diameter hole in base.
Obtain inspection of broken base and concrete plugs / pipe caps before backfilling excavation. Abandon remaining structure by backfilling with processed / imported pea gravel or sand. Compact or vibrate material to eliminate voids and settling. Top 2 feet shall be compacted native soil or sandy loam.
B. At Water System Building: Cut and remove water pipe, electrical conduit/wiring as needed for construction of new pipe from well to exterior building wall connection and abandon remaining sections to removed pump wet well. Removed electrical conduit/wiring to pump control panel/boxes not used by new pump controls and seal CMU wall holes with non-shrink grout and paint to match existing walls. Backfill excavation with compacted native soil or sandy loam.
C. Abandoned Utilities: Cap off pipe and conduits with a concrete plug pipe ends that is a minimum three times the diameter of the pipe long.at existing pump wet well and at building entrance. Contractor’s option to install a permanent manufactured PVC pipe cap matching pipe size and material or other approved plug on inlet pipe since it is below the surface water level of Waldo Lake. Excavate and cut pipe near Waldo lake if need to plug pipe ends if needed. Do not disturb soil inside water body.
D. Pull or terminate any conductors according to code.
3.03 RESTORATION
A. Finished surfaces shall be the same as the surrounding surface (i.e. lawn grass, native grass, asphalt pavement, compacted gravel, etc.).
B. Backfilling:
1. Ensure that areas to be filled are free from standing water, frost, frozen material, and debris.
2. Place backfill materials in horizontal layers not exceeding 12 inches in loose depth. Compact each layer, at optimum moisture content to a density equal to surrounding ground. Compaction equipment shall be able to compact backfill with a minimum 2,200 pounds per square foot force.
C. Grading:
1. Restored Areas: Grade surface to blend with original contours and provide positive drainage.
3.04 DISPOSAL
A. Dispose of unsuitable and excess material off National Forest property.
4.01 MEATHOD OF MEASUREMENT
A. Measurement will be lump sum for all equipment, materials, and labor to complete work described in this section.
5/19/2020 Shadow Bay Campground Water Well 02 41 13 - 3
Payment will be made under:
024113-1 Selective Site Demolition Lumps Sum
5/19/2020 Shadow Bay Campground Water Well 031000
SECTION 03 10 00
CONCRETE FORMS AND ACCESSORIES
1.01 SUMMARY
A. This section specifies construction of concrete forms.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Plywood: B-B Plyform.
B. Steel.
1. Prefabricated.
2. Concrete Reinforcing: 6”x6” 10/10 wire mesh
C. Lumber.
1. Standard grade, (concealed surfaces only).
D. Form Ties and Spreaders.
1. Form Ties: Snap-off type, galvanized metal, fixed length, cone type, with waterproofing washer and leaving no metal within 1 inch of the concrete face.
E. Form Release Agent.
1. Colorless mineral oil which will not stain concrete, or absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.
2. Diesel or oil based release agents shall not be used.
PART 3 - EXECUTION
2.01 CONSTRUCTION
A. Construct forms to prevent leakage of mortar, and any shifting or deformation during the placement and finishing of concrete.
B. Wet forms to allow removal without damaging the concrete per manufacturer’s instructions.
C. Place 6”x6” 10/10 wire mesh concrete reinforcement one third off bottom of concrete using manufactured concrete rebar spacers.
D. Joints. (NOT USED)
2.02 Arrangement of joints (NOT USED).
2.03 INSPECTION
A. Obtain CO inspection and approval of forms at least 4 hours prior to placing concrete. Notify CO at least 72 hours in advance of concrete pour that forms will be ready for inspection.
2.04 CLEANING
A. Remove all sawdust, shavings, and other debris from within the forms.
B. Form Removal.
1. Do not disturb forms until concrete has gained enough strength to carry its own weight and such construction loads as may occur.
2. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.
A. There will be no separate measurement or payment for work in this section.
Payment will be included at the contract unit price as shown on the Schedule of items.
SECTION 03 20 00
CONCRETE REINFORCEMENT
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies reinforcing bars and welded wire fabric.
