This is a Brand Name Justification document for the Pine Ridge Service Unit (PRSU), Healthcare Technology Management/Clinical Engineering, requesting a specific medical device. The document seeks to procure a Belmont Rapid Infuser, Model R-2, 903-00037 - 1000mL/min, with a critical justification that only one model currently exists that can save patients experiencing rapid blood loss or hypothermia without aluminum leeching. The procurement is for the agency's minimum needs, with potential severe consequences if not awarded - patients may not survive rapid blood loss in the Pine Ridge Service Unit.

The document includes a detailed justification for sole source/expedited processing under FAR 11.104(b), indicating the brand name purchase is essential to the government's requirements. The recommended source's details are redacted, but the estimated procurement value is also obscured. The justification emphasizes the unique capability of the device and the lack of alternative options that can meet the agency's specific medical treatment requirements. The document is signed and digitally certified by various officials, including a Program/Project Manager, Contracting Officer, and includes references to federal acquisition regulations.

View the file

Other files

File Type Posted
Open Market Sol Pkg 25Q00051.pdf PDF
Sol Pkg 25Q00051.pdf PDF
SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Brand Name Justification 3 specialized equipment, including major components thereof, when it is likely that award to any other source would result in-

(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C.

2304(d)(1)(B) or 41 U.S.C. 253 (d)(1)(B).)

(iii) For DOD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-

(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B).)

(b) Application. This authority shall be used, if appropriate, in preference to the authority in 6.302-7; it shall not be used when any of the other circumstances is applicable. Use of this authority may be appropriate in situations such as the following (these examples are not intended to be all inclusive and do not constitute authority in and of themselves):

(1) When there is a reasonable basis to conclude that the agency's minimum needs can only be satisfied by-

(i) Unique supplies or services available from only one source or only one supplier with unique capabilities; or

(ii) For DOD, NASA, and the Coast Guard, unique supplies or services available from only one or a limited number of sources or from only one or a limited number of suppliers with unique capabilities.

(2) The existence of limited rights in data, patent rights, copyrights, or secret processes; the control of basic raw material; or similar circumstances, make the supplies and services available from only one source (however, the mere existence of such rights or circumstances does not in and of itself justify the use of these authorities) (see Part 27).

(3) When acquiring utility services (see 41.101), circumstances may dictate that only one supplier can furnish the service (see 41.202); or when the contemplated contract is for construction of a part of a utility system and the utility company itself is the only source available to work on the system.

(4) When the agency head has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items, and only one source is available.

(c) Application for brand name descriptions. An acquisition that uses a brand name description or other purchase description to specify a particular brand name, product, or feature of a product, peculiar to one manufacturer, does not provide for full and open competition regardless of the number of sources solicited. It shall be justified and approved in accordance with FAR 6.303 and 6.304. The justification should indicate that the use of such Descriptions in the acquisition is essential to the Government's requirements, thereby precluding consideration of a product manufactured by another company. (Brand-name or equal descriptions, and other purchase descriptions that permit prospective contractors to offer products other than those specifically referenced by brand name, provide for full and open competition and do not require justifications and approvals to support their use.)

(d) Limitations.

(1) Contracts awarded using this authority shall be supported by written justifications and

Brand Name Justification 4 approvals described in 6.303 and 6.304.

(2) For contracts awarded using this authority, the notices required by 5.201 shall have been published and any bids and proposals must have been considered.

File details come from the government source that posted it. Updated .