BUILDING AUTOMATION SYSTEM

STATEMENT OF WORK

Objective

This contract provides industry certified Building Automation System (BAS) virtual and onsite training workshops for Federal Aviation Administration (FAA) personnel.

Background

There are primarily two types of building automation systems installed in the NAS, Honeywell’s INet, and Schneider Corporation’s SmartStruxure. These systems monitor all power systems and environmental controls for the facilities that they are installed in. The power systems include commercial, back-up, and emergency systems. The environmental controls include boilers, chillers, HVAC systems, air handlers and cooling towers, and other closely related systems. Building Automation Systems allow a facility’s power system watch-stander to monitor all systems from a single location.

The FAA estimates a minimum of 312 and a maximum of 648 employees will require industry certified INeT Building Automation Systems (BAS) training for FAA site technicians, Technical Services Operations Group (TSOG), Operations Engineering Support Group (OESG), and Second Level Engineering employees that operate, maintain, and support NAS facilities.

The FAA estimates a minimum of 312 and a maximum of 864 employees will require industry certified SmartStruxure Building Automation Systems (BAS) training for FAA site technicians, Technical Services Operations Group (TSOG), Operations Engineering Support Group (OESG), and Second Level Engineering employees that operate, maintain, and support NAS facilities.

This training will need to be completed by the completion of this contract. Virtual training should include basic knowledge, including configuration, connectivity, operation, maintenance, and troubleshooting. Training at an FAA facility should include all of the Virtual training’s subjects as well as site-specific configuration training.

Requirements

The Contractor must furnish all labor, training materials, simulators, services, and equipment, to complete any of the following training workshops, if ordered on a task order:

INet

· Base Year:

· The Contractor must host no less than two (2), and no more than six (6), three (3) day, INeT Engineering and Troubleshooting Virtual training events in the base year, with no less than (NLT) 24 and no more than (NMT) 72 students.

· Option years 1 - 4:

· The Contractor must host no less than two (2), and no more than six (6), three (3) day INeT Engineering and Troubleshooting Virtual training events in each of the option years 1 – 4, with NLT 24 and NMT 72 students.

· The Contractor must host 3 day INeT Engineering and Troubleshooting training events at NLT four (4) and NMT six (6) FAA facilities in each option year 1-4, with NLT 48 and NMT 72 students each year.

Smartstruxure

· Base year:

· The Contractor must host NLT two (2) and NMT eight (8) four (4) day SmartStruxure Engineering and Troubleshooting Virtual training events in the base year, with NLT 24 and NMT 96 students each year.

· Option years 1 - 4:

· The Contractor must host NLT two (2) and NMT eight (8) four (4) day SmartStruxure Engineering and Troubleshooting Virtual training events in each option year 1-4, with NLT 24 NMT 96 students each year.

· The contractor must host no less than Four (4) no more than eight (8) four (4) day SmartStruxure Engineering and Troubleshooting training events at eight (8) FAA facilities in each option year 1-4, with NLT 48 NMT 96 students each year.

Classroom sizes and training scheduling may be contingent upon future determinations related to COVID-19 or other pandemic restrictions.

The Contractor must furnish all training supplies, e.g., appropriate Building Automation System models and simulators, interconnect cables, test equipment, and personal safety/protective gear to include all necessary and appropriate equipment to conduct training. The Contractor must maintain all supplies, test equipment, simulators, cables, software, and personal safety/protective gear in clean, well-maintained, and suitable condition for training and in accordance with this Statement of Work and all applicable Occupational Safety and Health Administrations Standards.

Access, Security, Use of Facilities and Work Hours

Training must be conducted on an 8-hour academic day, Monday through Friday schedule. Training must not be held on weekends or federal holidays. Training may be conducted at an FAA facility or virtually as required out of personal safety concerns.

Security: For onsite training, the Contractor must provide the FAA with a list of the personnel who will require access to the facilities. The Contractor’s personnel must not have criminal backgrounds and be able to pass a local background investigation prior to entrance to FAA facilities. Contractor personnel must not violate any security regulations pertaining to the facility. Violators may be removed from the premises with the right to reenter revocable.

Access to FAA Data and Facilities Support

The Contractor and the Contracting Officer’s Representative (COR) or other designated official will coordinate to ensure that the Contractor has access to the following FAA data and facilities support:

· Access to FAA drawings, specifications, and other data.

· Access to FAA facilities, to include a conference room and large monitor.

Deliverables

· For onsite FAA facility training, for each student, the Contractor must provide all training materials, and any software licenses and/or manufacturer specific equipment required for activities performed during the training workshop.

· The Contractor must provide the virtual platform for virtual training.

· For every class taught, the Contractor must submit to every student a pre-class knowledge test and a post-class test. Students who attend 100% of the training and who answer at least 70% of the post-class test questions correctly will have successfully completed the course. A numerical graded roster must be provided to the COR or other designated official for each class taught.

· Attendance is mandatory for successful completion of the course. Students must be present for 100% of class time in order to pass the course.

· The Contractor must provide each student with a Certificate of Completion upon successful completion of the workshop. Upon failure, the Contractor must provide the FAA with the reason(s) for the failure.

· For virtual training, the Contractor must provide electronic reporting that verifies student participation. This reporting can be either a real-time or a daily email verification of student participation. Reporting must occur at the beginning of each workshop day and after each lunch break.

· For onsite training, the Contractor must provide both electronic reporting and daily sign in rosters with the invoice for the services rendered. Both electronic reporting and the rosters shall report attendance at the beginning of each workshop day and after each lunch break. The rosters shall list the students who attended the workshop, and each students’ responses to an end of class survey upon completion of the workshop. Rosters must also be included when filing the invoices for services rendered.

Other Direct Costs

The Contracting Officer (CO) may authorize Contractor Travel, Training Materials Shipping, and Other Direct Costs in support of this contract. Advance CO approval is required before ODCs may be charged.

Program Management The Contractor must maintain a spreadsheet, submitted in the Contractor’s format and approved by the FAA, no later than the fifth (5th) working day of the month, to the COR, and must also include monthly invoices, listing task orders in a way that shows current status of:

· Training:

· Funding and invoice status, including invoice number/date and task order number/date issued;

· Description of training/course number;

· Number of students in attendance for each course;

· Location of training;

· Date of training;

· Status of action items from last Program Management Review or any other meeting.

Semi-Annual Program Management Review (PMR) Meetings The Contractor must participate in semi-annual program management review to discuss the program and contract status in terms of performance, schedule, and cost. However, program management reviews may be called by the FAA or requested by the Contractor at any time to discuss contract anomalies. The Contractor must prepare an agenda, action items and minutes for the PMR. The Contractor must coordinate the scheduling of PMRs with the COR or other designated official. In addition, the PMR proposed agenda must be delivered to the FAA three weeks in advance, and the action items and meeting minutes must be submitted within five working days of the PMR. The list of items to review may include, but is not limited to:

1. Contract implementation;

a. Accomplishments and shortfalls of performance during the reporting period;

b. Planned activities for the next reporting period;

c. Problems and issues; and

d. Outstanding action items.

Semi-annual reviews may be conducted at the Contractor’s facility, at the FAA, or via teleconference. The FAA CO, COR, or their representative, will designate all PMR dates and locations.

Period of Performance The Period of Performance is one base year with 4 option years Base Year: 365 successive calendar days after Contract Award date Option Year 1: 365 successive calendar days Option Year 2: 365 successive calendar days Option Year 3: 365 successive calendar days Option Year 4: 365 successive calendar days