1.02 RELATED SECTIONS
A. Section 03 10 00 – Concrete Forms and Accessories B. Section 03 30 00 – Cast-in-Place Concrete
1.03 REFERENCES
A. ACI 318 - Building Code Requirements for Reinforced Concrete B. ACI SP-66 - American Concrete Institute - Detailing Manual.
C. ANSI/ASTM A497 - Welded Deformed Steel Wire Fabric for Concrete
Reinforcement.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Reinforcement Steel.
1. Bar reinforcement - ASTM A615 Grade 60.
B. Reinforcing Fabric.
1. Welded wire Reinforcement. 6X6, W1.4/W1.4 - ASTM A185.
C. ACCESSORY MATERIALS
1. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture.
3. PART 3 - EXECUTION
3.01 INSTALLATION
A. Secure reinforcement against displacement caused by construction loads or placing of concrete. Tie all bar intersections with annealed iron wire of not less than 16 gauge.
Hook or support wire mesh during placing concrete slabs to insure placement as detailed.
B. Field bending and cutting will be permitted if performed in accordance with the ACI code.
C. Keep reinforcement free of dirt, oil, paint, grease, mill scale, and loose or thick rust.
D. Place, support and secure reinforcement against displacement. Do not deviate from required position.
E. Do not displace or damage vapor barrier.
F. Accommodate placement of formed openings.
G. Conform to ACI 318 for concrete cover over reinforcement.
4. PART 4 - MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section.
Payment will be included at the contract unit price as shown on the Schedule of items.
END OF SECTION 032000
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies cast-in-place concrete.
1.02 RELATED SECTIONS
A. 03 10 00 – Concrete Forms and Accessories B. 03 20 00 – Concrete Reinforcement C. 03 35 23 – Exposed Aggregate Concrete
1.03 REFERENCES
A. ACI 304 - Recommended Practice for Measuring, Mixing, Transporting and Placing
Concrete.
B. ACI 308 - Standard Practice for Curing Concrete.
C. ACI 318 - Building Code Requirements for Reinforced Concrete.
D. ASTM C94 - Ready-Mixed Concrete.
E. ASTM C150 - Portland Cement.
F. ASTM C260 - Air Entraining Admixtures for Concrete.
1.04 QUALITY ASSURANCE
A. Perform work in accordance with ACI 301.
B. Acquire cement and aggregate from same source for all work.
C. Use only 1 brand of cement and admixtures unless otherwise approved in writing by the COR.
1.05 SUBMITTALS
A. Provide the COR with delivery ticket in accordance with ASTM C94 for each load of concrete.
B. Mix Design showing compliance with the requirements of these Specifications prior to placement with sufficient time for approval.
C. Compressive Test results.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Cement.
1. Type I or Type II Portland Cement: ASTM C150. Use only 1 brand of cement.
2. For areas with poor aggregate quality: Type II Portland Cement, ASTM
C150. Use only 1 brand of cement.
3. Type III Portland Cement: ASTM C150. For use at the Contractor's option under Cold Weather Concreting and Curing and Proportioning Concrete for Cold Weather.
B. Aggregate.
1. ASTM C33, "Specifications for Concrete Aggregate,” Size Number 57.
2. For areas with poor quality aggregate, aggregate shall conform to ASTM
C33 and meet the following minimum standards:
TEST ASTM LIMIT
Fine Aggregate Sieve Analysis
C 33
(as specified below)
Clay lumps & Friables C 142 2% Max Light Weight Material C 123 2% Max Material finer than C 117 3% Max No. 200 Sand Equivalent
C 241
80% Min
Soundness (NaSO4) C 88 10% Max
Coarse Aggregate Sieve Analysis
C 33
(as specified below)
Clay Lumps & Friables C 142 0.5% Max Light Weight Material C 123 1.0% Max
Gradation follows:
Fine Aggregate Coarse Aggregate Sieve Passing Size % Passing
(Weight) Sieve Passing Size % Passing
(Weight) 3/8 100 1-1/2 100 No. 4 90-100 1 90-100 No. 16 45-75 3/4 50-80 No. 30 25-55 3/8 15-40 No. 100 0-8 No. 4 0-10 C. Admixtures for Concrete.
