BPM006394_-Western_Technologies_.pdf
PDF 19 MB Posted
- Attached to
- Master Agreement AZ|CTR074825
- Contract number
- CTR074825
- Issued by
- Arizona
About this file
This document is a Request for Proposal (RFP) Solicitation No. BPM006394 issued by the Arizona Department of Environmental Quality (ADEQ) for Brownfields Environmental Site Assessment Services. The solicitation involves Western Technologies, Inc., a company based in Tempe, Arizona, which has submitted an offer to provide environmental assessment and related services. The document includes multiple attachments covering offer and acceptance, boycott of Israel disclosure, forced labor ban certification, confidential information designation, key personnel details, and conformance statements.
The proposed contract covers comprehensive environmental services including Phase I and Phase II Environmental Site Assessments (ESAs), asbestos and lead-based paint surveys, underground storage tank investigations, site characterizations, remediation planning, and related environmental compliance activities. Western Technologies has proposed a team of seven key personnel with extensive experience in environmental consulting, including technical directors, project managers, and specialists with certifications in industrial hygiene, environmental property assessment, and hazardous materials management. The offer is valid for 180 days following the solicitation due date, and the company has committed to providing services across various environmental domains with a focus on brownfields assessment and redevelopment support for state and local agencies in Arizona.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006394 Brownfields Environmental Site
Assessment Services
Arizona Department of
Environmental Quality
1110 W. Washington St.
Phoenix, AZ 85007
Solicitation Attachment – Offer and Acceptance | Revision No. 6 | Revised 03-24
Attachment 1 – Offer and Acceptance Form
SUBMISSION OF OFFER: The undersigned hereby offers and agrees to provide Brownfields Environmental Site Assessments in compliance with all terms, conditions, specifications, and amendments in the Solicitation and any written exceptions in the Offer indicated by the latest dated version below
CERTIFICATION: By signature in the above, Offeror certifies that it:
1. Will not discriminate against any employee or applicant for employment in violation of Federal Executive Order 11246, [Arizona] State Executive
Orders 2023-09, 2023-01, 2009-09 or A.R.S. §§ 41-1461 through 41-1465;
2. Has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or Service to a public servant in connection with the submitted offer. Failure to provide a valid signature affirming the stipulations required by this clause will result in rejection of the Offer. Signing the Offer with a false statement will void the Offer, any resulting contract, and may be subject to legal penalties under law;
3. Complies with A.R.S. § 18-132 when offering electronics or information technology products, Services, or maintenance;
4. Has submitted this Offer as a firm offer for 180 days following the Solicitation due date and time per the Instructions to Offers. Any extensions to the Offer Acceptance Period shall be made in accordance with the A.A.C. R2-7-C310;
5. Did not and will not involve collusion or other anti-competitive practices; and
6. Is not debarred from, or otherwise prohibited from, participating in any contract awarded by federal, state, or local government.
7. Acknowledges and agrees to the terms provided in the DBRA Requirements for Contractors and Subcontractors Under EPA Grants.
ACCEPTANCE OF OFFER
The offer is hereby accepted.
The Contractor is now bound to sell the Materials or Services listed by the attached Contract and based upon the Solicitation, including all terms, conditions, specifications, amendments, etc., and the Contractor’s Offer as accepted by the State.
The Contract shall henceforth be referred to as Contract No.
The effective date of the Contract is
The Contractor is cautioned not to commence any billable work or to provide any Material or Service under this Contract until Contractor receives purchase order or written notice to proceed.
State of Arizona Awarded this day of 20
Louis Anaya Chief Procurement Officer (CPO), MPA, C.P.M., CPPB
Procurement officer signature
Western Technologies 9/17/2024
Offeror company name Signature of person authorized to sign Offer Date
1805 W Drake Drive David Regonini | Technical Director of Environmental Services
Address Printed name and Title
Tempe, AZ 85283 Stephen Smelser | Manager of Environmental Services
City, State, ZIP Contact name and Title ssmelser@rma-western.com (602) 437-3737
Contact email address Contact phone number
Revised Offers:
Date Signature Date Signature
Best and Final Offer:
Date Signature
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Boycott of Israel Disclosure | Revision No. 2 | Revised 11-22
Attachment 2 – Boycott of Israel Disclosure
Please note that if any of the following apply to this Solicitation, Contract, or Contractor, then the Offeror shall select the “Exempt Solicitation, Contract, or Contractor” option below:
● The Solicitation or Contract has an estimated value of less than $100,000;
● Contractor is a sole proprietorship;
● Contractor has fewer than ten (10) employees; or
● Contractor is a non-profit organization.
Pursuant to A.R.S. § 35-393.01, public entities are prohibited from entering into contracts “unless the contract includes a written certification that the company is not currently engaged in, and agrees for the duration of the contract to not engage in, a boycott of Materials or Services from Israel.”
Under A.R.S. § 35-393:
1. "Boycott" means engaging in a refusal to deal, terminating business activities or performing other actions that are intended to limit commercial relations with entities doing business in Israel or in territories controlled by Israel, if those actions are taken either:
(a) Based in part on the fact that the entity does business in Israel or in territories controlled by Israel.
(b) In a manner that discriminates on the basis of nationality, national origin or religion and that is not based on a valid business reason.
2. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
5. "Public entity": (a) Means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State. (b) Includes the universities under the jurisdiction of the Arizona board of regents and community college districts as defined in section 15-1401.
The certification below does not include boycotts prohibited by 50 United States Code Section 4842 or a regulation issued pursuant to that section. See A.R.S. § 35-393.03.
In compliance with A.R.S. § 35-393 et seq., all Offerors must select one of the following:
X The Company submitting this Offer does not participate in, and agrees not to participate in during the term of the contract, a boycott of Israel in accordance with A.R.S. § 35-393 et seq. I understand that my entire response will become a public record in accordance with A.A.C. R2-7-C317;
☐ The Company submitting this Offer does participate in a boycott of Israel as described in A.R.S. § 35-393 et seq.; or
☐ Exempt Solicitation, Contract, or Contractor. Indicate which of the following statements applies to this Contract (may be more than one):
☐ Solicitation or Contract has an estimated value of less than $100,000;
☐ Contractor is a sole proprietorship;
☐ Contractor has fewer than ten (10) employees; or ☐ Contractor is a non-profit organization.
Western Technologies
Company name Signature of person authorized to sign
1805 W Drake Drive David Regonini | Technical Director of Environmental Services
Address Printed name and Title
Tempe, AZ 85283 dregonini@rma-western.com (602) 437-3737
City, State, ZIP Contact email address Contact phone number mailto:dregonini@rma-western.com
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Forced Labor of Ethnic Uyghurs Ban | Revision No. 3 | Revised 12-22
Attachment 3 – Forced Labor of Ethnic Uyghurs Ban
Please note that if any of the following apply to the Contractor, then the Contractor shall select the “Exempt Contractor” option below:
● Contractor is a sole proprietorship;
● Contractor has fewer than ten (10) employees; OR
● Contractor is a non-profit organization.
Pursuant to A.R.S. § 35-394, written certification is required to show that the company entering into a contract with a public entity does not use the forced labor, or use any contractors, subcontractors or suppliers that use the forced labor or any goods or services produced by the forced labor or any goods or services produced by the forced labor, of ethnic Uyghurs in the People's Republic of China.
Under A.R.S. § 35-394:
1. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
2. "Public entity" means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State.
In compliance with A.R.S. § 35-394, all Contractors must select one of the following:
X Company does not use, and agrees not to use during the term of the contract, any of the following:
● Forced labor of ethnic Uyghurs in the People’s Republic of China;
● Any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China; or
● Any Contractors, Subcontractors, or suppliers that use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.
☐ The Company does participate in the use of Forced Uyghurs Labor as described in A.R.S. § 35-394.
☐ Exempt Contractor: Select all statements that apply to the Contractor:
☐ Contractor is a sole proprietorship;
☐ Contractor has fewer than ten (10) employees; and/or ☐ Contractor is a non-profit organization.
Western Technologies
Company name Signature of person authorized to sign
1805 W Drake Drive David Regonini | Technical Director of Environmental Services
Address Printed name and Title
Tempe, AZ 85283 dregonini@rma-western.com (602) 437-3737
City, State, ZIP Contact email address Contact phone number mailto:dregonini@rma-western.com
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Confidential Information Designation | Revision No. 3 | Revised 03-24
Attachment 4 – Confidential Information Designation
All materials submitted as part of a response to a solicitation are subject to Arizona public records law and will be disclosed if there is an appropriate public records request at the time of or after the award of the contract. Recognizing there may be materials included in a solicitation response that are proprietary or a trade secret, a process is set out in A.A.C. R2-7-103 (copy attached) that will allow qualifying materials to be designated as confidential and excluded from disclosure. For purposes of this process the definition of “trade secret” will be the same as that set out in A.A.C. R2-7-101(51).
Complete this form and return it with your Offer along with the appropriate supporting information to assist the State in making its determination as to whether any materials submitted as part of your Offer should be designated confidential because the material is proprietary or a trade secret and therefore not subject to disclosure. Offerors shall create a redacted version of documents containing confidential information upon request from the Procurement Officer.
STATE WILL NOT CONSIDER ANY MATERIAL IN YOUR OFFER “CONFIDENTIAL” UNLESS DESIGNATED ON THIS FORM.
Check one of the following – if neither is checked, State will assume that it is equivalent to “DOES NOT”:
X This response DOES NOT contain proprietary or trade secret information. I understand that my entire response will become public record in accordance with A.A.C. R2-7-C317; or
☐ This response DOES contain trade secret information because it contains information that:
1. Is a formula, pattern, compilation, program, device, method, technique or process;
2. Derives independent economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by, other persons who can obtain economic value from its disclosure or use; and
3. Is the subject of efforts by myself or my organization that are reasonable under the circumstances to maintain its secrecy.
NOTE: Failure to attach an explanation may result in a determination that the information does not meet the statutory trade secret definition. All information that does not meet the definition of trade secret as defined by A.A.C. R2-7-101(51) will become public in accordance with A.A.C. R2-7-C317. State may make its own determination on materials in accordance with A.A.C. R2-7-103.
If State agrees with Offeror’s designation of trade secret or confidentiality and the determination is challenged, the Offeror hereby agrees to cooperate and support the defense of the determination with all interested parties, including legal counsel or other necessary assistance.
By submitting this response, Offeror agrees that the entire Offer, including confidential, trade secret, and proprietary information may be shared with an evaluation committee and technical advisors during the evaluation process. Offeror agrees to indemnify and hold State, its agents and employees, harmless from any claims or causes of action relating to State’s withholding of information based upon reliance on the above representations, including the payment of all costs and attorney fees incurred by State in defending such an action.
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Confidential Information Designation | Revision No. 3 | Revised 03-24
Attachment – Confidential Information Designation (for reference only)
A.A.C. R2-7-103 [Confidential Information] as was current at time of Solicitation issuance
A. If a person wants to assert that a person's offer, specification, or protest contains a trade secret or other proprietary information, a person shall include with the submission a statement supporting this assertion. A person shall clearly designate any trade secret and other proprietary information, using the term "confidential".
Contract terms and conditions, pricing, and information generally available to the public are not considered confidential information under this Section.
B. Until a final determination is made under subsection (C), an agency chief procurement officer shall not disclose information designated as confidential under subsection (A) except to those individuals deemed by an agency chief procurement officer to have a legitimate state interest.
C. Upon receipt of a submission, an agency chief procurement officer shall make one of the following written determinations:
1. The designated information is confidential and the agency chief procurement officer shall not disclose the information except to those individuals deemed by the agency chief procurement officer to have a legitimate state interest;
2. The designated information is not confidential; or
3. Additional information is required before a final confidentiality determination can be made.
D. If an agency chief procurement officer determines that information submitted is not confidential, a person who made the submission shall be notified in writing. The notice shall include a time period for requesting a review of the determination by the state procurement administrator.
E. An agency chief procurement officer may release information designated as confidential under subsection (A) if:
1. A request for review is not received by the state procurement administrator within the time period specified in the notice; or
2. The state procurement administrator, after review, makes a written determination that the designated information is not confidential.
X
Exceptions to Instructions to Offerors (RFP) Article /
Paragraph or Exhibit
Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
X
Exceptions to Scope of Work and Specifications Article /
Paragraph or Exhibit
Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
NO – Offeror acknowledges that it has read and understands the Scope of Work and Specifications, along with any respective Exhibits, Addendums, and Appendices of the
Standard Instructions to Offerors (RFP)
CONFORMANCE TO THE SCOPE OF WORK AND SPECIFICATIONS
Place an "X" in one of the following boxes to indicate the Offeror's conformance:
YES – Offeror acknowledges that it has read and understands the Scope of Work and Specifications, along with any respective Exhibits, Addendums, and Appendices of the
CONFORMANCE TO THE INSTRUCTIONS TO OFFERORS
Place an "X" in one of the following boxes to indicate the Offeror's conformance:
YES – Offeror acknowledges that it has read and understands the Instructions to Offerors (RFP) of the Solicitation Documents and attests that its Offer complies with all aspects.
NO – Offeror acknowledges that it has read and understands the Instructions to Offerors (RFP) in the Solicitation Documents, and attests that its Offer complies with all aspects
Special Instructions to Offerors
If taking exceptions, the relevant subsequent sections must be completed. Add additional rows as needed.
This document must be returned in an Excel (.xls or .xlsx) format.
STATE WILL NOT CONSIDER ANY EXCEPTIONS UNLESS DESIGNATED ON THIS FORM.
READ ALL INSTRUCTIONS TO OFFERORS BEFORE TAKING ANY EXCEPTIONS. OFFERS WITH EXCEPTIONS MAY BE FOUND NOT SUSCEPTIBLE FOR AWARD UNDER
IF NEITHER BOX IS MARKED WITH AN "X" UNDER ANY SECTION BELOW, THE OFFEROR’S RESPONSE TO THAT SECTION WILL BE CONSIDERED “YES” AND
STATE WILL INTERPRET THE OFFER AS IF THERE WERE NO EXCEPTIONS TAKEN.
Request for Proposal
Solicitation No. BPM006394
Brownfields Environmental Site Assessment Services
Arizona Department of Environmental Quality
1110. W Washington St.
Phoenix, AZ 85007
Attachment 5 - BPM006394 Conformance Statements and Exceptions Requests
Offeror Name: Western Technologies, Inc.
Solicitation Attachment – Conformance Statements and Exceptions Requests | Revision No. 2 | Revised 03-24
X
Exceptions to Contract Terms & Conditions
Article / Paragraph or
Exhibit Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
Addendum A to Special Terms & Conditions
Addendum B to Special Terms & Conditions
Uniform Terms & Conditions
Scope of Work and Specifications
CONFORMANCE TO THE CONTRACT TERMS AND CONDITIONS
Place an "X" in one of the following boxes to indicate the Offeror's conformance: g p g y p
Addendums, and Appendices of the Solicitation Requirements and attests that its Offer complies with all aspects. g p , g y p , Addendums, and Appendices of the Solicitation Requirements and attests that its Offer complies with all aspects EXCEPT FOR the exceptions listed below.
Special Terms & Conditions
Solicitation Attachment – Conformance Statements and Exceptions Requests | Revision No. 2 | Revised 03-24
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Key Personnel | Revision No. 1 | Revised 11-22
Attachment 6 – Key Personnel
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, please utilize the same form for each additional Personnel by making copies of this page as needed.
1 Name: David Regonini, REPA Job title: Technical Director of Environmental Services
Length of employment with the company: 36 years Length of time in current role: 16 years
Proposed percentage of overall time to be dedicated to the Services: 20%
If applicable, length of time in related experience with large local, state or federal government agencies: 20 years
Proposed position with regard to the Services: Project Manager – Professional Level V
Proposed primary responsibilities with regard to the Services:
Scoping, project design, budgeting/budget monitoring, staffing, scheduling, client communications, preparation of deliverables, and technical review.
Describe experience in performing Services similar to those that are to be assigned:
David has experience with a multitude of environmental programs addressing Phase I and Phase II due diligence assessments, assessment of brownfields for redevelopment, NEPA-level environmental assessments, solid and hazardous waste, underground storage tanks, water quality, environmental compliance, asbestos and lead, and occupational exposure. He has managed similar contracts including ADEQ Pollutants, ADEQ Asbestos/Lead/Indoor Air Quality, City of Phoenix Phase I/Phase II, City of Phoenix Asbestos/Lead, Maricopa County Environmental/Asbestos/Lead/Indoor Air Quality, and others.
List job-related certifications, training, and education:
Registered Environmental Property Assessor (REPA), National Registry of Environmental Professionals AHERA Asbestos Inspector AHERA Asbestos Management Planner AHERA Asbestos Contractor Supervisor EPA-Certified Lead-Based Paint Risk Assessor OSHA HAZWOPER 40-Hour training with updates BS, Environmental Science/Chemistry, Northern Arizona University
Resume: Attachment 6, Key Personnel Resumes, Supplement 1
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: Stephen J. Smelser, RG Job title: Manager of Environmental Services company: 27 years Length of time in current role: 15 years
Proposed percentage of overall time to be dedicated to the Services: 20%
If applicable, length of time in related experience with large local, state or federal government agencies: 30 years
Proposed position with regard to the Services: Project Manager – Professional Level VI
Proposed primary responsibilities with regard to the Services:
Scoping, project design, budgeting/budget monitoring, staffing, scheduling, client communications, preparation of deliverables, and technical review.
Describe experience in performing Services similar to those that are to be assigned:
Stephen is a registered geologist with over 40 years of experience spanning numerous Phase I and II environmental site assessments (ESAs); underground storage tank (UST) investigations; site characterizations, design and operation of remedial pilot test, design of remedial plans and specifications, asbestos assessments; test drilling; soil sampling and logging; installation of groundwater monitoring wells; groundwater sampling; soil vapor extraction well installations; soil vapor sampling; and the installation soil vapor wells, air sparge wells and groundwater water wells for investigation and remediation of soil and groundwater. He actively manages work under the ADEQ UST contract.
List job-related certifications, training, and education:
Registered Geologist, AZ No.26394 Registered Geologist, CA No.5828 OSHA 40-Hour HAZWOPER BS, Geology, Arizona State University
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: Todd Sayers Job title: Regional Vice President company: 28 years Length of time in current role: 3 years
Proposed percentage of overall time to be dedicated to the Services: 20%
If applicable, length of time in related experience with large local, state or federal government agencies: 28 years
Proposed position with regard to the Services: Project Manager – Professional Level V
Proposed primary responsibilities with regard to the Services:
Oversee and manage all Phase I & II Environmental Site Assessments (ESAs), Asbestos-Containing Materials (ACM), and lead-related activities in the Northern Arizona region, including the review and approval of all associated reports.
Describe experience in performing Services similar to those that are to be assigned:
Todd has years of experience in Phase I & II ESAs, site investigations, the removal and characterization of underground storage tanks, industrial hygiene, indoor air quality, building sciences disciplines, and remedial action. Additionally, Todd’s experience includes project management, technical review, client development, and data interpretation.
List job-related certifications, training, and education:
AHERA Asbestos Inspector AHERA Asbestos Management Planner AHERA Asbestos Contractor Supervisor EPA-Certified Lead-Based Paint Risk Assessor Radiation Safety, Monitoring, Device Operation of Niton XRF Analyzers, Niton Corporation OSHA 40-Hour HAZWOPER OSHA 32-Hour Construction Industry Standards, Western Technologies NIOSH Method 582 Certified Microscopist Surface and Groundwater Sampling, ADHS BS, Geology, University of Kansas
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: Suzette Numkena Job title: Environmental Project Manager company: 8 years Length of time in current role: 1 year
Proposed percentage of overall time to be dedicated to the Services: 40%
If applicable, length of time in related experience with large local, state or federal government agencies: 30 years
Proposed position with regard to the Services: Project Manager – Professional Level IV
Proposed primary responsibilities with regard to the Services:
Oversee and execute grant writing initiatives, conduct comprehensive assessments and evaluations for Phase I & II Environmental Site Assessments (ESAs), Brownfields, Resource Conservation and Recovery Act (RCRA) projects, renewable energy projects, and Asbestos-Containing Materials (ACM) and lead projects.
Describe experience in performing Services similar to those that are to be assigned:
Suzette has 30 years of experience completing projects for state, tribal, and federal agencies, including the ADEQ LUST Backlog Reduction Program and COP Aviation Hazardous Building Materials Program managing brownfields, Phase I & II, ACM & Lead, RCRA, renewable energies, and lead projects.
List job-related certifications, training, and education:
AHERA Inspector AHERA Contractor/Supervisor AHERA Management Planner AHERA Project Designer EPA-Certified Lead-Based Paint Risk Assessor OSHA 40-Hour HAZWOPER BS, Environmental Science, Northern Arizona University
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: Josh Vachal Job title: Environmental Department Manager company: 9 years Length of time in current role: 5 years
Proposed percentage of overall time to be dedicated to the Services: 35%
If applicable, length of time in related experience with large local, state or federal government agencies: 9 years
Proposed position with regard to the Services: Project Manager – Professional Level IV
Proposed primary responsibilities with regard to the Services:
Maintaining a strong partnership with ADEQ, overseeing and coordinating activities related to Asbestos-Containing Materials (ACM), Lead, and Phase I & II Environmental Site Assessments (ESA) projects across the Northern Arizona region.
Describe experience in performing Services similar to those that are to be assigned:
Josh has experience in leading regulated building materials surveys, indoor air quality testing and monitoring, lead-based paint, specializing in asbestos abatement oversight, regulatory compliance, and remediation oversight. Additionally, Josh has experience assisting both private and public agencies throughout Northern Arizona.
List job-related certifications, training, and education:
EPA-Certified Lead-Based Paint Inspector and Risk Assessor AHERA Building Inspector AHERA Contractor Supervisor AHERA Management Planner ADEQ Grade I Water Distribution System Operation & Maintenance ADEQ Grade I Drinking Water Treatment AS, Environmental Technology, Lake Area Technical Institute, Watertown, SD
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: Jason Wunschel, CIH Job title: Industrial Hygiene Program Manager company: 1 years Length of time in current role: 1 years
Proposed percentage of overall time to be dedicated to the Services: 20%
If applicable, length of time in related experience with large local, state or federal government agencies: 12 years
Proposed position with regard to the Services: Technical Specialist – Professional Level IV
Proposed primary responsibilities with regard to the Services:
Serve as the Certified Industrial Hygienist (CIH) for our team, overseeing and managing lead and Asbestos-Containing Materials (ACM) projects, and managing health and safety provisions for workers and the community.
Describe experience in performing Services similar to those that are to be assigned:
With extensive experience in industrial hygiene and environmental consulting in the Southwest, Jason oversees industrial hygiene services and procedures. He liaises with federal, state, and local agencies on behalf of clients and develops training materials to effectively communicate regulatory requirements to clients with diverse backgrounds and experience levels. His responsibilities include surveying for asbestos-containing materials, conducting air monitoring and asbestos surveys, reviewing and interpreting data, and generating comprehensive reports.
List job-related certifications, training, and education:
Certified Industrial Hygienist (CIH) Certified Asbestos Consultant (CA & NV) CDPH & EPA Lead Inspector/Assessor (Lead I/A) CASQA Qualified Industrial Stormwater Practitioner (QISP) CASQA IGP Trainer of Record (ToR) AHERA Building Inspector AHERA Contractor Supervisor AHERA Management Planner AHERA Project Designer OSHA 40-Hour HAZWOPER BS, Microbiology, California Polytechnic State University, San Luis Obispo, CA
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 1 Name: John Holmquest Job title: Environmental Specialist company: 11 years Length of time in current role: 11 years
Proposed percentage of overall time to be dedicated to the Services: 40%
If applicable, length of time in related experience with large local, state or federal government agencies: 28 years
Proposed position with regard to the Services: Technical Specialist – Professional Level IV
Proposed primary responsibilities with regard to the Services:
Responsible for site reconnaissance, historical research, and report productions for Phase I & II Environmental Impact Assessments (ESA).
Describe experience in performing Services similar to those that are to be assigned:
John has over 27 years of experience in all phases of environmental projects including Phase I and Phase II environmental site assessments, underground storage tank removals, groundwater monitoring, soil vapor sampling and RBCA evaluation, NEESHAP surveys, indoor air quality assessment, asbestos abatement oversight, lead-based paint sampling, and field analysis of lead-based paint using XRF instrumentation.
List job-related certifications, training, and education:
Professional Geologist – WI No. 501-13 AHERA Building Inspector AHERA Contract Supervisor OSHA 40-Hour HAZWOPER Radiation Safety, Monitoring, Device Operation of Niton XRF Analyzers BA, Geology, University of Minnesota
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 2 Name: Kelby Williams, PE Job title: Geotechnical Project Manager company: 11 years Length of time in current role: 2 years
Proposed percentage of overall time to be dedicated to the Services: 10%
If applicable, length of time in related experience with large local, state or federal government agencies: 11 years
Proposed position with regard to the Services: Technical Specialist – Professional Level III
Proposed primary responsibilities with regard to the Services:
Scope, manage, and direct projects involving multiple disciplines involving environmental and geotechnical engineering. She will coordinate with agencies and co-operative contract users on scheduling, access, and deliverables. She will participate in projects involving cap design, or design of other types of engineering controls.
Describe experience in performing Services similar to those that are to be assigned:
Kelby has over 10 years of experience providing materials testing and inspection oversight, and geotechnical engineering on projects including solar canopies, university building construction, medical building construction, transmission lines, manufacturing plants, and wastewater treatment plants.
List job-related certifications, training, and education:
Professional Engineer, Civil – AZ No. 67238 OSHA 40-hour HAZWOPER
MSHA
BS, Civil Engineering Technology, Southern Polytechnic State University, GA
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 3 Name: Phillip Schneider Job title: Southwest Division President company: 1 year Length of time in current role: 1 year
Proposed percentage of overall time to be dedicated to the Services: 10%
If applicable, length of time in related experience with large local, state or federal government agencies: 32 years
Proposed position with regard to the Services: Technical Specialist – Professional Level VI
Proposed primary responsibilities with regard to the Services:
Review scoping, project design, budgeting/budget monitoring, staffing, scheduling, client communications, and technical review.
Describe experience in performing Services similar to those that are to be assigned:
32 years of experience providing environmental professional level 6 services for ADEQ.
Phil has experience with a multitude of environmental programs addressing due diligence assessments, assessment of brownfields for redevelopment, solid and hazardous waste, underground storage tanks, water quality, environmental compliance, and occupational exposure.
List job-related certifications, training, and education:
Mechanical Engineer - AZ No.24789 OSHA 40-hour HAZWOPER BS, Mechanical Engineering, South Dakota School of Mines, SD MBA, Business Management, Western Internation University, AZ
Assessment Services
Arizona Department of Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 3 Name: Kenna Karjala Job title: Environmental Project Manager company: 3 years Length of time in current role: 2 years
Proposed percentage of overall time to be dedicated to the Services: 40%
If applicable, length of time in related experience with large local, state or federal government agencies: 5 years
Proposed position with regard to the Services: Technical Specialist – Professional Level I
Proposed primary responsibilities with regard to the Services:
Performing and managing surface and subsurface soil sampling, characterizations of underground storage tank systems, heavy metal, and petroleum product impacts, and bacteria testing for potable water for Phase I & II Environmental Site Assessments (ESA’s).
Describe experience in performing Services similar to those that are to be assigned:
Kenna Karjala has experience in field work and scientific technical writing since 2019.
Background in environmental law, ecological restoration, and ecosystem assessments.
Experience since 2021 in environmental engineering and consulting services including Phase I and Phase II Environmental Site Assessments (ESA’s), vapor sampling, lead and asbestos sampling.
List job-related certifications, training, and education:
National Radon Proficiency Program (NRPP) Radon Measurement Professional AHERA Building Inspector AHERA Contractor Supervisor EPA-Certified Lead-Based Paint Risk Assessor ADEQ Grade I Water Distribution System Operator MSHA Part 48 New Miner EPA Construction General Permit (CGP) Site Inspector OSHA 40-Hour HAZWOPER BS, Ecosystem Science and Restoration, Aquatic Ecology, University of Montana, MT www.rmacompanies.com 1
DAVID REGONINI, REPA
Principal-in-Charge & Environmental Quality Control Manager
As the corporate-level director of environmental services, David has supervisory and project responsibilities at seven locations. With over 36 years of professional experience, he has developed a set of interdisciplinary skills with a multitude of environmental programs addressing due diligence assessments of real estate, assessment of brownfields for redevelopment, NEPA level environmental assessments, solid and hazardous waste, water quality, environmental compliance, asbestos and lead, and occupational exposure. David’s project management responsibilities including project design, budgeting and budget monitoring, staffing, scheduling, communication with clients, staff, regulatory agencies, attorneys, architects, contractors, and other involved parties, preparation of detailed technical reports, and technical review. He has direct knowledge about policy-making as a past-member of the Phoenix Environmental Quality Commission, and with planning and zoning considerations as a former member of the Paradise Valley Village Planning Committee.
YEARS OF EXPERIENCE
EDUCATION
BS, Environmental Science/Chemistry, Northern Arizona University
LICENSES/REGISTRATIONS
Registered Environmental Property Assessor (REPA)
Registered Environmental Assessor I, California
AHERA-Certified Building Inspector
AHERA-Certified Contractor Supervisor
AHERA-Certified Management Planner
EPA-Certified Lead-Based Paint Risk Assessor
OSHA 40-Hour HAZWOPER with UpdatesRELEVANT EXPERIENCE
WELNICK MARKETPLACE, PHOENIX, AZ
Project Manager for AAI/ASTM-compliant ESA, Phase II investigation, and asbestos inspection, abatement design, and oversight at this historic structure slated for redevelopment as a multi-venue entertainment facility in the Van Buren Redevelopment Zone of downtown Phoenix.
QUEBEDEUAX CHEVROLET REDEVELOPMENT PROJECT, PHOENIX, AZ
Project Manager for AAI/ASTM-compliant ESA and Phase II investigation and asbestos inspection, abatement design, and oversight of this 1930’s vintage Chevrolet dealership operating as a custom motorcycle shop and vehicle restoration facility planned for redevelopment as the Van Buren entertainment facility.
SCOTTSDALE WATERFRONT DEVELOPMENT, SCOTTSDALE, AZ
Project Manager for ASTM-compliant ESAs and investigations to support redevelopment of 1960’s vintage automobile dealership, multi-tenant shopping center including a dry-cleaning business, and a multi-tenant office complex into a multi-use commercial retail and high-rise condominium project along a major canal in downtown Scottsdale. Won closure for the dry-cleaning facility through the ADEQ Voluntary Remediation Program.
DISTRICT ON APACHE DORMITORY COMPLEX, TEMPE, AZ
Project Manager for ASTM-compliant ESA, site investigations, drywell closure, asbestos surveys, and abatement oversight for this privately-operated off-campus university housing project. The assembled land initially consisted of two hotels, vacant residential parcels, a sports bar and grill, vacant land, and an apartment complex.
WASHINGTON PARK CORPORATE CENTER, PHOENIX, AZ
Project Manager for AAI/ASTM-compliant ESAs, investigations, and remedial action addressing 1950’s era industrial properties built over an archeologically significant Hohokam village planned for redevelopment as a multi-use commercial/residential development consisting of professional offices, restaurants, a hotel, bank, and up-scale apartment complex. Prepared work plans, waste management plans, data quality objectives, and remediation work plans for submittal/approval with EPA under the PCB Self-Implementing Clean-Up provisions of TSCA. Coordinated with engineer for design and installation of clay barrier, performed soil vapor sampling, and prepared/submitted site investigation reports to ADEQ Voluntary Remediation Program for co-located organic vapor contaminants. Won ADEQ closure based on the soil vapor assessment. Monitored remediation contractors during removal of 25,000 tons of www.rmacompanies.com 2
DAVID REGONINI | CONTINUED
solid and TSCA regulated waste. Coordinated communication between client, land purchasers, lenders, city personnel, lawyers, and regulatory agencies. Coordinated with owner and archeologist for identification, recovery, and repatriation of human remains at this culturally sensitive location. Completed NEPA Environmental Assessment of the apartment portion of the project following HUD environmental protocols, include a vapor intrusion assessment, remediation plan, cost forecast and risk analysis.
PROPOSED OFF-CAMPUS STUDENT HOUSING PROJECT, PHOENIX, AZ
Project Manager for the implementation of AAI/ASTM –compliant ESA of a downtown city block in Phoenix that was planned for sale and redevelopment as part of a private housing venture in connection with ASU’s downtown campus.
The project involved 12 separate parcels, including a pawn shop and former car dealer, vehicle repair facilities, store fronts, a restaurant and a bowling alley. Unique historical sources were used to identify prior uses dating back to the 1800s.
AUTOMOTIVE SALES AND MAINTENANCE FACILITIES, NATIONWIDE LOCATIONS.
Project Manager for all due diligence and compliance inspections and evaluations at more than 100 sites in Arizona, California, Nevada, Colorado, New Mexico, Texas, South Carolina, Georgia and Florida. Implemented ASTM-AAI compliant ESAs for the acquisition and relinquishment of sites under purchase and lease agreements.
FORMER MOTOROLA 56TH STREET FACILITY, PHOENIX, AZ
Project Manager for this dual scope AAI/ASTM-compliant ESA and comprehensive asbestos survey for the redevelopment of this former State Superfund site to a K-12 charter school. Completed extensive technical review of existing reports to affect cost savings on asbestos abatement and remedial action.
NEPA ENVIRONMENTAL ASSESSMENT REVIEW, NAZCARE ASSISTED LIVING CARE FACILITY, PRESCOTT, AZ Project Manager for a combined EA and ESA of a proposed assisted living care expansion project involving a historical dwelling.
NEPA ENVIRONMENTAL ASSESSMENT REVIEW AND CONSTRUCTION STORMWATER POLLUTION PREVENTION
PLAN, BOB STUMP VETERANS ADMINISTRATION HEALTHCARE FACILITY, PRESCOTT, AZ
Project Manager for an environmental assessment and development of a construction stormwater pollution prevention plan for a proposed parking lot modification.
NEPA ENVIRONMENTAL ASSESSMENT REVIEW, NORTH COUNTY HEALTHCARE, FLAGSTAFF, WILLIAMS, AND
HOLBROOK, AZ
Project Manager for this NEPA level environmental assessment of three proposed healthcare facilities in rural Northern Arizona communities. Project conformed the Department of Health and Human Services, Health Resource Service Administration.
NEPA ENVIRONMENTAL ASSESSMENT AND PHASE I ESA, PROPOSED HOUSING REHABILITATION AND
EXPANSION, PASCUA YAQUI TRIBE, SOUTH TUCSON, AZ
Project Director for AAI/ASTM-compliant ESA and NEPA level environmental assessment for this proposed rehabilitation and expansion of tribal housing. This project involved a formally narrated EA record for consideration by the Bureau of Indian Affairs due to a land lease, and a HUD Form 4128 assessment due to HUD participatory financing. We prepared both documents on a dual track.
PHASE I ESA AND HUD EA REVIEW, PASCUA PUEBLO 4 AND 13, REHABILITATION AND NEW CONSTRUCTION OF
SINGLE FAMILY DWELLINGS, PASCUA YAQUI TRIBE
Project Manager for implementation of AAI/ASTM compliant Phase I ESA for land designated for development with 20 new single-family units. Project expanded to HUD 4128 Environmental Record Review, and then to full Environmental Assessment following BIA guidance for NEPA compliance.
SAN CARLOS APACHE HOUSING AUTHORITY, HOMESITE REDEVELOPMENTS, SAN CARLOS, PERIDOT, BYLAS, AZ Project Manager for AAI-compliant ESAs and HUD level environmental record reviews on over 40 separate homesites for NEPA compliance.
STEVE SMELSER, RG
Manager of Environmental Services
Steve Smelser, a registered geologist with 30 years of experience, excels in managing and performing Phase I and II Environmental Site Assessments (ESAs), underground storage tank (UST) investigations, and site characterizations. His expertise includes test drilling, soil sampling, groundwater monitoring, soil vapor extraction, air sparging, and bioremediation.
Steve has conducted hundreds of ESAs on diverse properties and led numerous remedial investigations, emergency actions, and feasibility studies. His deep understanding of ADEQ’s regulatory requirements ensures compliance and effective remediation. Steve’s proactive management style, technical proficiency, and meticulous attention to detail provide clients with innovative solutions, efficient project execution, and successful site closures, making him an invaluable asset to brownfields remediation projects.
YEARS OF EXPERIENCE
EDUCATION
BS, Geology, Arizona State University
LICENSES/REGISTRATIONS
Registered Geologist, AZ #26394
Registered Geologist, CA #5828
OSHA 40-Hour HAZWOPER
RELEVANT EXPERIENCE
PHASE I AND II ENVIRONMENTAL SITE ASSESSMENT/DEMOLITION OVERSIGHT/REMEDIATION,
INDUSTRIAL FACILITY, CHANDLER, AZ
Project Manager for the assessment and remediation of a metal plating facility in Chandler, Arizona. Previous assessment identified various process areas with soils containing elevated concentrations of heavy metals and cyanide compounds.
Following a decision to decommission the plant, WT was contracted to conduct a comprehensive Phase I/II assessment of the Site, oversee the demolition, and direct and document the remediation of impacted and/or hazardous soils. Phase I tasks included a site reconnaissance, interviews, agency record reviews, aerial photograph reviews, historical research, data evaluation, and technical report preparation. Phase II investigation involved performance of soil sampling and testing to identify and characterize the extent of the impacted soils at the site, concrete sampling and testing for waste management purposes, and technical report preparation. The assessment/remediation was conducted under the ADEQ Voluntary Remediation Program.
PHASE I AND II ENVIRONMENTAL SITE ASSESSMENT, HARQUAHALA VALLEY, AZ
Principal/Project Manager for a Phase I ESA for approximately 18,000 acres of agriculturally developed property.
Performed the physical assessment of the Site using an aerial reconnaissance followed by several days of ground reconnaissance. A number of farm maintenance developments were identified which housed aboveground storage tanks containing petroleum products, fertilizers, pesticides and/or herbicides; pesticide/herbicide storage and mixing areas;
and petroleum storage/equipment maintenance areas with petroleum stained soils. Performed a Phase II assessment, and conducted remediation of an area of petroleum-impacted soil at the Site.
PHASE I ENVIRONMENTAL SITE ASSESSMENTS, CITY OF TEMPE LIGHT RAIL PROJECT, TEMPE, AZ Project Manager responsible for developing multiple Phase I ESAs in Tempe, Arizona. Projects involved investigation of five sites to assess if there were potential environmental impacts from the past or present site usage. The properties included a residential building, a sports bar and trailer park, a maintenance yard, a closed automotive repair and fueling facility, and a commercial rental facility. As part of the final report, GEC- SA&B provided recommendations for additional Phase II work.
PHASE II ENVIRONMENTAL SITE ASSESSMENT, CITY OF TEMPE, TEMPE, AZ
Project Manager for a Phase II ESA for a 62-acre proposed park which had been a solid waste landfill. Assessment consisted of the installation of eight soil borings for the purpose of profiling the landfill deposits, and collecting soil
STEVE SMELSER| CONTINUED
and ground water samples for laboratory analysis. Analysis of groundwater samples indicated the presence of elevated concentrations of petroleum hydrocarbons and metals, and trace concentrations of pesticides and VOCs.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .