This is a bid proposal document for the City of Los Angeles Department of Public Works Bureau of Engineering for the Broadway-Manchester Active Transportation Equity Project, a federally-funded transportation improvement initiative. The project spans 2.8 miles along Manchester Avenue (from Vermont Avenue to South Broadway) and South Broadway (from Manchester Avenue to Imperial Highway) in South Los Angeles, Council District 8. The project will implement protected bike lanes, improved medians, pedestrian refuge islands, curb extensions, sidewalk improvements, upgraded access ramps, pedestrian signals, improved bus stops, shade trees, landscapes, and irrigation systems. Bids must be received no later than 10:00 a.m. on September 23, 2026, at Los Angeles City Hall. A pre-bid meeting is scheduled for August 27, 2026, at 10:00 a.m. via Google Meet. The completion time is 560 calendar days, with liquidated damages assessed at $15,000 per calendar day. The project includes 220 line items encompassing demolition and removals, civil work, landscape and irrigation, street lighting, traffic signals, and storm drain improvements, with quantities ranging from single units to tens of thousands of square feet or linear feet.
The bid proposal is structured as a cash contract with an estimated total bid amount to be calculated by bidders using the provided schedule of work and prices. Bid items 2 through 9 are fixed-cost items with pre-printed dollar amounts totaling $4,140,000, and specialty items including mobilization, site conditions allowances, and environmental mitigation are identified. The prime contractor must perform at least 50 percent of the contract work with its own organization, excluding designated specialty items. Davis-Bacon prevailing wage rates apply to this federally-assisted project. A bid bond of at least 10 percent of the total bid amount is required, and the successful bidder must provide faithful performance and labor and material bonds. Bidders must hold a valid California Contractor's License Classification "A" and comply with numerous federal and state requirements, including the Disadvantaged Business Enterprise Program (currently suspended per interim final rule), California Senate Bill 854 registration, Buy Clean California Act requirements, Iran Contracting Act compliance, and equal employment opportunity provisions. The project is funded through federal sources (Federal Project No. ATPL-5006(895)) and is subject to Title VI of the Civil Rights Act and various labor compliance, safety, and environmental regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PROPOSAL
In and for the
City of Los Angeles, California Department of Public Works
Bureau of Engineering
BROADWAY-MANCHESTER ACTIVE
TRANSPORTATION EQUITY PROJECT
- FEDERAL ID NO. ATPL-5006(895)
- W.O. M0015817
Rev. 7/18/2018 i
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION
EQUITY PROJECT
Federal Project No. ATPL-5006(895)
W. O. No. M0015817
PAGE
Table of Contents…………………………………………………………………… 5 pages
Important Notice……………………………………………………………………. 5 pages
PART I
Bid Proposal ………….…….…………….……………………….………………… F-1
Schedule of Work and Prices……………………….…………………………… F-2a thru F-2j
Responsibility Questionnaire……………………….……………………….……… F-3a thru F-3m
Bidder Certification CEC Form 50……………………….……………………… F-3n
Signature Sheet and Affidavit……………………….…………………………… F-4
Bid Bond……………………….……………………….……………………………. F-5
Noncollusion Affidavit……….………………….……………………….………… F-6
List of Subcontractors (Local Agency Bidder – DBE Information)…………… F-7
List of Subcontractors (Vendor and/or Supplier and Broker Participation Recognition)………………………………………………………………............ F-8
Equal Employment Opportunity Certification/Equal Employment Opportunity Officer……………………….…………………….….…………….. F-9
Nonlobbying Certification for Federal-Aid Contract………….………………… F-10
Disclosure of Lobbying Activities……………………….…………………………. F-11
Instructions for Completion of SF-LLL, Disclosure of Lobbying Activities…….. F-12
Certification of Compliance with Child Support Obligations………………… F-13
Equal Benefits Ordinance/First Source Hiring Ordinance……...………….… F-14
Bidder’s/Proposer’s List…………………………………………………………… F-15a thru F-15d
Subcontractor/Subcontractor Substitutions……………………………...….… F-16
Iran Contracting Act of 2010 Compliance Affidavit……….……………………… F-19a thru F-19c
Table of Contents (Continued) ii
PART II
Notice Inviting Bids……………………..…….……………………….…………… B-1 and B-2 Race-Conscious Disadvantaged Business Enterprise (RC DBE) Program for Construction Contracts …………….……………………………………………… C-1 thru C-12
1. SPECIFICATIONS AND PLANS
1-1 General….……………………….…………………………… C-1
2. BID REQUIREMENTS AND CONDITIONS
2-1 General….……………………….…………………………… C-1 2-2 Disadvantaged Business Enterprise (DBEs)………..…… C-1 thru C-2 2-3 Administrative Reconsideration…………….………..…… C-2
3. AWARD AND EXECUTION OF CONTRACT
3-1 General……………………….……………………….……… C-3 3-2 Beginning of Work, Time of Completion, and Liquidated
Damages……………………………………………………… C-3
4. SUBCONTRACTORS
4-1 Subcontracting…………….………………………………… C-2 thru C-3 4-2 Subcontractor Approval………….…………..……………… C-3 4-3 Adding a Subcontractor………...………….……………… C-3 4-4 Subcontractor Substitution………...………….…………… C-3 and C-4 4-5 Reducing a Subcontract………...………….……………… C-4 4-6 Penalties……………………….………………….………….. C-4
5. PERFORMANCE OF DISADVANTAGED BUSINESS ENTERPRISES (DBEs)
5-1 General……………………….………………….…………… C-4
6. SUBCONTRACTOR AND DBE RECORDS
6-1 Monthly Subcontracting/Trucking Verification………… C-4 6-2 Prompt Payment of Funds Withheld to Subcontractors… C-4 and C-5
7. MISCELLANEOUS
7-1 Labor Code Requirements……………………….………… C-5 7-1.01 Prevailing Wage……………………….……………………… C-5 7-2 Payroll Records……………………….……………………… C-5 and C-6 7-3 Buy America Requirements…….………………….……… C-6 7-4 Highway Construction Equipment……………………… C-6 and C-7 7-5 Sound Control Requirements……...…………………….… C-7 iii