1. Air-entraining admixtures - ASTM C260.
2. Water-reducing retarding admixtures - ASTM C494, Type D. Water-reducing, retarding admixtures may be used when approved by the COR.
The time limit between batching and placing concrete may be extended up to an additional 2 hours. Use a quantity of admixture within the range of the manufacturer's recommendation. The amount of water may be reduced; other proportions shall remain the same.
3. Furnish the following information to the COR for approval:
a. Brand name of the admixture.
b. Amount of admixture, per cubic yard of concrete to be used.
c. Reason for requesting the use of the admixture.
D. Water.
1. Clear, clean, and suitable for domestic consumption.
2.02 CONCRETE MIX
A. Schedule - Concrete Types and Finishes.
1. Proportion concrete in accordance with ACI 318. The strength of concrete (f'c), air entrainment, slump, and finish meet the requirements below:
a. Structural Concrete /Foundation Walls and Slabs.
Unit Requirement Compressive Strength (f'c) (28 day) 3,000 psi Air Entrained 4-6% Slump (±1 inch) 5” Finish form Finish with honeycomb filled surface
B. Add air entraining agent to normal weight concrete mix for work exposed to exterior.
C. Proportioning Concrete for Cold Weather.
1. For concrete placed under "Cold Weather Concreting and Curing" condition, the Contractor may elect to alter the required proportions in one of the following ways:
a. Type III Portland Cement.
1) Type III Portland Cement may be substituted in equal quantities for Type I or II Portland Cement.
b. Additional Cement.
1) An additional sack per cubic yard of Type I or Type II Portland Cement may be added.
D. Temperature Limits for Cold Weather Concrete.
1. Provide concrete having a minimum temperature of 50 degrees F and a maximum temperature of 90 degrees F at the time of placing. The temperature of the mixing water shall not exceed 140 degrees F. If aggregates are heated, heat uniformly with steam or water coil. Aggregate temperature shall not exceed 95 degrees F. Aggregate water mix temperature shall not exceed 80 degrees F. Do not use materials containing frost or icy lumps.
E. Proportioning Grout Fill.
1. Fine concrete aggregate with 3 sacks of cement per cubic yard and a maximum slump of 6 inches.
3. PART 3 - EXECUTION
3.01 MIXING
A. Hand Mixed.
1. Hand mixing may be allowed only upon written approval of the CO. Hand mixed batches shall not to exceed 1/2 cubic yard in volume.
3.02 MIX ADJUSTMENTS
A. After the mix period but no later than 15 minutes from start of mixing, water may be added once for purposes of acquiring minimum slump, provided specified water-cement ratio is not exceeded. Adding water beyond these conditions constitutes re-tempering which will not be allowed. When water is added, an additional 20 revolutions at mixing speed is required.
B. Air-entraining admixtures will not be allowed to be added after the start of mixing for purposes of acquiring minimum air content.
3.03 CONCRETE PLACEMENT
A. Notify COR a minimum of 72 hours prior to placement.
B. Convey concrete from a mixer to the forms as near final position as practical in a manner which will prevent segregation or loss of materials.
C. Place concrete in maximum 18 inch horizontal layers.
D. Immediately after placing, thoroughly compact concrete with mechanical vibrators.
Hand tamping or "spudding" when permitted, will be approved in writing by the
COR.
E. Place each concrete section in a continuous operation, such as bottom slab, walls, and top slab.
F. Do not drop concrete freely from higher than 4 feet above the surface of concrete being poured.
G. Do not place concrete in water or allow water to rise over freshly placed concrete until a set is sufficient to prevent damage.
3.04 PROTECTION FROM RAINFALL
A. Protect flat work during periods of precipitation with adequate waterproof covering. Support covering so that finishing may be performed and initial set obtained without damage. Dragging of tarpaulins or other covering across unset concrete will not be permitted.
3.05 CURING
A. Commence curing and protection of concrete immediately after placing. Cure Type
I and Type II Portland Cement 7 days continuously and Type III Portland Cement 3 days continuously by one of the following methods:
1. Water Curing.
a. Keep all surfaces of concrete and forms left on concrete wet. Shade concrete from sun with covering material or with sand or sawdust on slab, except during periods of required finishing. Use of sprinklers or flooding is permitted on slabs.
3.06 COLD WEATHER CONCRETING AND CURING
A. When descending air temperature at the project falls below 40 degrees F the
Contractor may at their option, continue concreting under conditions stated below.
Normal concreting operations may resume when the temperature at the site exceeds 40 degrees F.
B. Provide cover and heating equipment sufficient to maintain the temperature of the concrete at not less than 50 degrees F for a period of 3 days for Type I and Type II cement. Maintain the temperature at not less than 50 degrees F for a period of 2 days for Type III cement or when one additional sack of Type I or Type II cement is added.
C. Provide additional protection to prevent the concrete temperature from dropping more then 40 degrees F in the 24 hour period following the required protection period.
D. Keep all surfaces of concrete and any forms remaining on concrete wet. Remove and replace any concrete injured by frost and freezing as directed by the COR.
3.07 FIELD QUALITY CONTROL
A. All tests will be performed by and at the expense of the Contractor. Concrete for the samples shall be provided by the Contractor at no additional cost to the Government. Samples for testing will be selected on a random sample basis in accordance with ASTM C172. If the measured slump or air content falls outside the specified limits, a check test shall be made immediately on another portion of the same load. In the event of a second failure, the concrete shall be considered to have failed the requirements of the specification.
B. The following concrete tests will be taken:
1. Slump.
a. Testing will be in accordance with ASTM C143. If the slump is greater than the specified range, the concrete will be rejected.
2. Air Content.
a. Testing will be in accordance with ASTM C231. If the air content exceeds the specified range, the concrete will be rejected.
3. Compressive Tests.
a. Compressive test cylinders will be molded, cured, prepared and tested in accordance with ASTM C31 and ASTM C39. Cylinders will be taken for testing at 7 and 28 days.
C. Test results of cylinders tested at 28 days will form the basis for acceptance or rejection of concrete strength. Each 28 day compressive test result shall be the average of the compressive test of 2 cylinders from the same batch. No more than 2 samples from each load will be taken. The concrete strength will be evaluated in accordance with ACI 318. The strength level of the concrete will be considered satisfactory if the averages of all sets of 3 consecutive strength test results equal or exceed the required f'c and no individual strength test result falls below the required f'c by more than 500 psi.
4. PART 4 - MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section.
Payment will be included at the contract unit price as shown on the Schedule of
END OF SECTION 033000
5/19/2020 Shadow Bay Campground Water Well 331113 - 1/5
SECTION 33 11 13
UTILITY PIPE MATERIALS
A. This section specifies the furnishing of utility materials. Installation of these items is covered in other sections of the specifications.
1.02 RELATED SECTIONS
1.03 DEFINITIONS
A. Pipe Sizes.
1. All references to pipe sizes refer to the nominal diameter.
1”, 2”, 3” & 4”
1.04 SUBMITTALS
A. Submit sufficient descriptive literature to demonstrate compliance with these specifications for the following:
1. Pressure pipe and fittings (water).
Approved Companies: Spears Manufacturing Company, JM Eagle, EBAA Iron Inc, Tyler Union
2. Pipe and fittings.
Approved Companies: Spears Manufacturing Company, JM Eagle, EBAA Iron Inc, Tyler Union
3. Specialties.
1.05 QUALITY ASSURANCE
A. All piping and components used in contact with drinking water shall comply with ANSI/NSF 61, Drinking Water System Components - Health Effects. All plastic pipe and components shall also comply with ANSI/NSF 14, Plastic Pipe Components and Related Materials.
Approved Companies: EBAA Iron Inc and Tyler Union…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .