BPM004541_Solicitation_Attachment_12_-_Pricing_Document__3_.docx

DOCX document 87 KB Posted

Attached to
Master Agreement AZ|CTR062460
Contract number
CTR062460
Issued by
Arizona

About this file

This document is a Request for Proposal (RFP) Solicitation No. BPM004541 for Communications Cabling Systems, issued by the Arizona Department of Administration State Procurement Office. The primary offeror is Level 7 Technologies (doing business as Aspen Technologies), which is proposing a contract for various communications cabling and infrastructure products from multiple manufacturers including Belden Corp, CommScope, Corning, Panduit, and others.

The pricing document details a comprehensive list of materials and labor services with specific discount structures. Most manufacturers are offered at a 15% discount off list price, with a few exceptions at 10%. The contract includes multiple product categories such as fiber optics, copper cables, connectivity equipment, safety systems, and infrastructure components. Labor rates are also provided, ranging from $41.10 per hour for Outside Plant (OSP) Cabling Technicians to $52.98 per hour for Project Managers. Optional services include GIS Mapping and Building Information Modeling (BIM), though specific pricing is not defined. The contract appears to be a statewide indefinite delivery vehicle for communications infrastructure procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal Solicitation No.

BPM004541

Description:

Communications Cabling Systems Arizona Department of Administration State Procurement Office 100 N 15th Ave., Suite 305 Phoenix, AZ 85007

Attachment 12: Pricing Document

Materials
Offeror Name: Level 7 Technologies (dba Aspen Technologies)

1. This is a list of Materials that will be under contract.

2. Please note that in the detail of the Specifications (Exhibit 1 to the Scope of Work) attached to this RFP, some of the categories may have limitations on the Manufacturers.

3. Column 3, the Item Description may be used to describe one product or a category of products;

4. Column 4, Price List Title & Date/No refers to any Product Lists or catalogues that the Offeror maintains. If no such list exist, please mark as N/A.

5. Column 5, if a Price List is provided, or of the Offeror chooses to Cost plus , the Offer is not required to fill in the List Price column and should mark as N/A.

6. The Offeror may choose to submit their offer for each Item below as Discount % off List Price OR Cost Plus but not both.

Item
Manufacturer Name
Description
Price List Title & Date/No
List Price
Discount % off List Price or MSRP (not labor)
*Cost plus % (not labor)
BELDEN CORP
BROADCAST
4/1/2022

15%

BELDEN CORP
CATV COAX
4/1/2022

15%

BELDEN CORP
CONNECTIVITY
4/1/2022

15%

BELDEN CORP
EQUIPMENT
4/1/2022

15%

BELDEN CORP
EXCLUDES: Automation; Direct Attach; ICM; Industrial Connectivity, Wireless and LRC
BELDEN CORP
FIBER OPTICS
4/1/2022

15%

BELDEN CORP
NEW GEN
4/1/2022

15%

BELDEN CORP
PPC
4/1/2022

15%

BELDEN CORP
PREMISE
4/1/2022

15%

BELDEN CORP
PROVIDERS
4/1/2022

15%

BELDEN CORP
SAFETY AND SECURITY
4/1/2022

15%

BERK TEK INC

3/14/2022

15%

CABLOFIL (LEGRAND)

1/2/2022

10%

CHATSWORTH PRODUCTS, INC

1/3/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
BB FIBER
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
BFG
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
CA
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
COAX
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
COPPER APPARATU
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
COPPER CABLE
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
ENCLOSURES
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
EXCLUDE: AI Apparatus, AI Cables, MOD Plugs CS-CommScope
COMMSCOPE ENTERPRISE SOLUTIONS
FBR OP JNG PT
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
FIBER APPARATUS
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
FIBER CABLE
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
FIBER DROP CABL
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
IMVISION
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
OSP COPPER APP
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
PANELS
4/1/2022

15%

COMMSCOPE ENTERPRISE SOLUTIONS
POF
4/1/2022

15%

CORNING OPTICAL COMMUNICATIONS
C&A
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
CAB
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
Cable
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
CLS
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
EXCLUDES: CMD; CMD H&E; SDP and Wireless
CORNING OPTICAL COMMUNICATIONS
FOC
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
FOE
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
FOJ
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
FOX
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
PNP
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
XFO
4/18/2022

15%

CORNING OPTICAL COMMUNICATIONS
XMD
4/18/2022

15%

EATON COROPORATION
B-LINE
2/7/2022

15%

GREAT LAKES DATA RACKS &

7/12/2021

10%

HUBBELL PREMISE WIRING, INC

1/17/2022

15%

LEVITON MFG CO
LEVITON
3/1/2022

15%

OBERON COMPANY

4/1/2022

15%

ORTRONICS INC (LEGRAND)

3/1/2022

15%

Panduit
CA - CABINETS AND THERMALS
4/1/2022

15%

Panduit
CB - CABLE GROUP
4/1/2022

15%

Panduit
CO - COPPER NETWORK GROUP
4/1/2022

15%

Panduit
Exclude: NK4 - NETKEY CABLE; NK10 - NETKEY FIBER ENCLOSURES qty 1 and NK12 - NETKEY OUTLETS qty 1 NO LIST available
4/1/2022
Panduit
EXCLUDES: Panduit offers many categories, if not called out above ALL OTHER Categories have been excluded. Along with any and all items that do not have a list price available
4/1/2022
Panduit
FB - FIBER NETWORK GROUP
4/1/2022

15%

Panduit
FR - FIBER RUNNER CABLE ROUTING GROUP
4/1/2022

15%

Panduit
ID - IDENTIFICATION GROUP
4/1/2022

15%

Panduit
NK - NETKEY NETWORK GROUP
4/1/2022

15%

Panduit
OU - OUTLET NETWORK GROUP
4/1/2022

15%

Panduit
PC - POWER CONNECTORS GROUP
4/1/2022

15%

Panduit
PC1 - COPPER COMPRESSION POWER CONN
4/1/2022

15%

Panduit
PC2 - ALUMINUM COMPRESSION POWER CONN
4/1/2022

15%

Panduit
PC3 - TAPS/REDUCERS COMPRESSION POWER CONN
4/1/2022

15%

Panduit
PC4 - COPPER MECHANICAL POWER CONN
4/1/2022

15%

Panduit
PC5 - ALUMINUM MECHANICAL POWER CONN
4/1/2022

15%

Panduit
PC6 - MULTI-TAP ALUMINUM MECH POWER CONN
4/1/2022

15%

Panduit
PC8 - CONTRACTOR GROUNDING
4/1/2022

15%

Panduit
PI - PHY INF & ACCESSORIES
4/1/2022

15%

Panduit
PV - PHYSICAL INFRASTRUCTURE MANAGEMENT
4/1/2022

15%

Panduit
RK - RACK & CABLE MANAGEMENT GROUP
4/1/2022

15%

Panduit
SR - PAN-WAY SURFACE RACEWAY GROUP
4/1/2022

15%

Panduit
STB - PAN-STEEL STAINLESS STEEL BULK GROUP
4/1/2022

15%

Panduit
WD - WIRING DUCT GROUP
4/1/2022

15%

SIEMON COMPANY

4/15/2022

15%

SUPERIOR ESSEX COMMUNICATIONS

3/1/2022

15%

TRIPP MFG. CO.

4/1/2022

15%

WBT
nVent CADDY Performance Cable Tray
12/1/2021

10%

WIREMOLD COMPANY (LEGRAND)
Code A
3/14/2022

15%

WIREMOLD COMPANY (LEGRAND)
Code B
3/14/2022

15%

WIREMOLD COMPANY (LEGRAND)
Code C
3/14/2022

15%

WIREMOLD COMPANY (LEGRAND)
Code D
3/14/2022

15%

WIREMOLD COMPANY (LEGRAND)
Code G
3/14/2022

15%

Labor
Offeror Name
Item
Class-Item Description
Quantity
Unit
Unit Price
Discount
Total
1
OSP Cabling Technician
1.00
HR
$41.10

$41.10

2
ISP Cabling Technician
1.00
HR
$42.25

$42.25

3
Cabling Lead Forman / Supervisor
1.00
HR
$46.04

$46.04

4
Project Manager, Cabling
1.00
HR
$52.98

$55.00

5
CAD Drafter
1.00
HR
$46.00

$46.00

Subtotal:
$230.29
Tax:
0.00
Freight:
0.00
Discount:
0.00
TOTAL:
$230.29

Optional Services, the Offeror may whether to offer or not.

Labor (Optional only)
Offeror Name
Item
Class-Item Description
Quantity
Unit
Unit Price
Discount
Total
1
GIS Mapping : Using Geographic Information Systems (GIS) to map out where fiber or other cables are installed and used to allow the State to see where it can better connect into a fiber (or other cabling) system.
1.00
HR

N/A

2
BIM Modelling: Building Information modelling (BIM) involves the generation and management of digital representations of physical and functional characteristics of places
1.00
HR

N/A image1.jpeg

File details come from the government source that posted it. Updated .