7-6 Permits and Licenses……….……………………………… C-7 7-7 Partnering……………..…………………………………….. C-7 7-8 Modification to Standard Plan…………………………… C-7 7-9 Quality Assurance Program…….……………….………… C-7 7-10 Authority of U.S. Comptroller General and Inspector on
Projects Using American Recovery and Reinvestment Act (ARRA) Funds (if ARRA funded)……………………………. C-7 and C-8
7-11 Monthly Employment Report (if ARRA funded)….……… C-8 7-12 Female and Minority Goals……….………………………… C-8 and C-9 7-13 Federal Trainee Program…...……………………………… C-9 and C-10 7-14 Title VI Assurances……...………………………………… C-10 and C-11 7-15 Required Contract Provisions, Federal-Aid Contracts
(Form FHWA-1273)……………………………….………… C-11 7-16 Use of United States-Flag Vessels………………………. C-11
8. (Blank)
9. (Blank)
10. (Blank)
11. (Blank)
12. (Blank)
13. (Blank)
14. REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS
FHWA-1273……………………………………………………………… FR-1
I. General............................................................................................. FR-2 II. Nondiscrimination.............................................................................. FR-2 thru FR-4 III. Nonsegregated Facilities.................................................................... FR-4 IV. Davis-Bacon and Related Act Provisions........................................... FR-4 thru FR-8 V. Contract Work Hours and Safety Standards Act................................. FR-8 thru FR-9 VI. Subletting or Assigning the Contract................................................. FR-9 thru FR-10 VII. Safety: Accident Prevention.............................................................. FR-10 VIII. False Statements Concerning Highway Projects................................ FR-10 IX. Implementation of Clean Air Act and Federal Water Pollution Control
Act…………………………………………………………………………… FR-11 X. Certification Regarding Debarment, Suspension, Ineligibility, and
VoluntaryExclusion............................................................................ FR-11 thru FR-13 XI. Certification Regarding Use of Contract Funds for Lobbying.............. FR-13 XII. Use of United States-Flag Vessels FR-13
PART III
General Instructions and Information for Bidders……………………………… 3-1 thru 3-8
Senate Bill 854……………………………………………………………………. 1 page
Required Insurance and Minimum Limits……………………………………… 1 page iv
Schedule of Stipulated Unit Prices (2021)…….………………………………… 13 pages
Department of Water & Power Standard Drawings…….……………………… 6 pages
Holiday Season Street Closure Restrictions…………………………………… 11 pages
Board of Public Works “Zero Sanitary Sewer Overflows Policy” (ZSSO)…… 3 pages
Debarment and Suspension Certification……………………….…………… 1 page
Subcontracting Request (Exhibit 16-B)……..…………………………………… 2 pages
City of Los Angeles Labor Compliance Manual……………………………… 13 pages
Important Notice Section………………………………………………………… 1 page
Contractor Daily Field Report (BCA 167) and Instructions…………...……… 2 pages
Equal Benefits Ordinance……..………………………………………………… 4 pages
Municipal Lobbying Ordinance……..………………………………………….. 24 pages
Disclosure Ordinances Affidavit……….…………………………………………. 1 page
Federal Wage Rates published on [08/06/2026]……………………………… 29 pages
Construction & Demolition Waste Recycling Ordinance Compliance Packet… 12 pages
Bid Rigging………………………………………………..……………………….. 1 page
Implementation of Cargo Preference Act Requirements……………………. 5 pages
Contractors' Use of Criminal History for Consideration of Employment Applications Ordinance…………………………………………………………… page
Contractor Evaluation Program…………… ……………………………………. 1 page
Contractor Special Recognition Program……… ……………………………… 1 page
DOT Standard Title VI Assurances……………………………………………… 9 pages
Buy Clean California Act Implementation……………………………………… 2 pages
Executive Directive 35: Equitable Access to Contracting Opportunities……. 1 Page
ATTACHMENTS
1. Plan Drawings, Index No. P-39637 (513 Sheets)
2. Specifications:
i. General Conditions
ii. General Requirements
iii. Technical Specifications (Roadway)
iv. Technical Specifications (Street Lighting)
v. Technical Specifications (Traffic) v
vi. Geotechnical Foundation Report
vii. Attachment (Hazardous Materials Report)
viii. Attachment (Aerially Deposited Lead (ADL) Memorandum
Rev. 11/5/25 (BIS)
IMPORTANT NOTICE
A. BIDDER'S SUBMITTALS
Part I - Must be properly completed and submitted to the Board of Public Works not later than the time and date designated on Page F-1 of the Proposal at the following address:
Los Angeles City Hall 200 North Spring Street, Room 355 Los Angeles, California 90012 Attention: Contract Section.
Please note: all items in Part I of the Bid Proposal that are meant for submission must be submitted with the bid.
B. PRE-BID MEETING
A pre-bid meeting has been scheduled for August 27, 2026 at 10:00 a.m. via Google meet at meet.google.com/mbk-ngft-qqt or join by phone at (US) +1 484-422-0026 PIN: 571 913 104#.
C. CONTRACTOR PARTICIPATION
The Prime Contractor shall perform, with its own organization, contract work amounting to at least 50% of the contract price. Any items designated as specialty items by the City and performed by Subcontractors shall be deducted from the contract price before computing the amount of the work required to be performed by the Prime Contractor with its own forces.
This percentage shall be of the original contract price, exclusive of specialty items performed by Subcontractors, but include the cost of materials and manufactured products purchased or produced by the Prime Contractor.
D. BIDDER INFORMATION AND ASSISTANCE
1. Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to:
Brian Ahn Bureau of Street Services 1149 S Broadway, 4th Floor Los Angeles, CA 90015 E-Mail: brian.ahn@lacity.org
The deadline for receipt of written questions is September 2, 2026.
E. CONTRACTOR'S LICENSE CLASSIFICATION
At the time of bid the contractor must possess a valid State of California Contractor's License Classification of "A".
F. CALIFORNIA STATE SENATE BILL 854:
A. Contractors are advised of the following changes made by California State Senate
Bill 854 to the State of California Department of Industrial Relations:
1. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the California Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
2. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5.
3. DIR maintains a current list of registered contractors.
https://efiling.dir.ca.gov/PWCR/Search.action
B. Please see the one page section, “Senate Bill 854” in Part III of the Bid Proposal for more information about Senate Bill 854.”
G. PLANHOLDERS LIST
The Planholders List is available 24 hours a day and can be obtained via the Bureau of Engineering’s web site at http://eng.lacity.org. Click on Contractors tab; and then click on PLANHOLDERS LIST link.
H. ESCROW BID DOCUMENTS
All Bidders must abide by the requirements listed in the General Requirements, Section 01351 “Escrow Bid Documents”, including the timely submittal of the Escrow Bid Documents by the three low Bidders.
The Escrow Bid Documents shall be submitted to the Board of Public Works Office, by the three (3) low Bidders, in sealed containers, within forty-eight (48) hours after the time for receipt of Bids. The containers shall be clearly marked on the outside with the Bidder's name, date of submittal, project name and the words "Escrow Bid Documents".
I. IRAN CONTRACTING ACT OF 2010
In accordance with California Public Contract Code Sections 2200-2208, all bidders https://efiling.dir.ca.gov/PWCR/Search.action http://eng.lacity.org/ submitting proposals for entering into or renewing contracts with the City of Los Angeles for goods and services estimated at $1,000,000 or more are required to complete, sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit”.
J. DISADVANTAGED BUSINESS ENTERPRISE (DBE)
In compliance with the DBE Program Interim Final Rule (IFR) published by the U.S.
Department of Transportation on October 3, 2025, DBE Contract Goal Setting and Counting, along with DBE monitoring and compliance, is suspended until further notice.
During the suspension, there will be:
- No contract goals
- No Good Faith Efforts evaluation
- No counting of DBE participation
- No monitoring of DBE Program compliance
- No DBE forms submission
If you have any questions, please contact bca.biphelp@lacity.org
K. BIDDER’S LIST OF SUBCONTRACTORS
All bidders shall complete and submit the List of Subcontractors page (Page F-7 of the Bid Proposal) with their bid.
L. CALIFORNIA FEDERAL NUMBER OF TRAINEES DETERMINATION
The Calculated Required Number of Federal Trainees for this project is FOURTEEN
(14) per Part II of the Bid Proposal, “Disadvantaged Business Enterprise (DBE) Program for Construction Contracts,” Section 7, “Miscellaneous,” Sub-Section 7-13, “Federal Trainee Program.”
M. DAVIS BACON WAGE RATES
The Davis Bacon Wage Federal Rates are applicable to this project and have been included in PART III of the Bid Proposal.
N. CARGO PREFERENCE ACT
1. For all projects awarded after February 15, 2016
Use of United States – flag vessels:
The contractor agrees – mailto:bca.biphelp@lacity.org
(1) To utilize privately owned United State-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for Unites States-flag commercial vessels.
(2) To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.
(3) To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.
2. Please see the five page section in Part (3) of the Bid Proposal for more information.
O. ELECTRONIC SIGNATURE POLICY
(Types of Documents Permitted for Electronic and Scanned Signature)
This Policy is intended to broadly support the use of electronic signatures. Departments are encouraged to consult with the City Attorney’s Office if Departments are uncertain if the electronic/scanned signature is acceptable for a document. However, below are examples of the types of documents where electronic/scanned signatures are allowed:
1. Memos, forms, board letters and other correspondence Electronic/Scanned
2. Contracts Electronic/Scanned
3. Certificates and Permits Electronic/Scanned
4. Notarized Document Scanned
Please note that Ethics Form 50 and 55 must be signed via a software that is accepted by the Ethics Commission (i.e. DocuSign, Adobe). (Issued March 19, 2020)
P. TITLE VI OF THE CIVIL RIGHTS ACT OF 1964
The (Title of Recipient), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US. C.§§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Q. BUY CLEAN CALIFORNIA ACT (BCCA)
I. For projects with a bid due date on or after July 1, 2021 that include eligible materials as part of the permanent work, the successful bidder shall be required to provide current facility-specific Environmental Product Declaration (EPD) for the materials and meet the State of California maximum limits for Global Warming Potential as listed by California's Department of General Services with the applicable submittal.
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division- Resources-List-Folder/Buy-Clean-California-Act
II. Please see the two-page section, “Buy Clean California Act Implementation” in Part Ill of the Bid Proposal for more information about Buy Clean California Act.
THE DOCUMENTS CONTAINED HEREIN HAVE BEEN APPROVED BY:
Arsen Voskerchyan, P.E.
Division Engineer Project Award and Control Division Bureau of Engineering https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act
PART I
Print and submit with your bid Part I single-sided only except for the “Equal Benefits Ordinance Affidavit” which will be submitted on RAMP.
All bidders shall note the submission deadline dates and times for the following items as stated in Section 2-2, "Disadvantaged Business Enterprises (DBE's)" of the RC DBE Program for Construction Contracts as well as the Important Notice :
2. Exhibit 15-G “Local Agency Bidder DBE Commitment (Construction Contracts)”
3. Exhibit 15-H “DBE Information-Good Faith Efforts”
1. Exhibit 12-B “Bidders List of Subcontractors (DBE and Non-DBE)”
F-1 Rev. 1/18/2019
PART I OF III
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY PROJECT
Federal Project No. ATPL-5006(895)
W.O. M0015817
In and for the
City of Los Angeles California
TYPE OF CONTRACT CASH
PROPOSAL ATTACHMENTS Plan Drawings Index No. P-39637 (513 sheets)
SPECIFICATIONS General Conditions, General Requirements, Technical Specifications
Roadway, Technical Specifications Street Lighting, Technical Specifications Traffic, Geotechnical Foundation Report, Standard Specifications for Public Works Construction (Greenbook) 2012, 2014, 2017 and 2021 Edition* as amended by the City's Brown Book, May 4, 2022 Edition*.
PROJECT LOCATION See Plan Drawings
COMPLETION TIME 560 Calendar Days
LIQUIDATED DAMAGES $15,000 Per Calendar Day
BID DATE
Bids must be received no later than 10:00 a.m. on September 23, 2026 at Los Angeles City Hall; 200 North Spring Street, Room 355; Los Angeles, California 90012.
Call the Board Office at (213) 978-0262 if you have difficulties gaining access to City Hall.
Firm Name:
Address:
Telephone Number ( ) Fax Number ( )
Email Address:
Contractor's License Number: Classification: Expiration Date:
Business Tax Registration Certificate (BTRC) No.
* Part 1 of the Greenbook and Brown Book are not a part of the Specifications.
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Mobilization with Class A Field Office per General Requirements
Section 01292 & 01721
LS
Allowance for differing site conditions per General
Requirements, Section 01212 & 01253 3,000,000$
Allowance for Contaminated Soil per General Requirements, Section 01212 400,000$
Allowance for neighborhood impact mitigation per General
Requirements, Section 01212 200,000$
Allowance for Permits per General Requirements Sections
01212, 01280, and 01292 50,000$
Allowance for Environmental Mitigation per General
Requirements, Section 01212 & 01280 240,000$
Allowance for Additional Potholing per General
Requirements Sections 01212 , 01280 and 01732 100,000$
Allowance for Opportunity to Partner per General
Requirements Sections 01212 and 01353 150,000$
Allowance for Worksite Traffic Control Plan (WTCP) preparation including LADOT permit submittals, permit fees 150,000$
10 Implementation of LADOT approved Worksite Traffic Control Plan LS
Prepare Stormwater Pollution Prevention Plan (SWPPP) and
Implement SWPPP Mitigation Measures per General
LS
12 Clearing and Grubbing SF 83,300
13 Unclassified Excavation, including Haul CY 16,070
14 Remove Concrete Curb LF 14,350
15 Remove Concrete Integral Curb and Pavement (c = 7') LF 180
16 Remove Concrete Cross Gutter or Longitudinal Gutter SF 2,000
17 Remove Concrete Sidewalk including Curb Ramp SF 144,970
18 Remove Concrete Driveway SF 6,900
19 Remove Concrete Pavement SF 17,000
20 Remove Asphalt Concrete Pavement SF 510,500
21 Cold Milling AC Pavement SF 14,300
22 Variable Grind Cold Milling AC Pavement SF 234,000
23 Remove Abandoned Water pipe LF 388
24 Remove Storm Drain Pipe LF 22
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
Demolition/Removals
F-2a
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
25 Remove Abandoned Storm Drain Pipe LF 24
26 Remove Sewer Pipe LF 7
27 Remove Street Sign EA 12
28 Remove Flexible Bollard EA 650
29 Tree Removal EA 19
30 Remove ZICLA EA 4
31 Remove Brick Pavers SF 210
32 Remove Chain Link Fence LF 140
33 Remove Wrought Iron Fence LF 420
34 Remove Payphone EA 9
35 Remove and Relocate Mailbox EA 1
36 Remove and Relocate Trash Can EA 8
37 Remove and Relocate Picket Fence LF 32
38 Remove and Relocate Wrought Iron Fence LF 140
39 Untreated Base Material CY 6307
40 Asphalt Concrete TN 13190
41 Concrete Pavement (t=4") CY 6810
42 Concrete Walk and Housewalk (t=4") SF 104800
43 Concrete Bus Island (t = 8") SF 13990
44 Concrete Driveway SF 9013
45 Concrete Driveway Modified SF 2206
46 Stamped Concrete Access Path (t=8") SF 22000
47 Concrete Pad Electrical Equipment Foundation (t=18") SF 75
48 Concrete Cross Gutter CY 32
Civil
F-2b
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
49 Precast Porous Concrete Panel with Porous Curb & Gutter LF 300
50 Concrete Curb Type A LF 19400
51 Concrete Retaining Curb Per S-442-6 Detail 7 LF 1830
52 Concrete Type C Integral Curb & Gutter (a = 2 ft.) LF 10250
53 Concrete Type C Integral Curb & Concrete Pavement (c = 5 ft.) SF 840
54 Concrete Type C Integral Curb & Concrete Pavement (c = 6 ft.) SF 106870
55 Concrete Type C Integral Curb & Concrete Pavement (c = 7 ft.) SF 604
Concrete Type C Integral Curb & Concrete Pavement (w = 12 ft.)
(Bus Pad)
SF 23830
57 Curb Ramp - Case D (Includes Detectable Warning Surface) EA 171
Curb Ramp - Case D Modified (Includes Detectable Warning
Surface)
EA 16
Curb Ramp - Case E Modified (Includes Detectable Warning
Surface)
EA 27
60 Curb Ramp - Case F (Includes Detectable Warning Surface) EA 11
Curb Ramp - Case F Modified (Includes Detectable Warning
Surface)
EA 28
62 Median Cut Through (Includes 2 Detectable Warning Surface) EA 51
63 Removable Bollards EA 88
64 Pipe Handrail LF 1280
65 Steel Tube Fence LF 380
66 Anti Vandalism Electrical Enclosure Fence LF 108
67 Single Swing Gate EA 5
Transit Shelter - Remove & Relocate
EA 3
Bus Bench - Remove & Relocate
EA 10
Trash Receptacles - Remove & Relocate
EA 13
8' Bench
EA 22
6' Bench
EA 4
Pebble Seating
EA 8
F-2c
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Trash Receptacle
EA 26
Bike Racks
EA 28
Adjust Water Meter to Grade
EA 30
Adjust Water Valve to Grade
EA 137
Adjust Water Monitor Cover to Grade
EA 1
Remove Irrigation Cleanout
EA 2
Remove Irrigation Service Equipment
LS 1
81 Decomposed Granite SF 1460
82 Existing Tree Protection EA 219
83 Amended Soil CY 18100
84 Agronomic Soil Testing EA 42
85 36" Box - Street Tree EA 100
86 10' Root Barrier LF 1000
87 Mulch - 3" deep SF 358120
88 Sod SF 44400
89 1 Gallon - Shrubs EA 9388
90 1-Year Plant Establishment Maintenance LS 1
91 3" Ductile Iron Pipe LF 1520
92 3" Mechanical Equipment Package (Pump, Check Valve, Ball Valves, Flowmeter)EA 2
93 Check Valve Vault EA 2
94 Stormwater Self-Flushing Filtration Unit EA 2
95 Irrigation Day Tank EA 2
96 Irrigation Maintenance Hole EA 2
97 Irrigation POC Shut Off Valve (2") EA 4
Landscape and Irrigation
F-2d
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
98 Irrigation POC Shut Off Valve (1") EA 11
99 Irrigation Backflow Preventor/Enclosure (2") EA 2
100 Irrigation Backflow Preventor/Enclosure (1") EA 11
101 Irrigation Gate Valve (2.5") EA 140
102 Irrigation Ball Valve (1.5") EA 395
103 Irrigation Ball Valve (1") EA 24
104 Irrigation Quick Coupling Valve (1") EA 226
105 Irrigation 2-wire Controller/ Pedestal EA 3
106 Irrigation Conventional Controller/ Pedestal EA 11
107 Irrigation 2-wire Cable LF 22000
108 Irrigation Conventional wire LF 2400
109 Irrigation Master Valve (2") EA 4
110 Irrigation Master Valve (1") EA 11
111 Irrigation Flow Sensor (2") EA 2
112 Irrigation Flow Sensor (1") EA 11
113 Irrigation Remote Control Valve (1"/1.5") EA 221
114 Irrigation Remote Control Valve (1") EA 16
115 Irrigation Drip Zone Valve with Decoder (1") EA 77
116 Irrigation Drip Zone Valve (1") EA 11
117 Irrigation Storm Water Main SCH 80 (2.5") LF 22000
118 Irrigation Potable Water Main SCH 80 (2.5") LF 100
119 Irrigation Potable Water Main SCH 80 (1.25") LF 580
120 Irrigation Sleeves (4"ave.) LF 54140
121 Irrigation Tree Root Watering System EA 218
122 Irrigation 4" Pop-up Shrub Bubbler EA 8916
F-2e
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
123 Irrigation Sub-Surface Drip at Sod Turf SF 44400
124 Irrigation Sub-Surface Drip at Shrubs SF 10370
125 Irrigation On-Grade Drip at Existing Trees SF 5180
126 Adjust Street Light Pull Box to Grade EA 8
127 Remove and Relocate Street Light Pull Box EA 3
Install Pedestrian Pole, Foundation & luminaire (Stand-Alone
Pole)
EA 330
129 Install Pedestrian Clamp and Luminaire EA 73
130 Install CD953C Poles EA 21
131 Foundation (CD953C) EA 21
132 Install CD929A Poles EA 8
133 Foundation (CD929A) EA 8
134 Install Type 2 Pull Box EA 419
135 Relocate Pole (CD941A) EA 1
136 Relocate Pole (CD953C) EA 2
137 LED Luminaire (68W) EA 10
138 LED Luminaire (80W) EA 93
139 LED Luminaire (107W) EA 16
140 LED Luminaire (165W) EA 11
141 Remove and dispose of luminaire EA 109
142 Remove & Dispose Pole (14' Ornamental Post Top Ped) EA 11
143 Remove & Dispose Pole (15' Round Alum. Ped) EA 7
144 Remove & Dispose Pole (CD953C) EA 43
145 Remove & Dispose Pole (CD941A) EA 7
146 Remove & Dispose Pole (CD929B) EA 9
Street Lighting
F-2f
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
147 Remove & Dispose Pole (CD814E) EA 2
Remove & Dispose Pole Foundation and Pullbox (14' Ornamental
Post Top Ped)
EA 10
Remove & Dispose Pole Foundation and Pullbox (15' Round
Alum. Ped)
EA 7
150 Remove & Dispose Pole Foundation and Pullbox (CD953C) EA 43
151 Remove & Dispose Pole Foundation and Pullbox (CD941A) EA 7
152 Remove & Dispose Pole Foundation and Pullbox (CD929B) EA 9
153 Remove & Dispose of Pole foundation and Pullbox (CD814E) EA 2
154 Install 10 amp fuse kit (include cartridge fuse) EA 492
155 1" galvanized conduit (Parkway) EA 4605
156 1.5" galvanized conduit (St. Cross) EA 3560
157 3#8 THWN AWG wire EA 45402
158 #10 THWN AWG wire LF 13150
159 Pole Cap Kit and Node LF 186
160 Furnish and Install 2070 Controller EA 11
161 Furnish and Install 351 Cabinet EA 7
162 Furnish and Install 356 Cabinet EA 4
163 Furnish and Install 357 Cabinet EA 14
164 Furnish and Install F-332 Foundation (for 351 & 356 Cabinets) EA 2
165 Furnish and Install F-8 Foundation (for 357 Cabinets) EA 14
166 Relocate Existing Cabinet Equipment EA 1
167 Furnish and Install New Service Point EA 15
168 Furnish and Install Type 1 Pole and Foundation EA 13
169 Furnish and Install Type 1A Pole and Foundation EA 13
170 Furnish and Install Type 7 Pole and Foundation EA 36
LADOT
F-2g
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
171 Furnish and Install Type 9 Pole and Foundation EA 61
172 Furnish and Install Type 17-3-100 Pole and Foundation EA 6
173 Furnish and Install Type 19-4-100 Pole and Foundation EA 3
174 Furnish and Install Type 24-4-100 Pole and Foundation EA 1
175 Furnish and Install Type 26-4-100 Pole and Foundation EA 35
176 Furnish and Install Type 29-5-100 Pole and Foundation EA 13
177 Furnish and Install Type C-1-100 Pole and Foundation EA 1
178 Furnish and Install BSL Pole and Foundation EA 28
179 Furnish and Install Signal Mast Arm (0-30') EA 10
180 Furnish and Install Signal Mast Arm (35'-50') EA 48
181 Furnish and Install Luminaire Mast Arm EA 84
182 Furnish and Install Luminaire EA 85
183 Furnish and Install Signal Head (3-Section) EA 182
184 Furnish and Install Signal Head (4-Section) EA 11
185 Furnish and Install Bicycle Signal Head (3-Section) EA 4
186 Furnish and Install Signal Head (3-Section Pedestrian Hybrid Beacon)EA 84
187 Furnish and Install Pedestrian Signal Head EA 144
188 Furnish and Install Accessible Pedestrian Signal EA 160
189 Furnish and Install Detector Loop - Vehicle EA 204
190 Furnish and Install Detector Loop - Bicycle (3') EA 12
191 Furnish and Install Detector Loop - Transit Priority (Width 25' or less)EA 14
192 Furnish and Install Detector Loop - Transit Priority (Width more than 25')EA 6
193 Furnish and Install CCTV Camera System Complete EA 1
194 Furnish and Install Street Name Sign EA 22
195 Furnish and Install Ped Xing Street Name Sign EA 28
F-2h
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
196 Furnish and Install Sign, Pole-Mounted or Mast-Arm Mounted EA 73
197 Furnish and Install Pedestrian Barricade EA 105
198 Furnish and Install Splice Vault EA 2
199 Furnish and Install No. 2 Pull Box EA 113
200 Furnish and Install No. 3 Pull Box EA 277
201 Furnish and Install 1" Conduit LF 60
202 Furnish and Install 2" Conduit LF 4880
203 Furnish and Install 3" Conduit LF 18230
204 Intercept existing conduit, Join and extend into pull box EA 23
205 Furnish and Install Intersection Wiring/Cables LS 26.25
206 Furnish and Install Fiber Optic (96SM) Cable LF 8500
207 Furnish and Install 25-Pair Interconnect Cable LF 11880
208 Communications Interconnect Connection (by Intersection) EA 26
209 Remove and Salvage Traffic Signal Equipment LS 12
210 Adjust to Grade Traffic Signal Pull Box EA 10
211 Adjust to Grade Splice Vault (Fiberoptics) EA 1
212 Remove and Relocate Splice Vault (Fiberoptics) EA 1
213 Striping LS 1
214 Signing LS 1
215 Adjust to Grade Storm Drain Maintenance Hole EA 24
216 Adjust to Grade Sewer Maintenance Hole EA 44
217 Remodel Catch Basin EA 68
218 Catch Basin (W=3.5') EA 1
219 Catch Basin (W=7') EA 1
Storm Drain
F-2i
BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY
PROJECT - FEDERAL ID NO. ATPL-5006(895)
W.O. M0015817
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
220 18" Reinforced Concrete Pipe LF 50
C. SPECIALTY ITEMS: Bid Items Nos. 3, 9-11, 21, 22, 29, 32, 33, 38, 64-67, 81-125, 126-159 and 160-214 are designated as
"Specialty Items."
TOTAL BID AMOUNT:
Unit abbreviation: LS=lump sum, LF=linear feet, EA=each, SF=square feet, CY=cubic yard, TN=ton
NOTES
A. MOBILIZATION: If the successful bidder shows an amount in excess of $1,500,000 for Mobilization (Bid Item No. 1), the bidder will be paid $1,500,000 per Specification Section 01292 of the General Requirements. The difference between the Contractor’s bid amount for Bid Item No. 1 and $1,500,000 will be paid after the Statement of Completion has been issued.
B. FIXED COST ITEMS: Bid Item Nos. 2 through 9 are considered Fixed Cost Items at the time of bid. The pre-printed dollar amounts in figures listed in the SCHEDULE OF WORK AND PRICES shall not be changed or deleted.
F-2j
C O N S T R U C T I O N
Responsibility Questionnaire (rev 1/23/2020) 1
CITY OF LOS ANGELES
CONTRACTOR RESPONSIBILITY ORDINANCE (CRO) QUESTIONNAIRE
Unless otherwise exempt from the Contractor Responsibility Ordinance (Los Angeles Administrative Code Section 10.40, et. seq.), a Company/Firm bidding with the City of Los Angeles must complete this Questionnaire. If no bid is required, the prospective contractor still must submit a Questionnaire.
The signatory for this Questionnaire must be authorized to respond to these questions on behalf of the Company/Firm. Any false or misleading statement(s), the failure to answer any of the required questions, or the failure to submit the completed Questionnaire with its bid may render the bid/proposal non-responsive. If a response does not fit in the space provided, then you may submit an attachment with your questionnaire.
The Company is responsible for keeping the Questionnaire responses current. If any changes have occurred that would render any of the responses inaccurate in any way, this document must be updated within thirty
(30) days of the change(s).
A. BIDDER / PROPOSER / PROSPECTIVE CONTRACTOR CONTACT INFORMATION
Business Name Contractor’s License Number
Street Address City State Zip
Contact Person, Title Phone Fax
TYPE OF SUBMISSION:
The Questionnaire being submitted is:
An initial submission of a completed Questionnaire.
An update of a prior Questionnaire dated ______/______/______.
No change. I certify under penalty of perjury under the laws of the State of California that there has been no change to any of the responses since the last Questionnaire dated ____/______/____ was submitted by the firm.
B. BUSINESS ORGANIZATION / STRUCTURE
Indicate the organizational structure of your firm. “Firm” includes a sole proprietorship, corporation, joint venture, consortium, association, or any combination thereof.
Corporation: Date incorporated: _____/_____/_____ State of incorporation:
List the corporation’s current officers.
President: __________________________________________________________________________ Vice President: ______________________________________________________________________ Secretary: __________________________________________________________________________ Treasurer:
F-3a
Responsibility Questionnaire (rev 1/23/2020) 2
List all the stock owners who own 5% or more of the corporation’s stock. Publicly traded corporations do not need to list its stock owners.
(Use this space. If you need additional space, you can attach a document)
Partnership: Date formed: _____/_____/_____ State of formation: ____________ List all partners in your firm.
(Use this space. If you need additional space, you can attach a document)
Sole Proprietorship: Date started: _____/_____/_____ List any firm(s) that you have been associated with as an owner, partner, or officer for the last five years. Do not include ownership of stock in a publicly traded company in your response to this question.
(Use this space. If you need additional space, you can attach a document)
Joint Venture: Date formed: _____/_____/_____
(1) List each firm that is a member of the joint venture and (2) List the percentage of ownership the firm will have in the joint venture. NOTE: Each member of the Joint Venture must complete a separate Questionnaire for the Joint Venture’s submission to be considered a responsive bid.
(Use this space. If you need additional space, you can attach a document)
C. OWNERSHIP AND NAME CHANGES
1. Is your firm a subsidiary, parent, holding company, or affiliate of another firm?
Yes No
If Yes, explain the relationship between your firm and the associated firm(s). Include information about an affiliated firm only if one firm owns 50% or more of another firm, or if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
F-3b
Responsibility Questionnaire (rev 1/23/2020) 3
2. Have any of your firm’s owners, partners, or officers operated a similar business in the past five years?
Yes No
If Yes, list the names and addresses of all such businesses, and the person who operated the business. Include information about a similar business only if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
3. Has your firm changed names in the past five years?
Yes No
If Yes, list all prior names, addresses, and the dates they were used. Explain the reason for each name change in the last five years.
(Use this space. If you need additional space, you can attach a document)
4. Are any of your firm’s contractor licenses held in the name of a corporation or partnership?
Yes No
If Yes, list the name of the corporation or partnership that actually holds the license.
(Use this space. If you need additional space, you can attach a document)
D. FINANCIAL RESOURCES AND RESPONSIBILITY
5. In the past five years, has your firm ever been denied construction bonding?
Yes No
If Yes, explain the circumstances surrounding each instance.
F-3c
Responsibility Questionnaire (rev 1/23/2020) 4
6. Is your firm now, or has it been at any time in the last five years, the debtor in a bankruptcy case?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
7. Is your firm in the process of, or in negotiations toward, being sold or dissolved?
Yes No
If Yes, explain the circumstances.
(Use this space. If you need additional space, you can attach a document)
E. INSURANCE
8. In the past five years, has any bonding company made any payments to satisfy any claims made against a bond issued on your firm’s behalf?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
9. Indicate the status of your firm’s current workers’ compensation insurance policy (check one):
Workers’ Compensation Insurance Policy Currently in Effect Legally Self-Insured No Workers’ Compensation Policy Currently in Effect*
*If you do not have a worker’s compensation insurance policy currently in effect, and you are not legally self-insured, provide an explanation.
F-3d
Responsibility Questionnaire (rev 1/23/2020) 5
10. List the Experience Modification Rate (EMR) issued to your firm annually by your workers’ compensation insurance carrier for the last three years. Begin with the most recent year (YR 1) that an EMR rate was issued (EMR -1). If any of the rates for the three years is or was 1.00 or higher, provide an explanation below.
YR. 1: EMR-1: YR 2: EMR-2: YR. 3: EMR-3:
(Use this space. If you need additional space, you can attach a document)
11. Within the past five years, has your firm employed workers that were not covered under workers’ compensation insurance or state approved self-insurance?
Yes No
If Yes, explain each instance. If No, attach a statement from your workers’ compensation insurance provider that you have been continuously insured for the past five years.
(Use this space. If you need additional space, you can attach a document)
F. PERFORMANCE HISTORY
12. How many years has your firm been in operation? _______ Years.
13. Has your firm ever entered into any contract with the City of Los Angeles or any of its departments?
Yes No
If, Yes, list all contracts your firm has had with the City of Los Angeles for the last five (5) years. If your firm has had more than 10 contracts with the City of Los Angeles, then use the 10 most recent (and most similar) contracts. For each contract listed in response to this question, include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost; (e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
14. List all contracts that require similar work as the current bid/proposal in which your firm has had with any private or governmental entity (other than the City of Los Angeles) over the last five years. If your firm has had more than 10 contracts with similar work with any private or other governmental entities, then use the 10 more recent (and most similar) contracts. For each contract listed in response to this question, F-3e
Responsibility Questionnaire (rev 1/23/2020) 6 include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost;
(e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
15. In the past five years, has a governmental or private entity or individual terminated your firm’s contract prior to its completion?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
16. In the past five years, has your firm previously hired a debarred subcontractor to perform work on a government contract?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17A. In the past five years, has your firm been debarred or determined to be a non-responsible bidder or contractor?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17B.. Has your firm ever received a Notice of Unsatisfactory Performance by the Bureau of Contract Administration pursuant to the City Contractor’s Performance Evaluation Ordinance (LAAC Section 10.39)?
Yes No
If Yes, please enter the date of the Notice(s).
F-3f
Responsibility Questionnaire (rev 1/23/2020) 7
G. DISPUTES
18A. In the past five years, has your firm been a defendant in a court case or other legal proceeding on a matter related to any of the following issues? For parts (a) and (b) below, check Yes even if the matter only proceeded to arbitration, mediation or other dispute resolution process. For part (c), check Yes only if the matter proceeded to court litigation, even if the case was later settled or dismissed.
(a) Payment to subcontractors?
Yes No
(b) Work performance on a contract?
Yes No
(c) Employment-related litigation brought by an employee?
Yes No
18B. If you answer Yes to any of the questions below, explain the circumstances surrounding each instance.
For each instance, you must include the following in your response: the name of the plaintiff(s), the specific cause(s) of action or claim(s), the original date of filing; and the disposition/current status.
(Use this space. If you need additional space, you can attach a document)
19. Does your firm have any outstanding judgments pending against it?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
20. In the past five years, has your firm been assessed liquidated damages on a contract?
Yes No
If Yes, explain the circumstances surrounding each instance and identify all the projects for which liquidated damages were assessed, the amount of liquidated damages assessed and paid, and the name and address of the project owner.
F-3g
Responsibility Questionnaire (rev 1/23/2020) 8
H. COMPLIANCE
For the following questions, the term “owners” does not include stock owners in your firm if your firm is a publicly traded corporation.
21A. In the past five years, has your firm or any of its owners, partners or officers, ever been investigated, cited, assessed any penalties, or been found to have violated any laws, rules, or regulations enforced or administered, by any of the governmental entities listed on page 12:
Yes No
21B. If Yes, explain the circumstances surrounding each instance, including the governmental entity or entities that were involved, the dates of such instances, and the outcome.
(Use this space. If you need additional space, you can attach a document)
22. Within the past five years, has your firm, or any person employed by your firm, been investigated, found to have violated, cited, assessed any penalty, or been subject to any disciplinary action by a licensing agency for violation of any licensing law, rule or regulation?
Yes No
If Yes, explain the circumstances surrounding each instance in the last five years.
(Use this space. If you need additional space, you can attach a document)
23. In the past five years, has your firm, any of its owners, partners, or officers, been penalized or given a letter of warning by the City of Los Angeles for failing to obtain authorization from the City for the substitution of a Minority-owned (MBE), Women-owned (WBE), or Other (OBE) business enterprise?
Yes No If Yes, explain the circumstances surrounding each instance in the last five years.
F-3h
Responsibility Questionnaire (rev 1/23/2020) 9
24A. Provide the name(s), address(s) and telephone number(s) of the apprenticeship program sponsor(s) approved by the California Division of Apprenticeship Standards that will provide apprentices to your company for use on any public works projects that you are awarded by the City of Los Angeles.
(Use this space. If you need additional space, you can attach a document)
Provide the name(s), address(s) and telephone number(s) of the apprenticeship program sponsor(s) approved by the California Division of Apprenticeship Standards that have provided apprentices to your company on any public works project on which your firm has participated within the last 3 years.
(Use this space. If you need additional space, you can attach a document)
I. BUSINESS INTEGRITY
For the following questions, the term “firm” includes any owner, partner, or officer in the firm. If your firm is a publicly traded corporation, the term “owner(s)” does not include its stock owners.
25A. For questions (a), (b), and (c) below, check Yes if the situation applies to your firm.
(a) Is a governmental entity or public utility currently investigating your firm for making a false claim or material misrepresentation?
Yes No
(b) In the past five years, has a governmental entity or public utility alleged or determined that your firm made a false claim or material misrepresentation?
Yes No
(c) In the past five years, has your firm been convicted of, or found liable in a civil suit for, making a false claim or material misrepresentation to any governmental entity or public utility?
Yes No
25B. If you check Yes to any of the three questions above, explain the circumstances surrounding each instance of a false claim or material misrepresentation.
(Use this space. If you need additional space, you can attach a document)
26. In the past five years, has your firm or any of its owners or officers been convicted of a crime involving the
24B.
F-3i
Responsibility Questionnaire (rev 1/23/2020) 10 bidding of a government contract, the awarding of a government contract, the performance of a government contract, or the crime of theft, fraud, embezzlement, perjury, or bribery?
Yes No
If Yes, explain the circumstances surrounding each instance.
F-3j
Responsibility Questionnaire (rev 01/23/2020) 11
TERMS OF ACCEPTANCE AND SIGNATURE:
I certify under penalty of perjury under the laws of the State of California that I read and understand the questions contained in this questionnaire and the responses contained herein and on all Attachments. I further certify that I have provided full and complete answers to each question, and that all information provided in response to this Questionnaire is true and accurate to the best of my knowledge and belief.
Electronic Signature:
Signature Date
I understand that checking this box constitutes a legal signature confirming that I acknowledge and agree to the above Terms of Acceptance.
Execution of document by E-signature. By clicking on the check box, it indicates an electronic signature.
This is considered to be the legal equivalent of a manual or “wet” signature. Once signed electronically, this document is considered original and legally binding.
F-3k
Responsibility Questionnaire (rev 01/23/2020) 12
ATTACHMENT A: GOVERNMENTAL ENTITIES FOR QUESTION NO. 21A
Check Yes in response to Question No. 21A if your firm or any of its owners, partners or officers, have ever been investigated, cited, assessed any penalties, or found to have violated any laws, rules, or regulations enforced or administered, by any of the governmental entities listed below (or any of its subdivisions), including but not limited to those examples specified below. The term “owner” does not include owners of stock in your firm if your firm is a publicly traded corporation. If you answered Yes, provide an explanation of the circumstances surrounding each instance, including the entity involved, the dates of such instances, and the outcome.
FEDERAL ENTITIES
Federal Department of Labor
• American with Disabilities Act
• Immigration Reform and Control Act
• Family Medical Leave Act
• Fair Labor Standards Act
• Davis-Bacon and laws covering wage requirements for federal government contract workers
• Migrant and Seasonal Agricultural Workers
Protection Act
• Immigration and Naturalization Act
• Occupational Safety and Health Act
• anti-discrimination provisions applicable to government contractors and subcontractors
• whistleblower protection laws
Federal Department of Justice
• Civil Rights Act
• American with Disabilities Act
• Immigration Reform and Control Act of 1986
• bankruptcy fraud and abuse
Federal Department of Housing and Urban Development (HUD)
• anti-discrimination provisions in federally subsidized/assisted/sponsored housing programs
• prevailing wage requirements applicable to HUD related programs
Federal Environmental Protection Agency
• Environmental Protection Act
National Labor Relations Board
• National Labor Relations Act
Federal Equal Employment Opportunity Commission
• Civil Rights Act
• Equal Pay Act
• Age Discrimination in Employment Act
• Rehabilitation Act
• Americans with Disabilities Act
STATE ENTITIES
California’s Department of Industrial Relations
• wage and labor standards, and licensing and registration
• occupational safety and health standards
• workers’ compensation self insurance plans
• Workers’ Compensation Act
• wage, hour, and working standards for apprentices
• any provision of the California Labor Code
California’s Department of Fair Employment and Housing
• California Fair Employment and Housing Act
• Unruh Civil Rights Act
• Ralph Civil Rights Act
California Department of Consumer Affairs
• licensing, registration, and certification requirements
• occupational licensing requirements administered and/or enforced by any of the Department’s boards, including the Contractor’s State Licensing Board
California’s Department of Justice
LOCAL ENTITIES
City of Los Angeles or any of its subdivisions for violations of any law, ordinance, code, rule, or regulation administered and/or enforced by the City,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .